Ceramic tile mold for gas turbine
By designing ceramic tile molds for gas turbines with automatic loading and unloading functions, the problem of low manual operation efficiency during ceramic tile forming process is solved, and efficient molding of ceramic tile is achieved.
Patent Information
- Application Number
- CN202421164290.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-27
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2034-05-27
AI Technical Summary
During the forming process of ceramic tiles, manual loading and unloading is required, resulting in low production efficiency.
Design a ceramic tile mold for gas turbine, including the equipment body having two stamping spaces, upper mold and lower mold, equipped with a conveying device and feeding assembly, realize automatic loading and unloading of raw materials, through components such as material separation platform and hydraulic cylinder Automatically convey raw materials and finished products.
Automatic loading and unloading during ceramic tile forming process is realized, reducing labor intensity and improving production efficiency.
Smart Images

Figure CN222328567U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of ceramic tile forming, and specifically relates to a ceramic tile mould for a gas turbine. Background Art
[0002] Ceramic tiles can be made of ceramic materials. Due to their high flexural and compressive strength, uniform density, light weight and non-water absorption, they can be used on gas turbines.
[0003] In the prior art, ceramic tiles are generally formed using a forming mold on a forming table. However, during the ceramic tile forming process, manual loading and unloading is required, which greatly reduces production efficiency. To this end, a ceramic tile mold for a gas turbine is provided. Utility Model Content
[0004] The utility model aims to provide a ceramic tile mould for a gas turbine, so as to solve the problem that manual loading and unloading are required in the process of ceramic tile forming, which greatly reduces the production efficiency.
[0005] To achieve the above purpose, the utility model provides the following technical solution: a ceramic tile mold for a gas turbine, comprising:
[0006] The equipment body has two punching spaces;
[0007] An upper die is arranged at the stamping end of the equipment body;
[0008] A lower mold is arranged on a workbench of the equipment body;
[0009] The conveying device is provided with two groups, which are respectively located on both sides of the equipment body;
[0010] A material dividing assembly is arranged at the feeding end of the equipment body and is used to convey the raw materials to be stamped to the two stamping spaces respectively;
[0011] There are two groups of feeding components, which are arranged corresponding to the stamping space on each equipment body, and are used to convey the raw materials on the material distribution component and unload the ceramic tiles after stamping on the lower mold.
[0012] Preferably, the material dividing assembly comprises two material dividing platforms slidably mounted at the feeding end of the equipment body, the material dividing platforms are provided with a plurality of evenly distributed first auxiliary feeding rollers, and the equipment body is provided with first electric cylinders that respectively drive the two material dividing platforms.
[0013] Preferably, the feeding assembly includes a hydraulic cylinder located on one side of the workbench of the equipment body, the output end of the hydraulic cylinder is provided with a mounting platform, the mounting platform is provided with a screw module, the moving end of the screw module is provided with a mounting plate, and two push plates are provided on the side wall of the mounting plate.
[0014] Preferably, it also includes a lower mold mounting seat for mounting the lower mold;
[0015] The lower mold mounting seat includes a mounting groove arranged on the workbench of the equipment body, the bottom spring of the mounting groove is connected to the mounting seat, the lower mold is mounted on the mounting seat, the bottom of the mounting seat is provided with a guide rod penetrating the bottom of the mounting groove, and the workbench of the equipment body is provided with a second electric cylinder, the output end of the second electric cylinder extends into the mounting groove and is provided with a lifting plate.
[0016] Preferably, a plurality of second auxiliary feeding rollers are provided on the workbench of the equipment body and on both sides of the lower mold.
[0017] Compared with the prior art, the beneficial effects of the utility model are as follows: a ceramic tile mold for a gas turbine provided by the utility model is provided with two stamping spaces through the equipment body, and the raw materials to be stamped are respectively transported to the two stamping spaces by the material dividing platform, and the raw materials on the material dividing assembly are loaded through the feeding assembly, and the ceramic tiles after stamping on the lower mold are unloaded at the same time, thereby realizing automatic loading and unloading of ceramic tiles during the forming process, without the need for manual loading and unloading, reducing the labor intensity of the staff and improving the production efficiency of ceramic tiles. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the main cross-sectional structure of the utility model;
[0019] Figure 2 It is a schematic diagram of the top cross-sectional structure of the utility model.
