Concrete construction abutted seam fixing device

The concrete construction joint fixing device addresses misalignment and leakage issues in formwork assembly by using a connecting and locking mechanism to ensure precise alignment and secure attachment, enhancing the quality of poured concrete.

CN222161995UActive Publication Date: 2024-12-13MCC TIANGONG GROUP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323119201.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-20
Publication Date
2024-12-13
Estimated Expiration
2033-11-20

AI Technical Summary

Technical Problem

Traditional concrete construction processes suffer from misalignment and leakage due to imprecise formwork assembly, leading to quality defects in poured concrete.

Method used

A concrete construction joint fixing device with a connecting structure and locking mechanism that ensures precise alignment and secure attachment of formwork components, utilizing various shapes and locking structures to prevent gaps and deviations.

Benefits of technology

Prevents misalignment and leakage by ensuring tight assembly of formwork components, thereby maintaining the visual quality and integrity of concrete structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222161995U_ABST
    Figure CN222161995U_ABST
Patent Text Reader

Abstract

The utility model discloses a concrete construction abutted seam fixing device which is clamped on a formwork and comprises a connecting structure and a lock catch structure, the connecting structure is inserted into the formwork and used for being connected with other formworks, the lock catch structure is arranged on the connecting structure and used for being fixed when the connecting structure is inserted into the formwork, and the lock catch structure is connected with the formwork. The connecting structure at least comprises the following three shapes: a cross shape, a linear shape and an L shape, so that three connecting modes can be provided according to the requirement of the template. According to the concrete construction abutted seam fixing device, the formworks need to be inserted into the connecting structures, the formworks are fixed through the lock catch structures, and the situation that gaps are generated in the connecting position of the two formworks can be eradicated, so that the quality problems that the formworks are not tightly spliced and exceed standard allowable deviation, and grout leakage, slab staggering and the like are extremely likely to be caused after concrete pouring are completed are eradicated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of concrete construction of building engineering, in particular to a concrete construction joint fixing device. Background Art

[0002] Under the condition of meeting the needs of the construction party, striving for excellent project quality is also the direction that all construction units are constantly working towards. During the construction of the main structure of a housing construction project, the quality of concrete pouring and its molding quality are important components of visual acceptance.

[0003] At present, the construction processes such as steel bar processing, formwork installation, steel bar installation and connection, and concrete construction are relatively mature. However, it is inevitable that quality defects such as misalignment and leakage will occur after the concrete components are cast and formed, which seriously affects the visual quality of the concrete project. In the traditional construction process, the installation of wooden formwork is to cut the formwork into appropriate sizes and then assemble it. The level of the operators directly affects the assembly effect. The formwork assembly of some projects is not strict and exceeds the allowable deviation of the specification. After the concrete is poured, it is very easy to cause leakage, misalignment and other quality defects. Utility Model Content

[0004] The utility model aims to provide a concrete construction joint fixing device to solve the problems raised in the above background technology.

[0005] To achieve the above purpose, the utility model provides the following technical solution: a concrete construction joint fixing device, which is clamped on the template, comprising:

[0006] A connecting structure is inserted into the template and used to connect other templates.

[0007] A locking structure is provided on the connecting structure, and is used to fix the connecting structure when it is plugged into the template.

[0008] Preferably, the connection structure includes at least the following three shapes: a cross shape, a straight shape and an L shape, so that there are three connection modes according to the needs of the template.

[0009] Preferably, the connection structure includes an outer plate, the outer plate is connected to a center plate, one end of the center plate is connected to an inner plate, and the connection structure is used to connect other templates.

[0010] Preferably, the template is provided with a tenon, the size of the tenon matches the size of the center plate, and the tenon is used to be inserted into the interior of the connection structure.

[0011] Preferably, the locking structure includes a connecting plate, a rotating shaft is connected to the connecting plate, a rotating plate is connected to the rotating shaft, a plug-in plate is provided on the rotating plate, a locking buckle is connected to the outer plate, and the locking structure is used to fix the template and the connecting structure.

[0012] Preferably, the outer plate is provided with a plug-in slot, and the tenon is also provided with the plug-in slot, the size of the plug-in slot matches the size of the plug-in board, and the template is fixed to the connecting structure by plugging the plug-in board into the connecting slot.

[0013] Preferably, the insertion slot provided on the outer plate and the insertion slot provided on the tenon are matched in position, so that the positions of the two insertion slots can be ensured to be the same.

