Leaked liquid collecting device and conveying belt
By designing a liquid leakage collection device, the combined structure of elastic liquid absorber and extruded frame is used to absorb and store leakage, which solves the problem of oil dripping after sesame oil filling, improves safety and absorption effect, and avoids the The oil flows to the ground, maintaining the normal operation of the conveyor.
Patent Information
- Application Number
- CN202420595075.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-03-26
AI Technical Summary
In the prior art, sesame oil is prone to residual oil after filling and dripping onto the conveyor belt, causing the oil to flow to the ground, affecting the beauty of the workshop and insufficient safety. At present, cardboard can only be laid on the ground to absorb, and the effect of preventing falls is not good. .
Design a liquid leakage collection device, including a bearing mechanism and an extrusion mechanism, and has a built-in elastic liquid suction piece. The liquid suction piece consists of a slidingly connected frame and a pull rod. The leakage liquid is absorbed through the absorbing part and the liquid is transferred through the extrusion frame. Squeeze into the storage chamber, use a transparent tube to observe the liquid level, and discharge it in time to avoid affecting the absorption effect.
Effectively avoid leakage of liquid to the ground, improve safety, does not affect the normal use of the conveying device, and timely discharge liquid through transparent tubes to maintain the absorption effect.
Smart Images

Figure CN222159715U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of grain and oil production, and specifically relates to a leakage collection device and a conveyor belt. Background Art
[0002] After grain and oil are produced, they need to be packaged. In the prior art, the filling, capping, labeling and coding of sesame oil are integrated on a production line. When packaging, the empty bottles are first placed on a conveyor, which transports the empty bottles to an oil filling machine. The oil filling device pressurizes the internal sesame oil and injects it into the empty bottles through the oil outlet. After that, the conveying mechanism continues to transport the bottles to the capping device, labeling device and coding device in turn for capping, labeling and coding operations, and then they are output for boxing and packaging.
[0003] After each filling, oil residue is likely to remain at the filling port, which will drip onto the conveyor belt and flow to the ground through the gaps on the conveyor belt. The oil that flows to the ground can easily cause workers to fall. In order to solve this technical problem, currently only cardboard can be laid on the ground to absorb the dripping oil, which affects the appearance of the workshop, has little effect in preventing falls, and is not safe enough. Utility Model Content
[0004] Aiming at the problem that in the prior art only cardboard can be laid on the ground to absorb dripping oil, which affects the appearance of the workshop, has little effect in preventing falls and is not safe enough, the utility model provides a leakage collection device and a conveyor belt.
[0005] The technical solution adopted by the utility model is as follows:
[0006] A leakage collection device comprises a receiving mechanism, wherein a squeezing mechanism is arranged inside the receiving mechanism, and an elastic liquid absorbing member is arranged inside the squeezing mechanism;
[0007] The receiving mechanism comprises a box body with an open top, and the box body is divided into an installation cavity and a storage cavity from top to bottom;
[0008] The extrusion mechanism comprises an extrusion frame slidably connected in the installation cavity, the elastic liquid absorbing member is arranged in the extrusion frame, the extrusion frame comprises a first frame body and a second frame body slidably connected, and the first frame body and the second frame body are respectively provided with a first liquid passing hole and a second liquid passing hole;
[0009] The elastic liquid-absorbing member comprises an extrusion part arranged in the extrusion frame, an absorption part is arranged on the top of the extrusion part, and the absorption part is arranged outside the receiving mechanism and the extrusion mechanism.
[0010] After adopting this technical solution, the device is installed under the conveyor belt, so that the absorption part of the elastic liquid absorbent is in contact with the leaking part, and the flowing liquid is absorbed by the elastic liquid absorbent. After absorbing for a period of time, the elastic liquid absorbent can be squeezed by sliding the first frame and / or the second frame, so that the liquid in the elastic liquid absorbent flows into the storage cavity for temporary storage, and the liquid in the storage cavity can be processed after a period of time. Receiving the leaked liquid by this device can effectively prevent the leaked liquid from flowing down the device to the ground, improve safety, and will not affect the normal use of the conveyor device.
[0011] Preferably, the extrusion mechanism includes a first pulling mechanism and a second pulling mechanism which are symmetrically arranged on both sides of the extrusion mechanism and have the same structure. The first pulling mechanism includes a first pull rod and a second pull rod arranged on the first frame and the second frame. The first pull rod and the second pull rod are staggered. A fixed block is arranged on the receiving mechanism. The first pull rod and the second pull rod both penetrate the fixed block, and the first pull rod and the second pull rod are both slidably connected to the fixed block. The ends of the first pull rod and the second pull rod are provided with handles.
