Stainless steel air pipe structure
By designing the cleaning port and rack system in the stainless steel air duct, the problem of inconvenient cleaning of traditional air duct structures is solved, convenient disassembly and efficient cleaning of air ducts is achieved, and work efficiency and sealing are improved.
Patent Information
- Application Number
- CN202420654995.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-12-10
- Estimated Expiration
- 2034-04-01
AI Technical Summary
The structure of traditional stainless steel air ducts is not convenient for internal cleaning during use, affecting the exhaust effect, and is troublesome to disassemble the interface and low working efficiency.
A stainless steel air duct structure is designed. The side wall of the air duct is equipped with a cleaning port, equipped with a sealing plate and a rack and rack system. The gear is driven to rotate through the rotating rod, overcome the elastic force of the elastic parts, open the sealing plate, facilitate internal cleaning, and Optional T-bar brush and sealing rubber pads are available for improved cleaning efficiency and sealing.
It realizes convenient disassembly and cleaning of stainless steel air ducts, improves work efficiency, ensures the exhaust effect of air ducts, enhances sealing, and reduces noise pollution.
Smart Images

Figure CN222142252U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of pipeline structures, and in particular relates to a stainless steel air duct structure. Background Art
[0002] Stainless steel air ducts have excellent physical and chemical properties such as corrosion resistance, heat resistance, and high strength. Therefore, stainless steel air ducts are widely used in: dust-free workshop purification systems in the electronics industry, aseptic workshop purification systems for medicine and food, central air-conditioning systems in office buildings and factories, exhaust ducts for dust removal, smoke exhaust, oil absorption, etc. for industrial pollution control, coal mine gas extraction systems, and return air systems for coal mine environment control.
[0003] Stainless steel ducts will inevitably carry impurities during the exhaust process, which will adhere to the inner wall of the stainless steel duct after long-term accumulation, affecting the exhaust effect of the duct. In the use of traditional stainless steel ducts, their interfaces are only fixed by welding, which is troublesome to disassemble. It is very inconvenient for workers to clean the inside of the duct, and the work efficiency is low. Utility Model Content
[0004] The utility model aims to provide a stainless steel air duct structure to solve the problem that the structure of the traditional stainless steel air duct is inconvenient for internal cleaning.
[0005] The cam is an airtight container, the first end of which is provided with a toothed plate, the second end of which is provided with a toothed plate, the toothed plate being adapted to seal the container and the handle being adapted to seal the container.
[0006] The working principle and beneficial effect of this solution are as follows: in this solution, the gear is driven to rotate by the rotating rod, and since the first rack and the second rack are respectively meshed with the two ends of the gear, the first rack and the second rack overcome the elastic force of the elastic member and move in opposite directions until the first rack is disengaged from the first locking groove and the second rack is disengaged from the second locking groove, thereby opening the sealing plate and cleaning the inside of the air duct body through the cleaning port. That is, this solution improves the structure of the traditional stainless steel air duct, making the stainless steel air duct detachable and the disassembly operation simple, so that the staff can perform cleaning work and improve work efficiency.
[0007] Optionally, a T-shaped rod is provided on a side wall of the locking block away from the sealing plate, and a brush is provided on the T-shaped rod, and the brush abuts against the inner wall of the air duct body.
[0008] In this solution, the brush on the T-bar abuts against the inner wall of the air duct body, so when the sealing plate is disassembled, the brush can initially brush off the impurities on the inner wall of the air duct body.
[0009] Optionally, there are two T-shaped rods, which are respectively located at two ends of the locking block.
[0010] In this solution, when the number of T-shaped rods is two, compared with when the number of T-shaped rods is one, this solution can brush off more impurities on the inner wall of the air duct body.
[0011] Optionally, a first sealing rubber pad is provided on the locking block, the first sealing rubber pad is tightly pressed against the inner wall of the air duct body, and a through hole for the first rack or the second rack to pass through is opened on the first sealing rubber pad.
[0012] In this solution, the first sealing rubber pad can prevent the gas in the air duct body from entering the cavity of the locking block, thereby preventing the air in the air duct body from leaking through the gap between the rotating rod and the sealing plate, thereby improving the sealing of the stainless steel air duct.
[0013] Optionally, a second sealing rubber pad is provided on a side wall of the sealing plate facing the cleaning port.
[0014] In this solution, the second sealing rubber pad can prevent the gas in the air duct body from leaking out through the gap between the air duct body and the sealing plate, thereby further improving the sealing performance of the stainless steel air duct.
