Leak-proof heating pipeline connecting structure
By using a combined structure of heat-resistant PEX polymerization pipe, sliding components and fixed components in heating pipe connections, the problem of poor sealing of threaded connections is solved, leakage prevention and convenient disassembly and assembly are achieved, and the life of the sealing ring is extended.
Patent Information
- Application Number
- CN202420465219.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-03-11
AI Technical Summary
The existing heating pipe connection structure has poor sealing properties of threaded connections, which leads to steam or hot water leaking easily, affecting the heating effect.
Adopt a leak-proof connection structure composed of heat-resistant PEX polymerization pipe, sealing ring, sliding assembly and fixing assembly. The sealing ring position is adjusted through the sliding assembly, and the fixed assembly is used to make the sealing ring close to the pipe joint to prevent steam or hot water leakage. .
Improves the sealing of pipe connections, avoids steam or hot water leakage, simplifies the disassembly and assembly process, and extends the service life of the sealing ring.
Smart Images

Figure CN222163925U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of heating pipe connection structures, and in particular relates to a leakage-proof heating pipe connection structure. Background Art
[0002] In order to meet the basic living needs of residents in northern my country for heating in winter, the government often uses heating pipes to transport the heat energy produced by boilers to indoor heating equipment through heat media such as steam and hot water to meet the production and living needs of residents.
[0003] At present, in order to facilitate disassembly, commonly used steam heating pipes are often connected by threaded connection. However, this connection method has gaps and poor sealing. The steam or hot water in the pipe will leak from the gaps, making the pipe heating effect poor.
[0004] Therefore, in order to solve the problem that the existing heating pipe connection structure is a threaded connection with a gap, has poor sealing, and the internal steam or hot water is easy to leak, the existing heating pipe connection structure is improved. Utility Model Content
[0005] In order to overcome the problem that the existing heating pipe connection structure is a threaded connection with poor sealing performance, internal steam or hot water is prone to leakage, resulting in poor heating effect.
[0006] The technical solution of the utility model is: a leakage-proof heating pipe connection structure, including a No. 1 pipe, a No. 2 pipe, a sealing ring, a sliding component, and a fixed component; the No. 1 pipe and the No. 2 pipe are both tubular structures formed by a polymer of heat-resistant PEX, the rear side of the No. 1 pipe is connected to the No. 2 pipe, the outer side of the No. 1 pipe is sleeved with a sealing ring, the outer side of the No. 1 pipe is provided with a sliding component for adjusting the position of the sealing ring, and the outer side of the sealing ring is sleeved with a fixed component.
[0007] Preferably, the position of the sealing ring is changed by a sliding component, and the sealing ring is sleeved on the joint between pipe No. 1 and pipe No. 2, and the sealing ring is made to fit tightly against the joint between pipe No. 1 and pipe No. 2 by a fixing component to prevent internal steam or hot water from leaking from the joint.
[0008] Preferably, a plug-in tube made of PEX is fixedly connected to the front side of pipe No. 2, and the plug-in tube is plugged into the inside of pipe No. 1. The PEX material has good heat resistance and can withstand internal steam and hot water. The plug-in tube is plugged into pipe No. 1 to connect pipe No. 1 and pipe No. 2.
[0009] Preferably, the sliding assembly includes a slide groove and a slider; a slide groove is opened on the No. 1 pipe, and an annular slider matching the slide groove is slidably connected in the slide groove. The slider slides in the slide groove to change the movement of the sealing ring bonded to one end of the slider on the outside of the No. 1 pipe.
[0010] Preferably, the sealing ring is bonded to one side of the slider, and the sealing ring is sleeved on the outside of the connection between pipe No. 1 and pipe No. 2. The sealing ring is moved to the joint between pipe No. 1 and pipe No. 2 by the slider, and the sealing ring can play a sealing role to prevent steam and hot water leakage.
