Soft foundation reinforcing device for engineering foundation construction

By introducing negative pressure adsorption components and compaction structures into the soft foundation reinforcement device, the problem of dust flying during compaction is solved, real-time dust capture and cleaning is realized, and environmental protection and safety of the construction environment are improved.

CN222139677UActive Publication Date: 2024-12-10ZHONGYI GUOFU GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420829070.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2024-12-10
Estimated Expiration
2034-04-19

AI Technical Summary

Technical Problem

The existing soft foundation reinforcement device will cause dust to fly during compaction, pollute the environment and endanger the health and safety of construction workers.

Method used

A soft foundation reinforcement device including a mobile frame, compaction structure and negative pressure adsorption component is designed. The compaction weight blocks are driven to collide with the foundation through an electric cylinder, and the raised dust is captured by using the negative pressure adsorption component. Dust removal filter and air pressure sensors monitor and alarm in real time to ensure the cleanliness of the construction environment.

Benefits of technology

It effectively reduces the degree of pollution during the compaction and reinforcement process, improves the environmental protection of the construction environment and the health and safety of operators, and ensures real-time cleaning and handling of dust.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222139677U_ABST
    Figure CN222139677U_ABST
Patent Text Reader

Abstract

The utility model discloses a soft foundation reinforcing device for engineering foundation construction, and belongs to the technical field of soft foundation reinforcing equipment, the soft foundation reinforcing device comprises a movable frame body, and a compaction structure capable of conducting compaction and reinforcing treatment on a soft foundation in a circulating and reciprocating mode is arranged in an inner cavity of the movable frame body; the compaction structure comprises a compaction barrel base with the top end connected with the top wall of the inner cavity of the movable frame body, and an electric air cylinder is connected to the top wall of the inner cavity of the air cylinder supporting frame. According to the soft foundation reinforcing device, the soft foundation encountered in the engineering foundation construction process can be subjected to circulating and reciprocating tamping and reinforcing treatment through the compacting structure connected to the movable frame body; and dust raised during tamping of the foundation can be subjected to negative-pressure dust removal treatment through a negative-pressure adsorption component connected to the movable frame body, so that the pollution degree to the construction environment in the tamping and reinforcing process of the soft foundation is effectively reduced, environmental protection is facilitated, and meanwhile, health and safety of field operators are also facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of soft foundation reinforcement equipment, and more specifically, to a soft foundation reinforcement device for engineering foundation construction. Background Art

[0002] my country's highway industry specifications define soft soil foundation as a weak soil layer with low strength and high compression, most of which contain a certain amount of organic matter. Therefore, the soft foundation needs to be reinforced. At present, the reinforcement treatment of soft foundation mostly adopts the method of strong compaction. Before the strong compaction of the soft foundation, it is necessary to lay a layer of loose materials such as sand, gravel or crushed stone with a thickness of about 0.5-2m on the surface of the soft foundation. The purpose of this is to form a hard layer on the surface, which is conducive to the entry of strong compaction equipment for construction.

[0003] The document with prior art publication number CN218712853U provides a soft foundation reinforcement device for engineering construction, which has the function of enabling a first gear fixedly connected to an output end of the first motor to rotate by starting a first motor, thereby causing the first gear to move forward and backward in a first tooth groove, and then causing a first sliding rod fixedly connected to the first gear to move forward and backward, thereby causing a sliding block slidably connected to the first sliding rod to slide back and forth, and enabling a first gear fixedly connected to an output end of the second motor to rotate by starting a second motor, thereby causing the first gear to move left and right in a second tooth groove, and then causing a second sliding rod fixedly connected to the first gear to move forward and backward, thereby causing a sliding block slidably connected to the second sliding rod to slide back and forth, and then allowing the counterweight block to be adjusted back and forth and left and right, thereby improving the efficiency of reinforcing the soft foundation.

[0004] Although the above-mentioned prior art solution can achieve the relevant beneficial effects through the structure of the prior art, it still has the following defects: although the above-mentioned prior art soft foundation reinforcement device can compact and reinforce the soft foundation by the free downward falling counterweight block colliding with the soft foundation, it will cause dust to fly at the ramming site, which will not only pollute the air environment, but also be detrimental to the health and safety of on-site operators.

