Power construction engineering project management device
By designing a movable power construction project management device, the problem of difficulty in recording on site of power construction projects is solved, convenient recording platform expansion and device height adjustment are achieved, and recording convenience and device stability are ensured in remote construction sites.
Patent Information
- Application Number
- CN202420030677.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-06
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2034-01-06
Smart Images

Figure CN222319663U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of project management devices, in particular to a power construction project management device. Background Art
[0002] Electricity is a form of energy. It has many advantages such as easy conversion, easy control, easy use, clean and economical. Electricity has gradually become the technical foundation of human material and spiritual civilization in modern society. Therefore, power construction projects are becoming more and more important. In order to make the construction of power construction projects go smoothly, the staff needs to go to the construction site for on-site inspection. This requires the use of power construction project management devices to conduct exploration and record of the power construction site in order to grasp the on-site conditions of the power construction project and the progress of the project;
[0003] However, the construction sites of some power construction projects are relatively remote, making it inconvenient to conduct statistical records indoors. It is necessary to inspect the construction site outdoors on site. Due to limited outdoor conditions, it is inconvenient for staff to use documents to record and it is inconvenient to record the progress of power construction projects. Utility Model Content
[0004] The purpose of the utility model is to provide a power construction project management device to solve the problem raised in the above background technology that due to limited outdoor conditions, it is inconvenient for staff to use files to record and it is inconvenient to record the progress of power construction projects.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an electric power construction project management device, comprising a box body and a first display board, the two ends of the upper side of the box body are movably connected with one end of the first display board and one end of the second display board through hinges, and the two sides of the box body are provided with slide grooves, the slide grooves are slidably connected with the slider at the lower end of the connecting pipe, and the inner side of the connecting pipe is connected with the supporting screw rod, the outer side of the connecting pipe is fixed with a limiting block, and the side of the box body close to the limiting block is provided with a limiting groove;
[0006] A card slot is provided on the upper side of the first display board and the upper side of the second display board, a placement box is provided on the inner side of the box, and rollers are installed on both sides of the placement box, and the rollers are connected to the inner side of the box, and a card block is connected to one side of the placement box, and the card block is connected to the inner side of the box.
[0007] Preferably, the lower side of the box body is movably connected to the connecting rod through a rotating shaft, and the inner side of the connecting rod is connected to the docking screw.
[0008] Preferably, a buckle is fixed on the lower side of the box body, and the buckle is connected to the docking screw.
[0009] Preferably, a support block is fixed to the bottom of the box.
[0010] Preferably, a docking groove is formed at one end of the first display board close to the second display board, and a placement groove is formed at one end of the second display board close to the docking groove.
[0011] Preferably, a docking bolt is disposed inside the placement groove, and one end of the docking bolt extends through the placement groove and engages with the docking groove.
[0012] Compared with the prior art, the beneficial effects of the utility model are as follows: the power construction project management device pulls the connecting pipe and rotates the supporting screw to make the first display panel and the second display panel parallel to the upper side of the box body, so that the first display panel and the second display panel are supported by the supporting screw and are parallel to the upper side of the box body, rotates the connecting rod to make the limit buckle of the supporting block limit the rotation of the connecting rod, rotates the docking screw, and makes it convenient for the power construction project management device to adapt to the site and personnel for use, pulls the docking bolt, and restricts the docking bolt to the inside of the docking groove after docking with the docking groove, so that the first display panel and the second display panel are not easily damaged by opening themselves due to shaking.
[0013] 1. The electric power construction project management device, when the staff inspects the construction site outdoors at the construction site of the electric power construction project, can place the box on the ground, rotate the first display board and the second display board, so that the first display board and the second display board are opened to the two sides of the box, and then pull the connecting pipe to move the connecting pipe outward along the slide groove, and then rotate the support screw, through the connecting pipe and the support screw are threaded connection, so that the support screw part is separated from the connecting pipe, and the support screw moves upward, so that the upper end of the support screw is engaged with the card slot, so that the first display board and the second display board are supported by the support screw and parallel to the upper side of the box, so that the plane of the upper side of the box is expanded, so that the recording platform of the staff is enlarged, which is convenient for recording the progress of the electric power construction project. At this time, the placement box can be opened, and the inside of the placement box can be placed with documents and tools. At this time, the documents are placed on the surface of the first display board and the second display board, so that the staff can use the electric power construction project management device to record the situation of the electric power construction site with documents, which is convenient for recording the progress of the electric power construction project;
[0014] 2. The power construction project management device rotates the connecting rod to release the docking screw from the restriction of the buckle, and then engages and docks the connecting rod with the limit buckle of the support block, so that the limit buckle of the support block restricts the rotation of the connecting rod, so that the box can be more stably separated from the ground, and the docking screw is rotated. The connecting rod and the docking screw are threadedly connected, so that the docking screw can be telescopically moved inside the connecting rod, so that the height of the box from the ground can be adjusted, so that when using the power construction project management device, the staff can adjust the height of the box according to the on-site needs of the power construction site, which is convenient for the power construction project management device to adapt to the site of the power construction project and convenient for the staff to use the project management device;
[0015] 3. The electric power construction project management device pulls the docking bolt to dock the docking bolt with the docking groove, and the rubber pad at the slot opening is interference fit with the convex rod of the docking bolt, so that the docking bolt is restricted inside the docking groove after docking with the docking groove, so that the first display panel and the second display panel are restricted to the upper side of the box body and are not easy to open by themselves when shaking, so that when the electric power construction project management device is transported or transferred, the first display panel and the second display panel are not easy to open by themselves and be damaged due to shaking, and when the project management device is transported at the electric power construction project site and is bumpy, the project management device is not easy to open by itself and be damaged. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the front cross-sectional structure of the utility model;
[0017] Figure 2 It is a schematic diagram of the right side cross-sectional structure of the utility model;
[0018] Figure 3 This is a schematic diagram of the front cross-sectional structure of the support screw and the limit block of the utility model;
[0019] Figure 4 This is a schematic diagram of the right side cross-sectional structure of the placement box and the card block of the utility model;
[0020] Figure 5 It is a schematic diagram of the front cross-sectional structure of the placement groove and the docking bolt of the utility model.
