Simple transporting device for mountain high-abrupt-slope photovoltaic modules

By designing a mountainous photovoltaic module transportation device that includes a traction device and a trolley track, the problem of low transportation efficiency and high cost of photovoltaic modules in mountainous high and steep slope areas is solved, and efficient and safe photovoltaic module transportation is achieved.

CN222388943UActive Publication Date: 2025-01-24THREE GORGES GREEN DEV CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420351855.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-26
Publication Date
2025-01-24
Estimated Expiration
2034-02-26

AI Technical Summary

Technical Problem

In high and steep slopes in mountainous areas, the photovoltaic construction area has a large slope and a long slope, which leads to low efficiency and high cost in manual overflow. The drone is prone to operating failures due to signal attenuation, so it is impossible to efficiently transport photovoltaic modules.

Method used

Design a transport device that includes a traction device fixed on the top of the slope and a trolley track laid on the slope. The traction unit and the steel cable are connected to the transport trolley. The transport trolley and the trolley track slide and cooperate to achieve Efficient transportation of photovoltaic modules.

Benefits of technology

This device can efficiently solve the problem of large -length photovoltaic components in high -steep and steep slopes in mountains, reduce transportation costs, improve construction efficiency, and ensure the safety of transportation through structural design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222388943U_ABST
    Figure CN222388943U_ABST
Patent Text Reader

Abstract

The utility model discloses a simple transporting device for a mountain high abrupt slope photovoltaic module, which comprises a traction device fixed at the top of a slope, the traction device is connected with a transporting trolley through a steel cable in a hanging manner, the transporting trolley is in sliding fit with a trolley track paved on the slope surface, and the transporting trolley comprises a rectangular frame structure formed by connecting a main beam and a secondary beam; a plurality of connecting beams are connected to the inner wall of the frame; four running mechanisms are symmetrically connected to the lower surface of the frame structure and matched with the trolley track, the trolley track comprises a plurality of anchoring mechanisms, each anchoring mechanism comprises stand columns symmetrically arranged on the two sides, the bottom ends of the stand columns are matched with the slope in an inserted mode, and the top ends of the stand columns are perpendicularly connected with the two ends of a track crosspiece through steel pipe fasteners; the outer surface of the rail crosspiece is sleeved with a sleeve to be connected with the lower surface of the rail, the rail is connected with the upper surfaces of the sleeves of the anchoring mechanisms, and the anchoring mechanisms are connected into a whole. The device has the advantages of being low in cost, convenient to install, easy to operate and capable of efficiently solving the problem of reshipment of the mountain photovoltaic high-abrupt-slope large-length photovoltaic module.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of photovoltaic construction, and more specifically, relates to a simple transportation device for photovoltaic components on high and steep slopes in mountains. Background Art

[0002] Some photovoltaic power stations are built in mountainous areas with high altitudes. The project area is located on the top of the mountain and the arrays are concentrated together. For example, a photovoltaic project in a county in Yunnan has an altitude of 1700m to 2160m. The structural stability of the project area is poor, the terrain slope ranges from 15 to 39°, and more than 70% of the entire photovoltaic field has a slope of 30 to 39°. The 3#~5# array reaches more than 50, and the mountain slope of the array in this area is about 500m long. The photovoltaic panels are arranged facing north and south (30° east by north). Because the slope is steep, the entire photovoltaic field is limited by the site scope and slope, and it is impossible to build roads on the site, and the equipment cannot be transported to each photovoltaic array. For such construction areas, only a combination of manual transportation and drone lifting can be used, but the two solutions are inefficient and costly, and cannot efficiently meet the construction progress requirements; therefore, it is necessary to design a simple transportation device for photovoltaic components on steep slopes in mountains to solve the above problems. Summary of the invention

[0003] The purpose of the utility model is to provide a simple transportation device for photovoltaic components on steep slopes in mountains, which solves the problem in the prior art that the photovoltaic construction area has a large and long mountain slope, resulting in low efficiency and high cost of manual transportation, and the UAV is blocked by the mountains and the signal is attenuated, and operational failures are prone to occur, resulting in shortened flight distance. The utility model has the characteristics of low cost, easy installation, simple operation, and efficient solution to the problem of transporting long-length photovoltaic components on steep slopes in mountains.

[0004] In order to realize the above technical features, the technical solution adopted by the utility model is:

[0005] A simple transportation device for photovoltaic components on steep mountain slopes comprises a traction device fixed on the top of the slope, the traction device is connected to a transportation trolley through a steel cable, and the transportation trolley is slidably matched with a trolley track laid on the slope.

[0006] Furthermore, the traction device is preferably a winch, which is fixed by using nearby buildings or ground, and the tail is blocked and fixed with a wire rope to avoid overturning. When the traction force is large, it is necessary to set up a support in front of the winch to prevent the winch from being tilted due to single-sided force.

[0007] Furthermore, a guide wheel is fixed on the slope top surface in front of the winch for guiding the steel cable.

