Dredging equipment for water conservancy construction

By designing a silt cleaning equipment for water conservancy construction with rotating rollers and cutting blades, the problem of insufficient debris in the sludge cleaning is solved, effective silt crushing and convenient maintenance of equipment is achieved, and the sewage suction pump is extended Service life.

CN222183484UActive Publication Date: 2024-12-17福建中永建设工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420009887.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-03
Publication Date
2024-12-17
Estimated Expiration
2034-01-03

AI Technical Summary

Technical Problem

The existing silt cleaning equipment for water conservancy construction lacks the crushing of debris in the sludge during the sludge cleaning process, resulting in the subsequent sewage suction equipment being prone to blockage, and the fixed installation of crushing equipment is not convenient for loading, unloading and maintenance, shortening its service life.

Method used

A silt cleaning device including a rotating roller, cutting blade and driving assembly is designed. The cutting blade is rotated by a rotating column and a support ring to break the silt, and a sewage suction pump and a conveying pipe are equipped to discharge the treated silt. And the equipment structure is easy to disassemble and maintain.

Benefits of technology

Effectively crush large particles in the silt, avoid blockage, extend the service life of the sewage suction pump, and simplify the disassembly and maintenance process of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222183484U_ABST
    Figure CN222183484U_ABST
Patent Text Reader

Abstract

The desilting equipment for the water conservancy construction comprises a frame body, a top plate is installed on the top of the frame body through four guide rods, a rotating roller is rotatably installed on one side of a feeding port of the frame body, a first motor is started to drive the rotating roller to rotate, and then a digging shovel is driven to dig sludge in a river channel into the frame body; a second motor is started to drive an output convex shaft to rotate, so that a rotating column drives a surface cutting blade to rotate, large-particle impurities in the sludge are fully crushed, the crushed sludge is concentrated at the bottom of a frame body, and the treated sludge is discharged through a conveying pipe by utilizing a sludge suction pump; a limiting nut is detached to be separated from a guide rod, a top plate is lifted through a handle part, an output convex shaft at the output end of a first motor is separated from an insertion groove, a rotating column is pulled out and pulled out of a supporting sleeve, and therefore the rotating column is taken out, and a bolt on a fixing sleeve can be detached to replace a cutting blade.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of silt removal equipment, in particular to silt removal equipment for water conservancy construction. Background Art

[0002] During the water conservancy construction process, dredging equipment is needed to deal with some smaller river silt. During the silt cleaning process, there is a lack of crushing of debris in the sludge, which leads to blockage in subsequent sewage suction equipment. Since most crushing equipment is fixedly installed, it is not convenient to load and unload for maintenance, which greatly shortens its service life.

[0003] A river dredging equipment for water conservancy project construction (application number: 202023310978.8), including a hull and a dredging structure, the dredging structure including a silt suction port, a silt suction pipe, a longitudinal moving structure of the silt suction pipe, a silt suction pump, a processing box, an internal crushing structure, a strip impurity removal structure and a water outlet, the longitudinal moving structure of the silt suction pipe includes a bottom motor, a side support rod, a screw rod, a fixed sleeve and a pipe fixing seat, the internal crushing structure includes a crushing motor, a crushing shaft, a crushing telescopic rod and a crushing knife. The device is provided with a longitudinal moving structure of the silt suction pipe, so that the height of the silt suction port can be adjusted; the device is provided with a crushing telescopic rod and a crushing knife, so that impurities can be crushed for easy collection; the device is provided with a removal arc and a sliding spring, so that strip impurities can be removed separately to avoid clogging the filter plate.

