Novel clean pipeline mounting device
By designing a clean pipeline installation device including a lifting mechanism and a limiting mechanism, the problem of difficulty in adjusting existing devices when installing pipes of different heights is solved, flexible adjustment of height and angle is achieved, and installation efficiency and adaptability are improved.
Patent Information
- Application Number
- CN202420595445.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2034-03-26
AI Technical Summary
The existing clean pipeline installation devices are inconvenient to adjust the height when installing pipes of different heights, and the use efficiency is poor.
A new type of clean pipe installation device including a base, a support frame, a lifting mechanism, a rotating disc, a limiting mechanism, a fixing mechanism and a universal wheel is designed, and is carried out through an electric push rod, a slider, a movable rod, a rotating disc, and a limiting ring. , switch rod, threaded rod and buffer pads, etc., to adjust height and angle, and adapt to pipe installation of different heights and sizes.
It realizes flexible installation of pipes of different heights and sizes, improving installation efficiency and scope of use.
Smart Images

Figure CN222334669U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of clean pipelines, in particular to a novel clean pipeline installation device. Background Art
[0002] Clean pipes are usually thin-walled pipes made of non-polluting materials such as stainless steel to prevent corrosion, oxidation or other contaminants on the inner surface of the pipes. Clean pipe assembly welding is the assembly welding of temporary pipes at the installation site, mainly based on the distribution of the pipe installation area. First, the pipeline operator uses the assembly tool to assemble and fix the pipes. After the pipe assembly is completed, the welding operator will perform assembly welding on the fixed pipes.
[0003] The Chinese patent application with application number CN202320607361.7 discloses a novel clean pipe installation device, including a base plate, a support column, a reinforcing rib, a support plate and a universal wheel, wherein the support column is fixedly connected to the four corners of the top of the base plate, the reinforcing rib is fixedly connected to the inner side of the support column, the support plate is fixedly connected to the top of the support column, the universal wheel is fixedly connected to the four corners of the bottom of the base plate, the two sides on the left side of the top of the support plate are fixedly connected with a first positioning plate, the two sides on the right side of the top of the support plate are provided with an adjustment groove, and the right side of the inside of the adjustment groove is provided with a second positioning plate. The utility model provides an adjustment mechanism, a support assembly and an auxiliary moving assembly so that the support assembly supports the air duct, and since there is no device for moving and installing the pipeline, and the air duct needs to be hoisted under the ceiling, multiple pillars need to be installed during installation to limit the air duct support, thereby reducing the problem of air duct installation efficiency.
[0004] However, the existing installation device still has some defects. When the user needs to install pipes of different heights, it is inconvenient to adjust the height and the use efficiency is poor. Utility Model Content
[0005] In view of the above-mentioned deficiencies in the prior art, the utility model provides a novel clean pipe installation device, the purpose of which is to solve the problems of inconvenience in adjusting the height and poor use efficiency when users need to install pipes of different heights.
[0006] In order to achieve the above-mentioned utility model object, the technical solution adopted by the utility model is: a new clean pipeline installation device, including a base, a support frame connected to the base, a stabilizing mechanism installed on the base, a lifting frame connected to the support frame, a lifting mechanism connected between the lifting frame and the support frame, a rotating disk connected to the lifting frame, a limiting mechanism connected to one side of the rotating disk, a fixed seat connected to the upper surface of the rotating disk, a fixing mechanism connected to the fixed seat, and a universal wheel fixedly connected to the lower surface of the base;
[0007] The lifting mechanism includes an electric push rod 1 installed on a support frame, a slider 1 is connected to the protruding end of the electric push rod 1, a movable rod 1 is hinged between the slider 1 and the lifting frame, a slide rail is provided on the lower surface of the lifting frame, a slider 2 is movably connected to the slide rail, and a movable rod 2 is hinged between the slider 2 and the support frame.
[0008] Furthermore, the limiting mechanism includes a limiting ring installed on the rotating disk, the limiting ring is provided with a positioning hole, the upper surface of the rotating disk is connected with a mounting seat, the mounting seat is sleeved with a switch rod, a switch spring is connected between the switch rod and the mounting seat, and the switch rod is plugged into the positioning hole.
[0009] Furthermore, the stabilizing mechanism includes a recovery groove installed on the base, the upper surface of the base is fixedly connected to the second electric push rod, and the protruding end of the second electric push rod is connected to the fixing plate.