[0005] In view of this, we propose a soft foundation reinforcement device for engineering foundation construction. Summary of the invention

[0006] 1. Technical problems to be solved

[0007] The purpose of the present application is to provide a method for reinforcing a soft foundation for engineering foundation construction, which solves the technical problems raised in the above-mentioned background technology.

[0008] 2. Technical solution

[0009] The technical solution of the present application provides a soft foundation reinforcement device for engineering foundation construction, comprising a mobile frame, and universal wheels with brakes are connected to the four corners of the bottom of the mobile frame;

[0010] The inner cavity of the mobile frame is provided with a compaction structure that can cyclically compact and reinforce the soft foundation;

[0011] The compaction structure includes a compaction cylinder seat whose top end is connected to the top wall of the inner cavity of the movable frame, a vertical cavity and a movable cavity are respectively provided on the compaction cylinder seat, the movable cavity is connected to the vertical cavity, and the movable cavity is located below the vertical cavity, a compaction weight is provided in the movable cavity, a lifting slider is slidably connected in the vertical cavity, a through hole is provided on the lifting slider, a middle connecting rod is connected between the lifting slider and the compaction weight, a pressure relief pipe is connected to the top of the compaction cylinder seat, the top of the pressure relief pipe passes through the top of the movable frame and is connected to a cylinder support frame, a cylinder support frame connected to the top of the movable frame is also provided above the compaction cylinder seat, an electric cylinder is connected to the top wall of the inner cavity of the cylinder support frame, and the bottom end of the electric cylinder respectively passes through the movable frame and the compaction cylinder seat and is connected to the top of the lifting slider;

[0012] The mobile frame is also provided with a negative pressure adsorption component which can perform negative pressure dust removal on the dust raised when the compaction structure tamps the foundation.

[0013] As an optional solution of the technical solution of the present application document, the negative pressure adsorption component includes a negative pressure cylinder connected to the side wall of the mobile frame, the top of the negative pressure cylinder is connected to an air pump, the input end of the air pump is connected to a negative pressure tube, and one end of the negative pressure tube away from the air pump is fixedly connected to the top of the negative pressure cylinder;

[0014] An opening is provided at the upper part of the side wall of the negative pressure cylinder, an outer frame is movably inserted in the opening, a dust removal filter is connected to the inner cavity of the outer frame, and a sealing strip is sleeved and fixed on the outer periphery of the outer frame;

[0015] The end of the outer frame is connected to an end seat, and the end of the outer frame away from the end seat is connected to a guide slide bar;

[0016] A guide slot is provided on the side wall of the inner cavity of the negative pressure cylinder, into which the guide slide bar can be movably inserted;

[0017] The bottom opening of the negative pressure cylinder is covered with a bottom cover assembly;

[0018] An air pressure sensor is connected to the side wall of the inner cavity of the negative pressure cylinder, and an audible and visual alarm is connected to the side wall of the negative pressure cylinder, which can send out an alarm signal when the value detected by the air pressure sensor is lower than a predetermined critical value;

[0019] A suction pipe is fixedly connected to the lower part of the negative pressure cylinder close to the mobile frame, a one-way air inlet valve is arranged on the suction pipe, and an air inlet hood is fixedly connected to the side of the suction pipe away from the negative pressure cylinder.

[0020] As an optional solution of the technical solution of this application document, the air pressure sensor is located above the dust removal filter;

[0021] The end seat is fixedly connected to the side wall of the negative pressure cylinder by screws;

[0022] A reserved hole for the suction pipe to pass through is opened on the side wall of the movable frame, and the air intake cover passes through the reserved hole.

[0023] As an optional solution of the technical solution of the present application document, the bottom cover assembly includes a cover plate sealingly covered on the bottom opening of the negative pressure cylinder, an inner ring seat located below the outer frame is provided above the cover plate, and an elastic sponge ring tightly attached to the side wall of the inner cavity of the negative pressure cylinder is sleeved and fixed on the outer periphery of the inner ring seat;

[0024] An inner fixing rod is connected in the inner cavity of the inner ring seat, a traction rod is connected at the bottom of the inner fixing rod, and the bottom end of the traction rod is connected to the top surface of the cover plate.

