Geotechnical engineering investigation drilling water level measuring device
By designing cleaning components and roller systems in the water level measurement device for drilling in geotechnical engineering survey, the problems of high operation difficulty and inaccurate measurement data in the prior art are solved, and more efficient water level measurement and convenient operation are achieved.
Patent Information
- Application Number
- CN202421255700.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-04
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2034-06-04
AI Technical Summary
The existing geotechnical engineering survey drilling water level measurement device is difficult to operate in caves and mine environments, and it is easy to cause distortion or inaccuracy of measurement data due to accumulation of dust and dirt.
A drilling water level measuring device including an operating frame and cleaning assembly is designed, using cylinder drive push plates and sliding plates to enable the brush to effectively remove debris from the measurement line, and reduce the measurement line in the winding through the rollers and connecting rods. Friction and entanglement in the process.
It improves the accuracy of water level measurement and the convenience of operation, reduces measurement errors caused by dirt accumulation, and improves the winding efficiency of the measurement line.
Smart Images

Figure CN222296209U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of geotechnical engineering investigation, and more specifically to a geotechnical engineering investigation borehole water level measuring device. Background Art
[0002] Soil is a general term for any kind of rock and soil that makes up the earth's crust from the perspective of engineering and construction. Rock and soil can be subdivided into five categories: hard (hard rock), sub-hard (soft rock), weakly connected, loosely unconnected, and with special composition, structure, state and properties. In China, the first two categories are called rocks and the last three are called soil. The collective name is "rock and soil". In geological exploration, a cylindrical circular hole with a small diameter and a large depth drilled underground by drilling equipment is also called a well. Water level refers to the elevation of the free water surface of the water body above the fixed base surface, and its unit is meter. The water level measurement in the borehole is to measure the water level in the borehole to provide data for subsequent projects.
[0003] The working environment of geological exploration is not only on the ground, but sometimes it needs to be carried out inside caves. At the same time, geological exploration is also needed during the mining process of mines. However, the rock exploration borehole water level measuring instrument in the existing technology is in the form of a cart. The space for working in caves and underground is originally small. The water level measuring instrument in the form of a cart is not only difficult to operate, but also occupies a large space, making it inconvenient to enter and exit caves and mines.
[0004] After searching, a Chinese patent with application number CN202322131253.X discloses a geotechnical engineering survey borehole water level measuring instrument, which can disassemble the positioning sleeve on the rotating rod to the positioning plate. During use, the entire device can be disassembled and assembled, which makes it more flexible and convenient to carry during use.
[0005] When the above-mentioned geotechnical engineering survey borehole water level measuring instrument is actually used, a large amount of dust, soil or other impurities may accumulate on the measuring device during geotechnical engineering survey. The accumulation of dust and dirt may aggravate the wear or damage of the measuring device, resulting in distorted or inaccurate measurement data. Utility Model Content
[0006] In order to overcome the above defects of the prior art, the utility model provides a geotechnical engineering survey borehole water level measuring device to solve the problems raised in the above background technology.
[0007] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0008] A geotechnical engineering survey borehole water level measuring device comprises an operating frame, a cleaning assembly is installed on the top of the operating frame;
[0009] The cleaning assembly includes an outer shell, a cylinder is installed inside the outer shell, a push plate is installed at the output end of the cylinder, sliding plates are arranged on both sides of the push plate, slide rails are installed on the rear sides of the two sliding plates, one side of the two sliding plates is fixedly connected with a spring, two sliding grooves are provided on the front side of the outer shell, support plates are arranged inside the two sliding grooves, one side of the two support plates is fixedly connected with a support rod, the inner sides of the two support rods are fixedly connected with motors, and brushes are installed on the output ends of the two motors.
[0010] By adopting the above technical solution: the cylinder is installed inside the shell, the push plate is installed on the output end of the cylinder, the bottom ends of the two sliding plates are slidably connected to the inside of the slide rail, one end of the two springs are bonded and fixed to one side of the two sliding plates, the other ends of the two springs are fixedly connected to the two ends of the inner side of the shell, the two support plates are slidably connected to the inside of the slide groove, the two support rods are fixedly connected to one side of the support plate, the brush is installed on the output end of the motor, and the bottom end of the brush is rotatably connected to the bottom end of the inner side of the support rod.
[0011] As a further description of the above technical solution: a support frame is fixedly connected to the top of the operating frame, and a wire reel is installed on one side of the top of the support frame.
[0012] By adopting the above technical solution: the bottom of the support frame is welded and fixed to the top of the operating frame, and the wire reel is installed on one side of the top of the support frame.
[0013] As a further description of the above technical solution: a measuring line is installed on the outside of the wire drum, and a measuring probe is fixedly connected to the bottom end of the measuring line.
[0014] By adopting the above technical solution: the measuring line is installed on the outside of the line reel, and the top end of the measuring probe is fixedly connected to the bottom end of the measuring line.
[0015] As a further description of the above technical solution: a mounting frame is fixedly connected to one side of the top end of the support frame, and a motor is fixedly connected to the front side of the mounting frame.