[0004] The above patents use equipment to clean sludge, but lack the ability to crush debris in the sludge, which makes subsequent sewage suction equipment prone to blockage. Since most crushing equipment is fixedly installed, it is not convenient to load and unload for maintenance, which greatly shortens its service life. Therefore, we need to provide a dredging equipment for water conservancy construction. Utility Model Content

[0005] The purpose of the utility model is to provide a dredging device for water conservancy construction to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a dredging device for water conservancy construction, comprising a frame, a top plate is installed on the top of the frame through four guide rods, a rotating roller is rotatably installed on one side of the feeding port of the frame, a plurality of digging shovels are integrally processed on the surface of the rotating roller, a first motor for rotating the rotating roller is arranged on one side of the frame, a crushing mechanism for cutting off debris in the sludge is installed inside the frame, and an output mechanism for transporting the treated sludge is arranged on one side of the frame;

[0007] The crushing mechanism includes a rotating column, a supporting ring, a fixed sleeve, a cutting blade, a driving assembly and a base assembly. The base assembly is fixedly installed inside the frame, and two rotating columns are rotatably installed inside the base assembly, and the supporting rings on the surfaces of the two rotating columns are located at the top of the base assembly, a fixed sleeve is fixedly installed on the surface of the rotating column by bolts, and three cutting blades are fixedly installed on the surface of the fixed sleeve, and a driving assembly for rotating the rotating column is arranged on the top of the top plate.

[0008] Preferably, the driving assembly includes a second motor, an output cam and an insertion groove, two second motors are fixedly mounted on the top of the top plate, the output ends of the two second motors pass through the bottom of the top plate and are fixedly mounted with an output cam, and the tops of the two rotating columns are provided with insertion grooves matching the output cams.

[0009] Preferably, the tops of the two rotating columns are movably sleeved with protective sleeves, and the tops of the two protective sleeves are fixedly mounted on the bottom of the top plate.

[0010] Preferably, the base support assembly includes a fixing plate and a supporting sleeve, the fixing sleeve is fixedly installed inside the frame, and a supporting sleeve for inserting the lower end of the rotating column is installed inside the fixing sleeve, and the top of the supporting sleeve is in contact with the bottom of the fixing plate.

[0011] Preferably, the output mechanism comprises a sewage suction pump and a delivery pipe, one side of the frame is connected to the delivery pipe, and the interior of the delivery pipe is connected to the sewage suction pump.

[0012] Preferably, one of the frames is provided with a sealing shield for protecting the first motor.

[0013] Preferably, two handles are fixedly mounted on the top of the top plate, and limiting nuts are threadedly mounted on the tops of the four guide rods.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] The utility model starts the first motor to drive the rotating roller to rotate, and then drives the excavating shovel to dig the sludge in the river channel into the frame, starts the second motor to drive the output cam to rotate, and realizes that the rotating column drives the surface cutting blade to rotate, so as to fully crush the large particles of debris in the sludge. The crushed sludge will be concentrated at the bottom of the frame, and the treated sludge will be discharged through the conveying pipe by using the sewage suction pump. When disassembling and maintaining the rotating roller, the limit nut is disassembled to separate from the guide rod, and the top plate is lifted by the handle, so that the output cam at the output end of the first motor is separated from the insertion groove, and the rotating column is pulled out from the supporting sleeve, so as to take out the rotating column, and the bolts on the fixed sleeve can also be disassembled to replace the cutting blade. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a three-dimensional schematic diagram of the structure of the utility model;

[0017] Figure 2 It is a three-dimensional exploded view of the structure of the utility model;

[0018] Figure 3 It is a three-dimensional diagram of the local structure of the utility model;

[0019] Figure 4 It is a three-dimensional diagram of the base support assembly of the present utility model.

[0020] In the figure: 1. frame; 2. guide rod; 3. top plate; 4. rotating roller; 5. digging shovel; 6. first motor; 7. crushing mechanism; 71. rotating column; 72. supporting ring body; 73. fixing sleeve; 74. cutting blade; 75. driving assembly; 751. second motor; 752. output cam; 753. inserting groove; 76. bottom support assembly; 761. fixing plate; 762. supporting sleeve; 8. output mechanism; 81. sewage suction pump; 82. delivery pipe; 9. protective sleeve; 10. sealing shield; 11. limiting nut. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figure 1-4 The utility model provides a technical solution: a dredging device for water conservancy construction, comprising a frame 1, a top plate 3 is installed on the top of the frame 1 through four guide rods 2, a rotating roller 4 is rotatably installed on one side of the feeding port of the frame 1, and a plurality of digging shovels 5 are integrally processed on the surface of the rotating roller 4, a first motor 6 for rotating the rotating roller 4 is arranged on one side of the frame 1, a crushing mechanism 7 for cutting off debris in the sludge is installed inside the frame 1, and an output mechanism 8 for transporting the treated sludge is arranged on one side of the frame 1;