[0012] After adopting this technical solution, the first frame and the second frame can be pulled by holding the two handles with the left and right hands respectively to move them toward the middle, thereby squeezing the elastic liquid absorbent and squeezing out the liquid absorbed by the elastic liquid absorbent.
[0013] Preferably, an annular boss is provided in the box body, a fixing plate is placed on the annular boss, a first slide groove is provided on the fixing plate, the second frame body is slidably connected in the first slide groove, and a third liquid passage hole is provided on the fixing plate.
[0014] After adopting this technical solution, the extrusion frame can be supported by the fixed plate, so that the extrusion frame can slide smoothly on the fixed plate.
[0015] Preferably, a second slide groove is provided in the second frame, and the first frame is slidably connected in the second slide groove.
[0016] After adopting this technical solution, the first frame can slide smoothly in the second slide groove through the second slide groove.
[0017] Preferably, a drain port is provided at the bottom of the box body, and a valve is provided at the drain port.
[0018] After adopting this technical solution, the liquid in the box storage box can be discharged through the valve without removing the device, thereby improving convenience.
[0019] Preferably, the elastic liquid-absorbing member is a sponge.
[0020] Preferably, the bottom of the box is connected to a transparent tube arranged on the outer surface of the box.
[0021] After adopting this technical solution, the liquid level in the storage cavity can be observed through the transparent tube. When it is observed that the liquid level is too high, the liquid is discharged in time to avoid affecting the effect of absorbing the leakage.
[0022] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:
[0023] 1. Receiving the leaked liquid through this device can effectively prevent the leaked liquid from flowing down the device to the ground, and can effectively prevent the operator from falling due to stepping on the oil flowing to the ground, thereby improving safety and not affecting the normal use of the conveying device.
[0024] 2. The liquid level in the storage chamber can be observed through the transparent tube. When the liquid level is observed to be too high, the liquid should be discharged in time to avoid affecting the effect of absorbing leakage. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The present invention will be described by way of examples with reference to the accompanying drawings, in which:
[0026] Figure 1 It is a three-dimensional structural schematic diagram of the leakage collection device in the utility model;
[0027] Figure 2 It is a two-dimensional internal structure schematic diagram of the leakage collection device in the utility model;
[0028] Among them: 1-elastic liquid absorbing part, 2-box, 301-first frame, 302-second frame, 303-second pull rod, 304-handle, 305-first pull rod, 306-second liquid hole, 307-fixing block, 308-second slide groove, 309-first liquid hole, 401-first slide groove, 402-third liquid hole, 5-transparent tube. DETAILED DESCRIPTION
[0029] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.
[0030] In the description of the embodiments of the present application, it should be noted that the terms "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or are the positions or positional relationships in which the utility model product is usually placed when in use. They are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0031] Combine the following Figure 1-Figure 2 The utility model is described in detail.
[0032] Example 1
[0033] like Figure 1-2 As shown, a leakage collection device comprises a receiving mechanism, wherein a squeezing mechanism is arranged inside the receiving mechanism, and an elastic liquid absorbing member 1 is arranged inside the squeezing mechanism;
[0034] The receiving mechanism comprises a box body 2 with an opening at the top, and the box body 2 is divided into an installation cavity and a storage cavity from top to bottom;
[0035] The extrusion mechanism includes an extrusion frame slidably connected in the installation cavity, the elastic liquid absorbent member 1 is arranged in the extrusion frame, the extrusion frame includes a first frame body 301 and a second frame body 302 slidably connected, and the first frame body 301 and the second frame body 302 are respectively provided with a first liquid hole 309 and a second liquid hole 306;
[0036] The elastic liquid-absorbing member 1 comprises an extrusion portion arranged in an extrusion frame, an absorption portion is arranged on the top of the extrusion portion, and the absorption portion is arranged outside the receiving mechanism and the extrusion mechanism.
[0037] The device can be installed below the leakage site so that the absorption part of the elastic liquid absorbent member abuts against the leakage site, and the flowing liquid is absorbed by the elastic liquid absorbent member 1. After absorbing for a period of time, the elastic liquid absorbent member 1 can be squeezed by sliding the first frame 301 and / or the second frame 302, so that the liquid in the elastic liquid absorbent member 1 flows into the storage chamber for temporary storage. After a period of time, the liquid in the storage chamber can be processed.
