Combined sewage well structure
Through the combined sewage well structure, the fixed structure and auxiliary structure of prefabricated foundation parts and segmented pipelines are used to solve the problems of long construction period and large manpower investment in sewage wells, rapid installation and effective sewage treatment are achieved, and workers are improved maintenance are improved. Convenience and preventive effect of sewage wells.
Patent Information
- Application Number
- CN202420887542.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-04-26
AI Technical Summary
The existing sewage wells have a long construction period, large labor investment and high labor volume.
The combined sewage well structure is adopted, including prefabricated foundation parts and segmented pipes, and the fast installation and sealing is achieved through fixed structures and auxiliary structures. The segmented pipes are fixed with steel nails and sealing gaskets. The steps and anti-blocking parts are convenient for maintenance and blocking impurities.
It shortens the installation and construction time of sewage wells, reduces manpower investment, improves the convenience of workers' downhole maintenance and prevents sewage wells from blocking and prevents sewage leakage and well blockage.
Smart Images

Figure CN222161520U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sewage facilities, in particular to a combined sewage well structure. Background Art
[0002] The existing sewage wells in the community are used to discharge sewage and can also be used for urban rainwater drainage. The sewage wells have a large inner diameter, which makes it convenient for workers to go down the well for maintenance and cleaning.
[0003] Existing sewage wells are generally made of concrete or bricks, which takes a long time to build and requires a large workload for workers.
[0004] A Chinese patent with authorization announcement number CN216195378U discloses a quickly installed combined sewage well, which proposes a quickly installed combined sewage well to solve the problems of long construction period and large manpower investment in existing sewage wells. The patent includes a well body, which is composed of multiple sections of annular concrete prefabricated components. The sections are connected by prefabricated tenons and mortises. The bottom section is a base section, and the well body is provided with at least one pipe interface.
[0005] Similarly, in order to solve the problems raised by the above-mentioned technology, such as long construction period, large manpower investment and high labor workload of workers in existing sewage wells, this application proposes another solution to provide more solutions for people in this field without affecting the independence of the above-mentioned technology. Utility Model Content
[0006] The utility model aims to solve the shortcomings of the prior art that the installation and construction period of the existing sewage well is long and the investment of manpower and material resources is large, and a combined sewage well structure is proposed.
[0007] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a combined sewage well structure, including a prefabricated foundation member, the prefabricated foundation member is in an inverted "T" shape, and its lower end is provided with two openings, a segmented pipe is installed on the upper end of the prefabricated foundation member, and a fixing structure is provided at the relative position of the prefabricated foundation member and the segmented pipe, the fixing structure includes four connecting shafts, the lower end of the connecting shaft is fixedly connected to the prefabricated foundation member, the upper end of the connecting shaft is fixedly connected to a fixing ring, four positioning grooves are provided at the lower end of the segmented pipe, a circular hole is provided on the arc surface of the segmented pipe near the positioning groove, a steel nail is penetrated in the fixing ring, the steel nail passes through the circular hole and the inside of the fixing ring in sequence, and one end thereof extends out of the segmented pipe.
[0008] The effect achieved by the above components is: by inserting the fixing ring into the positioning groove and inserting the steel nail into the fixing ring, the prefabricated foundation member can be connected to the segmented pipeline, and the steel nail can be inserted into the backfill soil to fix the connection of the pipeline.
[0009] Preferably, a sealing gasket is fixedly connected to the inner wall of the circular hole, and the sealing gasket is a rubber gasket.
[0010] The effect achieved by the above components is: the sealing gasket is used to seal the inside of the segmented pipe after the steel nails are fixed to prevent sewage leakage.
[0011] Preferably, a spiral pattern is formed on an arc surface at one end of the steel nail, and one end of the steel nail is in a pointed cone shape.
[0012] The effect achieved by the above components is that after the spiral pattern is inserted into the soil for fixation, it is used to increase the friction force and enhance the fixing strength of the steel nail.
[0013] Preferably, a plurality of steps are fixedly connected to the inner wall of the segmented pipe, and the steps are spaced evenly apart.
[0014] The effect achieved by the above components is that the steps are used to facilitate workers to go down the well for maintenance or cleaning.
[0015] Preferably, an anti-blocking piece is fixedly connected to the inner wall of the segmented pipeline, and the middle portion of the anti-blocking piece is curved in an arc shape.