[0021] In the figure: 1. box body; 2. first display board; 3. second display board; 4. slide groove; 5. connecting pipe; 6. supporting screw; 7. limiting block; 8. limiting groove; 9. clamping slot; 10. placement box; 11. clamping block; 12. connecting rod; 13. docking screw; 14. buckle; 15. supporting block; 16. docking groove; 17. placement groove; 18. docking bolt. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1 , Figure 3 and Figure 4The utility model provides a technical solution: a power construction project management device, including a box body 1 and a first display board 2, the two ends of the upper side of the box body 1 are movably connected with one end of the first display board 2 and one end of the second display board 3 through hinges, and the two sides of the box body 1 are provided with a slide groove 4, the slide groove 4 is slidably connected with the slider at the lower end of the connecting pipe 5, and the inner side of the connecting pipe 5 is connected with the supporting screw 6, the outer side of the connecting pipe 5 is fixed with a limiting block 7, and a limiting groove 8 is provided on the side of the box body 1 close to the limiting block 7, and the upper side of the first display board 2 is connected with the second display board 3. A card slot 9 is opened on the upper side of the plate 3, a placement box 10 is arranged on the inner side of the box body 1, and rollers are installed on both sides of the placement box 10, and the rollers are connected to the inner side of the box body 1, a card block 11 is connected to one side of the placement box 10, and the card block 11 is connected to the inner side of the box body 1, the connecting pipe 5 is threadedly connected to the support screw 6, a rubber pad is connected to the outer side of the limit block 7, and the rubber pad of the limit block 7 is interference fit with the limit groove 8, and a rubber pad is connected to the outer side of the card block 11, and the rubber pad of the card block 11 is interference fit with the groove on the inner side of the box body 1.
[0024] During specific implementation, when the staff inspects the construction site outdoors at the construction site of the power construction project, the box body 1 can be placed on the ground, the first display board 2 and the second display board 3 can be rotated to open the first display board 2 and the second display board 3 to the two sides of the box body 1, and then the connecting pipe 5 can be pulled to move the connecting pipe 5 outward along the slide groove 4, and then the supporting screw 6 can be rotated to partially detach from the connecting pipe 5 through the connecting pipe 5 and the supporting screw 6 through the threaded connection, and the supporting screw 6 can be moved upward so that the upper end of the supporting screw 6 is engaged with the card slot 9, so that the first display board 2 and the second display board 3 are supported by the supporting screw 6 and are parallel to the upper side of the box body 1, so that the plane on the upper side of the box body 1 is expanded, so that the recording platform of the staff is enlarged, which is convenient for recording the power construction. During the progress of the project, when the use of the first display board 2 and the second display board 3 is finished, the rubber pad of the limit block 7 and the limit groove 8 are in interference fit, so that the connecting pipe 5 is convenient to be restricted on both sides of the box body 1, and the placement box 10 can be opened at this time, and the interior of the placement box 10 can be used to place documents and tools, and the rollers installed on the placement box 10 can make the placement box 10 smoothly pulled out without getting stuck, and the rubber pad of the clamping block 11 and the groove on the inner side of the box body 1 are in interference fit, so that the placement box 10 can be stably restricted inside the box body 1, and the documents are placed on the surface of the first display board 2 and the second display board 3 at this time, so that the staff can use the electric power construction project management device to record the situation of the electric power construction site with documents, and it is convenient to record the progress of the electric power construction project.
[0025] See also Figure 1 and Figure 2It can be seen that the lower side of the box body 1 is movably connected to the connecting rod 12 through a rotating shaft, and the inner side of the connecting rod 12 is connected to the docking screw 13, a buckle 14 is fixed to the lower side of the box body 1, and the buckle 14 is connected to the docking screw 13, a support block 15 is fixed to the bottom of the box body 1, the connecting rod 12 and the docking screw 13 are threadedly connected, the docking screw 13 and the buckle 14 are snap-fitted and docked, the buckle 14 adopts a "C"-shaped structure, and a limiting buckle is fixed to the outer side of the support block 15, and the limiting buckle of the support block 15 is the same as the buckle 14.