[0025] As an optional solution of the technical solution of this application document, the lower parts of the left and right side walls of the movable frame are connected to supports, the bottom of the supports are connected to electric hydraulic cylinders, and the bottom ends of the electric hydraulic cylinders are connected to reinforced bases.

[0026] As an optional solution of the technical solution of this application document, the bottom end of the movable cavity is open.

[0027] 3. Beneficial effects

[0028] One or more technical solutions provided in the technical solution of this application have at least the following technical effects or advantages:

[0029] 1. This soft foundation reinforcement device can perform cyclic compaction and reinforcement treatment on the soft foundation encountered in the process of engineering foundation construction through the compaction structure connected to the mobile frame, and when compacting the soft foundation, it can also perform negative pressure dust removal treatment on the dust raised when compacting the foundation through the negative pressure adsorption component connected to the mobile frame, thereby effectively reducing the degree of pollution to the construction environment during the soft foundation compaction and reinforcement process, which is beneficial to environmental protection and is also beneficial to the health and safety of on-site operators.

[0030] 2. The braked universal wheels at the bottom of the mobile frame can be used to facilitate the movement of the device to the position to be compacted and reinforced. The electric hydraulic cylinder can then be controlled to extend. When the reinforced base is in contact with the ground and the mobile frame is lifted up, the braked universal wheels are separated from the ground, so that the device can be stably fixed before compacting and reinforcing the soft foundation.

[0031] 3. The electric cylinder drives the compaction weight to reciprocate up and down, and then the falling compaction weight collides with the soft foundation to achieve compaction and reinforcement of the foundation.

[0032] 4. The dust raised when the compaction weight collides with the tamped foundation is continuously sucked into the air inlet hood under the action of the negative pressure suction of the vacuum pump, and then the dust sucked into the inner cavity of the negative pressure cylinder is intercepted and filtered by the dust filter and collected in the inner cavity of the negative pressure cylinder. The air pressure sensor monitors the air pressure in the space above the outer frame of the inner cavity of the negative pressure cylinder in real time, and transmits the detection value to the external main controller in real time. When the dust filter is blocked and the detection value of the air pressure sensor is lower than the predetermined critical value, the external main controller controls the sound and light alarm to turn on, and then the sound and light alarm sends an alarm signal to remind the staff to remove the dust filter from the inside of the negative pressure cylinder in time and clean it.

[0033] 5. After the foundation compaction and reinforcement work is completed, the staff will move the device to the garbage disposal point. When the dust collected inside the negative pressure cylinder needs to be cleaned, the device will be moved to the garbage disposal point first, and then the cover connected to the bottom of the negative pressure cylinder will be removed, and then the cover will be slowly moved vertically downward. During this process, the elastic sponge ring that is tightly attached to the side wall of the inner cavity of the negative pressure cylinder will gradually scrape off the dust adhering to the side wall of the inner cavity of the negative pressure cylinder. When the inner ring seat is completely removed from the inner cavity of the negative pressure cylinder, the dust accumulated on the surface of the cover will be dumped down, so that people can clean up the dust raised during the compaction of the soft foundation collected in the negative pressure cylinder. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 This is a schematic diagram of the overall structure of a soft foundation reinforcement device for engineering foundation construction disclosed in a preferred embodiment of the present application;

[0035] Figure 2 This is a schematic structural diagram of a negative pressure adsorption component in a soft foundation reinforcement device for engineering foundation construction disclosed in a preferred embodiment of the present application;

[0036] Figure 3 This is a schematic structural diagram of a filter assembly in a soft foundation reinforcement device for engineering foundation construction disclosed in a preferred embodiment of the present application;

[0037] Figure 4 A soft foundation reinforcement device for engineering foundation construction disclosed in a preferred embodiment of this application Figure 2 A schematic diagram of the enlarged local structure of part A.