[0011] Preferably, the fixing assembly includes a No. 1 fixing ring and a No. 2 fixing ring; a U-shaped No. 1 fixing ring is sleeved on the outside of the sealing ring, and a No. 2 fixing ring is arranged on the left side of the No. 1 fixing ring opposite to the No. 1 fixing ring. The No. 1 fixing ring and the No. 2 fixing ring are squeezed inwardly to make the sealing ring close to the joint of the pipeline, thereby fixing the sealing ring and the pipeline.
[0012] Preferably, the fixing assembly also includes a protective plate; the front and rear sides of the No. 1 fixing ring and the No. 2 fixing ring are fixedly connected with protective plates, which can form a barrier on the outside of the sealing ring, slow down the speed at which the sealing ring is eroded by the external environment, and extend the life of the sealing ring.
[0013] Preferably, the left side of the No. 1 fixing ring is fixedly connected with an anchor with a threaded structure, and the No. 2 fixing ring is provided with an anchor hole, the anchor is inserted into the anchor hole, and a nut is sleeved on the outer side of the anchor, which is close to the left side of the No. 2 fixing ring and matches the anchor. By tightening the nut, the No. 2 fixing ring can be moved closer to the No. 1 fixing ring. When the No. 2 fixing ring can no longer move, the fixation is completed.
[0014] Beneficial effects of the utility model:
[0015] 1. By changing the original threaded pipe connection method to plug-in, the pipes that originally needed to be screwed can be connected by plugging and unplugging, which makes disassembly and assembly more convenient. The sealing ring is sleeved at the joint between the No. 1 pipe and the No. 2 pipe, and the fixing component is used to apply force to the sealing ring so that the sealing ring is close to the outer wall of the pipe near the joint to prevent internal steam or hot water from leaking;
[0016] 2. The sealing ring is driven to move on the No. 1 pipe by moving the slider in the slide groove. By moving the position of the sealing ring, the sealing ring can be prevented from being cut off due to being too high during installation, thereby protecting the sealing ring. At the same time, the sealing ring is installed on the slider so that the sealing ring can be transported together with the No. 1 pipe. The protective plate can block the sealing ring, protect the sealing ring, and extend the service life of the sealing ring. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1What is shown is a first three-dimensional structural schematic diagram of the leak-proof heating pipe connection structure of the utility model;
[0018] Figure 2 The second three-dimensional structural schematic diagram of the leak-proof heating pipe connection structure of the utility model is shown;
[0019] Figure 3 The three-dimensional structure diagram of the second pipe and the plug-in pipe of the leak-proof heating pipe connection structure of the utility model is shown;
[0020] Figure 4 The three-dimensional structure diagram of the second pipe and the first pipe of the leak-proof heating pipe connection structure of the utility model is shown;
[0021] Figure 5 The three-dimensional structure diagram of the first pipe, the sealing ring and the sliding assembly of the leak-proof heating pipe connection structure of the utility model is shown;
[0022] Figure 6 Shown is a schematic diagram of the three-dimensional structure of the No. 1 fixing ring of the leak-proof heating pipe connection structure of the utility model.
[0023] Explanation of the reference numerals: 1. Pipe No. 1; 2. Pipe No. 2; 3. Sealing ring; 4. Sliding assembly; 5. Fixed assembly; 6. Plug-in tube; 7. Anchor; 401. Slide groove; 402. Sliding block; 501. Fixing ring No. 1; 502. Fixing ring No. 2; 503. Protective plate. DETAILED DESCRIPTION
[0024] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0025] See also Figure 1-2 The utility model provides an embodiment: a leakage-proof heating pipe connection structure includes a No. 1 pipe 1, a No. 2 pipe 2, a sealing ring 3, a sliding component 4, and a fixing component 5; the No. 1 pipe 1 and the No. 2 pipe 2 are both tubular structures formed by heat-resistant PEX polymerization, the rear side of the No. 1 pipe 1 is connected to the No. 2 pipe 2, the outer side of the No. 1 pipe 1 is sleeved with a sealing ring 3, the outer side of the No. 1 pipe 1 is provided with a sliding component 4 for adjusting the position of the sealing ring 3, the outer side of the sealing ring 3 is sleeved with a fixing component 5, the position of the sealing ring 3 is changed by the sliding component 4, the sealing ring 3 is sleeved on the joint of the No. 1 pipe 1 and the No. 2 pipe 2, and the sealing ring 3 is made to fit closely to the joint of the No. 1 pipe 1 and the No. 2 pipe 2 through the fixing component 5 to prevent internal steam or hot water from leaking from the joint.