[0026] During specific implementation, the connecting rod 12 is rotated to disengage the docking screw 13 from the restriction of the buckle 14, and then the connecting rod 12 is engaged and docked with the limit buckle of the support block 15, so that the limit buckle of the support block 15 restricts the rotation of the connecting rod 12, so that the box body 1 can be more stably separated from the ground, and the docking screw 13 is rotated. The connecting rod 12 and the docking screw 13 are threadedly connected, so that the docking screw 13 can be telescopically moved inside the connecting rod 12, so that the height of the box body 1 from the ground can be adjusted, so that when using the power construction project management device, the staff can adjust the height of the box body 1 according to the on-site needs of the power construction site, which is convenient for the power construction project management device to adapt to the site of the power construction project and convenient for the staff to use the project management device.
[0027] See also Figure 1 and Figure 5 It can be seen that a docking groove 16 is provided at one end of the first display panel 2 close to the second display panel 3, and a placement groove 17 is provided at one end of the second display panel 3 close to the docking groove 16, a docking bolt 18 is arranged inside the placement groove 17, and one end of the docking bolt 18 extends through the placement groove 17 and connects with the docking groove 16, a rubber pad is connected to the opening of the placement groove 17, and the rubber pad at the opening of the placement groove 17 and the protruding rod of the docking bolt 18 are in interference fit.
[0028] During specific implementation, the docking bolt 18 is pulled to dock the docking bolt 18 with the docking groove 16, and the rubber pad at the opening of the placement groove 17 is interference fit with the convex rod of the docking bolt 18, so that the docking bolt 18 is restricted inside the docking groove 16 after docking with the docking groove 16, so that the first display panel 2 and the second display panel 3 are restricted to the upper side of the box body 1 and are not easy to open by themselves when shaking, so that when the power construction project management device is transported or transferred, it is not easy for the first display panel 2 and the second display panel 3 to open by themselves and be damaged due to shaking, and when the project management device is transported at the power construction project site and is bumpy, the project management device is not easy to open by itself and be damaged.
[0029] In summary, when the staff inspects the construction site outdoors at the construction site of the electric power construction project, they pull the connecting pipe 5 and rotate the supporting screw 6, so that the supporting screw 6 moves upward, so that the first display board 2 and the second display board 3 are supported by the supporting screw 6 and are parallel to the upper side of the box body 1, so that the staff's recording platform is enlarged, which is convenient for recording the progress of the electric power construction project, and the staff can use the electric power construction project management device to record the situation of the electric power construction site with documents, and rotate the connecting rod 12 so that the limit buckle of the support block 15 limits the rotation of the connecting rod 12, and the rotation docking The screw 13 allows the height of the box 1 from the ground to be adjusted. The height of the box 1 can be adjusted according to the on-site needs of the power construction site, so that the power construction project management device can adapt to the site and personnel for use. The docking bolt 18 is pulled to dock the docking bolt 18 with the docking groove 16, so that the docking bolt 18 is restricted inside the docking groove 16 after docking with the docking groove 16, so that when the project management device is transported at the power construction site and bumps occur, the project management device is not easy to open and be damaged by itself. The contents not described in detail in this description belong to the existing technology known to professional and technical personnel in this field.
[0030] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A power construction project management device, comprising a box (1) and a first display board (2), characterized in that: The two ends of the upper side of the box body (1) are movably connected to one end of the first display board (2) and one end of the second display board (3) through hinges, and slide grooves (4) are provided on both sides of the box body (1). The slide grooves (4) are slidably connected to the slider at the lower end of the connecting tube (5), and the inner side of the connecting tube (5) is connected to the supporting screw (6). A limiting block (7) is fixed on the outer side of the connecting tube (5), and a limiting groove (8) is provided on the side of the box body (1) close to the limiting block (7); A card slot (9) is provided on the upper side of the first display board (2) and the upper side of the second display board (3); a placement box (10) is provided on the inner side of the box body (1); rollers are installed on both sides of the placement box (10), and the rollers are connected to the inner side of the box body (1); a card block (11) is connected to one side of the placement box (10), and the card block (11) is connected to the inner side of the box body (1).
2. The power construction project management device according to claim 1, characterized in that: The lower side of the box body (1) is movably connected to the connecting rod (12) via a rotating shaft, and the inner side of the connecting rod (12) is connected to the docking screw rod (13).
3. The power construction project management device according to claim 2, characterized in that: A buckle (14) is fixed on the lower side of the box body (1), and the buckle (14) is connected to the docking screw (13).
4. The power construction project management device according to claim 3 is characterized by: A support block (15) is fixed to the bottom of the box body (1).
5. The power construction project management device according to claim 1, characterized in that: A docking groove (16) is provided at one end of the first display board (2) close to the second display board (3), and a placement groove (17) is provided at one end of the second display board (3) close to the docking groove (16).
6. The power construction project management device according to claim 5, characterized in that: A docking bolt (18) is arranged inside the placement groove (17), and one end of the docking bolt (18) extends through the placement groove (17) and is connected to the docking groove (16).