All-steel attached type lifting scaffold free end ultrahigh rear embedded part device
By using the rigid connection between prefabricated zigzag-staggered rod members and climbing frame guide rails in construction, and combining the oblique pull rod design of galvanized steel plates and steel pipes, the problem of excessive height of the climbing frame in the non-standard shear wall area is solved. Ensures the safety and stability of the frame.
Patent Information
- Application Number
- CN202421125460.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-22
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2034-05-22
AI Technical Summary
In construction, in non-standard shear wall areas, conventional cable-stayed steel wire ropes and embedded additional wall connections on the boards are difficult to meet the requirements of the free end height of the climbing frame, resulting in the cantilever height exceeding the safety specifications.
The prefabricated zigzag rod is used for rigid connection with the climbing frame guide rail. An oblique pull rod is welded through the rear embedded parts and steel pipes. The galvanized steel plate and Φ48.3*3.6 steel pipe are used to ensure that the free end height of the climbing frame is less than 6m, meeting the construction of the construction. Tool-based scaffolding safety technical specifications.
It realizes that embedded parts can be installed within a safe distance under different floor height changes to ensure the safety and stability of the frame and prevent the cantilever height from exceeding the specification requirements.
Smart Images

Figure CN222333238U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of shear wall scaffolding implementation, in particular to a free end super-high rear embedded component device of a full-steel attached lifting scaffolding. Background Art
[0002] At present, there are many shear walls in the core tube area, and most of the attachment positions are located at the shear wall position. Conventional treatment measures such as inclined steel wire ropes and pre-embedded additional wall ties on the plate are not easy to implement. When the height of the working layer is 5.4m (non-standard layer), the height of the free end of the climbing frame is 5.4m (layer height) + 1.5m (protection height) = 6.9m. The free end of the climbing frame conflicts with Article 4.4.8 of the "Technical Specifications for Safety of Tool-type Scaffolding in Construction" JGJ202-2010, which states that "the cantilever height of the frame shall not be greater than 2 / 5 of the frame height and shall not be greater than 6m". Conventional treatment measures such as inclined steel wire ropes and pre-embedded additional wall ties on the plate are difficult to meet its requirements. Utility Model Content
[0003] Therefore, in order to solve the above-mentioned shortcomings, the utility model provides an ultra-high post-embedded device for the free end of an all-steel attached lifting scaffolding. According to the characteristics of the building, it is planned to use prefabricated inclined rods to rigidly connect them with the climbing frame guide rails to ensure that the height of the free end of the climbing frame is less than 6m.
[0004] The utility model is implemented in this way: a super-high post-embedded device for the free end of a full-steel attached lifting scaffold is constructed, characterized in that it has post-embedded parts and steel pipes, the post-embedded parts are fixed to the wall by bolts, an oblique pull rod is welded with the post-embedded parts and the steel pipes, and when the climbing frame encounters a 5.4m floor, four 10# post-cut bolts are used to connect it to the wall at the position of the poured shear wall, the front end of the steel pipe is connected to the climbing frame guide rail by fasteners, the connection height is greater than 900mm, and the height of the free end of the climbing frame is ensured to be less than 6m.
[0005] According to the utility model, a super-high rear embedded component device for the free end of a full-steel attached lifting scaffold is characterized in that the rear embedded component is a galvanized steel plate with a specification of 200*200*10.
[0006] According to the utility model, a super-high rear embedded device for the free end of a full-steel attached lifting scaffold is characterized in that the steel pipe is a Φ48.3*3.6 steel pipe.
[0007] The utility model has the following advantages: the utility model provides an ultra-high post-embedded device for the free end of an all-steel attached lifting scaffold. According to the characteristics of the building, it is planned to use prefabricated inclined rods to be rigidly connected to the guide rails of the climbing frame to ensure that the height of the free end of the climbing frame is less than 6m. When the height of the working layer is 5.4m (non-standard layer), the height of the free end of the climbing frame is 5.4m (layer height) + 1.5m (protection height) = 6.9m. The free end of the climbing frame conflicts with Article 4.4.8 of the "Technical Specifications for Safety of Tool Scaffolds in Construction" JGJ202-2010, "The cantilever height of the frame shall not be greater than 2 / 5 of the frame height, and shall not be greater than 6m". In this case, as the height of different floors changes, embedded parts can be installed at the safe distance required by the specification, and then the safety and stability of the frame can be guaranteed. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] Figure 1 It is a schematic diagram of the connection of the device of this application;
[0009] Figure 2 It is a schematic diagram of the implementation structure of the device of the present application;
[0010] Figure 3 It is a schematic diagram of the galvanized steel sheet in this application.