[0038] Explanation of the numbers in the figure: 1. Moving frame; 2. Tamping cylinder seat; 3. Tamping weight; 4. Lifting slide block; 5. Middle connecting rod; 6. Cylinder support frame; 7. Electric cylinder; 8. Electric hydraulic cylinder; 9. Strengthening base; 10. Air intake hood; 11. One-way air intake valve; 12. Air pump; 13. Outer frame; 14. End seat; 15. Sound and light alarm; 16. Traction rod; 17. Negative pressure cylinder; 18. Air pressure sensor; 19. Dust filter; 20. Sealing strip; 21. Guide slide; 22. Inner ring seat; 23. Elastic sponge ring; 24. Inner fixing rod. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application. The present application is further described in detail below in combination with the drawings in the specification.

[0040] Reference Figure 1The embodiment of the present application provides a soft foundation reinforcement device for engineering foundation construction, including a mobile frame 1, and the four corners of the bottom of the mobile frame 1 are connected to universal wheels with brakes. A compaction structure that can cyclically compact and reinforce the soft foundation is provided in the inner cavity of the mobile frame 1. The compaction structure includes a compaction cylinder seat 2 whose top is connected to the top wall of the inner cavity of the mobile frame 1, and a vertical cavity and a movable cavity are respectively provided on the compaction cylinder seat 2. The movable cavity is connected to the vertical cavity, and the movable cavity is located below the vertical cavity. A compaction weight 3 is provided in the movable cavity, and a lifting slider 4 is slidably connected in the vertical cavity. A through hole is provided, a middle connecting rod 5 is connected between the lifting slider 4 and the compaction weight 3, a pressure relief pipe is connected to the top of the tamping cylinder seat 2, the top of the pressure relief pipe passes through the top of the mobile frame 1 and is connected to a cylinder support frame 6, a cylinder support frame 6 connected to the top of the mobile frame 1 is also provided above the tamping cylinder seat 2, an electric cylinder 7 is connected to the top wall of the inner cavity of the cylinder support frame 6, and the bottom end of the electric cylinder 7 passes through the mobile frame 1 and the tamping cylinder seat 2 respectively and is connected to the top of the lifting slider 4, and the mobile frame 1 is also provided with a negative pressure adsorption component that can perform negative pressure dust removal on the dust raised when the compaction structure tamps the foundation. The lower part of the left and right side walls of the mobile frame 1 are connected to a support, the bottom of the support is connected to an electric hydraulic cylinder 8, and the bottom end of the electric hydraulic cylinder 8 is connected to a reinforced base 9. The bottom end of the movable cavity is open. The braked universal wheels at the bottom of the mobile frame 1 facilitate the movement of the device to the position to be compacted and reinforced, and then the electric hydraulic cylinder 8 can be controlled to extend. When the reinforced base 9 contacts the ground and the mobile frame 1 is lifted up, the braked universal wheels are separated from the ground, so that the device can be stably fixed before compacting and reinforcing the soft foundation. The electric cylinder 7 drives the compaction weight 3 to reciprocate up and down, and then the falling compaction weight 3 collides with the soft foundation to achieve the compaction and reinforcement of the foundation.