[0016] By adopting the above technical solution: the mounting frame is fixedly connected to one side of the top of the support frame, and the motor is installed on the front side of the mounting frame.
[0017] As a further description of the above technical solution: a screw rod is installed at the output end of the motor, and a first roller is installed on the outer side of the screw rod.
[0018] By adopting the above technical solution: the screw rod is installed on the output end of the motor, and the inside of the bottom end of the first roller is threadedly connected with the outside of the screw rod.
[0019] As a further description of the above technical solution: connecting rods are fixedly connected to both sides of the first roller, and a second roller is fixedly connected between one ends of the two connecting rods.
[0020] By adopting the above technical solution: one end of the two connecting rods are plugged and fixed to the two sides of the first roller, and the other ends of the two connecting rods are plugged and fixed to the two sides of the second roller.
[0021] As a further description of the above technical solution: a sliding rod is installed inside the top end of the second roller.
[0022] By adopting the above technical solution: the inside of the top end of the second roller is slidably connected to the outside of the slide rod, and both ends of the slide rod are fixedly connected to the inner side of the mounting frame.
[0023] Technical effects and advantages of the utility model:
[0024] 1. By setting up a cleaning component, compared with the prior art, the push plate is contracted so that the two springs can push the sliding plate to move relative to each other, and then the two support plates are used to drive the two brushes to move relative to the outside of the measuring line, which can effectively remove the debris and sediment attached to the measuring line in the borehole, reduce the measurement error caused by dirt accumulation, and ensure the accuracy of water level measurement;
[0025] 2. By setting the first roller, the connecting rod and the second roller, compared with the prior art, the first roller is arranged on the left and right sides of the outer side of the screw rod, and the second roller is driven to move by the two connecting rods, so that the measuring line can move more smoothly during the winding process, reducing the resistance caused by friction, and at the same time can effectively prevent the measuring line from being entangled during winding, thereby improving the winding efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0027] Figure 2 This is a schematic diagram of the screw rod structure of the utility model.
[0028] Figure 3 This is a schematic diagram of the slide bar structure of the utility model.
[0029] Figure 4 This is a schematic diagram of the connecting rod structure of the utility model.
[0030] Figure 5 It is a schematic diagram of the push plate structure of the utility model.
[0031] Figure 6 This is a schematic diagram of the support plate structure of the utility model.
[0032] The accompanying drawings are marked as follows: 1. operating frame; 2. housing; 3. cylinder; 4. push plate; 5. sliding plate; 6. slide rail; 7. spring; 8. slide groove; 9. support plate; 10. support rod; 11. motor; 12. brush; 13. support frame; 14. wire drum; 15. measuring wire; 16. measuring probe; 17. mounting frame; 18. motor; 19. screw rod; 20. first roller; 21. connecting rod; 22. second roller; 23. slide rod. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0034] The embodiment of the present application discloses a geotechnical engineering investigation borehole water level measuring device, comprising an operating frame 1, a cleaning assembly is installed on the top of the operating frame 1;
[0035] The cleaning component comprises a shell 2, a cylinder 3 is installed inside the shell 2, a push plate 4 is installed at the output end of the cylinder 3, sliding plates 5 are arranged on both sides of the push plate 4, slide rails 6 are installed on the rear sides of the two sliding plates 5, springs 7 are fixedly connected on one side of the two sliding plates 5, two slide grooves 8 are arranged on the front side of the shell 2, support plates 9 are arranged inside the two slide grooves 8, support rods 10 are fixedly connected on one side of the two support plates 9, motors 11 are fixedly connected on the inner sides of the two support rods 10, brushes 12 are installed on the output ends of the two motors 11, and the push plate 4 is driven to move telescopically by the cylinder 3, so that the push plate 4 can push the two sliding plates 5 to move through the beveled surfaces at both ends, and the sliding plates 5 are pushed to move relative to each other by the two springs 7, so that the two sliding plates 5 can drive the two support plates 9 to slide inside the slide groove 8, and the two support plates 9 can drive the two brushes 12 to move to both sides of the measuring line 15, and the two motors 11 provide power for the rotation of the brushes 12, so that the debris and sediment in the borehole of the measuring line 15 can be effectively removed to ensure the accuracy of the water level measurement.
[0036] Reference Figure 1 As shown, a support frame 13 is fixedly connected to the top of the operating frame 1, a wire drum 14 is installed on one side of the top of the support frame 13, a measuring line 15 is installed on the outer side of the wire drum 14, and a measuring probe 16 is fixedly connected to the bottom end of the measuring line 15. The measuring line 15 is unwound by the wire drum 14, so that the measuring line 15 can drive the measuring probe 16 to move telescopically in the borehole, thereby facilitating the measurement of the water level inside the borehole.
