Construction frame for electric power engineering

By integrating limit frames, waste collection frames, sliders, discharge pipes and adsorption mechanisms on the construction rack, the problem of inconvenient placement of construction waste and tools is solved, centralized collection of garbage and convenient access to tools is achieved, and the Construction efficiency and safety.

CN222138618UActive Publication Date: 2024-12-10JINGBIAN COUNTY XINRUI IND & TRADE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420755825.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2024-12-10
Estimated Expiration
2034-04-12

AI Technical Summary

Technical Problem

The existing construction rack lacks a special garbage storage area, which makes it difficult to clean up construction garbage, and the tools are inconvenient to place, making it easy to trip.

Method used

A construction rack including vehicle body, hydraulic lifting platform, working platform, fence, limiting mechanism, slider, waste collection frame, tool placement frame, discharge pipe and adsorption mechanism is designed to realize centralized collection of garbage through these components. and convenient placement of tools.

Benefits of technology

It realizes centralized collection of construction waste and convenient access to tools, reduces the bent operation of construction personnel, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222138618U_ABST
    Figure CN222138618U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction frame for electric power engineering, which comprises a vehicle body, a hydraulic lifting platform and a working platform, the hydraulic lifting platform is arranged at the top of the vehicle body, the working platform is arranged at the top of the hydraulic lifting platform, a fence is fixedly arranged at the top of the working platform, and two limiting mechanisms are fixedly arranged at the top of the fence. And a limiting frame is slidably connected between the two limiting mechanisms, two sliding blocks are slidably connected to the limiting frame, a waste collecting frame and a tool containing frame are fixedly installed at the tops of the two sliding blocks correspondingly, and the waste collecting frame is fixedly connected with the tool containing frame. The construction waste collecting device is reasonable in structural design, construction waste generated during construction can be collected in a centralized mode, construction workers can conveniently clean the construction waste subsequently, tools carried by the construction workers can be placed in a centralized mode, the construction workers do not need to stoop to pick up and take the tools when the tools are taken, and the tools are conveniently taken by the construction workers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of electric power engineering construction, in particular to a construction frame for electric power engineering. Background Art

[0002] Power engineering refers to engineering related to the production, transmission and distribution of electric energy. In a broad sense, it also includes engineering that uses electricity as power and energy in various fields. At the same time, it can be understood that power transmission and transformation industry expansion projects usually use construction scaffolding during construction. The construction scaffolding is a working platform set up to ensure the smooth progress of each construction process.

[0003] In the prior art, the operator stands on the construction frame to carry out power construction. During the construction process, a lot of construction waste will be generated, and the existing construction frame does not have a special garbage storage place. Therefore, during construction, the construction workers will discard the construction waste on the work platform. The construction workers will need to pick up the discarded garbage later, which is inconvenient to clean up. During construction, the construction workers need to carry many tools, and the tools are placed on the work platform. Whenever the tools are used, the construction workers need to bend down to pick up the placed tools, which is inconvenient to use, and the placed tools are easy to trip the construction workers. For this reason, we designed a construction frame for power engineering to solve the above problems. Utility Model Content

[0004] The utility model aims to solve the problems in the prior art and provides a construction frame for electric power engineering.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A construction frame for power engineering, comprising a vehicle body, a hydraulic lifting platform and a work platform, the hydraulic lifting platform is installed on the top of the vehicle body, the work platform is installed on the top of the hydraulic lifting platform, a fence is fixedly installed on the top of the work platform, two limit mechanisms are fixedly installed on the top of the fence, a limit frame is slidably connected between the two limit mechanisms, two sliders are slidably connected to the limit frame, a waste collection frame and a tool placement frame are respectively fixedly installed on the top of the two sliders, the waste collection frame and the tool placement frame are fixedly connected, a discharge pipe connected to the interior of the waste collection frame is fixedly installed through the inner bottom of the waste collection frame, a blocking mechanism is slidably connected through the discharge pipe, the side wall of the blocking mechanism is abutted against the inner side wall of the discharge pipe, and an adsorption mechanism is provided between the side wall of the discharge pipe and the side wall of the blocking mechanism.

[0007] Preferably, the limiting mechanism comprises two connecting plates fixedly mounted on the top of the fence, a limiting rod is fixedly mounted between the two connecting plates, and the limiting frame is slidably connected between the two limiting rods.

