Sewage discharge device

By connecting multiple drainage pipes outside the sewage tank and installing flow meters to detect the blockage, the timely alarm and discharge of the sewage discharge device is achieved, the equipment damage and overflow caused by blockage of sewage discharge pipelines is solved, and the normal discharge of sewage is ensured. .

CN222275700UActive Publication Date: 2024-12-31珠海润都制药股份有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420482478.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-12-31
Estimated Expiration
2034-03-13

AI Technical Summary

Technical Problem

The blockage of sewage discharge pipelines in chemical pharmaceutical companies leads to air pumps, which may cause equipment damage, sewage tank sewage is not discharged in time, and overflowing sewage tanks.

Method used

Design a sewage discharge device, by connecting two drain pipes outside the sewage tank, and installing a flowmeter on the third drain pipe. When the first drain pipe is blocked, the flowmeter cannot detect the water flow, alarm and start the second one The drainage pipe discharges sewage to ensure normal discharge of sewage.

Benefits of technology

Timely alarm and discharge are achieved to prevent equipment damage, avoid overflow of sewage tanks, and ensure normal discharge of sewage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222275700U_ABST
    Figure CN222275700U_ABST
Patent Text Reader

Abstract

The utility model relates to a sewage discharge device which comprises a water inlet pipe, a sewage tank, a water level upper limit detector, a water level lower limit detector, a first valve, a second valve, a first filter, a first water pump, a third valve, a fourth valve, a fifth valve, a second filter, a second water pump, a sixth valve, a flow meter, a first water discharge pipe and a second water discharge pipe, the sewage discharging device is simple in structure, the two water discharging pipes are connected outside the sewage tank, the other ends of the two water discharging pipes are connected with the third water discharging pipe, the flow meter is installed on the third water discharging pipe, and sewage is discharged through the first water discharging pipe and the third water discharging pipe; if the flow meter on the third drainage pipe cannot detect the water flow, an alarm prompt is given, and the second drainage pipe and the third drainage pipe are started at the same time to discharge sewage, so that when the first drainage pipe is blocked, an alarm can be given in time, and normal discharge of the sewage is not influenced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sewage discharge, in particular to a sewage discharge device. Background Art

[0002] In chemical and pharmaceutical enterprises, sewage is inevitably generated and discharged into a sewage tank. The sewage passes through a drain pipe, is filtered by a filter, and is pumped to the next process for treatment by a water pump. When the filter is clogged by impurities in the sewage, the sewage discharge pipe is clogged, and the water pump is empty, which may cause equipment damage. The sewage in the sewage tank cannot be discharged and overflows from the sewage tank. Therefore, a sewage discharge device is needed that can timely check the blockage of the discharge pipe. When the discharge pipe is blocked, the sewage discharge device can alarm in time, and at the same time, it will not affect the normal discharge of sewage. Utility Model Content

[0003] In order to solve the problems of blockage of sewage discharge pipes, empty pumping of water pumps, possible damage to equipment, untimely discharge of sewage from sewage tanks, and sewage overflow from sewage tanks during sewage discharge, the utility model provides a sewage discharge device with a simple structure. Two drain pipes are connected outside the sewage tank, the other ends of the two drain pipes are connected to a third drain pipe, a flow meter is installed on the third drain pipe, sewage is discharged through the first drain pipe and the third drain pipe, when the first drain pipe is blocked, the flow meter on the third drain pipe cannot detect water flow, an alarm is given, and the second and third drain pipes are started to discharge sewage at the same time, so that when the first drain pipe is blocked, an alarm can be given in time without affecting the normal discharge of sewage.