[0037] Reference Figure 4As shown, a mounting frame 17 is fixedly connected to one side of the top of the support frame 13, a motor 18 is fixedly connected to the front side of the mounting frame 17, a screw rod 19 is installed at the output end of the motor 18, a first roller 20 is installed on the outside of the screw rod 19, connecting rods 21 are fixedly connected on both sides of the first roller 20, a second roller 22 is fixedly connected between one ends of the two connecting rods 21, a slide rod 23 is installed inside the top of the second roller 22, the screw rod 19 is driven to rotate by the motor 18, so that the first roller 20 can move on the outside of the screw rod 19, and the first roller 20 can drive the second roller 22 to slide on the outside of the slide rod 23 through the two connecting rods 21, so that the measuring line 15 is subjected to more uniform force during the winding process, reducing the wear of the measuring line 15 caused by excessive force on a single point, and preventing the measuring line 15 from being entangled during the winding process, thereby improving the winding efficiency.
[0038] Working principle of the utility model: The utility model designs a geotechnical engineering survey borehole water level measuring device, the specific structure is as shown in the attached manual Figure 1-6 As shown, in the technical solution, through the mutual cooperation between various structures, when it is necessary to measure the water level of the borehole, the wire drum 14 is started first, and the wire drum 14 unwinds the measuring wire 15 so that the measuring probe 16 can enter the borehole for measurement. When the measurement is completed, the cylinder 3 is started, and the cylinder 3 is contracted to drive the push plate 4 to move backward, and the two sides of the push plate 4 are fitted with the oblique cut surface of one side of the sliding plate 5. At the same time, the two springs 7 are used to push the sliding plate 5 to one side, so that the two sliding plates 5 can slide inside the slide rail 6, thereby driving the two support plates 9 to slide inside the slide groove 8, so that the two support plates 9 can move relative to each other, and then the two motors 11 are started, and the two motors 11 are used to drive the brush 12 to rotate. 9 moves relative to each other, so that the two brushes 12 can move to the outside of the measuring line 15, so that the outside of the measuring line 15 can be cleaned, and then the wire drum 14 and the motor 18 are started, and the wire drum 14 can reel the measuring line 15, and at the same time, the motor 18 drives the screw rod 19 to rotate, so that the screw rod 19 drives the first roller 20 to move left and right, and the first roller 20 moves and can drive the second roller 22 to slide on the outside of the slide rod 23 through the connecting rod 21, and the two first rollers 20 and the connecting rod 21 roll on the surface of the measuring line 15, so as to support the wire drum 14 to reel the measuring line 15, and at the same time, the first roller 20 and the second roller 22 move left and right, which can effectively prevent the measuring line 15 from being entangled when reeling, thereby improving the reeling efficiency of the wire drum 14.
[0039] Among them, the drawings of the embodiments disclosed in the present utility model only involve structures related to the embodiments disclosed in the present utility model, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;
[0040] The contents not described in detail in the specification belong to the prior art known to those skilled in the art, and the model parameters of each electrical appliance are not specifically limited and can be determined using conventional equipment. In this technical solution, the electrical control components not mentioned are not shown in the figure because they belong to the prior art, and will not be described here;
[0041] Finally: The above are only preferred embodiments of the present utility model and are not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A geotechnical engineering survey borehole water level measuring device, comprising an operating frame (1), characterized in that: A cleaning component is installed on the top of the operating frame (1); The cleaning component comprises a housing (2), a cylinder (3) is installed inside the housing (2), a push plate (4) is installed at the output end of the cylinder (3), sliding plates (5) are arranged on both sides of the push plate (4), a slide rail (6) is installed on the rear side of the two sliding plates (5), one side of the two sliding plates (5) is fixedly connected to a spring (7), two slide grooves (8) are provided on the front side of the housing (2), a support plate (9) is arranged inside the two slide grooves (8), one side of the two support plates (9) is fixedly connected to a support rod (10), the inner side of the two support rods (10) is fixedly connected to a motor (11), and the output ends of the two motors (11) are installed with a brush (12).
2. The geotechnical engineering survey borehole water level measuring device according to claim 1, characterized in that: The top end of the operating frame (1) is fixedly connected to a support frame (13), and a wire drum (14) is installed on one side of the top end of the support frame (13).
3. The geotechnical engineering survey borehole water level measuring device according to claim 2, characterized in that: A measuring line (15) is installed on the outside of the wire reel (14), and a measuring probe (16) is fixedly connected to the bottom end of the measuring line (15).
4. The geotechnical engineering survey borehole water level measuring device according to claim 2, characterized in that: A mounting frame (17) is fixedly connected to one side of the top end of the support frame (13), and a motor (18) is fixedly connected to the front side of the mounting frame (17).
5. The geotechnical engineering investigation borehole water level measuring device according to claim 4, characterized in that: A screw rod (19) is mounted on the output end of the motor (18), and a first roller (20) is mounted on the outside of the screw rod (19).
6. The geotechnical engineering investigation borehole water level measuring device according to claim 5, characterized in that: Connecting rods (21) are fixedly connected to both sides of the first roller (20), and a second roller (22) is fixedly connected between one ends of the two connecting rods (21).
7. The geotechnical engineering investigation borehole water level measuring device according to claim 6, characterized in that: A sliding rod (23) is installed inside the top end of the second roller (22).
