Gluing machine for plywood core veneer
By adopting inclined slide, small holes, top plate and twisted dragon structures in the glue machine, the problems of uneven colloidal outflow and agglomeration are solved, and a more uniform coating and longer colloidal use cycle is achieved, reducing waste and Risk of blockage.
Patent Information
- Application Number
- CN202421017858.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-11
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2034-05-11
AI Technical Summary
During the long-term use of existing glue machines, it is difficult to adjust the outflow amount when the colloid flows out of the glue storage tank, resulting in the colloid being prone to agglomeration on both sides of the glue coating shaft, wasting the colloid and affecting the uniformity of the glue coating.
A plywood core plate gluer is designed, using an inclined slide plate and a small hole structure to adjust the direction of colloid flow, combining the top plate and twisted dragon structure in the glue storage tank to adjust the colloid output and stirring state, and cleaning with guide columns and scrapers Coagulates colloids to reduce waste and blockage.
It effectively reduces the agglomeration problem of colloids on both sides of the rubber coating shaft, improves the uniformity of glue coating and the use cycle of colloids in the rubber storage tank, and reduces colloid waste and glue leakage and blockage.
Smart Images

Figure CN222290465U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of plywood processing, in particular to a plywood core board gluing machine. Background Art
[0002] Plywood is a commonly used material in construction and decoration, vehicles and ships, and furniture making. The plywood core board is made by cutting some wood into thin slices, aligning these slices with adhesive, and pasting them together layer by layer in the direction of the wood grain, which is then heated and pressed.
[0003] The gluing machine is one of the main equipment for producing plywood. Its main parts include a gluing shaft, a glue storage tank and a heating device. It is a mechanical device that evenly applies the modulated adhesive to the surface of the veneer.
[0004] Through long-term observation, although the existing gluing machine can apply adhesive on the plywood veneer by using a relatively rolling gluing shaft, the colloid flowing out of the glue storage tank is usually transferred to the gluing shaft in a fixed direction, and it is difficult to adjust the amount of colloid flowing out of the glue storage tank, which can easily cause a lot of excess colloid to flow to both sides of the gluing shaft and cause caking; therefore, a plywood core board gluing machine is proposed to address the above problems. Utility Model Content
[0005] In order to make up for the deficiencies of the prior art and solve at least one technical problem raised in the background technology, the utility model provides a plywood core board gluing machine.
[0006] The technical solution adopted by the utility model to solve its technical problems is: a plywood core board gluing machine described in the utility model comprises a gluing machine main body; a plurality of groups of gluing shafts are installed in the middle of the gluing machine main body; a glue storage tank is installed on the top of the gluing machine main body; a glue leakage port is fixedly connected to the bottom of the glue storage tank; the glue leakage port is located at the top of the plurality of groups of gluing shafts; a bracket is fixedly connected to the inner wall of the glue storage tank; a first rotating shaft is rotatably connected to the middle of the bracket; two groups of top plates are fixedly connected to the middle of the first rotating shaft; the end of the top plate is arranged close to the inner wall of the glue storage tank; a plurality of groups of first support rods are fixedly connected to the middle of the gluing machine main body; a slide plate is fixedly connected to the bottom of the plurality of groups of the first support rods; the slide plate is arranged at the bottom of the glue leakage port; the middle of the slide plate is gradually inclined; the middle of the slide plate is provided with a plurality of groups of small holes; the problem of more colloid being directly transferred to the middle of the gluing shaft and the colloid agglomeration and waste occurring over a long period of time is reduced.
[0007] Preferably, a fixing frame is fixedly connected to the middle part of the two groups of top plates; a second rotating shaft is rotatably connected to the middle part of the fixing frame; an auger is fixedly connected to the middle part of the second rotating shaft; a first tooth block is fixedly connected to the top of the second rotating shaft; a second tooth block is fixedly connected to the middle part of the first rotating shaft; the first tooth block and the second tooth block are arranged to mesh with each other; the use cycle of the colloid inside the glue storage tank is improved, and the problem of colloid waste is reduced.
[0008] Preferably, a fixed block is fixedly connected to the middle of the first rotating shaft; a bayonet is slidably connected to the middle of the fixed block; a block is fixedly connected to the end of the bayonet; a slide rail is opened in the middle of the fixed block; the block is slidably arranged in the middle of the slide rail; a guide column is fixedly connected to the bottom of the bayonet; the guide column and the glue leakage port are shaped to match each other; after the glue leakage port is used, part of the colloid adheres to the inner wall of the glue leakage port, and the problem of agglomeration is reduced if it is not cleaned in time, thereby reducing the phenomenon of blockage in the glue leakage port.