[0026] See also Figure 3-5In this embodiment, a plug-in tube 6 composed of PEX is fixedly connected to the front side of the No. 2 pipeline 2, and the plug-in tube 6 is plugged into the inner side of the No. 1 pipeline 1. The sliding assembly 4 includes a slide groove 401 and a slider 402; a slide groove 401 is provided on the No. 1 pipeline 1, and an annular slider 402 matching the slide groove 401 is slidably connected in the slide groove 401. The sealing ring 3 is bonded to one side of the slider 402, and the sealing ring 3 is sleeved on the outer side of the connection between the No. 1 pipeline 1 and the No. 2 pipeline 2. The PEX material has good heat resistance and can withstand internal steam and hot water. The plug-in tube 6 is plugged into the No. 1 pipeline 1 to connect the No. 1 pipeline 1 and the No. 2 pipeline 2. The slider 402 slides in the slide groove 401 to change the sealing ring 3 bonded to one end of the slider 402 to move outside the No. 1 pipeline 1, and the slider 402 moves the sealing ring 3 to the joint between the No. 1 pipeline 1 and the No. 2 pipeline 2. The sealing ring 3 can play a sealing role to prevent steam and hot water leakage.
[0027] See also Figure 2 , 6 In this embodiment, the fixing assembly 5 includes a No. 1 fixing ring 501 and a No. 2 fixing ring 502; a U-shaped No. 1 fixing ring 501 is sleeved on the outer side of the sealing ring 3, and a No. 2 fixing ring 502 opposite to the No. 1 fixing ring 501 is arranged on the left side of the No. 1 fixing ring 501, and the fixing assembly 5 also includes a protective plate 503; the No. 1 fixing ring 501 and the No. 2 fixing ring 502 are fixedly connected with the protective plate 503 on both the front and rear sides, and the No. 1 fixing ring 501 is fixedly connected with an anchor 7 with a threaded structure on the left side, and the No. 2 fixing ring 502 is provided with an anchor hole, and the anchor 7 is inserted into In the anchor hole, a nut is sleeved on the outer side of the anchor 7, which is close to the left side of the second fixing ring 502 and matches the anchor 7. The first fixing ring 501 and the second fixing ring 502 are squeezed inward to make the sealing ring 3 close to the joint of the pipeline, thereby fixing the sealing ring 3 and the pipeline. The protective plate 503 can form a barrier on the outside of the sealing ring 3, slowing down the speed at which the sealing ring 3 is eroded by the external environment and extending the life of the sealing ring 3. By tightening the nut, the second fixing ring 502 can be moved closer to the first fixing ring 501. When the second fixing ring 502 can no longer move, the fixation is completed.
[0028] When working, the construction personnel firstly adhere the sealing rubber ring to the rear side of the slider 402, then slide the slider 402 to make the sealing ring 3 sleeved on the outside of the No. 1 pipeline 1, and transport the No. 1 pipeline 1, the No. 2 pipeline 2 and the fixing assembly 5 to the installation site;
[0029] When the No. 2 pipe 2 is installed, the No. 1 pipe 1 is sleeved on the outside of the connecting pipe so that the No. 1 pipe 1 is close to the No. 2 pipe 2, and then the slider 402 is pushed, and the slider 402 drives the sealing ring 3 to move on the No. 1 pipe 1 to the joint between the No. 1 pipe 1 and the No. 2 pipe 2;
[0030] Then, the No. 1 fixing ring 501 is pressed against the outer side of the sealing ring 3, and then the anchor hole on the No. 2 fixing ring 502 is aligned with the anchor 7 on the No. 1 fixing ring 501 and inserted so that the No. 2 fixing ring 502 is pressed against the other side. Then, the nut is sleeved on the anchor 7 and screwed. The nut moves on the anchor 7 and presses against the No. 2 fixing ring 502. The nut will push the No. 2 fixing ring 502 toward the position of the No. 1 fixing ring 501 until it can no longer move forward. The No. 1 fixing ring 501 and the No. 2 fixing ring 502 will squeeze the sealing ring 3 so that the sealing ring 3 is pressed against the outer wall of the pipe joint and fixed.