[0041] Reference Figure 2 and Figure 3, the embodiment of the present application provides a soft foundation reinforcement device for engineering foundation construction, the negative pressure adsorption component includes a negative pressure cylinder 17 connected to the side wall of the mobile frame 1, the top of the negative pressure cylinder 17 is connected to an air pump 12, the input end of the air pump 12 is connected to a negative pressure pipe, the end of the negative pressure pipe away from the air pump 12 is fixedly connected to the top of the negative pressure cylinder 17, an opening is provided at the upper part of the side wall of the negative pressure cylinder 17, an outer frame 13 is movably inserted in the opening, a dust removal filter 19 is connected to the inner cavity of the outer frame 13, a sealing strip 20 is fixedly sleeved on the outer periphery of the outer frame 13, an end of the outer frame 13 is connected to an end seat 14, a guide slide bar 21 is connected to the end of the outer frame 13 away from the end seat 14, and a guide slide bar 21 is provided on the inner cavity side wall of the negative pressure cylinder 17 The slide bar 21 is movably inserted into the guide slide groove therein. When the outer frame 13 is fully inserted into the inner cavity of the negative pressure cylinder 17 and the end seat 14 is fixed on the surface of the negative pressure cylinder 17, the gap between the outer frame 13 and the side wall of the inner cavity of the negative pressure cylinder 17 is sealed by the sealing strip 20. The bottom opening of the negative pressure cylinder 17 is covered with a bottom cover assembly. The side wall of the inner cavity of the negative pressure cylinder 17 is connected to an air pressure sensor 18. The side wall of the negative pressure cylinder 17 is connected to an audible and visual alarm 15 that can send an alarm signal when the value detected by the air pressure sensor 18 is lower than a predetermined critical value. The lower part of the negative pressure cylinder 17 close to the movable frame 1 is fixedly connected to a suction pipe, and a one-way air intake valve 11 is provided on the suction pipe. The side of the suction pipe away from the negative pressure cylinder 17 is fixedly connected to an air intake hood 10. The air pressure sensor 18 is located above the dust filter 19, and the end seat 14 is fixedly connected to the side wall of the negative pressure cylinder 17 by screws. A reserved hole for the suction pipe to pass through is opened on the side wall of the movable frame 1, and the air intake hood 10 passes through the reserved hole. The dust raised when the compaction weight 3 collides with the compacted foundation is continuously sucked into the air inlet hood 10 under the action of the negative pressure suction force of the vacuum pump 12, and then the dust sucked into the inner cavity of the negative pressure cylinder 17 is intercepted and filtered by the dust removal filter 19, and then collected in the inner cavity of the negative pressure cylinder 17. The air pressure sensor 18 monitors the air pressure in the space above the outer frame 13 of the inner cavity of the negative pressure cylinder 17 in real time, and transmits the detection value to the external main controller in real time. When the dust removal filter 19 is blocked and the detection value of the air pressure sensor 18 is lower than the predetermined critical value, the external main controller controls the sound and light alarm 15 to turn on, and then the sound and light alarm 15 sends an alarm signal to remind the staff to promptly remove the dust removal filter 19 from the inside of the negative pressure cylinder 17 and clean it.

[0042] Reference Figure 2 and Figure 4The embodiment of the present application provides a soft foundation reinforcement device for engineering foundation construction. The bottom cover assembly includes a cover plate that is sealed and covered on the bottom opening of the negative pressure cylinder 17. An inner ring seat 22 is provided above the cover plate and is located below the outer frame 13. An elastic sponge ring 23 that is tightly attached to the side wall of the inner cavity of the negative pressure cylinder 17 is fixed on the outer periphery of the inner ring seat 22. An inner fixing rod 24 is connected to the inner cavity of the inner ring seat 22. A traction rod 16 is connected to the bottom of the inner fixing rod 24, and the bottom end of the traction rod 16 is connected to the top surface of the cover plate. After the foundation compaction and reinforcement work is completed, the staff will move the device to the garbage disposal point. When it is necessary to clean the dust collected inside the negative pressure cylinder 17, first move the device to the garbage disposal point, then remove the cover connected to the bottom of the negative pressure cylinder 17, and then slowly move the cover vertically downward. During this process, the elastic sponge ring 23, which is tightly attached to the side wall of the inner cavity of the negative pressure cylinder 17, gradually scrapes off the dust adhering to the side wall of the inner cavity of the negative pressure cylinder 17. When the inner ring seat 22 is completely removed from the inner cavity of the negative pressure cylinder 17, the dust accumulated on the surface of the cover is dumped down, so that people can clean up the dust raised during the compaction of the soft foundation collected in the negative pressure cylinder 17.

[0043] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. The electrical components appearing in this article are all electrically connected to the main controller and the 220V mains, and the main controller is a common prior art such as a computer that plays a control role. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.