[0009] Preferably, two groups of connecting rods are fixedly connected to the bottom of the guide column; scrapers are fixedly connected to the ends of the two groups of connecting rods; the scrapers are fitted to the inside of the glue leakage port; and the problem of partially solidified colloid being difficult to clean inside the glue leakage port by only sliding the guide column is reduced.
[0010] Preferably, a second support rod is fixedly connected to the top of the second rotating shaft; a scraper is fixedly connected to the end of the second support rod; the scraper is arranged in contact with the top of the second tooth block; the stability of the mutual engagement between the second tooth block and the first tooth block is improved.
[0011] Preferably, a sealing gasket is fixedly connected to the end of the top plate; the sealing gasket is arranged in contact with the inner wall of the glue storage tank; the problem of part of the colloid being transferred to the other side of the top plate along the gap between the top plate and the glue storage tank is reduced.
[0012] Preferably, the side wall of the fixing block is concavely arranged, which can improve the stability of the card block placed in the middle of the fixing block and reduce the problem of slipping between the card block and the fixing block.
[0013] The utility model is beneficial in that:
[0014] 1. The utility model discloses a plywood core board gluing machine, which utilizes the inclined slide plate and the small hole in the middle of the main body of the gluing machine to reduce the problem of more colloid being directly transferred from one direction of the glue leakage port to the middle of the gluing shaft, which may cause the problem of less colloid on both sides of the gluing shaft over a long period of time, thereby improving the uniformity of gluing the glue shaft from the glue leakage port, and at the same time, cooperates with the two groups of top plates inside the glue storage tank to separate the colloid inside the glue storage tank, and utilizes the speed of the motor on the top of the first rotating shaft to adjust the amount of colloid output, thereby reducing the problem of more colloid being directly transferred to the middle of the gluing shaft, which may cause the problem of colloid agglomeration and waste over a long period of time.
[0015] 2. The plywood core board gluing machine described in the utility model can reduce the problem of part of the colloid inside the glue storage tank being in a static or slightly moving state inside the glue storage tank over a long period of time by utilizing the force of the auger rotating in the middle of the glue storage tank, thereby increasing the use cycle of the colloid inside the glue storage tank and reducing the problem of colloid waste. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0017] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the structure of the glue storage tank in the utility model;
[0019] Figure 3 It is a schematic diagram of the structure of the slide plate in the utility model;
[0020] Figure 4 This is a schematic diagram of the structure of the second gear block in the utility model;
[0021] Figure 5 This is a schematic diagram of the bayonet structure in the utility model;
[0022] Figure 6 for Figure 2 Enlarged view of point A.
[0023] In the figure: 1. Gluing machine body; 11. Gluing shaft; 12. Glue storage tank; 13. Glue leakage port; 14. Bracket; 15. First rotating shaft; 16. Top plate; 17. First support rod; 18. Slide plate; 19. Small hole; 2. Fixed frame; 21. Second rotating shaft; 22. Auger; 23. First tooth block; 24. Second tooth block; 3. Fixed block; 31. Pin; 32. Block; 33. Slide rail; 34. Guide column; 4. Connecting rod; 41. Scraper; 5. Second support rod; 51. Scraper; 6. Sealing pad; 7. Friction pad. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] like Figure 1-6As shown, a gluing machine for plywood core plates comprises a gluing machine body 1; a plurality of groups of gluing shafts 11 are installed in the middle of the gluing machine body 1; a glue storage tank 12 is installed on the top of the gluing machine body 1; a glue leakage port 13 is fixedly connected to the bottom of the glue storage tank 12; the glue leakage port 13 is arranged at the top of the plurality of groups of gluing shafts 11; a bracket 14 is fixedly connected to the inner wall of the glue storage tank 12; a first rotating shaft 15 is rotatably connected to the middle of the bracket 14; two groups of top plates 16 are fixedly connected in the middle of the first rotating shaft 15; the end of the top plate 16 is arranged close to the inner wall of the glue storage tank 12; a plurality of groups of first support rods 17 are fixedly connected to the middle of the gluing machine body 1; a slide plate 18 is fixedly connected to the bottom of the plurality of groups of the first support rods 17; the slide plate 18 is located at the glue leakage port 13 is set at the bottom; the middle part of the slide plate 18 is gradually inclined; a plurality of small holes 19 are set in the middle part of the slide plate 18; when working, the staff needs to install the gluing machine body 1 and the glue storage tank 12 together, and then after the gluing machine body 1 is installed in the working area, the staff can place the processed colloid in the glue storage tank 12 for storage, and transfer the colloid to the middle