[0020] In the figure: 1. Equipment body; 2. Upper mold; 3. Lower mold; 4. Conveying device; 5. Material dividing assembly; 5-1. Material dividing platform; 5-2. First auxiliary feeding roller; 5-3. First electric cylinder; 6. Feeding assembly; 6-1. Hydraulic cylinder; 6-2. Mounting platform; 6-3. Screw module; 6-4. Mounting plate; 6-5. Pushing plate; 7. Second auxiliary feeding roller; 8. Lower mold mounting seat; 8-1. Mounting groove; 8-2. Mounting seat; 8-3. Guide rod; 8-4. Second electric cylinder; 8-5. Lifting plate. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] See also Figure 1-2 The utility model provides a technical solution: a ceramic tile mold for a gas turbine, comprising an equipment body 1, having two stamping spaces; an upper mold 2 is arranged at the stamping end of the equipment body 1; a lower mold 3 is arranged on the workbench of the equipment body 1; two groups of conveying devices 4 are arranged, respectively located on both sides of the equipment body 1, one group of conveying devices 4 located at the feeding end of the equipment body 1 is arranged, and another group of conveying devices 4 located at the discharging end of the equipment body 1 is arranged, and two are arranged respectively corresponding to each stamping space; a material dividing component 5 is arranged at the feeding end of the equipment body 1, and is used to convey the raw materials to be stamped to the two stamping spaces respectively; a feeding ... Two groups of components 6 are provided, corresponding to the stamping space settings on each equipment body 1, for conveying the raw materials on the material dividing component 5 and loading the ceramic tiles after stamping on the lower mold 3. Two stamping spaces are set by the equipment body 1, and the material dividing platform 5 conveys the raw materials to be stamped to the two stamping spaces respectively. The raw materials on the material dividing component 5 are loaded through the feeding component 6, and the ceramic tiles after stamping on the lower mold 3 are unloaded. Automatic loading and unloading of ceramic tiles is realized during the forming process of ceramic tiles, without the need for manual loading and unloading, which reduces the labor intensity of the staff and improves the production efficiency of ceramic tiles.
[0023] Specifically, the material dividing component 5 includes two material dividing platforms 5-1 slidably installed at the feed end of the equipment body 1, and a plurality of evenly distributed first auxiliary feeding rollers 5-2 are provided on the material dividing platform 5-1. The equipment body 1 is provided with a first electric cylinder 5-3 that drives the two material dividing platforms 5-1 respectively. When in use, the two first electric cylinders 5-3 respectively drive the two material dividing platforms 5-1 to correspond to the conveying device 4 alternately in sequence, and then move to the stamping space of the equipment body 1 through the first electric cylinder 5-3 for material dividing. The material dividing component 5 cooperates with the two stamping spaces to ensure the production efficiency of ceramic tiles.
[0024] Specifically, the feeding assembly 6 includes a hydraulic cylinder 6-1 located on one side of the workbench of the equipment body 1, and a mounting platform 6-2 is provided at the output end of the hydraulic cylinder 6-1, and a screw module 6-3 is provided on the mounting platform 6-2. A mounting plate 6-4 is provided at the movable end of the screw module 6-3, and two pusher plates 6-5 are provided on the side wall of the mounting plate 6-4. After the stamping is completed, the hydraulic cylinder 6-1 is started to descend, and the screw module 6-3 is started to drive the mounting plate 6-4 and the two pusher plates 6-5 to move. The two pusher plates 6-5 respectively drive the raw materials on the material distribution assembly 5 to feed, and at the same time, the ceramic tiles that have been stamped on the lower mold 3 are unloaded. After the operation is completed, the hydraulic cylinder 6-1 drives the mounting platform 6-2, the screw module 6-3, the mounting plate 6-4, and the pusher plate 6-5 to rise, and the screw module 6-3 drives the mounting plate 6-4 and the pusher plate 6-5 to reset.
