Rapid cooling device for circulating water pipeline production
By combining liquid nitrogen pumps and air cooling devices, the problem of low cooling efficiency in water pipelines was solved, achieving rapid cooling and high-efficiency production.
Patent Information
- Application Number
- CN202421231023.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2034-05-31
AI Technical Summary
In the existing water pipe production process, the cooling efficiency is low, and the water needs to be air-dried after cooling, resulting in low production efficiency.
A rapid cooling method combining a liquid nitrogen pump and an air-cooling device is adopted. The liquid nitrogen pump vaporizes the liquid nitrogen to remove heat, and the fan removes the waste heat. At the same time, the conveying device reduces friction and can adapt to water pipes of different diameters.
This technology enables rapid cooling of water pipes, improves production efficiency, reduces drying time, and enhances overall production efficiency.
Smart Images

Figure CN222346260U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of cooling devices for water pipelines, in particular to a rapid cooling device for the production of circulating water pipelines. Background Art
[0002] In the production process of water pipes, the raw materials need to be heated, melted and extruded. The temperature of the newly extruded water pipes is relatively high and needs to be cooled. Now most of them are cooled by water cooling. After water cooling, the water on the water pipes needs to be air-dried before entering the next processing step. Summary of the invention
[0003] In view of the deficiencies of the prior art, the utility model provides a rapid cooling device for circulating water pipeline production.
[0004] The technical solution of the utility model is achieved as follows: a rapid cooling device for circulating water pipeline production, including a placement seat, support legs are installed on both sides of the bottom of the placement seat, the longitudinal section of the placement seat is a trough-shaped structure, a plurality of conveying devices for conveying pipelines are arranged in the placement seat, a nitrogen tank is placed below the placement seat, the outlet of the nitrogen tank is connected to a liquid nitrogen pump, the outlet of the liquid nitrogen pump is connected to a vertical connecting pipe, the vertical connecting pipe is connected to a horizontal pipe, the horizontal pipe is installed at the bottom of the bottom plate of the placement seat, a plurality of branch pipes distributed at equal intervals and arranged vertically are installed on the horizontal pipe, the branch pipes extend upward through the bottom plate of the placement seat, and an air cooling device is arranged on the top of the placement seat.
[0005] The air cooling device comprises a support rod fixedly connected to the top of two vertical plates of the placement seat, a horizontal plate is fixedly installed on the top of the support rod, and a plurality of fans are installed on the horizontal plate.
[0006] The conveying device includes two connecting rods, each of which is fixedly connected to a fixed seat, a rotating roller 1 is rotatably connected between the two fixed seats, a spring is sleeved on the outside of the connecting rod, the spring is fixedly connected to the top of the fixed seat, a movable seat is fixedly connected to the top of the spring, the movable seat is sleeved on the outside of the connecting rod, and a rotating roller 2 is rotatably connected between the two movable seats.
[0007] The branch pipe is a universal bamboo pipe.
[0008] The branch pipes and the conveying device are staggered.
[0009] There are 4 supporting legs, 2 on each side, a cross bar is fixedly connected between the two supporting legs on each side, the two ends of the horizontal tube are respectively located at the top of the cross bars on both sides, and the horizontal tube is installed on the cross bar through a U-shaped tube clamp.
[0010] The technical solution of the utility model has the following positive effects: a liquid nitrogen tank is placed at the bottom of the placement tank of the utility model, the liquid nitrogen tank is connected to a liquid nitrogen pump, and the liquid nitrogen comes out from the branch pipe. A large amount of heat will be carried during the gasification of the liquid nitrogen, thereby cooling the water pipe; a fan is arranged on the top of the placement tank, and the fan generates wind to take away the heat of the water pipe; the conveying device can reduce the friction of the water pipe when it moves forward, and can adapt to water pipes of different thicknesses through the spring. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is the front view of the utility model.
[0012] Figure 2 It is a side view of the utility model. DETAILED DESCRIPTION
[0013] like Figures 1 to 2 As shown, a rapid cooling device for circulating water pipeline production comprises a placement seat 1, four corners of the bottom of the placement seat 1 are installed with supporting legs 2, the longitudinal section of the placement seat 1 is a trough-shaped structure, a plurality of conveying devices for conveying pipelines are arranged in the placement seat 1, a nitrogen tank 3 is placed below the placement seat 1, the outlet of the nitrogen tank 3 is connected to a liquid nitrogen pump 16, the outlet of the liquid nitrogen pump 16 is connected to a vertical connecting pipe 4, the vertical connecting pipe 4 is connected to a horizontal pipe 5, the horizontal pipe 5 is installed at the bottom of the bottom plate of the placement seat 1, a plurality of branch pipes 6 distributed at equal intervals and arranged vertically are installed on the horizontal pipe 5, the branch pipe 6 extends upward through the bottom plate of the placement seat 1, and an air cooling device is arranged on the top of the placement seat 1;
[0014] Specifically, after the water pipe is extruded through the screw extruder, the temperature is high and needs to be cooled. The water pipe passes through the placement seat 1, the water pipe is placed on the conveying device, and the liquid nitrogen pump 16 is turned on. The liquid nitrogen comes out of the liquid nitrogen tank 3 and enters the vertical connecting pipe 4, and then passes through the horizontal pipe 5, and finally is discharged from the branch pipe 6. When the liquid nitrogen is discharged, it will become a gas. During the gasification process of the liquid nitrogen, it will absorb a large amount of heat, so the water pipe can be quickly cooled.