[0016] The effect achieved by the above components is: the anti-blocking component is used to intercept larger impurities in sewage and make them entangled thereon, and at the same time, its arc shape is bent to leave a certain space for workers to go down the well.
[0017] Preferably, auxiliary structures are provided at both ends of the prefabricated foundation member, and the auxiliary structures include fixed tubes, both ends of the fixed tubes are respectively fixedly connected to the inner wall of the prefabricated foundation member, and two movable tubes are rotatably connected inside the fixed tube, and one end of the movable tube away from the fixed tube is slidably inserted into the prefabricated foundation member.
[0018] The effect achieved by the above components is that the debris in the sewage can be blocked by the fixed pipes and movable pipes that cross horizontally and vertically, so that it is convenient for workers to clean up.
[0019] Preferably, a sealing plugging shaft is fixedly connected to one side of the arc surface of the movable tube, and a loosening plugging shaft is fixedly connected to the side of the arc surface of the movable tube away from the sealing plugging shaft.
[0020] The effects achieved by the above components are: by setting the sealing plugging shaft and the dredging plugging shaft, the blocking area is increased, and when there are many impurities in the sewage, it can be effectively blocked.
[0021] Preferably, the arc surface of the movable tube is threadedly connected with two fixing nuts, and the two fixing nuts are distributed at the upper and lower ends of the fixed tube.
[0022] The effect achieved by the above components is that after the movable tube is rotated to adjust the angle, the fixing nuts 45 located at the upper and lower ends of the fixed tube 41 can be rotated to make them abut and clamp on the fixed tube 41, so that the movable tube 42 cannot rotate and is fixed.
[0023] In summary, the beneficial effects of the utility model are:
[0024] In the utility model, when installing and constructing the combined sewage well, firstly, the prefabricated foundation member is placed in the base part, and its two ends are connected to the underground sewage pipe, and then a section of the segmented pipe is installed on the prefabricated foundation member. When the segmented pipe is moved downward for installation, the connecting shaft and the fixing ring are inserted inwardly into the positioning groove, and then when backfilling the soil, a steel nail is inserted into the circular hole, and the steel nail passes through the fixing ring and passes out of the segmented pipe. A sealing gasket is provided in the circular hole to prevent sewage leakage. At the same time, the steel nail is nailed into the backfilled soil after passing out, so as to fix the connected segmented pipe, and the cycle is carried out in sequence. After installing multiple segmented pipes, the installation of the combined sewage well can be completed, and steps are provided in the segmented pipes to facilitate workers to go down into the well for maintenance. At the same time, the anti-blocking member arranged in the segmented pipe is used to block large debris in the sewage when the sewage falls, so that it is wrapped around the anti-blocking member to prevent large debris from falling to the bottom and clogging the sewage well. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0026] Figure 2 This is a schematic diagram of the structure of the utility model for showing that a steel nail passes through a fixing ring;
[0027] Figure 3 This is a schematic diagram of the utility model for displaying the bottom structure of a segmented pipeline;
[0028] Figure 4 This is a cross-sectional schematic diagram of the utility model used to show the connection between the prefabricated foundation member and the segmented pipeline;
[0029] Figure 5 It is a partial schematic diagram of the fixing structure of the utility model;
[0030] Figure 6 It is a schematic diagram of the auxiliary structure of the utility model.
[0031] Legend: 1. Prefabricated foundation parts; 2. Segmented pipes; 3. Fixed structure; 31. Connecting shaft; 32. Fixed ring; 33. Positioning groove; 34. Round hole; 35. Steel nail; 36. Sealing gasket; 37. Spiral pattern; 38. Step; 39. Anti-blocking parts; 4. Auxiliary structure; 41. Fixed pipe; 42. Movable pipe; 43. Sealing plugging shaft; 44. Sealing plugging shaft; 45. Fixed nut. DETAILED DESCRIPTION
[0032] Reference Figure 1 As shown, the utility model provides a technical solution: a combined sewage well structure, including a prefabricated foundation member 1, the prefabricated foundation member 1 is in an inverted "T" shape, and its lower end is provided with two openings, a segmented pipeline 2 is installed on the upper end of the prefabricated foundation member 1, a fixing structure 3 is provided at the relative position of the prefabricated foundation member 1 and the segmented pipeline 2, and auxiliary structures 4 are provided at both ends of the prefabricated foundation member 1.