[0014] Compared with the prior art, the beneficial effect of the utility model is that the concrete construction joint fixing device requires the template to be inserted into the connecting structure, and the template is fixed by a locking structure, which can prevent the formation of gaps at the connection between the two templates, thereby preventing the templates from being assembled tightly and exceeding the allowable deviation of the specification, which is very likely to cause leakage, misalignment and other quality problems after the concrete pouring is completed. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the first embodiment of the utility model;

[0016] Figure 2 It is a schematic diagram of the second embodiment of the utility model;

[0017] Figure 3 It is a top view schematic diagram of the second embodiment of the utility model;

[0018] Figure 4 It is a schematic diagram of a third embodiment of the utility model;

[0019] Figure 5 This is a schematic diagram of the lock structure of the utility model in an open state;

[0020] Figure 6 This is a schematic diagram of the locking structure of the utility model in a closed state.

[0021] In the figure:

[0022] 1. Template 2. Connection structure 3. Locking structure

[0023] 11. Tenon 21, outer plate 22, center plate

[0024] 23. Inner plate 31, connecting plate 32, rotating shaft

[0025] 33. Rotating plate 34. Plug-in plate 35. Plug-in slot

[0026] 36. Lock DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0028] like Figure 1 , Figure 5 and Figure 6 As shown, the utility model provides a technical solution: a concrete construction joint fixing device, which is clamped on a template 1, the thickness of the template 1 is 14 mm, and a tenon 11 is provided on the template 1. The size of the tenon 11 matches the size of the center plate 22, and the tenon 11 is used to be inserted into the inside of the connecting structure 2, including: a connecting structure 2 and a locking structure 3, the connecting structure 2 is inserted on the template 1, the connecting structure 2 is used to connect other templates 1, the locking structure 3 is provided on the connecting structure 2, and the locking structure 3 is used to fix the connecting structure 2 when it is inserted into the template 1.

[0029] The connection structure 2 includes at least the following three shapes: a cross shape, a straight shape and an L shape. In this way, there are three connection methods according to the needs of the template 1. The connection structure 2 includes an outer plate 21. The thickness of the outer plate 21 is 1.5 mm. The outer plate 21 and the inner plate 23 are connected and supported by the center plate 22, resulting in the size between the outer plate 21 and the inner plate 23 being related to the width of the center plate 22. The size of the center plate 22 matches the size of the tenon 11. The thickness of the center plate 22 is 2 mm, ensuring that the tenon 11 can be inserted between the outer plate 21 and the inner plate 23. The two templates 1 are inserted into the inner side of the connection structure 2, so that the two templates 1 can be connected. There is no gap at the connection position of the two templates 1, and it can be ensured that there will be no misalignment, avoiding the possibility of leakage. The outer plate 21 is provided with The plug-in slot 35 and the tenon 11 are also provided with a plug-in slot 35. The size of the plug-in slot 35 matches the size of the plug-in board 34, so that the plug-in board 34 can be plugged into the two plug-in slots 35 without unstable plugging. The template 1 is fixed to the connecting structure 2 by plugging the plug-in board 34 into the plug-in slot 35. The plug-in slot 35 provided on the outer plate 21 and the plug-in slot 35 provided on the tenon 11 match in position, so that the two plug-in slots 35 are in the same position, so as to ensure that the plug-in board 34 can be plugged into the two plug-in slots 35 at the same time. One end of the outer plate 21 is connected to the center plate 22, and the outer plate 21 and the inner plate 23 are connected through the center plate 22. The other end of the center plate 22 is connected to the inner plate 23. The thickness of the inner plate 23 is 1.5 mm. The connecting structure 2 is used to connect other templates 1.

[0030] The locking structure 3 includes a connecting plate 31, which is used to carry a rotating shaft 32. The connecting plate 31 is connected to a rotating shaft 32, which is used to drive the rotating plate 33 to rotate. The rotating shaft 32 is connected to a rotating plate 33. When the rotating plate 33 rotates through the rotating shaft 32, the plug-in plate 34 is plugged into the plug-in slot 35, and a clamping rod is provided on the other side of the rotating plate 33 connected to the plug-in plate 34. The clamping rod is used to cooperate with the lock 36 to fix the rotating plate 33. A plug-in plate 34 is provided on the rotating plate 33, and the plug-in plate 34 is used to be plugged into the plug-in slot 35, so that the template 1 and the connecting structure 2 can be tightly connected. A lock 36 is connected to the outer plate 21, and the lock 36 can rotate, and the hook locks the clamping rod to fix the rotating plate 33. The rotating plate 33 can play a role of locking and releasing. The locking structure 3 is used to fix the template 1 and the connecting structure 2.

