High-strength embedded type embedded nut for building
By designing the detachable top cover and connecting rod mechanism on the embedded nut to clean thread impurities, combining zinc plating and reinforced nails, the problem of concrete affecting threads is solved, the installation efficiency and strength of the nuts are improved, and the corrosion resistance is achieved and connection stability.
Patent Information
- Application Number
- CN202421665521.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-12-17
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During use, the embedded nut is easily affected by concrete seepage or sputtering, resulting in thread damage and accumulation of impurities, affecting the installation accuracy and fixing strength.
A high-strength embedded embedded nut with a removable top cover is designed, using a connecting rod mechanism and cleaning brush head to clean thread impurities, and zinc coating and multiple sets of reinforced nails are applied to the nut housing to improve corrosion resistance and Connection strength.
Effectively prevent concrete impurities from entering the screw core hole, improve the cleanliness of bolts when inserting and rotating, reduce production costs, enhance the connection strength between nuts and bolts, and improve installation efficiency and corrosion resistance.
Smart Images

Figure CN222185405U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of embedded nuts, and more specifically to a high-strength embedded embedded nut for construction. Background Art
[0002] Embedded nuts are one of the important structural parts in the foundry and manufacturing industries, also known as embedded nuts. In the process of construction, many important components need to rely on embedded nuts to fix them, such as the fixation of tower crane bases and the installation of concrete walls. Embedded nuts have high strength and are easier to operate during later construction. They can improve the accuracy of component installation and avoid large errors caused by relevant personnel relying only on simple tools for measurement during operation.
[0003] There are also certain problems in the use of embedded pre-embedded nuts. After the pre-embedded nuts are fixed, concrete needs to be poured around them. Concrete can easily penetrate or splash into the nuts, causing damage to the threads or residual solidified concrete inside. The bolts cannot be normally turned into the nuts during later installation. Moreover, the bolts are stored at the construction site for a long time, and they are prone to accumulate dust and other impurities, which will affect the accuracy of installation of the pre-embedded nuts and the fixing strength during later use. Utility Model Content
[0004] 1. Technical issues to be solved
[0005] In view of the problems existing in the prior art, the purpose of the utility model is to provide a high-strength embedded pre-buried nut for construction. The nut has a removable top cover during installation to prevent concrete from entering. Impurities on the bolt thread can be cleaned when the bolt is screwed into the nut, making installation convenient and less affected by dust and impurities in the connection strength.
[0006] 2. Technical solution
[0007] To solve the above problems, the utility model adopts the following technical solutions.
[0008] A high-strength embedded pre-embedded nut for construction, comprising a nut shell, a screw core hole is provided in the center of the nut shell, a nut base is fixedly installed at the lower end of the nut shell, a nut limiting opening is provided at the upper end of the nut shell, a limiting ring is annularly installed on the outer side of the nut limiting opening, a screw cover is provided at the upper end of the nut limiting opening, a group of reinforcing nails are provided on the inner surface of the screw cover, and the reinforcing nails match the limiting ring, a group of annularly distributed cavities are provided inside the nut limiting opening, a plurality of first limiting grooves are provided inside the nut limiting opening, and the first limiting grooves are provided at the upper end of the cavity and connected to the cavity, a plurality of second limiting grooves are provided inside the nut limiting opening, and the second limiting grooves are connected to the cavities. The nut limit opening has a cavity and a screw core hole, a connecting rod mechanism is installed inside the nut limit opening, and the connecting rod mechanism includes a pressure rod, a connecting rod, a push rod, a hand rod, and a clamping plate. The inner wall of the nut limit opening is provided with a substrate, and the substrate is fixedly connected to the connecting rod mechanism on the side close to the inner wall of the nut limit opening, and a cleaning brush head is installed on the side of the substrate away from the inner wall of the nut limit opening. This scheme prevents impurities such as concrete mortar from entering the screw core hole and affecting the normal use of the thread by covering the embedded nut. The screw cover can be easily removed and used multiple times, thereby reducing production costs. After the bolt is inserted, it is manually operated so that the cleaning brush head is close to the bolt thread, and impurities on the thread are naturally cleaned when the embedded nut is screwed in, so that the installation of the nut and the thread is not hindered.
[0009] Furthermore, the pressure rod is arranged in the first limiting groove, and the pressure rod matches the first limiting groove, the connecting rod is movably connected to the pressure rod, and the connecting rod is arranged in the cavity, the push rod is arranged in the second limiting groove, and the push rod matches the second limiting groove, and the push rod is movably connected to the connecting rod. In this scheme, the connecting rod and the push rod can be driven by pressing the pressure rod with external force to push the substrate and the cleaning brush head inward. When the bolt is inserted into the screw core hole, the cleaning brush head can squeeze and clean its surface when the bolt rotates.