[0038] In this embodiment, Figure 1As shown, the squeezing mechanism includes a first pulling mechanism and a second pulling mechanism symmetrically arranged on both sides of the squeezing mechanism and having the same structure, the first pulling mechanism includes a first pull rod 305 and a second pull rod 303 arranged on the first frame 301 and the second frame 302, the first pull rod 305 and the second pull rod 303 are arranged alternately, a fixing block 307 is arranged on the receiving mechanism, the first pull rod 305 and the second pull rod 303 are both arranged through the fixing block 307, and the first pull rod 305 and the second pull rod 303 are both slidably connected to the fixing block 307, and the ends of the first pull rod 305 and the second pull rod 303 are both provided with a handle 304. The first frame 301 and the second frame 302 can be pulled by holding the two handles 304 with the left and right hands respectively, so that the two move toward the middle, thereby squeezing the elastic liquid absorbent 1 and squeezing out the liquid absorbed by the elastic liquid absorbent 1.
[0039] In this embodiment, an annular boss is provided in the box body 2, a fixing plate is placed on the annular boss, a first slide groove 401 is provided on the fixing plate, and the second frame body 302 is slidably connected in the first slide groove 401. Specifically, a second slider slidably connected to the first slide groove 401 is provided on the second frame body 302, and the sliding connection is achieved by the cooperation between the second slider and the first slide groove 401, and a third liquid passage hole 402 is provided on the fixing plate. The size of the annular boss is larger than that of the fixing plate, so that the fixing plate can be placed on the annular boss.
[0040] In this embodiment, a second slide groove 308 is provided in the second frame body 302, and the first frame body 301 is slidably connected in the second slide groove 308. Specifically, a second slider slidably connected to the second slide groove 308 is provided on the first frame body 301, and the sliding connection is achieved by the cooperation between the second slider and the second slide groove 308.
[0041] In this embodiment, a liquid discharge port is provided at the bottom of the box body 2, and a valve is provided at the liquid discharge port. The valve is a manual valve, and the liquid can be discharged by opening the valve.
[0042] In this embodiment, the elastic liquid-absorbing member 1 is a sponge, and the size of the sponge is set according to the area of the device required to receive the leaking liquid. If the liquid flows along the side wall of the device, the size of the sponge must ensure that the sponge abuts against the side wall.
[0043] In this embodiment, the bottom of the box body 2 is connected to a transparent tube 5 arranged on the outer surface of the box body 2.
[0044] The specific use method of the utility model is as follows:
[0045] Reference Figure 1-Figure 2, install the device below the leakage site so that the elastic liquid absorbent member 1 abuts against the side wall of the leakage site. When the liquid dripping from the leakage site falls, it will be absorbed by the absorption part of the elastic liquid absorbent member 1. After absorbing for a period of time, hold the handles 304 at both ends of the device respectively and pull them to both sides, so that the first frame 301 and the second frame 302 are pulled toward the middle, thereby pressurizing the elastic liquid absorbent member 1, so that the liquid absorbed in the elastic liquid absorbent member 1 flows out and flows into the storage chamber for storage. After the squeezing is completed, stop pulling the handle 304, and the first frame 301 and the second frame 302 return to their original positions under the action of the self-restoring force of the elastic liquid absorbent member 1; when it is observed through the transparent tube 5 that the liquid level in the storage chamber is too high, open the valve to discharge the liquid in the storage chamber.
[0046] Example 2
[0047] A conveyor belt, the conveyor belt contains the leakage collection device in Example 1, and the production line targeted is a canned hot pot sesame oil production line. The production line includes filling, capping, labeling, coding, sorting and packaging and other processes. The filling, capping, labeling, coding, sorting and packaging and other processes are the same as the prior art and are not the invention of the utility model, so their working principles and specific structures are not described here; the conveyor belt extends from filling, capping, labeling, coding to sorting and packaging processes, and the leakage receiving device in Example 1 is arranged under the entire conveyor belt, and the conveyor belt is a straight conveyor belt; the specific installation structure is that the conveyor belt includes a frame for supporting the conveyor belt body and a conveyor belt body, and there is a gap between the bottom of the conveyor belt body and the frame, and the device can be placed in the gap, and the friction between the elastic liquid absorbent 1 and the side wall of the frame makes it clamped in the gap. In other embodiments, a mounting block is disposed outside the box body 2, a screw hole is disposed on the mounting block, and a screw hole matching the screw hole is disposed on the frame body, so that the box body 2 is fixed to the frame body by bolts.