[0031] The first embodiment is a concrete construction joint fixing device, which is clamped on the template 1, the thickness of the template 1 is 14 mm, and a tenon 11 is provided on the template 1. The size of the tenon 11 matches the size of the center plate 22. The tenon 11 is used to be inserted into the inside of the connecting structure 2, including: a connecting structure 2 and a locking structure 3. The connecting structure 2 is inserted into the template 1, and the connecting structure 2 is used to connect other templates 1. The locking structure 3 is provided on the connecting structure 2, and the locking structure 3 is used to fix the connecting structure 2 when it is inserted into the template 1.

[0032] This embodiment adopts a cross-shaped connection structure 2, which can connect four templates 1 and then fix them through a locking structure 3. This embodiment is used when building walls over a large area and can effectively connect the four templates 1 tightly.

[0033] The second embodiment, as Figure 4 As shown, a concrete construction joint fixing device is clamped on a template 1, the thickness of the template 1 is 14 mm, a tenon 11 is provided on the template 1, the size of the tenon 11 matches the size of the center plate 22, the tenon 11 is used to be inserted into the inside of the connecting structure 2, including: a connecting structure 2 and a locking structure 3, the connecting structure 2 is inserted on the template 1, the connecting structure 2 is used to connect other templates 1, the locking structure 3 is provided on the connecting structure 2, and the locking structure 3 is used to fix the connecting structure 2 when it is inserted into the template 1.

[0034] Compared with the first embodiment, this embodiment reduces the connection between the two templates 1. It is practical when the area is not as large as the wall building area in the first embodiment. The two templates 1 are connected by plugging up and down and are also fixed by the locking structure 3. The effect is the same as that of the first embodiment.

[0035] The third embodiment, Figure 2 and Figure 3 As shown, a concrete construction joint fixing device is clamped on a template 1, the thickness of the template 1 is 14 mm, a tenon 11 is provided on the template 1, the size of the tenon 11 matches the size of the center plate 22, the tenon 11 is used to be inserted into the inside of the connecting structure 2, including: a connecting structure 2 and a locking structure 3, the connecting structure 2 is inserted on the template 1, the connecting structure 2 is used to connect other templates 1, the locking structure 3 is provided on the connecting structure 2, and the locking structure 3 is used to fix the connecting structure 2 when it is inserted into the template 1.

[0036] This embodiment is mainly used when building wall corners. Two templates 1 are plugged into the template 1 horizontally and vertically, and then fixed by a locking structure 3. Generally, the connection of the templates 1 at the corners is often accompanied by loose assembly and exceeding the allowable deviation of the specification. After the concrete is poured, it is very easy to cause quality defects such as leakage and misalignment. However, due to the fixation and intervention of the connection structure 2, similar situations will not occur, ensuring the stability and cleanliness of the wall.

[0037] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A concrete construction joint fixing device, which is clamped on a template, characterized in that: include: A connecting structure, the connecting structure is inserted into the template, and the connecting structure is used to connect the template; The connection structure comprises an outer plate, the outer plate is connected to a center plate, and one end of the center plate is connected to an inner plate; The lock buckle structure comprises a connecting plate, a rotating shaft is connected to the connecting plate, a rotating plate is connected to the rotating shaft, a plug-in plate is arranged on the rotating plate, and a lock buckle is connected to the outer plate; A locking structure is provided on the connecting structure, and is used to fix the connecting structure when it is plugged into the template.

2. A concrete construction joint fixing device according to claim 1, characterized in that: The connection structure includes at least the following three shapes: cross shape, straight shape and L shape.

3. A concrete construction joint fixing device according to claim 1, characterized in that: The template is provided with a tenon, and the size of the tenon matches the size of the center plate.

4. A concrete construction joint fixing device according to claim 3, characterized in that: The outer plate is provided with an inserting slot, and the tenon is also provided with the inserting slot, and the size of the inserting slot matches the size of the inserting plate.

5. A concrete construction joint fixing device according to claim 4, characterized in that: The inserting groove provided on the outer plate and the inserting groove provided on the tenon are matched in position.

Citation Information

Cited By

  • Slurry leakage prevention and slab staggering template abutted seam fixing device for concrete construction

    CN117569579A