[0004] In order to achieve the above object, the technical solution of the utility model is as follows:

[0005] A sewage discharge device, comprising a water inlet pipe, a sewage tank, an upper water level detector, a lower water level detector, a first valve, a second valve, a first filter, a first water pump, a third valve, a fourth valve, a fifth valve, a second filter, a second water pump, a sixth valve, a flow meter, a first drain pipe and a second drain pipe, wherein the water inlet pipe is connected to the top of the sewage tank, the upper water level detector is arranged at a position close to the top of the sewage tank, the lower water level detector is arranged at a position at the bottom of the sewage tank, one end of the first drain pipe is connected to the sewage tank, the other end of the first drain pipe is connected to the third drain pipe, one end of the second drain pipe is connected to the sewage tank, the other end of the second drain pipe is connected to the third drain pipe, the first valve, the second valve, the first filter, the first water pump and the third valve are sequentially installed on the first drain pipe, the fourth valve, the fifth valve, the second filter, the second water pump and the sixth valve are sequentially installed on the second drain pipe, and the flow meter is installed on the third drain pipe.

[0006] Furthermore, the first valve and the fourth valve are manual valves.

[0007] Furthermore, the second valve, the third valve, the fifth valve and the sixth valve are butterfly valves.

[0008] Furthermore, it is characterized in that a pressure gauge is also provided on the third drain pipe.

[0009] The features of this utility model are mainly reflected in:

[0010] The utility model provides a sewage discharge device, which has a simple structure. Two drainage pipes are connected outside a sewage tank, the other ends of the two drainage pipes are connected to a third drainage pipe, a flow meter is installed on the third drainage pipe, sewage is discharged through the first drainage pipe and the third drainage pipe, when the first drainage pipe is blocked, the flow meter on the third drainage pipe cannot detect the water flow, an alarm is given, and the second drainage pipe and the third drainage pipe are started to discharge sewage at the same time, so that when the first drainage pipe is blocked, an alarm can be given in time, and the normal discharge of sewage is not affected. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 This is a schematic diagram of the structure of the sewage discharge device of the utility model

[0012] Figure 2 The circuit diagram of the sewage discharge device of the utility model

[0013] Among them, the figure markings are as follows: 1-water inlet pipe, 2-sewage tank, 3-water level upper limit detector, 4-water level lower limit detector, 5-first valve, 6-second valve, 7-first filter, 8-first water pump, 9-third valve, 10-fourth valve, 11-fifth valve, 12-second filter, 13-second water pump, 14-sixth valve, 15-pressure gauge, 16-flow meter, 17-first drain pipe, 18-second drain pipe, 19-indicator light, 20-third drain pipe, 21-buzzer. DETAILED DESCRIPTION

[0014] The following will be combined with the accompanying drawings of the structural schematic diagram of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0015] As shown in Figure (1), a sewage discharge device comprises a water inlet pipe 1, a sewage tank 2, a water level upper limit detector 3, a water level lower limit detector 4, a first valve 5, a second valve 6, a first filter 7, a first water pump 8, a third valve 9, a fourth valve 10, a fifth valve 11, a second filter 12, a second water pump 13, a sixth valve 14, a flow meter 16, a first drain pipe 17 and a second drain pipe 18. The water inlet pipe 1 is a water inlet pipe for sewage to enter the sewage tank 2. The sewage tank 2 is used to temporarily store sewage. The detector 3 is used to detect the upper limit of the water level in the sewage tank 2, the lower limit detector 4 is used to detect the lower limit of the water level in the sewage tank 2, the first drain pipe 17 and the second drain pipe 18 are used to discharge the sewage in the sewage tank 2 out of the sewage tank 2, the first drain pipe 17 is the pipe from which the sewage is first discharged, the second drain pipe 18 is a spare sewage drainage pipe, when the first drain pipe 17 is blocked, the second drain pipe 18 is activated, the first filter 7 can filter impurities in the sewage passing through the first drain pipe 17, and the second filter 12 can filter impurities in the sewage passing through the second drain pipe 18 Impurities in sewage, the water inlet pipe 1 is connected to the top of the sewage tank 2, and the sewage is discharged into the sewage tank 2 through the water inlet pipe 1. The upper limit water level detector 3 is arranged at a position close to the top of the sewage tank 2, and the lower limit water level detector 4 is arranged at a position at the bottom of the sewage tank 2. One end of the first drain pipe 17 is connected to the sewage tank 2, so that the sewage in the sewage tank 2 can be discharged out of the sewage tank 2 through the first drain pipe 17. The other end of the first drain pipe 17 is connected to the third drain pipe 20, so that the sewage in the sewage tank 2 can be discharged to the next process through the third drain pipe 20 for treatment. One end of the second drain pipe 18 is connected to the sewage tank 2, and the other end of the second drain pipe 18 is connected to the third drain pipe 20. The first valve 5, the second valve 6, the first filter 7, the first water pump 8 and the third valve 9 are installed on the first drain pipe 17 in sequence. The fourth valve 10, the fifth valve 11, the second filter 12, the second water pump 13 and the sixth valve 14 are installed on the second drain pipe 18 in sequence. The flow meter 16 is installed on the third drain pipe 20, which can detect whether the sewage in the sewage tank 2 is discharged to the next process.