[0015] The air cooling device includes a support rod 7 fixedly connected to the top of two vertical plates of the placement seat 1, a horizontal plate 8 is fixedly installed on the top of the support rod 7, and a plurality of fans 9 are installed on the horizontal plate 8; specifically, when the fan 9 is turned on, the fan generates wind to take away the heat of the water pipe, and at the same time, the blown nitrogen can be moved and distributed in the entire placement seat 1.
[0016] The conveying device includes two connecting rods 10, each of which is fixedly connected to a fixed seat 11, a rotating roller 12 is rotatably connected between the two fixed seats 11, a spring 13 is sleeved on the outside of the connecting rod 10, the spring 13 is fixedly connected to the top of the fixed seat 11, a moving seat 14 is fixedly connected to the top of the spring 13, the moving seat 14 is sleeved on the outside of the connecting rod 10, and a rotating roller 2 15 is rotatably connected between the two moving seats 14; specifically, a circulating water pipeline is placed between the rotating roller 12 and the rotating roller 2 15, and when the circulating water pipeline moves forward, the rotating roller 12 and the rotating roller 2 15 will rotate, thereby reducing friction; the walking route of the water pipeline is also limited, so that liquid nitrogen can take away the heat on the water pipeline; the spring 13 can automatically adjust the distance between the rotating roller 12 and the rotating roller 2 15, thereby adapting to water pipelines of different thicknesses.
[0017] The branch pipe 6 is a universal bamboo tube; specifically, the universal bamboo tube can adjust the angle at will, which is more convenient to use.
[0018] The branch pipe 6 and the conveying device are arranged in a staggered manner; the positions of the branch pipe 6 and the conveying device do not conflict.
[0019] There are four supporting legs 2, two of which are arranged on each side. A cross bar 17 is fixedly connected between the two supporting legs 2 on each side. The two ends of the horizontal tube 5 are respectively located at the top of the cross bar 17 on both sides. The horizontal tube 5 is installed on the cross bar 17 through a U-shaped tube clamp 18; specifically, the two ends of the horizontal tube 5 are fixed on the cross bar 17.
Claims
1. A rapid cooling device for circulating water pipeline production, comprising a placement seat, with support legs installed on both sides of the bottom of the placement seat, characterized in that: The longitudinal section of the placement seat is a trough-shaped structure. Several conveying devices for conveying pipelines are arranged in the placement seat. A nitrogen tank is placed under the placement seat. The outlet of the nitrogen tank is connected to a liquid nitrogen pump. The outlet of the liquid nitrogen pump is connected to a vertical connecting pipe. The vertical connecting pipe is connected to a horizontal pipe. The horizontal pipe is installed at the bottom of the base plate of the placement seat. Several branch pipes distributed at equal intervals and arranged vertically are installed on the horizontal pipe. The branch pipes extend upward through the base plate of the placement seat. An air cooling device is arranged on the top of the placement seat.
2. The rapid cooling device for circulating water pipeline production according to claim 1 is characterized in that: The air cooling device comprises a support rod fixedly connected to the top of two vertical plates of the placement seat, a horizontal plate is fixedly installed on the top of the support rod, and a plurality of fans are installed on the horizontal plate.
3. The rapid cooling device for circulating water pipeline production according to claim 1 is characterized in that: The conveying device includes two connecting rods, each of which is fixedly connected to a fixed seat, a rotating roller 1 is rotatably connected between the two fixed seats, a spring is sleeved on the outside of the connecting rod, the spring is fixedly connected to the top of the fixed seat, a movable seat is fixedly connected to the top of the spring, the movable seat is sleeved on the outside of the connecting rod, and a rotating roller 2 is rotatably connected between the two movable seats.
4. The rapid cooling device for circulating water pipeline production according to claim 1 is characterized in that: The branch pipe is a universal bamboo pipe.
5. The rapid cooling device for circulating water pipeline production according to claim 1 is characterized in that: The branch pipes and the conveying device are staggered.
6. The rapid cooling device for circulating water pipeline production according to claim 1, characterized in that: There are 4 supporting legs, 2 on each side, a cross bar is fixedly connected between the two supporting legs on each side, the two ends of the horizontal tube are respectively located at the top of the cross bars on both sides, and the horizontal tube is installed on the cross bar through a U-shaped tube clamp.