[0008] Preferably, the sealing mechanism includes a sealing plate that is slidably connected to the side wall of the discharge pipe, one end of the side wall of the sealing plate abuts against the inner wall of the discharge pipe, and the other end of the side wall of the sealing plate is fixedly mounted with a mounting plate, and the side wall of the mounting plate abuts against the side wall of the discharge pipe.

[0009] Preferably, the adsorption mechanism comprises two first magnetic blocks fixedly mounted on the side wall of the discharge pipe, and two second magnetic blocks are fixedly mounted on the side wall of the mounting plate, and the side walls of the two first magnetic blocks abut against the side walls of the opposite second magnetic blocks and are adsorbed to each other.

[0010] Preferably, a plurality of locking universal wheels are provided at the bottom of the vehicle body.

[0011] Preferably, a pull ring is fixedly mounted on the side wall of the mounting plate.

[0012] Compared with the prior art, the utility model has the following beneficial effects:

[0013] 1. Through the setting of the limit frame, the waste collection frame, the slider, the discharge pipe, the limit mechanism, the blocking mechanism and the adsorption mechanism, it can collect the construction waste generated during the construction in a centralized manner, so as to facilitate the subsequent cleaning of the construction waste by the construction personnel.

[0014] 2. Through the setting of the limit frame, the tool placement frame, the slider and the limit mechanism, the tools carried by the construction workers can be placed centrally, and the construction workers do not need to bend down to pick up the tools when taking them, which is convenient for the construction workers to take the tools.

[0015] To sum up, the structural design of the utility model is reasonable. It can collect construction waste generated during construction in a centralized manner, which is convenient for construction workers to clean up the construction waste later. It can also place the tools carried by construction workers in a centralized manner. Construction workers do not need to bend down to pick up the tools when using them, which is convenient for construction workers to use tools. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the structure of the construction frame for power engineering proposed by the utility model;

[0017] Figure 2 A top view of the structure of the construction frame for power engineering proposed by the utility model;

[0018] Figure 3 for Figure 1 A magnified view of the structure at A;

[0019] Figure 4 for Figure 3 Enlarged view of the structure at point B in the figure.

[0020] In the figure: 1 vehicle body, 2 hydraulic lifting platform, 3 working platform, 4 fence, 5 connecting plate, 6 limit rod, 7 limit frame, 8 waste collection frame, 9 tool placement frame, 10 slider, 11 discharge pipe, 12 blocking plate, 13 mounting plate, 14 first magnetic block, 15 second magnetic block. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0022] Reference Figure 1-4 The construction frame for electric power engineering comprises a vehicle body 1, a hydraulic lifting platform 2 and a working platform 3. The bottom of the vehicle body 1 is provided with a plurality of locking universal wheels. The hydraulic lifting platform 2 is mounted on the top of the vehicle body 1. The working platform 3 is mounted on the top of the hydraulic lifting platform 2. A fence 4 is fixedly mounted on the top of the working platform 3. Two limiting mechanisms are fixedly mounted on the top of the fence 4. The limiting mechanisms comprise two connecting plates 5 fixedly mounted on the top of the fence 4. A limiting rod 6 is fixedly mounted between the two connecting plates 5. A limiting frame 7 is slidably connected between the two limiting rods 6.

[0023] A limit frame 7 is slidably connected between the two limit mechanisms, and two sliders 10 are slidably connected to the limit frame 7. A waste collection frame 8 and a tool placement frame 9 are fixedly installed on the top of the two sliders 10 respectively. The inner bottom of the waste collection frame 8 is inclined, and the waste collection frame 8 and the tool placement frame 9 are fixedly connected. Through the setting of the limit frame 7, the tool placement frame 9, the slider 10 and the limit mechanism, the tools carried by the construction workers can be placed centrally, and the construction workers do not need to bend down to pick up the tools when taking them, which is convenient for the construction workers to take the tools and the waste A discharge pipe 11 connected to the inside of the collecting frame 8 is fixedly installed through the inner bottom of the collecting frame 8, and a blocking mechanism is slidably connected to the discharge pipe 11, and the side wall of the blocking mechanism abuts against the inner side wall of the discharge pipe 11. The blocking mechanism includes a blocking plate 12 that is slidably connected to the side wall of the discharge pipe 11, and the side wall of one end of the blocking plate 12 abuts against the inner side wall of the discharge pipe 11, and a mounting plate 13 is fixedly installed on the side wall of the other end of the blocking plate 12, and the side wall of the mounting plate 13 abuts against the side wall of the discharge pipe 11, and a pull ring is fixedly installed on the side wall of the mounting plate 13;