[0010] Furthermore, a group of limiting walls are installed at the upper end of the nut limiting mouth, and the limiting walls are close to the first limiting groove. A group of limiting slots are provided on the limiting walls, and the limiting slots are arranged vertically from top to bottom. A hand rod is installed at the upper end of the pressure rod, and a clamping plate is installed on the upper part of the pressure rod, and the clamping plate matches the limiting slots. This solution enables the cleaning brush head to be positioned stably and the extrusion force can be adjusted according to the situation through the engagement of the clamping plate with the limiting slots at different positions, so that the impurities in the bolts can be cleaned more cleanly. After the bolts and nuts are fixed, the cleaning brush head can also prevent external dust and impurities from entering the screw core hole to a certain extent.
[0011] Furthermore, a first indicator block is provided on the outer wall of the nut limit opening, and a second indicator block matching the first indicator block is provided on the outer side of the screw cover. In this solution, when the first indicator block and the second indicator block correspond to each other, the limit ring and the reinforcement nail are just staggered, and the screw cover can be installed or removed at this time, making it more convenient for personnel to install and remove the screw cover, thereby improving installation efficiency.
[0012] Furthermore, the outer wall of the nut shell is provided with a zinc coating. In this solution, the corrosion resistance of the embedded nut is improved by electroplating the zinc coating on the nut shell, thereby avoiding the influence of corrosion on the strength of the building or equipment installation.
[0013] Furthermore, a plurality of groups of conical reinforcing nails are installed on the outer wall of the nut shell. This solution improves the connection strength between the embedded nut and concrete through the plurality of groups of reinforcing nails, thereby improving the overall strength of the embedded nut during use.
[0014] 3. Beneficial effects
[0015] Compared with the prior art, the advantages of the present invention are:
[0016] (1) This solution prevents impurities such as concrete mortar from entering the screw core hole and affecting the normal use of the thread by covering the embedded nut. The screw cover can be easily removed and used multiple times, reducing production costs. After the bolt is inserted, the cleaning brush head is manually operated so that it is close to the bolt thread. When the embedded nut is screwed in, impurities on the thread are naturally cleaned, so that the installation of the nut and thread is not obstructed.
[0017] (2) In this solution, the connecting rod and the push rod can be driven by pressing the pressure rod with external force, thereby pushing the base plate and the cleaning brush head inward. When the bolt is inserted into the screw core hole, the cleaning brush head can squeeze and clean the surface of the bolt when it rotates.
[0018] (3) This solution makes the cleaning brush head stable in position and can adjust the squeezing force according to the situation through the engagement of the card plate with the limit card slots at different positions, so that the impurities on the bolts can be cleaned more thoroughly. After the bolts and nuts are fixed, the cleaning brush head can also prevent external dust and impurities from entering to a certain extent. This solution uses the first indicator block and the second indicator block to correspond to each other. When the limit ring and the reinforcement nail are just staggered, the screw cover can be installed or removed at this time, making it more convenient for personnel to install and remove the screw cover, thereby improving installation efficiency.
[0019] (4) This solution improves the corrosion resistance of the embedded nut by electroplating the zinc coating on the nut shell, thereby preventing the strength of the building or equipment installation from being affected by corrosion.
[0020] (5) This scheme improves the connection strength between the embedded nut and the concrete through multiple sets of reinforcement nails, thereby improving the overall strength of the embedded nut. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a schematic diagram of the structure of the embedded nut of the utility model;
[0022] Figure 2 This is a schematic diagram of the cover structure of the embedded nut of the utility model;
[0023] Figure 3 It is a schematic diagram of the cross-sectional structure of the nut limiting opening of the utility model;
[0024] Figure 4 This is a schematic diagram of the back structure of the screw cover of the utility model;
[0025] Description of the numbers in the figure:
[0026] 1 nut housing, 2 nut base, 3 nut limiting opening, 4 first indicator block, 5 second indicator block, 6 limiting ring, 7 limiting wall, 8 screw cover, 9 reinforcing nail, 10 screw core hole, 11 limiting slot, 12 cavity, 13 first limiting slot, 14 second limiting slot, 15 connecting rod mechanism, 1501 pressure rod, 1502 connecting rod, 1503 push rod, 1504 hand rod, 1505 card plate, 16 base plate, 17 cleaning brush head. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model; it is obvious that the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the utility model without making creative work are within the scope of protection of the utility model.