Claims

1. A soft foundation reinforcement device for engineering foundation construction, characterized in that: It comprises a mobile frame (1), wherein the four corners of the bottom of the mobile frame (1) are connected to universal wheels with brakes; A compaction structure capable of cyclically compacting and reinforcing the soft foundation is provided in the inner cavity of the mobile frame (1); The compacting structure comprises a compacting cylinder seat (2) whose top end is connected to the top wall of the inner cavity of the movable frame (1); a vertical cavity and a movable cavity are respectively provided on the compacting cylinder seat (2); the movable cavity is connected to the vertical cavity, and the movable cavity is located below the vertical cavity; a compacting weight (3) is provided in the movable cavity; a lifting slider (4) is slidably connected in the vertical cavity; a through hole is provided on the lifting slider (4); a middle connecting rod (5) is connected between the lifting slider (4) and the compacting weight (3) The top of the tamping cylinder seat (2) is connected to a pressure relief pipe, the top of the pressure relief pipe passes through the top of the mobile frame (1) and is connected to a cylinder support frame (6), and a cylinder support frame (6) connected to the top of the mobile frame (1) is also provided above the tamping cylinder seat (2), and an electric cylinder (7) is connected to the top wall of the inner cavity of the cylinder support frame (6), and the bottom end of the electric cylinder (7) passes through the mobile frame (1) and the tamping cylinder seat (2) respectively and is connected to the top of the lifting slider (4); The mobile frame (1) is also provided with a negative pressure adsorption component capable of performing negative pressure dust removal on the dust raised when the compaction structure tamps the foundation.

2. The soft foundation reinforcement device for engineering foundation construction according to claim 1 is characterized in that: The negative pressure adsorption component comprises a negative pressure cylinder (17) connected to the side wall of the movable frame (1), the top of the negative pressure cylinder (17) is connected to an air pump (12), the input end of the air pump (12) is connected to a negative pressure tube, and one end of the negative pressure tube away from the air pump (12) is fixedly connected to the top of the negative pressure cylinder (17); An opening is provided at the upper part of the side wall of the negative pressure cylinder (17), an outer frame (13) is movably inserted in the opening, a dust removal filter (19) is connected to the inner cavity of the outer frame (13), and a sealing strip (20) is sleeved and fixed on the outer periphery of the outer frame (13); The end of the outer frame (13) is connected to an end seat (14), and the end of the outer frame (13) away from the end seat (14) is connected to a guide slide bar (21); A guide groove is provided on the inner side wall of the negative pressure cylinder (17) so that the guide slide bar (21) can be movably inserted therein; The bottom opening of the negative pressure cylinder (17) is covered with a bottom cover assembly; An air pressure sensor (18) is connected to the side wall of the inner cavity of the negative pressure cylinder (17), and an audible and visual alarm (15) is connected to the side wall of the negative pressure cylinder (17) for sending out an alarm signal when the value detected by the air pressure sensor (18) is lower than a predetermined critical value; A suction pipe is fixedly connected to the lower part of the negative pressure cylinder (17) on the side close to the movable frame (1), and a one-way air intake valve (11) is provided on the suction pipe. An air intake hood (10) is fixedly connected to the side of the suction pipe away from the negative pressure cylinder (17).

3. The soft foundation reinforcement device for engineering foundation construction according to claim 2 is characterized in that: The air pressure sensor (18) is located above the dust removal filter (19); The end seat (14) is fixedly connected to the side wall of the negative pressure cylinder (17) by means of screws; A reserved hole for the suction pipe to pass through is provided on the side wall of the movable frame (1), and the air intake cover (10) passes through the reserved hole.

4. The soft foundation reinforcement device for engineering foundation construction according to claim 2 is characterized in that: The bottom cover assembly comprises a cover plate which is sealed and covered on the bottom opening of the negative pressure cylinder (17); an inner ring seat (22) which is located below the outer frame (13) is provided above the cover plate; an elastic sponge ring (23) which is closely attached to the inner cavity side wall of the negative pressure cylinder (17) is sleeved and fixed on the outer periphery of the inner ring seat (22); An inner fixing rod (24) is connected to the inner cavity of the inner ring seat (22), a traction rod (16) is connected to the bottom of the inner fixing rod (24), and the bottom end of the traction rod (16) is connected to the top surface of the cover plate.

5. The soft foundation reinforcement device for engineering foundation construction according to claim 1 is characterized in that: The lower parts of the left and right side walls of the movable frame (1) are both connected to a support, the bottom of the support is connected to an electric hydraulic cylinder (8), and the bottom end of the electric hydraulic cylinder (8) is connected to a reinforced base (9).

6. The soft foundation reinforcement device for engineering foundation construction according to claim 1 is characterized in that: The bottom end of the activity cavity is open.