[0015] Optionally, one end of the rotating rod away from the cavity is fixedly connected to a rotating disk.
[0016] In this solution, a turntable is designed on the rotating rod to make it easier for workers to rotate the rotating rod.
[0017] Optionally, a limiting rod is slidably connected to the turntable, and a limiting hole for the end of the limiting rod to extend into is formed on a side wall of the sealing plate facing the turntable.
[0018] In this solution, the end of the limit rod is inserted into the limit hole, so that the limit rod can be fixed to prevent the rotating rod from being accidentally rotated by the staff.
[0019] Optionally, a fixing piece is fixedly connected to a side wall of the sealing plate facing the rotating disk, a connecting rope is bound to the fixing piece, and one end of the connecting rope away from the fixing piece is fixedly connected to the limiting rod.
[0020] In this solution, the limit rod is connected to the sealing plate by a connecting rope to prevent the limit rod from being lost.
[0021] Optionally, the sealing plate is provided with a channel for the rotating rod to pass through the sealing plate, the channel extends toward the cavity and communicates with the cavity; the rotating rod is coaxially fixedly connected with a bearing, and the bearing is fixedly installed in the channel.
[0022] In this solution, one end of the rotating rod is rotatably connected to the side wall of the cavity, and the rotating rod is also rotatably connected to the channel through a bearing, so that the stability of the rotating rod during rotation is improved.
[0023] Optionally, sound insulation cotton is fixedly connected to the inner wall of the air duct body.
[0024] In this solution, the sound insulation cotton plays a certain role in sound insulation and reduces noise pollution. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a radial cross-sectional view of a stainless steel air duct structure in Embodiment 1 of the present utility model;
[0026] Figure 2 for Figure 1 The local cross-section in the AA direction;
[0027] Figure 3 This is a radial cross-sectional view of a stainless steel air duct structure in Embodiment 2 of the present utility model;
[0028] Figure 4 This is a radial cross-sectional view of a stainless steel air duct structure in Embodiment 3 of the present invention. DETAILED DESCRIPTION
[0029] The following is further described in detail through specific implementation methods:
[0030] The marks in the drawings of the specification include: duct body 1, sealing plate 2, locking block 3, cavity 301, rotating rod 4, gear 5, first rack 6, second rack 7, bearing 8, turntable 9, elastic member 10, first locking groove 11, second locking groove 12, first sealing rubber pad 13, through hole 131, second sealing rubber pad 14, sound insulation cotton 15, limit rod 16, fixing member 17, connecting rope 18, T-bar 19, brush 20.
[0031] Embodiment 1
[0032] This embodiment is basically Figure 1 and Figure 2As shown: A stainless steel air duct structure, including an air duct body 1, the radial cross section of the air duct body 1 is rectangular, a cleaning port is provided on the right side wall of the air duct body 1, and a sealing plate 2 for sealing the cleaning port is provided on the right side wall of the air duct body 1. A locking block 3 is welded on the left side wall of the sealing plate 2, and a cavity 301 is provided inside the locking block 3, and a rotating rod 4, a gear 5, a first rack 6 and a second rack 7 are provided in the cavity 301. The left end of the rotating rod 4 is rotatably connected to the left side wall of the cavity 301, and the right end of the rotating rod 4 passes through the sealing plate 2. Specifically, a channel for the rotating shaft to pass through the sealing plate 2 is provided on the sealing plate 2, and the channel extends to the left and communicates with the cavity 301. A bearing 8 is fixedly connected in the channel, and the rotating rod 4 is coaxially fixedly connected with the bearing 8. A rotating disk 9 is welded on the right end of the rotating rod 4 so that the staff can rotate the rotating rod 4 through the rotating disk 9.
[0033] The gear 5 is coaxially fixedly connected to the rotating rod 4, the first rack 6 and the second rack 7 are respectively meshed with the two ends of the gear 5, and the first rack 6 and the second rack 7 are connected to the side wall of the cavity 301 through the elastic member 10. Figure 2 As shown, in this embodiment, the first rack 6 and the second rack 7 are arranged vertically, the first rack 6 meshes with the left end of the gear 5, the second rack 7 meshes with the right end of the gear 5, the bottom end of the first rack 6 is connected to the bottom wall of the cavity 301 through the elastic member 10, and the top end of the second rack 7 is connected to the top wall of the cavity 301 through the elastic member 10. The top inner wall of the air duct body 1 is provided with a first locking groove 11 for the top end of the first rack 6 to be inserted into, and the bottom inner wall of the air duct body 1 is provided with a second locking groove 12 for the bottom end of the second rack 7 to be inserted into. In this embodiment, the elastic member 10 is a telescopic spring, and the elastic member 10 is in a compressed state, the top end of the first rack 6 is inserted into the first locking groove 11, and the bottom end of the second rack 7 is inserted into the second locking groove 12. In this embodiment, a first cavity for vertical movement of the first rack 6 and a second cavity for vertical movement of the second rack 7 are also provided in the locking block 3. In this way, the first cavity and the second cavity are utilized to ensure that the first rack 6 and the second rack 7 can move vertically, thereby being smoothly inserted into the first lock groove 11 and the second lock groove 12.