part of the glue coating shaft 11 along the glue leakage port 13 at the bottom of the glue storage tank 12, and then glue the single board. By setting an inclined slide plate 18 in the middle part of the glue coating shaft 11, the colloid flowing out from the middle part of the glue leakage port 13 will contact the slide plate 18 first, and the fluidity of the colloid in the middle part of the inclined slide plate 18 makes the plurality of small holes 19 The colloid inside the slide plate 18 will be transferred to the middle part of the glue coating shaft 11 in different directions. At the same time, two groups of top plates 16 are arranged inside the glue storage tank 12, so that the two groups of top plates 16 can divide the inside of the glue storage tank 12 into a glue area and a glue-free area. When the motor on the top of the first rotating shaft 15 is used to rotate the first rotating shaft 15 and the two groups of top plates 16 inside the glue storage tank 12, the colloid inside the top plates 16 will be pushed to move, so that when the glue area is close to the glue leakage port 13, the colloid can be transferred to the middle part of the slide plate 18 by gravity. At the same time, when the top plates 16 continue to rotate, the colloid will move away from the glue leakage port 13 and stop injecting colloid into the glue leakage port 13. The staff can adjust the first rotating shaft 15 to adjust the glue area. The speed of the top motor is adjusted to adjust the amount of colloid injected into the middle of the gluing shaft 11. This step utilizes the inclined slide plate 18 in the middle of the gluing machine body 1 and the small hole 19 in the middle to reduce the amount of colloid directly transferred from the glue leakage port 13 in one direction to the middle of the gluing shaft 11. Over time, the problem of less colloid on both sides of the gluing shaft 11 is presented, and the uniformity of the glue coating of the glue coating shaft 11 by the glue leakage port 13 is improved. At the same time, the two groups of top plates 16 inside the glue storage tank 12 are used to separate the colloid inside the glue storage tank 12, and the speed of the motor at the top of the first rotating shaft 15 is used to adjust the amount of colloid output, reducing the amount of colloid directly transferred to the middle of the gluing shaft 11. Over time, the problem of colloid agglomeration and waste is presented.
[0026] like Figure 1-6As shown, the middle of the two groups of top plates 16 are fixedly connected with a fixing frame 2; the middle of the fixing frame 2 is rotatably connected with a second rotating shaft 21; the middle of the second rotating shaft 21 is fixedly connected with a screw dragon 22; the top of the second rotating shaft 21 is fixedly connected with a first tooth block 23; the middle of the first rotating shaft 15 is fixedly connected with a second tooth block 24; the first tooth block 23 and the second tooth block 24 are meshed with each other; when working, by arranging the second tooth block 24 in the middle of the first rotating shaft 15, the first rotating shaft 15 can work normally and rotate with the first tooth block 23 meshed with the second tooth block 24. A tooth block 23 can drive the second rotating shaft 21 and the auger 22 set in the middle of the fixed frame 2 to rotate, and cooperate with the multiple bending surfaces in the middle of the auger 22 to stir part of the colloid inside the glue storage tank 12. This step uses the force of the auger 22 rotating in the middle of the glue storage tank 12 to reduce the problem of part of the colloid inside the glue storage tank 12 being in a static or slightly moving state inside the glue storage tank 12, and the problem of part of the colloid inside the glue storage tank 12 solidifying and agglomerating over a long period of time, thereby improving the use cycle of the colloid inside the glue storage tank 12 and reducing the waste of colloid.
[0027] like Figure 1-6 As shown, a fixed block 3 is fixedly connected to the middle of the first rotating shaft 15; a bayonet 31 is slidably connected to the middle of the fixed block 3; a clamping block 32 is fixedly connected to the end of the bayonet 31; a slide rail 33 is provided in the middle of the fixed block 3; the clamping block 32 is slidably arranged in the middle of the slide rail 33; a guide column 34 is fixedly connected to the bottom of the bayonet 31; the guide column 34 and the glue leakage port 13 are arranged in a shape matching; during operation, by setting a fixed block 3 in the middle of the first rotating shaft 15, the staff can then rotate the clamping block 32 and align the clamping block 32 with the slide rail The rail 33 is aligned, and then the staff can loosen the latch 31 and use the downward gravity of the guide column 34 to make the block 32 slide in the middle of the slide rail 33. At the same time, the guide column 34 will slide in the middle of the glue leakage port 13 and clean up some of the attached colloid. This step, together with the sliding second tooth block 24, can improve the cleanliness of the inside of the glue leakage port 13, reduce the problem of part of the colloid adhering to the inner wall of the glue leakage port 13 after the glue leakage port 13 is used, and reduce the problem of agglomeration caused by not cleaning in time, thereby reducing the blockage of the glue leakage port 13.