[0028] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", "top / bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0029] In the description of the present invention, it should be noted that, unless otherwise clearly stipulated and limited, the terms "installed", "provided with", "mounted / connected", "connected", etc. should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] Embodiment 1:
[0031] See also Figure 1-3A high-strength embedded pre-embedded nut for construction comprises a nut shell 1, a screw core hole 10 is provided in the center of the nut shell 1, a nut base 2 is fixedly installed at the lower end of the nut shell 1, a nut limiting opening 3 is provided at the upper end of the nut shell 1, a limiting ring 6 is annularly installed on the outer side of the nut limiting opening 3, a screw cover 8 is provided at the upper end of the nut limiting opening 3, a group of reinforcing nails 9 are provided on the inner surface of the screw cover 8, and the reinforcing nails 9 match the limiting ring 6, a group of annularly distributed cavities 12 are provided inside the nut limiting opening 3, a plurality of first limiting grooves 13 are provided inside the nut limiting opening 3, and the first limiting groove 13 is provided at the upper end of the cavity 12 and connected to the cavity 12, a plurality of second limiting grooves 14 are provided inside the nut limiting opening 3, and the second limiting groove 14 connects the cavity 12 and the screw core hole 10, and the nut limiting A connecting rod mechanism 15 is installed inside the position opening 3, and the connecting rod mechanism 15 includes a pressure rod 1501, a connecting rod 1502, a push rod 1503, a hand rod 1504, and a clamping plate 1505. A base plate 16 is provided on the inner wall of the nut limit opening 3, and the base plate 16 is fixedly connected to the connecting rod mechanism 15 on the side close to the inner wall of the nut limit opening 3, and a cleaning brush head 17 is installed on the side of the base plate 16 away from the inner wall of the nut limit opening 3. This scheme prevents impurities such as concrete mortar from entering the screw core hole 10 and affecting the normal use of the thread by covering the embedded nut, and the screw cover 8 can be easily disassembled and used multiple times, thereby reducing production costs. After the bolt is inserted, it is manually operated so that the cleaning brush head 17 is close to the bolt thread, and impurities on the thread are naturally cleaned when the embedded nut is screwed in, so that the installation of the nut and the thread is not hindered.
[0032] See also Figure 3 The pressure rod 1501 is arranged in the first limiting groove 13, and the pressure rod 1501 matches the first limiting groove 13, the connecting rod 1502 is movably connected to the pressure rod 1501, and the connecting rod 1502 is arranged in the cavity 12, the push rod 1503 is arranged in the second limiting groove 14, and the push rod 1503 matches the second limiting groove 14, and the push rod 1503 is movably connected to the connecting rod 1502. In this scheme, the connecting rod 1502 and the push rod 1503 can be driven by pressing the pressure rod 1501 with external force, and the substrate 16 and the cleaning brush head 17 can move inward. When the bolt is inserted into the screw core hole 10, the cleaning brush head 17 can squeeze and clean its surface when the bolt rotates.
[0033] See also Figure 3A group of limiting walls 7 are installed at the upper end of the nut limiting opening 3, and the limiting wall 7 is close to the first limiting groove 13. There is a group of limiting card slots 11 on the limiting wall 7, and the limiting card slots 11 are arranged vertically from top to bottom. A hand rod 1504 is installed at the upper end of the pressure rod 1501, and a clamping plate 1505 is installed on the upper part of the pressure rod 1501, and the clamping plate 1505 matches the limiting card slot 11. In this scheme, the clamping plate 1505 is engaged with the limiting card slots 11 at different positions, so that the cleaning brush head 17 is stably positioned and the extrusion force can be adjusted according to the situation, so that the impurities in the bolts are cleaned more cleanly. After the bolts and nuts are fixed, the cleaning brush head 17 can also prevent external dust and impurities from entering the screw core hole 10 to a certain extent.
[0034] See also Figure 2-4 A first indicator block 4 is provided on the outer wall of the nut limit opening 3, and a second indicator block 5 matching the first indicator block 4 is provided on the outer side of the screw cover 8. In this solution, when the first indicator block 4 and the second indicator block 5 correspond, the limit ring 6 and the reinforcement nail 9 are just staggered, and the screw cover 8 can be installed or removed at this time, making it more convenient for personnel to install and remove the screw cover 8, thereby improving the installation efficiency.
[0035] See also Figure 1 The outer wall of the nut shell 1 is provided with a zinc coating. In this scheme, the corrosion resistance of the embedded nut is improved by electroplating the zinc coating on the nut shell 1, so as to avoid the strength of the building or equipment installation being affected by corrosion.
[0036] See also Figure 1 A plurality of groups of conical reinforcing nails 9 are installed on the outer wall of the nut housing 1. In this solution, the plurality of groups of reinforcing nails 9 are used to improve the connection strength between the embedded nut and the concrete, thereby improving the overall strength of the embedded nut.