[0010] Furthermore, the fixing mechanism includes a threaded rod installed on a fixing seat, one end of the threaded rod is connected to an arc seat, the other end of the threaded rod is connected to a fixed handle, a buffer pad is provided on one side of the arc seat, an auxiliary rod is connected below the threaded rod, and one end of the auxiliary rod is fixedly connected to the arc seat.
[0011] Furthermore, the buffer pad is made of rubber.
[0012] The beneficial effects of the utility model are:
[0013] The utility model discloses a novel clean pipe installation device. In actual use, according to the installation height of the pipe, an electric push rod 1 is started to drive a slider 1 to move, and then the height of the device can be adjusted through the cooperation between a movable rod 1 and a movable rod 2, so that pipes of different heights can be installed conveniently. The switch rod is pulled, and the angle of the rotating disk can be adjusted through the cooperation between the switch spring and the positioning hole, so that the use range of the device is expanded. The fixing handle is rotated to drive the threaded rod to rotate, and then the arc seat is driven to move, so that pipes of different sizes can be fixed. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1It is a cross-sectional view of a novel clean pipeline installation device of the utility model;
[0015] Figure 2 A new clean pipeline installation device of the utility model Figure 1 Enlarged view of point A in the middle.
[0016] Reference table of reference numerals:
[0017] 1. Base; 2. Support frame; 3. Stabilizing mechanism; 301. Recovery trough; 302. Electric push rod 2; 303. Fixed plate; 4. Lifting mechanism; 401. Electric push rod 1; 402. Sliding block 1; 403. Movable rod 1; 404. Slide rail; 405. Sliding block 2; 406. Movable rod 2; 5. Lifting frame; 6. Rotating disk; 7. Limiting mechanism; 701. Limiting ring; 702. Positioning hole; 703. Mounting seat; 704. Switch rod; 705. Switch spring; 8. Fixed seat; 9. Fixing mechanism; 901. Threaded rod; 902. Arc seat; 903. Fixed handle; 904. Buffer pad; 905. Auxiliary rod; 10. Universal wheel. DETAILED DESCRIPTION
[0018] The specific implementation of the utility model is further described below in conjunction with the accompanying drawings, wherein the same parts are represented by the same reference numerals.
[0019] It should be noted that the words "front", "rear", "left", "right", "up" and "down" used in the following description refer to directions in the drawings, and the words "inside" and "outside" refer to directions toward or away from the geometric center of a specific component, respectively.
[0020] In order to make the contents of the present invention more clearly understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0021] like Figure 1 to Figure 2 As shown, a novel clean pipeline installation device comprises a base 1, a support frame 2 is connected to the base 1, a stabilizing mechanism 3 is installed on the base 1, a lifting frame 5 is connected to the support frame 2, a lifting mechanism 4 is connected between the lifting frame 5 and the support frame 2, a rotating disk 6 is connected to the lifting frame 5, a limiting mechanism 7 is connected to one side of the rotating disk 6, a fixing seat 8 is connected to the upper surface of the rotating disk 6, a fixing mechanism 9 is connected to the fixing seat 8, and a universal wheel 10 is fixedly connected to the lower surface of the base 1;
[0022] The lifting mechanism 4 includes an electric push rod 401 installed on the support frame 2, the protruding end of the electric push rod 401 is connected to a slider 402, a movable rod 403 is hinged between the slider 402 and the lifting frame 5, a slide rail 404 is provided on the lower surface of the lifting frame 5, a slide rail 404 is movably connected to a slide rail 405, and a movable rod 406 is hinged between the slide rail 405 and the support frame 2.
[0023] Specifically, by starting the electric push rod 1 401, the slider 1 402 is driven to move, and then through the cooperation between the movable rod 1 403 and the movable rod 2 406, the height of the device can be adjusted to facilitate the installation of pipes of different heights.
[0024] The limiting mechanism 7 includes a limiting ring 701 installed on the rotating disk 6, and a positioning hole 702 is provided on the limiting ring 701. The upper surface of the rotating disk 6 is connected to a mounting seat 703, and a switch rod 704 is sleeved on the mounting seat 703. A switch spring 705 is connected between the switch rod 704 and the mounting seat 703, and the switch rod 704 is plugged into the positioning hole 702.
[0025] Specifically, by pulling the switch rod 704, the angle of the rotating disk 6 can be adjusted through the cooperation between the switch spring 705 and the positioning hole 702, thereby expanding the use range of the device.