[0023] The crushing mechanism 7 includes a rotating column 71, a supporting ring body 72, a fixed sleeve 73, a cutting blade 74, a driving assembly 75 and a base assembly 76. The base assembly 76 is fixedly installed inside the frame 1, and two rotating columns 71 are rotatably installed inside the base assembly 76, and the supporting ring bodies 72 on the surfaces of the two rotating columns 71 are located at the top of the base assembly 76, and the surface of the rotating column 71 is fixedly installed with a fixed sleeve 73 by bolts, and the surface of the fixed sleeve 73 is fixedly installed with three cutting blades 74, and the top of the top plate 3 is provided with a driving assembly 75 for rotating the rotating column 71.

[0024] The driving assembly 75 includes a second motor 751, an output convex shaft 752 and an insertion groove 753. Two second motors 751 are fixedly installed on the top of the top plate 3. The output ends of the two second motors 751 both penetrate the bottom of the top plate 3 and are fixedly installed with the output convex shaft 752. The tops of the two rotating columns 71 are both provided with an insertion groove 753 adapted to the output convex shaft 752.

[0025] In this embodiment, starting the second motor 751 drives the output cam 752 to rotate, and the output cam 752 is engaged with the insertion groove 753 at the top of the rotating column 71. When the output cam 752 rotates, it can drive the rotation adjustment of the rotating column 71, and the two second motors 751 may not be synchronous motors, and the convex portion on the surface of the output cam 752 is adapted to the insertion groove 753.

[0026] In order to enhance the stability of the rotating column 71 during rotation, a protective sleeve 9 is movably sleeved on the surface of the rotating column 71 to make the rotating column 71 rotate more stably. The tops of the two rotating columns 71 are movably sleeved with a protective sleeve 9, and the tops of the two protective sleeves 9 are fixedly mounted on the bottom of the top plate 3.

[0027] The bottom bracket assembly 76 includes a fixing plate 761 and a supporting sleeve 762. The fixing sleeve 73 is fixedly installed inside the frame 1, and the supporting sleeve 762 for inserting the lower end of the rotating column 71 is installed inside the fixing sleeve 73, and the top of the supporting sleeve 762 is in contact with the bottom of the fixing plate 761.

[0028] Furthermore, a fixed plate 761 with a supporting sleeve 762 is provided in the frame 1, and the supporting sleeve 762 is movably connected to the surface of the rotating column 71, which has a good limiting and anti-slip effect on the bottom of the rotating column 71, and cooperates with the bottom of the supporting ring body 72 to slide with the top of the supporting sleeve 762. The bottom of the supporting ring body 72 can be provided with a ring groove for the top of the supporting sleeve 762 to slide.

[0029] The output mechanism 8 includes a sewage suction pump 81 and a delivery pipe 82. One side of the frame 1 is connected to the delivery pipe 82, and the interior of the delivery pipe 82 is connected to the sewage suction pump 81.

[0030] It should be noted that the crushed sludge will be concentrated at the bottom of the frame 1, and the treated sludge will be discharged through the conveying pipe 82 by the sewage suction pump 81. The particles in the crushed sludge are smaller, which extends the service life of the sewage suction pump 81. The design of the sewage suction pump 81 enables it to discharge various solid and long-fiber impurities without clogging it.

[0031] Since the first motor 6 is in a relatively humid working environment, which may easily lead to a shortened lifespan, a sealing shield 10 is provided to provide better sealing protection for the first motor 6 . A sealing shield 10 for protecting the first motor 6 is installed on the frame 1 .

[0032] In order to facilitate the transportation of the top plate 3, a handle is provided to facilitate lifting the top plate 3, and a limit nut 11 is provided to fix the top plate 3 to the top of the frame 1 for easy loading and unloading. Two handles are fixedly installed on the top of the top plate 3, and the tops of the four guide rods 2 are all threadedly installed with limit nuts 11.