[0034] The top wall and the bottom wall of the locking block 3 are both bonded with a first sealing rubber pad 13. The first sealing rubber pad 13 on the top wall of the locking block 3 is tightly pressed against the top inner wall of the air duct body 1, and a through hole 131 for the first rack 6 to pass through is provided on the first sealing rubber pad 13 on the top wall of the locking block 3; the first sealing rubber pad 13 on the bottom wall of the locking block 3 is tightly pressed against the bottom inner wall of the air duct body 1, and a through hole 131 for the second rack 7 to pass through is provided on the first sealing rubber pad 13 on the bottom wall of the locking block 3. In this way, the first sealing rubber pad 13 is used to prevent the gas in the air duct body 1 from entering the cavity 301 of the locking block 3 through the gap between the first rack 6 and the locking block 3, and the gap between the second rack 7 and the locking block 3, and then entering the external environment through the channel, thereby preventing the gas in the air duct body 1 from leaking out.
[0035] A second sealing rubber pad 14 is bonded to the left side wall of the sealing plate 2. The second sealing rubber pad 14 can prevent the gas in the air duct body 1 from leaking through the gap between the air duct body 1 and the sealing plate 2, thereby further improving the sealing performance of the stainless steel air duct.
[0036] The inner wall of the air duct body 1 is bonded with sound insulation cotton 15, and the sound insulation effect of the sound insulation cotton 15 is utilized to reduce the noise generated during the use of the air duct body 1, thereby reducing noise pollution.
[0037] In this embodiment, when it is necessary to clean the inside of the air duct body 1, the staff rotates the rotating rod 4 counterclockwise through the turntable 9, and the gear 5 on the rotating rod 4 rotates counterclockwise accordingly. Since the first rack 6 and the second rack 7 are both engaged with the gear 5, the first rack 6 overcomes the elastic force of the elastic member 10 and moves downward, and the second rack 7 overcomes the elastic force of the elastic member 10 and moves upward, until the top end of the first rack 6 disengages from the first locking groove 11 and the bottom end of the second rack 7 disengages from the second locking groove 12, completing the unlocking of the locking block 3. The staff can remove the sealing plate 2 to expose the cleaning port of the air duct body 1, which is convenient for the staff to clean the inside of the air duct body 1 and improves the cleaning efficiency.
[0038] After completing the cleaning work, the sealing plate 2 is re-sealed at the cleaning port. Specifically, the staff rotates the rotating rod 4 counterclockwise through the turntable 9 to ensure that the first rack 6 and the second rack 7 do not extend out of the locking block 3, and then snaps the sealing plate 2 at the cleaning port. After the locking block 3 extends into the air duct body 1, the staff releases the turntable 9. When the first rack 6 is aligned with the first locking groove 11, the first rack 6 moves upward under the elastic force of the elastic member 10, and the top end of the first rack 6 is stuck in the first locking groove 11. When the second rack 7 is aligned with the second locking groove 12, the second rack 7 moves downward under the elastic force of the elastic member 10, and the bottom end of the second rack 7 is stuck in the second locking groove 12, so as to lock the locking block 3, thereby realizing the re-sealing of the cleaning port by the sealing plate 2.
[0039] In summary, in this embodiment, the structure of the traditional stainless steel air duct is improved so that the stainless steel air duct can be disassembled, which is convenient for the staff to clean the inside of the air duct body 1, improves the cleaning efficiency, ensures the exhaust effect of the air duct body 1, and the disassembly operation is simple and the disassembly speed is fast.