[0026] The stabilizing mechanism 3 comprises a recovery tank 301 mounted on the base 1 , an electric push rod 302 is fixedly connected to the upper surface of the base 1 , and a fixing plate 303 is connected to the extended end of the electric push rod 302 .
[0027] Specifically, the second electric push rod 302 is started to drive the fixing plate 303 to move downward, thereby driving the universal wheel 10 to leave the ground.
[0028] The fixing mechanism 9 includes a threaded rod 901 installed on the fixing seat 8, one end of the threaded rod 901 is connected to an arc seat 902, the other end of the threaded rod 901 is connected to a fixing handle 903, a buffer pad 904 is provided on one side of the arc seat 902, an auxiliary rod 905 is connected below the threaded rod 901, and one end of the auxiliary rod 905 is fixedly connected to the arc seat 902.
[0029] Specifically, the fixing handle 903 is rotated to drive the threaded rod 901 to rotate, thereby driving the arc seat 902 to move, so that pipes of different sizes can be fixed.
[0030] The buffer pad 904 is made of rubber.
[0031] The working principle of the present invention is that in actual use, according to the installation height of the pipeline, the electric push rod 401 is started to drive the slider 402 to move, and then the height of the device can be adjusted through the cooperation between the movable rod 403 and the movable rod 406, so as to facilitate the installation of pipelines of different heights. The switch rod 704 is pulled, and the angle of the rotating disk 6 can be adjusted through the cooperation between the switch spring 705 and the positioning hole 702 to expand the use range of the device. The fixing handle 903 is rotated to drive the threaded rod 901 to rotate, and then the arc seat 902 is driven to move, so that pipelines of different sizes can be fixed.
[0032] The above description is only a preferred embodiment of the present utility model patent and is not intended to limit the present utility model patent. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present utility model patent shall be included in the protection scope of the present utility model patent.
Claims
1. A new clean pipeline installation device, characterized in that: The invention comprises a base (1), the base (1) is connected to a support frame (2), a stabilizing mechanism (3) is installed on the base (1), a lifting frame (5) is connected to the support frame (2), a lifting mechanism (4) is connected between the lifting frame (5) and the support frame (2), a rotating disk (6) is connected to the lifting frame (5), a limiting mechanism (7) is connected to one side of the rotating disk (6), the upper surface of the rotating disk (6) is connected to a fixing seat (8), the fixing seat (8) is connected to a fixing mechanism (9), and the lower surface of the base (1) is fixedly connected to a universal wheel (10); The lifting mechanism (4) comprises an electric push rod (401) mounted on a support frame (2); a protruding end of the electric push rod (401) is connected to a slider (402); a movable rod (403) is hinged between the slider (402) and the lifting frame (5); a slide rail (404) is provided on the lower surface of the lifting frame (5); a slide rail (404) is movably connected to a slide rail (405); and a movable rod (406) is hinged between the slide rail (405) and the support frame (2).
2. A new clean pipeline installation device according to claim 1, characterized in that: The limiting mechanism (7) comprises a limiting ring (701) mounted on a rotating disk (6), a positioning hole (702) being provided on the limiting ring (701), a mounting seat (703) being connected to the upper surface of the rotating disk (6), a switch rod (704) being sleeved on the mounting seat (703), a switch spring (705) being connected between the switch rod (704) and the mounting seat (703), and the switch rod (704) being plugged into the positioning hole (702).
3. A new clean pipeline installation device according to claim 1, characterized in that: The stabilizing mechanism (3) comprises a recovery groove (301) mounted on a base (1); an upper surface of the base (1) is fixedly connected to a second electric push rod (302); and a protruding end of the second electric push rod (302) is connected to a fixing plate (303).
4. A new clean pipeline installation device according to claim 1, characterized in that: The fixing mechanism (9) comprises a threaded rod (901) mounted on a fixing seat (8); one end of the threaded rod (901) is connected to an arc-shaped seat (902); the other end of the threaded rod (901) is connected to a fixing handle (903); a buffer pad (904) is provided on one side of the arc-shaped seat (902); an auxiliary rod (905) is connected below the threaded rod (901); one end of the auxiliary rod (905) is fixedly connected to the arc-shaped seat (902).
5. A new clean pipeline installation device according to claim 4, characterized in that: The buffer pad (904) is made of rubber.
Citation Information
Patent Citations
Novel clean pipeline mounting device
CN219453082U