[0024] An adsorption mechanism is provided between the side wall of the discharge pipe 11 and the side wall of the sealing mechanism, and the adsorption mechanism includes two first magnetic blocks 14 fixedly mounted on the side wall of the discharge pipe 11, and two second magnetic blocks 15 are fixedly mounted on the side wall of the mounting plate 13, and the side walls of the two first magnetic blocks 14 are abutted against and adsorbed against the side walls of the opposite second magnetic blocks 15, and through the setting of the limit frame 7, the waste collection frame 8, the slider 10, the discharge pipe 11, the limit mechanism, the sealing mechanism and the adsorption mechanism, it is possible to centrally collect the construction waste generated during the construction, so as to facilitate the construction personnel to clean up the construction waste later.

[0025] The functional principle of the utility model can be explained through the following operation modes:

[0026] When the construction workers need to carry out construction, first, the construction workers push the device to the construction area, then lock the locking universal wheels on the bottom of the vehicle body 1, and then the construction workers stand on the working platform 3 and start the hydraulic lifting platform 2 to make the working platform 3 rise upward. Then the construction workers place the tools they carry in the tool placement frame 9, and the construction waste generated during the construction process is placed in the waste collection frame 8. During construction, the construction workers move on the working platform 3, pulling the waste collection frame 8 and the tool placement frame 9 to slide back and forth and left and right, so that the waste collection frame 8 and the tool placement frame 9 are always close to the construction workers, which is convenient for the construction workers to take tools and place construction waste. After the construction is completed, when the garbage in the waste collection frame 8 needs to be taken out, the garbage bag is placed under the discharge pipe 11, and the construction workers pull the mounting plate 13 to pull the blocking plate 12 out of the discharge pipe 11. The blocking plate 12 is separated from the blockage of the discharge pipe 11, and the garbage in the waste collection frame 8 falls through the discharge pipe 11 for collection.

[0027] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A construction frame for electric power engineering, comprising a vehicle body (1), a hydraulic lifting platform (2) and a working platform (3), characterized in that: The hydraulic lifting platform (2) is mounted on the top of the vehicle body (1), and the working platform (3) is mounted on the top of the hydraulic lifting platform (2). A fence (4) is fixedly mounted on the top of the working platform (3), and two limit mechanisms are fixedly mounted on the top of the fence (4). A limit frame (7) is slidably connected between the two limit mechanisms, and two sliders (10) are slidably connected to the limit frame (7). A waste collection frame (8) and a tool placement frame (9) are respectively fixedly mounted on the top of the two sliders (10). The waste collection frame (8) and the tool placement frame (9) are fixedly connected. A discharge pipe (11) connected to the inside of the waste collection frame (8) is fixedly mounted through the inner bottom of the waste collection frame (8), and the discharge pipe (11) is slidably connected to the discharge pipe (11). A blocking mechanism is slidably connected to the discharge pipe (11), and the side wall of the blocking mechanism abuts against the inner side wall of the discharge pipe (11). An adsorption mechanism is provided between the side wall of the discharge pipe (11) and the side wall of the blocking mechanism.

2. The construction scaffold for electric power engineering according to claim 1, characterized in that: The limiting mechanism comprises two connecting plates (5) fixedly mounted on the top of the fence (4), a limiting rod (6) fixedly mounted between the two connecting plates (5), and the limiting frame (7) is slidably connected between the two limiting rods (6).

3. The construction scaffold for electric power engineering according to claim 1, characterized in that: The blocking mechanism comprises a blocking plate (12) which penetrates and is slidably connected to the side wall of the discharge pipe (11), the side wall at one end of the blocking plate (12) abuts against the inner side wall of the discharge pipe (11), and the side wall at the other end of the blocking plate (12) is fixedly mounted with a mounting plate (13), and the side wall of the mounting plate (13) abuts against the side wall of the discharge pipe (11).

4. The construction scaffold for electric power engineering according to claim 3, characterized in that: The adsorption mechanism comprises two first magnetic blocks (14) fixedly mounted on the side wall of the discharge pipe (11), and two second magnetic blocks (15) fixedly mounted on the side wall of the mounting plate (13), and the side walls of the two first magnetic blocks (14) are in contact with the side walls of the opposite second magnetic blocks (15) and are adsorbed on each other.

5. The construction scaffold for electric power engineering according to claim 1, characterized in that: The bottom of the vehicle body (1) is provided with a plurality of locking universal wheels.

6. The construction scaffold for electric power engineering according to claim 3, characterized in that: A pull ring is fixedly mounted on the side wall of the mounting plate (13).