[0025] Specifically, it also includes a lower mold mounting seat 8 for installing the lower mold 3; the lower mold mounting seat 8 includes a mounting groove 8-1 set on the workbench of the equipment body 1, the bottom spring of the mounting groove 8-1 is connected to the mounting seat 8-2, the lower mold 3 is installed on the mounting seat 8-2, and the bottom of the mounting seat 8-2 is provided with a guide rod 8-3 that passes through the bottom of the mounting groove 8-1. A second electric cylinder 8-4 is provided in the workbench of the equipment body 1, and the output end of the second electric cylinder 8-4 extends into the mounting groove 8-1 and is provided with a lifting plate 8-5. By setting the lower mold mounting seat 8, during the process of pressing the upper mold 2 downward, the lower mold 3 and the mounting seat 8-2 are moved to the bottom of the mounting groove 8-1. Under the action of the guiding rod 8-3 and the spring, the force applied to the upper mold 2 during the pressing process of the ceramic tile is buffered, thereby preventing the mold from being crushed or the magnetic tile from being cracked, and the lifting plate 8-5 is driven upward by the second electric cylinder 8-4 to drive the mounting seat 8-2 and the lower mold 3 to rise and quickly enter the demolding position.
[0026] Specifically, a plurality of second auxiliary feeding rollers 7 are provided on the workbench of the equipment body 1 and on both sides of the lower mold 3. The second auxiliary rollers 7 are provided to ensure the stability of loading and unloading of the lower mold 3, thereby avoiding the problem that large friction between the workbench of the equipment body 1 and the material difference affects the normal use of the equipment.
[0027] Working principle: During the use of the utility model, first start the conveying device 4 to drive the raw material to be stamped to move, start the dividing component 5 so that the raw material to be stamped enters the dividing component 5 and is transported to two stamping spaces respectively, start the feeding component 6 to load the raw material on the dividing component 5, and at the same time, unload the ceramic tiles after stamping on the lower mold 3. The unloaded ceramic tiles are transported by the conveying device 4, thereby realizing automatic loading and unloading during the ceramic tile forming process.
[0028] In the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0029] The standard parts used in the present invention can all be purchased from the market, and special-shaped parts can be customized according to the instructions and the drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. Machinery, parts and equipment all adopt conventional models in the prior art, and the circuit connection adopts the conventional connection method in the prior art, which will not be described in detail here.
[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A ceramic tile mold for a gas turbine, characterized in that: include: The device body (1) has two punching spaces; An upper mold (2) is arranged at the stamping end of the equipment body (1); A lower mold (3) is arranged on a workbench of the equipment body (1); The conveying device (4) is provided in two groups and is respectively located on both sides of the equipment body (1); A material dividing assembly (5) is arranged at the feeding end of the equipment body (1) and is used to convey the raw materials to be stamped to the two stamping spaces respectively; The feeding components (6) are provided with two groups, which are arranged corresponding to the stamping space on each equipment body (1), and are used to convey the raw materials on the material distribution component (5) and to unload the ceramic tiles after stamping on the lower mold (3).
2. The ceramic tile mold for a gas turbine according to claim 1, characterized in that: The material distribution component (5) comprises two material distribution platforms (5-1) slidably mounted at the feeding end of the equipment body (1), the material distribution platform (5-1) is provided with a plurality of evenly distributed first auxiliary feeding rollers (5-2), and the equipment body (1) is provided with first electric cylinders (5-3) respectively driving the two material distribution platforms (5-1).
3. The ceramic tile mold for a gas turbine according to claim 1, characterized in that: The feeding assembly (6) comprises a hydraulic cylinder (6-1) located on one side of a workbench of the equipment body (1); a mounting platform (6-2) is provided at the output end of the hydraulic cylinder (6-1); a lead screw module (6-3) is provided on the mounting platform (6-2); a mounting plate (6-4) is provided at the movable end of the lead screw module (6-3); and two push plates (6-5) are provided on the side wall of the mounting plate (6-4).
4. The ceramic tile mold for a gas turbine according to claim 1, characterized in that: It also includes a lower mold mounting seat (8) for mounting the lower mold (3); The lower mold mounting seat (8) comprises a mounting groove (8-1) arranged on a working table of the equipment body (1); the bottom spring of the mounting groove (8-1) is connected to a mounting seat (8-2); the lower mold (3) is mounted on the mounting seat (8-2); the bottom of the mounting seat (8-2) is provided with a guide rod (8-3) penetrating the bottom of the mounting groove (8-1); a second electric cylinder (8-4) is arranged in the working table of the equipment body (1); the output end of the second electric cylinder (8-4) extends into the mounting groove (8-1) and is provided with a lifting plate (8-5).
5. The ceramic tile mold for a gas turbine according to claim 1, characterized in that: A plurality of second auxiliary feeding rollers (7) are provided on the workbench of the equipment body (1) and on both sides of the lower mold (3).