[0031] Through the above steps, the pipe connection method originally connected by thread is changed to plug-in, and the pipes that originally need to be screwed are connected by plugging and unplugging, which makes disassembly and assembly more convenient. The sealing ring 3 is sleeved on the joint between the No. 1 pipe 1 and the No. 2 pipe 2, and the fixing component 5 is used to apply force to the sealing ring 3 so that the sealing ring 3 is close to the outer wall of the pipe near the joint to prevent the internal steam or hot water from leaking, so as to solve the problem that the existing heating pipe connection structure is a threaded connection with poor sealing performance, and the internal steam or hot water is easy to leak, resulting in poor heating effect.
[0032] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of those skilled in the art without departing from the purpose of the present invention.
Claims
1. A leak-proof heating pipe connection structure, comprising a first pipe (1) and a second pipe (2); It is characterized in that The invention also comprises a sealing ring (3), a sliding component (4), and a fixing component (5); the first pipe (1) and the second pipe (2) are both tubular structures formed by a polymer of heat-resistant PEX; the rear side of the first pipe (1) is connected to the second pipe (2); the outer side of the first pipe (1) is sleeved with a sealing ring (3); the outer side of the first pipe (1) is provided with a sliding component (4) for adjusting the position of the sealing ring (3); and the outer side of the sealing ring (3) is sleeved with a fixing component (5).
2. A leak-proof heating pipe connection structure according to claim 1, It is characterized in that A plug-in pipe (6) made of PEX polymer is fixedly connected to the front side of the No. 2 pipeline (2), and the plug-in pipe (6) is plugged into the inner side of the No. 1 pipeline (1).
3. A leak-proof heating pipe connection structure according to claim 1, It is characterized in that The sliding assembly (4) comprises a sliding groove (401) and a sliding block (402); the first pipe (1) is provided with a sliding groove (401), and an annular sliding block (402) matching the sliding groove (401) is slidably connected in the sliding groove (401).
4. A leak-proof heating pipe connection structure according to claim 3, It is characterized in that The sealing ring (3) is bonded to one side of the slider (402), and the sealing ring (3) is sleeved on the outer side of the connection between the No. 1 pipeline (1) and the No. 2 pipeline (2).
5. A leak-proof heating pipe connection structure according to claim 1, It is characterized in that The fixing assembly (5) comprises a first fixing ring (501) and a second fixing ring (502); the outer side of the sealing ring (3) is sleeved with a U-shaped first fixing ring (501), and the left side of the first fixing ring (501) is provided with a second fixing ring (502) opposite to the first fixing ring (501).
6. A leak-proof heating pipe connection structure according to claim 5, It is characterized in that The fixing assembly (5) further comprises a protective plate (503); the protective plates (503) are fixedly connected to the front and rear sides of the No. 1 fixing ring (501) and the No. 2 fixing ring (502).
7. A leak-proof heating pipe connection structure according to claim 5, It is characterized in that The left side of the first fixing ring (501) is fixedly connected with an anchor piece (7) having a threaded structure, the second fixing ring (502) is provided with an anchor hole, the anchor piece (7) is inserted into the anchor hole, and a nut tightly attached to the left side of the second fixing ring (502) and matching with the anchor piece (7) is sleeved on the outer side of the anchor piece (7).