[0028] like Figure 1-6 As shown, two groups of connecting rods 4 are fixedly connected to the bottom of the guide column 34; scrapers 41 are fixedly connected to the ends of the two groups of connecting rods 4; the scrapers 41 are fitted with the inside of the glue leakage port 13; during operation, the scraper 41 is arranged at the bottom of the guide column 34, so that when the guide column 34 slides down, the scraper 41 will contact the inside of the glue leakage port 13. This step cooperates with the scraper 41 to further improve the cleanliness of the inner wall of the glue leakage port 13, and reduce the problem that part of the solidified colloid is inside the glue leakage port 13, which makes it difficult to clean it only by the sliding guide column 34.
[0029] like Figure 1-6 As shown, a second support rod 5 is fixedly connected to the top of the second rotating shaft 21; a scraper 51 is fixedly connected to the end of the second support rod 5; the scraper 51 is arranged in contact with the top of the second tooth block 24; when working, by arranging the second support rod 5 at the top of the second rotating shaft 21, the second rotating shaft 21 will drive the second support rod 5 and the scraper 51 to rotate at the top of the second tooth block 24 when rotating. This step cooperates with the contact surface of the scraper 51 with the top of the second tooth block 24 to reduce the adhesion of some colloids or impurities on the top of the second tooth block 24, and improve the stability of the mutual meshing of the second tooth block 24 and the first tooth block 23.
[0030] like Figure 1-6 As shown, a sealing gasket 6 is fixedly connected to the end of the top plate 16; the sealing gasket 6 is arranged in contact with the inner wall of the glue storage tank 12; when working, a sealing gasket 6 is arranged at the end of the first rotating shaft 15, so that the sealing gasket 6 will contact the inner wall of the glue storage tank 12. This step, combined with the sealing gasket 6 made of soft material, can improve the sealing performance of the contact between the top plate 16 and the inner wall of the glue storage tank 12, and reduce the problem of part of the colloid being transferred to the other side of the top plate 16 along the gap between the top plate 16 and the glue storage tank 12.
[0031] like Figure 1-6 As shown, the side wall of the fixed block 3 is recessed. During operation, by setting the side wall of the fixed block 3 to a recessed shape, this step cooperates with the recessed surface in the middle of the fixed block 3 to improve the stability of the card block 32 placed in the middle of the fixed block 3 and reduce the problem of slipping between the card block 32 and the fixed block 3.
[0032] like Figure 1-6 As shown, a plurality of friction pads 7 are fixedly connected to the middle of the block 32; the friction pads 7 are arranged in a circular array in the middle of the block 32; during operation, by arranging a plurality of friction pads 7 in the middle of the block 32, this step cooperates with the friction pads 7 to improve the stability of the contact between the operator's hand and the block 32, and improve the friction force when the two are in contact.
[0033] Working principle: after the gluing machine body 1 and the glue storage tank 12 are installed together and the gluing machine body 1 is then installed in the working area, the staff can place the processed colloid inside the glue storage tank 12 for storage, and transfer the colloid to the middle of the gluing shaft 11 along the glue leakage port 13 at the bottom of the glue storage tank 12, and then perform gluing on the single board. By providing an inclined slide plate 18 in the middle of the gluing shaft 11, the colloid flowing out from the middle of the glue leakage port 13 will contact the slide plate 18 first, and with the fluidity of the colloid in the middle of the inclined slide plate 18, the multiple groups of small holes 19 will transfer the colloid inside the slide plate 18 to the middle of the gluing shaft 11 in different directions. At the same time, two groups of top plates 16 are arranged inside the glue storage tank 12, so that the two groups of top plates 16 can divide the inside of the glue storage tank 12 into a glue area and a glue-free area. When the motor on the top of the first rotating shaft 15 is used to rotate inside the glue storage tank 12, the colloid inside the top plates 16 will be pushed to move, so that when the glue areas are close to the glue leakage port 13, the colloid can be transferred to the middle part of the slide plate 18 by gravity. At the same time, when the top plates 16 continue to rotate, the colloid will move away from the glue leakage port 13 and stop injecting colloid into the glue leakage port 13. The staff can adjust the speed of the motor on the top of the first rotating shaft 15 to adjust the speed of the motor. The amount of colloid injected into the middle of the glue coating shaft 11 is determined by providing a second tooth block 24 in the middle of the first rotating shaft 15, so that when the first rotating shaft 15 is