[0037] Working principle:
[0038] A high-strength embedded pre-embedded nut for construction. After the nut is fixed to the template, the second indicator block 5 on the screw cover 8 is aligned with the first indicator block 4 on the nut limit opening 3, installed and rotated to a suitable angle, the screw cover 8 can protect the inside of the nut from being contaminated by impurities such as concrete mortar, etc., when the template is poured with concrete, the reinforcing nails 9 outside the nut shell 1 are fully in contact with the concrete, so that the concrete is tightly connected with the nut after solidification, so that the strength meets the requirements of construction use, and when the bolts need to be connected, the screw cover 8 can be removed and reserved for other nuts to use, the bolts are inserted, and the hand lever 1504 is manually operated to insert the card plate 1505 into the appropriate limit card groove 11, and the pressure rod 1501 drives the connecting rod 1502 and the push rod 1503 to squeeze the base plate 16, so that the cleaning brush head 17 is against the bolt thread. At this time, the bolt is screwed in, and the cleaning brush head 17 can be used to clean the surface of the bolt thread to prevent impurities and dust from affecting the smooth fit of the thread. After installation, the cleaning brush head 17 can still play a certain role in preventing impurities from entering the threaded interface.
[0039] The above are only preferred specific implementation methods of the utility model; however, the protection scope of the utility model is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the utility model can make equivalent substitutions or changes based on the technical solution and improved ideas of the utility model, which should be included in the protection scope of the utility model.
Claims
1. A high-strength embedded pre-buried nut for construction, comprising a nut housing (1), wherein a screw core hole (10) is provided in the center of the nut housing (1). It is characterized by: A nut base (2) is fixedly mounted at the lower end of the nut housing (1); a nut limiting opening (3) is provided at the upper end of the nut housing (1); a limiting ring (6) is annularly mounted outside the nut limiting opening (3); a screw cover (8) is provided at the upper end of the nut limiting opening (3); a group of reinforcing nails (9) are provided on the inner surface of the screw cover (8); and the reinforcing nails (9) match the limiting ring (6); a group of annularly distributed cavities (12) are provided inside the nut limiting opening (3); a plurality of first limiting grooves (13) are provided inside the nut limiting opening (3); and the first limiting grooves (13) are provided at the upper end of the cavity (12) and connected to the cavity (12); and the nut limiting opening (3) is provided with a plurality of first limiting grooves (13). A plurality of second limiting grooves (14) are provided inside the nut limiting opening (3), and the second limiting grooves (14) are connected to the cavity (12) and the screw core hole (10); a connecting rod mechanism (15) is installed inside the nut limiting opening (3), and the connecting rod mechanism (15) comprises a pressure rod (1501), a connecting rod (1502), a push rod (1503), a hand rod (1504), and a clamping plate (1505); a base plate (16) is provided on the inner wall of the nut limiting opening (3), and the base plate (16) is fixedly connected to the connecting rod mechanism (15) on a side close to the inner wall of the nut limiting opening (3); and a cleaning brush head (17) is installed on a side of the base plate (16) away from the inner wall of the nut limiting opening (3).
2. A high-strength embedded pre-embedded nut for construction according to claim 1, Features: The pressure rod (1501) is arranged in the first limiting groove (13), and the pressure rod (1501) matches the first limiting groove (13); the connecting rod (1502) is movably connected to the pressure rod (1501), and the connecting rod (1502) is arranged in the cavity (12); the push rod (1503) is arranged in the second limiting groove (14), and the push rod (1503) matches the second limiting groove (14); the push rod (1503) is movably connected to the connecting rod (1502).
3. A high-strength embedded pre-embedded nut for construction according to claim 1, Features: A group of limiting walls (7) are installed at the upper end of the nut limiting opening (3), and the limiting walls (7) are close to the first limiting groove (13). A group of limiting slots (11) are provided on the limiting walls (7), and the limiting slots (11) are arranged vertically from top to bottom. A hand rod (1504) is installed at the upper end of the pressure rod (1501), and a clamping plate (1505) is installed on the upper part of the pressure rod (1501), and the clamping plate (1505) matches the limiting slots (11).
4. A high-strength embedded pre-embedded nut for construction according to claim 1, Features: A first indicating block (4) is provided on the outer wall of the nut limiting opening (3), and a second indicating block (5) matching the first indicating block (4) is provided on the outer side of the nut cover (8).
5. A high-strength embedded pre-buried nut for construction according to claim 1, Features: The outer wall of the nut housing (1) is provided with a zinc coating.
6. A high-strength embedded pre-embedded nut for construction according to claim 1, Features: The outer wall of the nut housing (1) is mounted with a plurality of groups of conical reinforcement nails (9).