[0048] The specific use method of the utility model is as follows:
[0049] Reference Figure 1-Figure 2, the device is clamped in the gap between the conveyor belt body and the frame, so that the elastic liquid-absorbing member 1 is in contact with the side wall of the frame. When the liquid dripping from the filling port falls on the conveyor belt, it will flow down along the gap between the conveyor belt body and the frame, and when it flows to the elastic liquid-absorbing member 1, it will be absorbed by the absorption part of the elastic liquid-absorbing member 1. After absorbing for a period of time, a staff member stands at each end of the conveyor belt, respectively holds the handles 304 at both ends of the conveyor belt body, and pulls them to both sides, so that the first frame 301 and the second frame 302 are pulled toward the middle, thereby pressurizing the elastic liquid-absorbing member 1, so that the liquid absorbed in the elastic liquid-absorbing member 1 flows out and flows into the storage chamber for storage. After the squeezing is completed, stop pulling the handle 304, and the first frame 301 and the second frame 302 return to their original positions under the action of the self-restoring force of the elastic liquid-absorbing member 1; when it is observed through the transparent tube 5 that the liquid level in the storage chamber is too high, open the valve to discharge the liquid in the storage chamber.
[0050] The above-mentioned embodiments only express the specific implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the protection scope of the present application. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the technical solution concept of the present application, and these all belong to the protection scope of the present application.
Claims
1. A leakage collection device, characterized in that: It comprises a receiving mechanism, wherein a squeezing mechanism is provided in the receiving mechanism, and an elastic liquid-absorbing member (1) is provided in the squeezing mechanism; The receiving mechanism comprises a box body (2) with an opening at the top, wherein the box body (2) is divided into an installation cavity and a storage cavity from top to bottom; The extrusion mechanism comprises an extrusion frame slidably connected in the installation cavity, the elastic liquid-absorbing member (1) is arranged in the extrusion frame, the extrusion frame comprises a first frame body (301) and a second frame body (302) slidably connected, and the first frame body (301) and the second frame body (302) are respectively provided with a first liquid-passing hole (309) and a second liquid-passing hole (306); The elastic liquid-absorbing member (1) comprises an extrusion portion arranged in an extrusion frame, an absorption portion is arranged on the top of the extrusion portion, and the absorption portion is arranged outside the receiving mechanism and the extrusion mechanism.
2. A leakage collection device according to claim 1, characterized in that: The extrusion mechanism includes a first pulling mechanism and a second pulling mechanism symmetrically arranged on both sides of the extrusion mechanism and having the same structure. The first pulling mechanism includes a first pull rod (305) and a second pull rod (303) arranged on the first frame (301) and the second frame (302). The first pull rod (305) and the second pull rod (303) are staggered. A fixed block (307) is provided on the receiving mechanism. The first pull rod (305) and the second pull rod (303) are both arranged through the fixed block (307). The first pull rod (305) and the second pull rod (303) are both slidably connected to the fixed block (307). The ends of the first pull rod (305) and the second pull rod (303) are both provided with handles (304).
3. A leakage collection device according to claim 1 or 2, characterized in that: An annular boss is provided in the box body (2), a fixed plate is placed on the annular boss, a first slide groove (401) is provided on the fixed plate, the second frame body (302) is slidably connected in the first slide groove (401), and a third liquid passage hole (402) is provided on the fixed plate.
4. A leakage collection device according to claim 1 or 2, characterized in that: A second sliding groove (308) is provided in the second frame body (302), and the first frame body (301) is slidably connected in the second sliding groove (308).
5. A leakage collection device according to claim 1 or 2, characterized in that: The bottom of the box body (2) is provided with a liquid discharge port, and a valve is provided at the liquid discharge port.
6. A leakage collection device according to claim 1 or 2, characterized in that: The elastic liquid-absorbing component (1) is a sponge.
7. A leakage collection device according to claim 1 or 2, characterized in that: The bottom of the box (2) is connected to a transparent tube (5) arranged on the outer surface of the box (2).
8. A conveyor belt, characterized in that: A liquid leakage collection device comprising the device according to any one of claims 1 to 7.