[0033] The specific settings and functions of the fixed structure 3 and the auxiliary structure 4 are described in detail below.
[0034] Reference Figure 2 , Figure 3 and Figure 4 As shown, in this embodiment: the fixing structure 3 includes four connecting shafts 31, the lower end of the connecting shaft 31 is fixedly connected to the prefabricated foundation member 1, the upper end of the connecting shaft 31 is fixedly connected to a fixing ring 32, the lower end of the segmented pipeline 2 is provided with four positioning grooves 33, the arc surface of the segmented pipeline 2 is provided with a circular hole 34 near the positioning groove 33, and the fixing ring 32 is provided with a steel nail 35, which passes through the circular hole 34 and the inside of the fixing ring 32 in sequence, and one end thereof extends out of the segmented pipeline 2. By inserting the fixing ring 32 into the positioning groove 33 and inserting the steel nail 35 into the fixing ring 32 at the same time, the prefabricated foundation member 1 and the segmented pipeline 2 can be connected, and the steel nail 35 can be inserted into the backfill soil to fix the connection of the pipeline.
[0035] The inner wall of the circular hole 34 is fixedly connected with a sealing gasket 36, which is a rubber gasket. The sealing gasket 36 is used to seal the inside of the segmented pipe 2 after the steel nail 35 is fixed to prevent sewage leakage. A spiral pattern 37 is provided on the arc surface at one end of the steel nail 35, and one end of the steel nail 35 is in a pointed cone shape. After the spiral pattern 37 is inserted into the soil for fixing, it is used to increase friction and enhance the fixing strength of the steel nail 35.
[0036] Reference Figure 5 As shown, specifically, a plurality of steps 38 are fixedly connected to the inner wall of the segmented pipe 2, and the spacing between the steps 38 is equal. The steps 38 are used to facilitate workers to go down the well for maintenance or cleaning. An anti-blocking member 39 is fixedly connected to the inner wall of the segmented pipe 2, and the middle part of the anti-blocking member 39 is curved in an arc shape. The anti-blocking member 39 is used to intercept larger impurities in the sewage and make them entangled thereon. At the same time, its arc shape is curved to leave a certain space for workers to go down the well.
[0037] Reference Figure 6As shown, in this embodiment: the auxiliary structure 4 includes a fixed pipe 41, both ends of which are fixedly connected to the inner wall of the prefabricated foundation member 1, and two movable pipes 42 are rotatably connected inside the fixed pipe 41. Specifically, a cylindrical block is fixedly connected to one end of the movable pipe 42 close to the fixed pipe 41, and the cylindrical block is movably connected in the fixed pipe 41. The end of the movable pipe 42 away from the fixed pipe 41 is slidably inserted in the prefabricated foundation member 1. The horizontally and vertically crossed fixed pipes 41 and movable pipes 42 can block debris in the sewage, making it convenient for workers to clean up.
[0038] It should also be added that a sealing plugging shaft 43 is fixedly connected to one side of the arc surface of the movable tube 42, and a dredging plugging shaft 44 is fixedly connected to the side of the arc surface of the movable tube 42 away from the sealing plugging shaft 43. By setting the sealing plugging shaft 43 and the dredging plugging shaft 44, the blocking area is increased, and when there are many impurities in the sewage, it can be effectively blocked. The arc surface of the movable tube 42 is threadedly connected to two fixing nuts 45, and the two fixing nuts 45 are distributed at the upper and lower ends of the fixed tube 41. After the movable tube 42 is rotated to adjust the angle, the fixing nuts 45 located at the upper and lower ends of the fixed tube 41 can be rotated to make them abut against the cylindrical block up and down and clamped on the fixed tube 41, so that the movable tube 42 cannot be rotated and is fixed.
[0039] Working principle: when installing the combined sewage well, first put the prefabricated foundation member 1 into the base part and connect its two ends to the underground sewage pipe. Then install a segmented pipe 2 on the prefabricated foundation member 1. When the segmented pipe 2 moves downward for installation, insert the connecting shaft 31 and the fixing ring 32 inward into the positioning groove 33. Then, when backfilling the soil, insert the steel nail 35 into the circular hole 34. The steel nail 35 passes through the fixing ring 32 and passes through the segmented pipe 2. A sealing gasket 36 is provided in the circular hole 34. In order to prevent sewage leakage, the steel nails 35 are penetrated outward and nailed into the backfilled soil, so as to fix the connected segmented pipes 2, and circulate in sequence. After installing multiple segmented pipes 2, the installation of the combined sewage well can be completed, and steps 38 are provided in the segmented pipes 2 to facilitate workers to go down into the well for maintenance. At the same time, the anti-blocking parts 39 arranged in the segmented pipes 2 are used to block large debris in the sewage when the sewage falls, so that it is wrapped around the anti-blocking parts 39 to prevent large debris from falling to the bottom and clogging the sewage well.