[0033] The device starts the first motor 6 to drive the rotating roller 4 to rotate, and then drives the digging shovel 5 to dig the sludge in the river channel into the frame 1, and starts the second motor 751 to drive the output cam 752 to rotate, so that the rotating column 71 drives the surface cutting blade 74 to rotate, and the large particles of debris in the sludge are fully crushed. The crushed sludge will be concentrated at the bottom of the frame 1, and the treated sludge will be discharged through the conveying pipe 82 by using the sewage suction pump 81. When disassembling and maintaining the rotating roller 4, the limit nut 11 is removed from the guide rod 2, and the top plate 3 is lifted by the handle, so that the output cam 752 at the output end of the first motor 6 is disengaged from the insertion groove 753, and the rotating column 71 is pulled out from the supporting sleeve 762, so as to take out the rotating column 71, and the bolts on the fixing sleeve 73 can also be removed to replace the cutting blade 74.

[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A dredging device for water conservancy construction, comprising a frame (1), characterized in that: A top plate (3) is installed on the top of the frame (1) via four guide rods (2); a rotating roller (4) is rotatably installed on one side of the feed inlet of the frame (1); a plurality of digging shovels (5) are integrally processed on the surface of the rotating roller (4); a first motor (6) for rotating the rotating roller (4) is provided on one side of the frame (1); a crushing mechanism (7) for cutting off debris in the sludge is installed inside the frame (1); and an output mechanism (8) for transporting the treated sludge is provided on one side of the frame (1); The crushing mechanism (7) comprises a rotating column (71), a supporting ring body (72), a fixed sleeve (73), a cutting blade (74), a driving assembly (75) and a base assembly (76); the base assembly (76) is fixedly installed inside the frame (1), and two rotating columns (71) are rotatably installed inside the base assembly (76), and the supporting ring bodies (72) on the surfaces of the two rotating columns (71) are located at the top of the base assembly (76); the surface of the rotating column (71) is fixedly installed with a fixed sleeve (73) by bolts, and the surface of the fixed sleeve (73) is fixedly installed with three cutting blades (74), and the top of the top plate (3) is provided with a driving assembly (75) for rotating the rotating column (71).

2. A dredging device for water conservancy construction according to claim 1, characterized in that: The driving assembly (75) comprises a second motor (751), an output convex shaft (752) and an insertion groove (753); two second motors (751) are fixedly mounted on the top of the top plate (3); the output ends of the two second motors (751) both pass through the bottom of the top plate (3) and are fixedly mounted with the output convex shaft (752); and the tops of the two rotating columns (71) are each provided with an insertion groove (753) adapted to the output convex shaft (752).

3. A dredging device for water conservancy construction according to claim 2, characterized in that: The tops of the two rotating columns (71) are both movably sleeved with protective sleeves (9), and the tops of the two protective sleeves (9) are both fixedly mounted on the bottom of the top plate (3).

4. The dredging equipment for water conservancy construction according to claim 1, characterized in that: The base support assembly (76) comprises a fixing plate (761) and a supporting sleeve (762); a fixing sleeve (73) is fixedly installed inside the frame (1); a supporting sleeve (762) for inserting the lower end of the rotating column (71) is installed inside the fixing sleeve (73); and the top of the supporting sleeve (762) is in contact with the bottom of the fixing plate (761).

5. The dredging equipment for water conservancy construction according to claim 1, characterized in that: The output mechanism (8) comprises a sewage suction pump (81) and a delivery pipe (82); one side of the frame (1) is connected to the delivery pipe (82), and the interior of the delivery pipe (82) is connected to the sewage suction pump (81).

6. The dredging equipment for water conservancy construction according to claim 1, characterized in that: One of the frames (1) is equipped with a sealing shield (10) for protecting the first motor (6).

7. The dredging equipment for water conservancy construction according to claim 1, characterized in that: Two handles are fixedly mounted on the top of the top plate (3), and limiting nuts (11) are threadedly mounted on the tops of the four guide rods (2).