[0011] Among them: post-embedded parts 1, steel pipes 2. DETAILED DESCRIPTION
[0012] The following will be combined with the attached Figure 1-Figure 3 The utility model is described in detail, and the technical solutions in the embodiments of the utility model are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0013] The utility model provides an ultra-high post-embedded device for the free end of a full-steel attached lifting scaffold, as shown in the figure, comprising a post-embedded device 1 and a steel pipe 2, the post-embedded device 1 being fixed to the wall by bolts, an oblique pull rod being welded by the post-embedded device 1 and the steel pipe 2, and when the climbing frame encounters a 5.4m floor, four 10# post-cut bolts are used to connect it to the wall at the position of the poured shear wall, the front end of the steel pipe 2 is connected to the climbing frame guide rail by a fastener, the connection height is greater than 900mm, and the height of the free end of the climbing frame is ensured to be less than 6m.
[0014] In the present application, the post-embedded part 1 is a galvanized steel plate with a specification of 200*200*10.
[0015] In the present application, the steel pipe 2 is a Φ48.3*3.6 steel pipe.
[0016] The specific implementation of this application is described in detail below;
[0017] The height of the all-steel frame is 19.5 meters, covering 4.5 standard floors. When the height of the working floor is 5.4m (non-standard floor), the height of the free end of the climbing frame is 5.4m (floor height) + 1.5m (protection height) = 6.9m. The free end of the climbing frame conflicts with Article 4.4.8 of "Safety Technical Specifications for Tool-type Scaffolding in Construction" JGJ202-2010, which states that "the cantilever height of the frame shall not be greater than 2 / 5 of the frame height and shall not be greater than 6m."
[0018] When this patent is implemented;
[0019] 1. On-site technicians will measure and lay out the actual distance of the climbing frame guide rail (wall shrinkage due to floor changes) to ensure that the connection between the upper end of the wall connection and the climbing frame guide rail is 900mm higher than the floor elevation.
[0020] 2. Use 200×200×10 galvanized steel plate and Φ48.3*3.6 steel pipe to weld a tool-type diagonal pull rod. When the climbing frame encounters a 5.4m floor, use 4 10# post-cut bolts to connect it to the wall at the position of the poured shear wall. The front end of the steel pipe is connected to the climbing frame guide rail with fasteners. The connection height is greater than 900mm to ensure that the height of the free end of the climbing frame is less than 6m.
[0021] This patent has the following advantages and beneficial effects: When the height of the working layer is 5.4m (non-standard layer), the height of the free end of the climbing frame is 5.4m (layer height) + 1.5m (protection height) = 6.9m, and the free end of the climbing frame conflicts with Article 4.4.8 of the "Technical Specifications for Safety of Tool-type Scaffolding in Construction" JGJ202-2010, which states that "the cantilever height of the frame shall not be greater than 2 / 5 of the frame height and shall not be greater than 6m". In this case, as the height of different floors changes, embedded parts can be installed at the safe distance required by the specification, thereby ensuring the safety and stability of the frame.
[0022] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A super-high rear embedded device for the free end of an all-steel attached lifting scaffold, characterized in that; The invention comprises a rear embedded part (1) and a steel pipe (2), wherein the rear embedded part (1) is fixed to the wall by bolts, and an oblique pull rod is welded by the rear embedded part (1) and the steel pipe (2). When the climbing frame encounters a 5.4m floor, four 10# rear-cut bolts are used to connect the climbing frame to the wall at the position of the poured shear wall. The front end of the steel pipe (2) is connected to the climbing frame guide rail by fasteners, and the connection height is greater than 900mm, thereby ensuring that the height of the free end of the climbing frame is less than 6m.
2. According to claim 1, a super-high rear embedded device for the free end of an all-steel attached lifting scaffold, characterized in that; The post-embedded part (1) is a galvanized steel plate with a specification of 200*200*10.
3. According to claim 1, a super-high rear embedded device for the free end of an all-steel attached lifting scaffold is characterized in that ; The steel pipe (2) is a Φ48.3*3.6 steel pipe.