[0040] By means of the auxiliary structure 4 arranged at the two ends at the bottom of the prefabricated foundation member 1, when there are many impurities in the sewage, the movable pipe 42 can be rotated to make the sealing plugging shaft 43 and the dredging plugging shaft 44 parallel to the pipe mouth, and at the same time, the fixing nut 45 is rotated to abut against the fixed pipe 41, so as to fix the movable pipe 42, thereby blocking a large amount of debris in the sewage, so as to facilitate later cleaning. Workers can directly clean the debris blocked on the sealing plugging shaft 43 and the dredging plugging shaft 44. At the same time, the movable pipe 42 can be rotated to make the sealing plugging shaft 43 and the dredging plugging shaft 44 rotate to a position perpendicular to the pipe mouth, which is suitable for when there are fewer debris in the sewage and can make the sewage pass more smoothly.
[0041] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
Claims
1. A combined sewage well structure, comprising a prefabricated foundation member (1), characterized in that: The prefabricated foundation member (1) is in an inverted "T" shape, and its lower end is provided with two openings at both ends. The upper end of the prefabricated foundation member (1) is installed with a segmented pipeline (2). A fixing structure (3) is provided at the relative position between the prefabricated foundation member (1) and the segmented pipeline (2). The fixing structure (3) comprises four connecting shafts (31). The lower ends of the connecting shafts (31) are fixedly connected to the prefabricated foundation member (1). The upper ends of the connecting shafts (31) are fixedly connected to a fixing ring (32). The lower end of the segmented pipeline (2) is provided with four positioning grooves (33). A circular hole (34) is provided on the arc surface of the segmented pipeline (2) near the positioning groove (33). A steel nail (35) is inserted into the fixing ring (32). The steel nail (35) passes through the circular hole (34) and the interior of the fixing ring (32) in sequence, and one end of the steel nail (35) extends out of the segmented pipeline (2).
2. A combined sewage well structure according to claim 1, characterized in that: A sealing gasket (36) is fixedly connected to the inner wall of the circular hole (34), and the sealing gasket (36) is a rubber gasket.
3. The combined sewage well structure according to claim 1 is characterized in that: A spiral pattern (37) is formed on an arc surface at one end of the steel nail (35), and one end of the steel nail (35) is in a pointed cone shape.
4. The combined sewage well structure according to claim 1 is characterized in that: A plurality of steps (38) are fixedly connected to the inner wall of the segmented pipeline (2), and the steps (38) are spaced evenly apart.
5. The combined sewage well structure according to claim 1 is characterized in that: An anti-blocking piece (39) is fixedly connected to the inner wall of the segmented pipeline (2), and the middle portion of the anti-blocking piece (39) is curved in an arc shape.
6. The combined sewage well structure according to claim 1 is characterized in that: Auxiliary structures (4) are provided at both ends of the prefabricated foundation member (1), and the auxiliary structures (4) include fixed tubes (41), both ends of the fixed tubes (41) are respectively fixedly connected to the inner wall of the prefabricated foundation member (1), and two movable tubes (42) are rotatably connected inside the fixed tube (41), and one end of the movable tube (42) away from the fixed tube (41) is slidably inserted into the prefabricated foundation member (1).
7. The combined sewage well structure according to claim 6 is characterized in that: A sealing plugging shaft (43) is fixedly connected to one side of the circular arc surface of the movable tube (42), and a loosening plugging shaft (44) is fixedly connected to the side of the circular arc surface of the movable tube (42) away from the sealing plugging shaft (43).
8. The combined sewage well structure according to claim 6, characterized in that: The arc surface of the movable tube (42) is threadedly connected to two fixing nuts (45), and the two fixing nuts (45) are distributed at the upper and lower ends of the fixed tube (41).
Citation Information
Patent Citations
Combined sewage well capable of being rapidly installed
CN216195378U