[0016] The first valve 5 and the fourth valve 10 are manual valves, the second valve 6 , the third valve 9 , the fifth valve 11 and the sixth valve 14 are butterfly valves, and a pressure gauge 15 is also provided on the third drain pipe 20 .

[0017] The specific workflow is as follows:

[0018] As shown in Figure (2), the switch of the upper limit water level detector 3 is SQ1, the switch of the lower limit water level detector 4 is SQ2, SA1 and SA3 are manual start-up conversion switches, SA2 is a mute switch, SA2 is normally closed, when SA2 is disconnected, the buzzer 21 stops beeping, SB2 and SB3 are reset switches, SB4 is a flow switch, KM1 is the first water pump 8, KM5 is the second water pump 13, KM8 is the second valve 6, KM9 is the is the third valve 9, KM10 is the fifth valve 11, KM11 is the sixth valve 14, the first valve 5 and the fourth valve 10 are normally open valves. When the sewage discharge system operates normally and there is no blockage, the sewage enters the sewage tank 2 through the water inlet pipe 1, and the water level in the sewage tank 2 continues to rise. When it rises to the upper limit water level detector 3, SQ1 is triggered to close, KM1 is energized, the normally open contact of SKM1 is closed and energized, the first water pump 8 starts to pump water, and the sewage passes through the first valve 5, the second valve 6, the first filter 7, the first water pump 8 and the third valve 9 on the first drain pipe 17, flows into the third drain pipe 20, and passes through the flow meter 16 to be discharged from the sewage tank 2. As long as the first drain pipe 17 is not blocked, the sewage will be continuously drained through the first drain pipe 17. The second water pump 13 is not energized, and the sewage will not be drained through the second drain pipe 18.

[0019] When the sewage discharge system is blocked, the sewage cannot flow into the third drainage pipe 20 through the first drainage pipe 17, the flow meter 16 has insufficient flow or does not detect the sewage flow, triggering the flow switch SB4 to close, KT1 to be energized, the delay switch SKT1 to close, KM3 to be energized, the normally open contact of SKM3 to close, KM13 to be energized, the normally open contact of SKM13 to close, KM6 to be energized, the indicator light 19 to light up, the normally open contact of SKM6 to close, the buzzer 21 to sound an alarm, indicating that the first drainage pipe 17 is blocked and needs to be repaired, the normally closed contact of SKM6 to open, KM1 to lose power, and the first water pump 8 to stop pumping water. Because the first water pump 8 stops pumping water, the water level in the sewage tank 2 rises. When it rises to the upper limit water level detector 3, SQ1 is triggered to close. At this time, KM5 is energized, the second water pump 13 starts to pump water, the normally open contact of SKM5 is closed and energized, and the sewage flows into the third drain pipe 20 through the fourth valve 10, the fifth valve 11, the second filter 12, the second water pump 13 and the sixth valve 14 on the second drain pipe 18, and is discharged from the sewage tank 2 through the flow meter 16. The spare second drain pipe 18 starts to work to prevent the sewage in the sewage tank 2 from being discharged during the maintenance of the first drain pipe 17; when the maintenance of the first drain pipe 17 is completed, the maintenance personnel trigger the reset switch SB2, KM6 loses power, the indicator light goes out, the normally open contact of SKM6 opens, the buzzer 21 stops alarming, the second water pump 13 stops pumping water, the second drain pipe 18 stops draining, and the first drain pipe 17 resumes draining.