[0008] Preferably, the transport trolley comprises a rectangular frame structure formed by connecting a main beam and a secondary beam, and a plurality of connecting beams are connected to the inner wall of the frame.

[0009] Preferably, a plurality of stop bars are vertically connected to the upper surface of the frame structure for limiting the position of goods.

[0010] Preferably, four operating mechanisms are symmetrically connected to the lower surface of the frame structure to cooperate with the trolley track.

[0011] Preferably, the trolley track includes a plurality of anchoring mechanisms, which include columns symmetrically arranged on both sides, the bottom ends of the columns are plug-fitted into the slope, and the top ends of the columns are vertically connected to the two ends of the track crossbar through steel pipe fasteners.

[0012] Furthermore, in addition to the columns, diagonal braces are also provided for fixing to the slope to enhance the stability of the structure.

[0013] Preferably, a sleeve is sleeved on the outer surface of the rail crosspiece and connected to the lower surface of the rail, and the rail is connected to the upper surfaces of the sleeves of multiple anchoring mechanisms, so that the multiple anchoring mechanisms are connected into a whole.

[0014] Furthermore, a collision head structure is provided at both ends of the track to prevent the transport trolley from running off the track due to excessive recovery or falling, thereby improving safety.

[0015] Preferably, the track includes two left and right tracks, the spacing between the tracks is the same as the spacing between the running mechanisms of the transport trolley, and the two tracks are connected and reinforced by a connector.

[0016] Preferably, the operating mechanism comprises a raised slider, which slides into a slot provided on the side surface of the track.

[0017] Furthermore, the hanging points at both ends are symmetrically designed and are hung with the hanging points at both ends of the pressure steel pipe when in use.

[0018] The beneficial effects of the utility model are:

[0019] 1. The utility model adopts a simple transportation device to efficiently transport photovoltaic panels to the construction area in the case that the photovoltaic slope is steep and long and it is impossible to use transportation equipment to transport the photovoltaic string components to the construction area, reducing the input of manual handling and drone lifting to meet the construction needs. The device has a simple structure, is easy to make, install, transport and maintain, and only needs to adjust the length of the winch wire rope according to the length of the mountain slope on site to meet the transportation task of the photovoltaic string components;

[0020] 2. The transport trolley of this device is suitable for the situation where the hillside is ups and downs and there are local broken lines. By changing the wheelbase, the transportation stability can be ensured to meet the transportation requirements;

[0021] 3. The running mechanism of the transport trolley of the device, i.e., the wheels, are always stuck in the grooves of the track and will not jump off the track, thus ensuring the safety of the trolley transportation. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0023] Figure 1 It is a schematic diagram of the structure of the utility model;

[0024] Figure 2 This is a schematic diagram of the main structure of the transport trolley in the utility model;

[0025] Figure 3 It is a side view structural schematic diagram of the transport trolley in the utility model;

[0026] Figure 4 This is a schematic diagram of the main structure of the trolley track in the utility model;

[0027] Figure 5 This is a schematic diagram of the cooperation between the transport trolley and the trolley track in the embodiment of the utility model;

[0028] In the figure: traction device 1, steel cable 11, transport trolley 2, main beam 21, secondary beam 22, connecting beam 23, trolley track 3, running mechanism 4, stop bar 5, column 6, steel pipe fastener 7, track crosspiece 8, sleeve 81, track 9, connecting piece 91, guide wheel 10. DETAILED DESCRIPTION

[0029] Embodiment 1:

[0030] like Figure 1~Figure 5 A simple transport device for photovoltaic modules on a steep mountain slope comprises a traction device 1 fixed on the top of the slope, the traction device 1 is connected to a transport trolley 2 through a steel cable 11, and the transport trolley 2 is slidably matched with a trolley track 3 laid on the slope.

[0031] Furthermore, the traction device 1 is preferably a winch, which is fixed by using nearby buildings or ground, and the tail is locked and fixed with a wire rope to avoid overturning. When the traction force is large, it is necessary to set up a support in front of the winch to prevent the winch from being tilted due to single-sided force.

[0032] Furthermore, a guide wheel 10 is fixed on the slope top surface in front of the winch for guiding the steel cable 11.

[0033] Preferably, the transport trolley 2 comprises a rectangular frame structure formed by connecting a main beam 21 and a secondary beam 22, and a plurality of connecting beams 23 are connected to the inner wall of the frame.

[0034] Preferably, a plurality of stop bars 5 are vertically connected to the upper surface of the frame structure for limiting the position of goods.

[0035] Preferably, four operating mechanisms 4 are symmetrically connected to the lower surface of the frame structure to cooperate with the trolley track 3.

[0036] Preferably, the trolley track 3 includes a plurality of anchoring mechanisms, which include columns 6 symmetrically arranged on both sides, the bottom ends of the columns 6 are plugged into the slope, and the top ends of the columns 6 are vertically connected to the two ends of the track 9 and the crossbar 8 through steel pipe fasteners 7.

[0037] Furthermore, in addition to the columns 6, diagonal braces are provided for fixing to the slope surface to enhance the stability of the structure.