[0040] Embodiment 2
[0041] The difference between this embodiment and the first embodiment is that: Figure 3 As shown, a limit rod 16 is slidably connected to the turntable 9. Specifically, a horizontal through hole is provided on the turntable 9, and the limit rod 16 is horizontally slidably connected in the horizontal through hole. A limit hole is provided on the right side wall of the sealing plate 2 for the end of the limit rod 16 to extend into. A fixing piece 17 is welded on the right side wall of the sealing plate 2. A connecting rope 18 is bound to the fixing piece 17. The end of the connecting rope 18 away from the fixing piece 17 is bound to the limit rod 16.
[0042] In this embodiment, the end of the limit rod 16 is inserted into the limit hole, thereby preventing the turntable 9 from rotating, preventing the staff from accidentally rotating the turntable 9 and removing the sealing plate 2, thereby improving safety. In addition, the connecting rope 18 can prevent the limit rod 16 from being lost.
[0043] Embodiment 3
[0044] The difference between this embodiment and the first embodiment is that: Figure 4 As shown, a T-shaped rod 19 is welded to the left wall of the locking block 3, and a brush 20 is bonded to the T-shaped rod 19. The end of the brush 20 away from the T-shaped rod 19 abuts against the inner wall of the air duct body 1. In this embodiment, there are two T-shaped rods 19, which are respectively located at the top and bottom ends of the left wall of the locking block 3. In this way, in this embodiment, when the sealing plate 2 is removed, the brush 20 on the T-shaped rod 19 will brush off the impurities on the inner wall of part of the air duct body 1 during the process of the sealing plate 2 moving to the right, thereby reducing the subsequent cleaning workload of the staff.
[0045] The above is only an embodiment of the utility model, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the utility model, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the utility model. The specific implementation methods and other records in the specification can be used to explain the content of the claims.
Claims
1. A stainless steel air duct structure, comprising an air duct body, a cleaning port is provided on the side wall of the air duct body, and a sealing plate for sealing the cleaning port is provided on the air duct body, characterized in that: A locking block is provided on a side wall of the sealing plate facing the cleaning port, a cavity is provided inside the locking block, a rotating rod, a gear, a first rack and a second rack are provided in the cavity, one end of the rotating rod is rotatably connected to the side wall of the cavity, and the other end of the rotating rod passes through the sealing plate, the gear and the rotating rod are coaxially fixedly connected, the first rack and the second rack are respectively meshed with the two ends of the gear, the first rack and the second rack are connected to the side wall of the cavity through an elastic member, a first locking groove for the end of the first rack to be inserted into and a second locking groove for the end of the second rack to be inserted into are provided on the inner wall of the air duct body, the first locking groove and the second locking groove are respectively located on the inner walls on both sides of the air duct body opposite to each other, and the elastic member is in a compressed state.
2. The stainless steel air duct structure according to claim 1, characterized in that: A T-shaped rod is arranged on a side wall of the locking block away from the sealing plate, and a brush is arranged on the T-shaped rod, and the brush abuts against the inner wall of the air duct body.
3. The stainless steel air duct structure according to claim 2, characterized in that: The number of the T-shaped rods is two, and the two T-shaped rods are respectively located at two ends of the locking block.
4. The stainless steel air duct structure according to claim 1 or 2, characterized in that: The locking block is provided with a first sealing rubber pad, which is tightly pressed against the inner wall of the air duct body, and the first sealing rubber pad is provided with a through hole for the first rack or the second rack to pass through.
5. The stainless steel air duct structure according to claim 4, characterized in that: A second sealing rubber pad is arranged on a side wall of the sealing plate facing the cleaning port.
6. The stainless steel air duct structure according to claim 1 or 2, characterized in that: One end of the rotating rod away from the cavity is fixedly connected with a rotating disk.
7. The stainless steel air duct structure according to claim 6, characterized in that: A limiting rod is slidably connected to the rotating disk, and a limiting hole for the end of the limiting rod to extend into is formed on a side wall of the sealing plate facing the rotating disk.
8. The stainless steel air duct structure according to claim 7, characterized in that: A fixing piece is fixedly connected to a side wall of the sealing plate facing the rotating disk, a connecting rope is bound to the fixing piece, and one end of the connecting rope away from the fixing piece is fixedly connected to the limiting rod.
9. The stainless steel air duct structure according to claim 1, characterized in that: The sealing plate is provided with a channel for the rotating rod to pass through the sealing plate, and the channel extends toward the cavity and communicates with the cavity; the rotating rod is coaxially fixedly connected with a bearing, and the bearing is fixedly installed in the channel.
10. The stainless steel air duct structure according to claim 1, characterized in that: The inner wall of the air duct body is fixedly connected with sound insulation cotton.
