Device for detecting influence range of static pressure compaction pile
By setting positioning lines and observation structures on the static compressed pile position, including observation holes and protection pipes, the problems of pile hole collapse and progress delays in the construction of static compressed piles are solved, and a reasonable hole formation sequence is achieved. The scope of impact is determined, which improves project quality and construction efficiency.
Patent Information
- Application Number
- CN202420016236.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-04
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-01-04
AI Technical Summary
In the construction of static pressing and tight piles, due to the large area occupied by the static press, the pile holes cannot be filled in time, and geological uncertainty may cause the pile holes to collapse, and the existing technology is difficult to effectively determine the reasonable hole spacing and formation The order of holes affects the construction progress and quality.
Design a device to check the influence range of static pressing and tight piles, including positioning lines and observation structures. By setting observation holes and protective pipes on the static pressing and tight pile positions, the observation holes are used to observe the hole-forming conditions, and the protection pipes are protected from collapse. Determine a reasonable order of pore formation and scope of influence.
It is realized that the impact range of pile formation is determined at one time before construction, reducing hole collapse, ensuring project quality, and avoiding progress delays caused by excessive hole formation spacing.
Smart Images

Figure CN222161380U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of foundation treatment, in particular to a device for testing the influence range of static pressure compaction piles. Background Art
[0002] At present, when static compaction piles are used in engineering projects, they are mostly designed as plum blossom-shaped piles. During construction, the holes are formed by skipping rows and rows, but because the static compaction machine occupies a large area when working, the pile holes completed by static compaction cannot be filled in time. Due to geological uncertainties, even if the holes are formed by skipping rows and rows, the impact range of compaction may cause the pile holes that are not filled to collapse. This requires increasing the spacing between holes.
[0003] Generally, the hole spacing will be increased, such as skipping two rows and two columns, which will seriously affect the construction progress. Therefore, it is particularly important to determine the reasonable hole spacing and choose the appropriate hole sequence. Therefore, a method for testing the influence range of single piles in static pressure compaction drilling is studied. Utility Model Content
[0004] The purpose of the utility model is to provide a device for testing the influence range of static pressure compaction piles to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above purpose, the utility model provides the following technical solutions: a device for checking the influence range of static pressure compaction piles, which is arranged on the ground and used for static pressure drilling of static pressure compaction piles, comprising:
[0006] A positioning line is arranged on the static pressure compaction pile position and is used for being arranged on the static pressure compaction pile position.
[0007] An observation structure is arranged on the positioning line and is used for observing the static pressure compaction pile position static pressure hole forming.
[0008] Preferably, the observation structure includes an observation hole opened on the positioning line, and a protection tube arranged on the observation hole for protecting the observation hole, and the observation structure is used to observe the static pressure compaction pile position after static pressure drilling.
[0009] Preferably, a guard plate is provided on the protection tube, and the guard plate is used to prevent the observation hole from being damaged when the protection tube and the observation hole are connected. The protection tube can effectively prevent the observation hole from collapsing.
[0010] Preferably, the size of the protection tube is smaller than the observation hole, so that the protection tube can be easily inserted into the observation hole.
[0011] Compared with the prior art, the beneficial effects of the utility model are: the device for testing the influence range of static pressure compaction piles is simple to implement, and the influence range of pile formation can be determined once before construction, and the pile formation sequence can be reasonably selected, which can reduce the collapse of adjacent pile holes due to the small pile hole spacing. It can well ensure the quality of the project, and also avoid the delay of progress when a larger pile spacing is selected. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a schematic diagram of the arrangement of observation holes in one embodiment of the utility model;
[0013] Figure 2 This is a schematic diagram of an observation hole and a pile hole according to an embodiment of the utility model;
[0014] Figure 3 Schematic diagram of an observation orifice according to an embodiment of the present invention.
[0015] In the figure:
[0016] 1. Static pressure compaction pile position 2. Positioning line 3. Protection pipe
[0017] 4. Observation hole DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0019] like Figure 1 As shown, the utility model provides a technical solution: a device for inspecting the influence range of static pressure compaction piles, which is arranged on the ground and is used for static pressure drilling of static pressure compaction pile positions 1, comprising: a positioning line 2 and an observation structure, the positioning line 2 is arranged on the static pressure compaction pile position 1, and is used to be arranged on the static pressure compaction pile position 1, and the influence range line 2 is pre-marked outward at a fixed distance according to the static pressure compaction pile position 1, the range line 2 is divided by lime powder around the static pressure compaction pile position 1, the positioning line 2 is equally divided according to an angle, and the observation structure is arranged on the positioning line 2, and is used to observe the static pressure drilling of the static pressure compaction pile position 1.
[0020] like Figure 2-3As shown, the observation structure includes an observation hole 4 opened on the positioning line 2, the observation hole 4 is positioned according to the positioning line 2, the observation hole 4 is drilled by a small-diameter drill rig of a small geological exploration rig to ensure the stability of the hole wall, and different hole depths are set according to the pile length, and a protection tube 3 is set on the observation hole 4 to protect the observation hole 4, the protection tube 3 is made of a steel pipe and a steel plate and can be reused, a guard plate is provided on the protection tube 3, the guard plate is set in the middle section of the protection tube 3, one end is plugged into the observation hole 4, and the observation hole 4 is observed through the protection tube 3, the guard plate is used to clamp the protection tube 3 on the top of the observation hole 4, the guard plate is used to prevent the protection tube 3 and the observation hole 4 from being damaged when the observation hole 4 is connected, the protection tube 3 can effectively prevent the observation hole 4 from collapsing, the size of the protection tube 3 is smaller than the observation hole 4, so that the protection tube 3 can be conveniently plugged into the observation hole, and the observation structure is used to observe the static pressure compaction pile position 1 after static pressure drilling.
[0021] According to the above, the present embodiment determines the position of the static pressure compaction pile position 1, and then marks the positioning line 2 around the static pressure compaction pile position 1, and then determines the position of the observation hole 4 according to the positioning line 2, and punches the hole, sets the protection tube 3 on the observation hole 4, protects the observation hole 4, statically pressurizes the static pressure compaction pile position 1, and then observes the hole formation through the observation hole 4, and selects the appropriate pile jumping construction sequence according to the determined static pressure compaction pile positioning line 2.
[0022] According to the above embodiment, in this embodiment, after the static pressure drilling is completed, a strong flashlight or a small camera is used to enter the hole to observe the hole wall condition of the observation hole 4. Among all the observation holes 4 that have not collapsed or whose hole walls have not changed, the positioning line of the observation hole 4 closest to the static pressure compaction pile hole position 1 is the static pressure compaction pile influence range line.
[0023] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A device for testing the influence range of static pressure compaction piles, which is arranged on the ground and used for static pressure drilling of static pressure compaction piles. It is characterized in that include: A positioning line, which is arranged on the static pressure compaction pile position; An observation structure is arranged on the positioning line and is used for observing the static pressure compaction pile position static pressure hole forming.
2. A device for testing the influence range of static compaction piles according to claim 1, Features: The observation structure comprises an observation hole opened on the positioning line, and a protection tube arranged on the observation hole for protecting the observation hole.
3. A device for testing the influence range of static pressure compaction piles according to claim 2, Features: A guard plate is provided on the protection tube, and the guard plate is used to prevent the observation hole from being damaged when the protection tube and the observation hole are connected.
4. A device for testing the influence range of static compaction piles according to claim 2 or 3, Features: The protection tube is smaller in size than the observation hole.