working normally and rotating, the first tooth block 23 engaged with the second tooth block 24 can drive the second rotating shaft 21 and the auger 22 set in the middle of the fixed frame 2 to rotate, and cooperate with the multi-section bending surface in the middle of the auger 22 to stir part of the colloid inside the glue storage tank 12. By providing a fixed block 3 in the middle of the first rotating shaft 15, the staff can then rotate the block 32 and align the block 32 with the slide rail 33, and then the staff can loosen the pin 31 and use the downward gravity of the guide column 34 to make The blocking block 32 slides in the middle of the slide rail 33, and the guide column 34 slides in the middle of the glue leakage port 13, and cleans up part of the attached colloid. A scraper 41 is provided at the bottom of the guide column 34, so that the scraper 41 contacts the inside of the glue leakage port 13 during the sliding process of the guide column 34. A second support rod 5 is provided at the top of the second rotating shaft 21, so that the second rotating shaft 21 drives the second support rod 5 and the scraper 51 to rotate at the top of the second tooth block 24 when rotating. A sealing gasket 6 is provided at the end of the first rotating shaft 15, so that the sealing gasket 6 contacts the inner wall of the glue storage tank 12, and the side wall of the fixed block 3 is set to a concave shape.
[0034] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.
Claims
1. A plywood core board gluing machine, comprising a gluing machine body (1); a plurality of gluing shafts (11) are installed in the middle of the gluing machine body (1); a glue storage tank (12) is installed on the top of the gluing machine body (1); the characteristics are: The bottom of the glue storage tank (12) is fixedly connected with a glue leakage port (13); the glue leakage port (13) is arranged at the top of the plurality of glue coating shafts (11); the inner wall of the glue storage tank (12) is fixedly connected with a bracket (14); the middle of the bracket (14) is rotatably connected with a first rotating shaft (15); the middle of the first rotating shaft (15) is fixedly connected with two groups of top plates (16); the ends of the top plates (16) are arranged close to the inner wall of the glue storage tank (12); the middle of the gluing machine body (1) is fixedly connected with a plurality of first support rods (17); the bottom of the plurality of first support rods (17) is fixedly connected with a slide plate (18); the slide plate (18) is arranged at the bottom of the glue leakage port (13); the middle of the slide plate (18) is gradually inclined; and the middle of the slide plate (18) is provided with a plurality of small holes (19).
2. A plywood core board gluing machine according to claim 1, characterized in that: A fixing frame (2) is fixedly connected to the middle of the two groups of top plates (16); a second rotating shaft (21) is rotatably connected to the middle of the fixing frame (2); a screw auger (22) is fixedly connected to the middle of the second rotating shaft (21); a first tooth block (23) is fixedly connected to the top of the second rotating shaft (21); a second tooth block (24) is fixedly connected to the middle of the first rotating shaft (15); and the first tooth block (23) and the second tooth block (24) are arranged to mesh with each other.
3. The plywood core board gluing machine according to claim 1, characterized in that: A fixing block (3) is fixedly connected to the middle of the first rotating shaft (15); a latch pin (31) is slidably connected to the middle of the fixing block (3); a latch block (32) is fixedly connected to the end of the latch pin (31); a slide rail (33) is provided in the middle of the fixing block (3); the latch block (32) is slidably arranged in the middle of the slide rail (33); a guide column (34) is fixedly connected to the bottom of the latch pin (31); the guide column (34) and the glue leakage port (13) are arranged to match each other in shape.
4. The plywood core board gluing machine according to claim 3, characterized in that: Two groups of connecting rods (4) are fixedly connected to the bottom of the guide column (34); scrapers (41) are fixedly connected to the ends of the two groups of connecting rods (4); and the scrapers (41) are arranged to fit the inside of the glue leakage port (13).
5. The plywood core board gluing machine according to claim 2, characterized in that: A second support rod (5) is fixedly connected to the top of the second rotating shaft (21); a scraper (51) is fixedly connected to the end of the second support rod (5); and the scraper (51) is arranged in contact with the top of the second tooth block (24).
6. The plywood core board gluing machine according to claim 1, characterized in that: A sealing gasket (6) is fixedly connected to the end of the top plate (16); the sealing gasket (6) is arranged in contact with the inner wall of the glue storage tank (12).
7. The plywood core board gluing machine according to claim 3, characterized in that: The side wall of the fixing block (3) is concave.