[0020] When the second drain pipe 18 is blocked, the sewage cannot flow into the third drain pipe 20 through the second drain pipe 18, the flow meter 16 has insufficient flow or does not detect the sewage flow, triggering the flow switch SB4 to close, KT1 to be energized, the delay switch SKT1 to close, KM4 to be energized, the normally open contact of SKM4 to close, KM13 to be energized, the normally open contact of SKM13 to close, KM7 to be energized, the indicator light 19 to light up, the normally open contact of SKM7 to close, and the buzzer 21 to sound an alarm, indicating that the second drain pipe 18 is blocked and needs maintenance. After the maintenance personnel trigger the reset switch SB3, KM7 loses power, the indicator light goes out, SKM7 turns on, and the buzzer 21 stops alarming.

[0021] According to the above process, when the first drain pipe 17 is blocked, the sewage discharge device alarms to prompt that the first drain pipe 17 is blocked, the first water pump 8 stops pumping water to prevent the first water pump 8 from pumping water empty and damaging the equipment, the second water pump 13 starts working, and the second drain pipe 18 starts to discharge sewage to prevent the sewage in the sewage tank 2 from overflowing during the maintenance of the first drain pipe 17.

[0022] To sum up, the sewage discharge device has a simple structure. Two drain pipes are connected outside the sewage tank. The other ends of the two drain pipes are connected to the third drain pipe. A flow meter is installed on the third drain pipe. The sewage is discharged through the first drain pipe and the third drain pipe. When the first drain pipe is blocked, the flow meter on the third drain pipe cannot detect the water flow, and an alarm is given. At the same time, the second drain pipe and the third drain pipe are started to discharge sewage, so that when the first drain pipe is blocked, an alarm can be given in time without affecting the normal discharge of sewage.

[0023] It should be noted that the above is only a preferred embodiment of the utility model. For those skilled in the art, it is obvious that the utility model is not limited to the details of the above exemplary embodiments. Without departing from the spirit or basic features of the utility model, the utility model can be implemented in other specific forms. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the utility model is limited by the attached claims rather than the above description, and it is intended to include all changes within the meaning and scope of the equivalent elements of the claims in the utility model.

Claims

1. A sewage discharge device, characterized in that: The sewage discharge device comprises a water inlet pipe (1), a sewage tank (2), an upper water level detector (3), a lower water level detector (4), a first valve (5), a second valve (6), a first filter (7), a first water pump (8), a third valve (9), a fourth valve (10), a fifth valve (11), a second filter (12), a second water pump (13), a sixth valve (14), a flow meter (16), a first drainage pipe (17) and a second drainage pipe (18), wherein the water inlet pipe (1) is connected to the top of the sewage tank (2), the upper water level detector (3) is arranged at a position close to the top of the sewage tank (2), the lower water level detector (4) is arranged at a position at the bottom of the sewage tank (2), and the first One end of the drainage pipe (17) is connected to the sewage tank (2), the other end of the first drainage pipe (17) is connected to the third drainage pipe (20), one end of the second drainage pipe (18) is connected to the sewage tank (2), the other end of the second drainage pipe (18) is connected to the third drainage pipe (20), the first valve (5), the second valve (6), the first filter (7), the first water pump (8) and the third valve (9) are sequentially mounted on the first drainage pipe (17), the fourth valve (10), the fifth valve (11), the second filter (12), the second water pump (13) and the sixth valve (14) are sequentially mounted on the second drainage pipe (18), and the flow meter (16) is mounted on the third drainage pipe (20).

2. The sewage discharge device according to claim 1, characterized in that: The first valve (5) and the fourth valve (10) are manual valves.

3. The sewage discharge device according to claim 2, characterized in that: The second valve (6), the third valve (9), the fifth valve (11) and the sixth valve (14) are butterfly valves.

4. The sewage discharge device according to claim 1, characterized in that: The third drainage pipe (20) is also provided with a pressure gauge (15).