[0038] Preferably, the outer surface of the crosspiece 8 of the track 9 is sleeved with a sleeve 81 connected to the lower surface of the track 9, and the track 9 is connected to the upper surfaces of the sleeve 81 of multiple anchoring mechanisms, connecting the multiple anchoring mechanisms into a whole.

[0039] Furthermore, both ends of the track 9 are provided with a collision structure to prevent the transport trolley 2 from excessively running out of the track 9 when being recovered or falling, thereby improving safety.

[0040] Preferably, the track 9 includes two left and right tracks 9 , the spacing between the tracks 9 is the same as the spacing between the running mechanisms 4 of the transport trolley 2 , and the two tracks 9 are connected and reinforced by a connector 91 .

[0041] Preferably, the operating mechanism 4 includes a protruding slider, which slides into a slot provided on the side surface of the track 9 .

[0042] Furthermore, the hanging points at both ends are symmetrically designed and are hung with the hanging points at both ends of the pressure steel pipe when in use.

[0043] Embodiment 2:

[0044] The traction mechanism of this device uses a 2T winch (20 meters / minute, motor power: 7.5kw) and is installed in a place with a wide field of vision for easy observation by operators and commanders. The center line of the guide pulley is perpendicular to the center line of the drum and is separated from the drum by a certain distance (L) greater than 20 times the width d of the drum to ensure that the deflection angle of the wire rope does not exceed 0.01 when it is wound around the two sides of the drum. In this way, the steel wires can be arranged in order on the drum without being wound obliquely or overlapping each other. The drum is customized to increase the drum's rope capacity (500m). The winch adopts , Multi-strand steel wire rope is used as a traction rope, which can meet the traction of 12 photovoltaic panels (400kg), with a safety factor of more than 9 times.

[0045] Transport trolley 2 adopts Galvanized square tube ( ) is mainly made of load-bearing frame, photovoltaic panel baffle ( Angle steel) and operating mechanism 4 (load-bearing rubber wheel 100kg or flangeless steel wheel).

[0046] Trolley track 3 is mainly supported by 8# channel steel. Track 9, Steel pipes are welded to serve as rail 9 connectors 91 (one connector 91 is 4m apart), and inner diameters are welded every 4m below the double rails 9. The sleeve 81 is mainly used to quickly fix the rail 9 crosspiece 8. The steel pipe passes through the casing 81 and bears the cross-arm load of the track 9; the column 6 still adopts The steel pipe is connected to the cross arm with fasteners, and the diagonal brace is connected to the column 6 with fasteners.

[0047] The working principle of the utility model is as follows:

[0048] The winch should be fixed to nearby buildings or ground as much as possible, and the tail should be locked and fixed with a wire rope. After fixing, the winch should not slide or overturn. When the traction force is large, a support should be set up in front of the winch to prevent the winch from being deflected due to single-sided force.

[0049] The guide wheel 10 can be placed on a cast foundation or a steel structure foundation using a fixed pulley. A pit (with a depth of not less than 500 mm) must be dug to pre-embed the foundation to ensure the stability of the guide wheel 10.

[0050] The double track 9 is made of 8# channel steel, connected with steel pipes every 4m, and the inner diameter casing 81 is welded below (the casing 81 is provided with auxiliary angle steel on the slope surface to increase the welding surface).

[0051] The columns 6 and the diagonal braces are both made of steel pipes, and a foundation pit of not less than 200mm depth can be dug for foundation pouring. The pouring depth of the columns 6 and the diagonal braces is 200mm, and the exposed length is not less than 500mm.

[0052] The cross arm of the track 9 passes through the sleeve 81 below the track 9 and is connected to the column 6 using fasteners. The accuracy of the position of the foundation column 6 and the cross bar must be ensured to avoid inaccurate connection.

[0053] A collision head must be installed at both ends of track 9. At the same time, the winch operator and the upper and lower command personnel communicate using walkie-talkies to avoid accidents caused by trolley derailment.

[0054] Before operation, the electrical and brake of the winch, the wire rope, and the stability of the full-stroke track 9 are checked. If the inspection is normal, the full-stroke transport trolley 2 no-load operation test can be carried out.

[0055] The simple transport device is tested and checked normally without load. The transport trolley 2 can be driven into the upper part of the track 9, and the photovoltaic panels are manually transported to the trolley (the contact surface is protected by a soft cushion). After the transportation is completed, the photovoltaic panels are fixed to the trolley with a drawstring.

[0056] The winch is started, the brake is opened, and the winch pulls the transport trolley 2 at a constant speed of 20m / min along the track 9 to slide down to the required transportation position, and the photovoltaic panels are manually unloaded and transported to the installation position along the mountain contour line.

[0057] After the unloading of the traction transport trolley 2 is completed, the transport trolley 2 is manually towed to the top of the mountain using a traction rope, and the photovoltaic components are loaded again to repeat the above operation process.

[0058] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The embodiments and features in the embodiments of the present application can be arbitrarily combined with each other without conflict. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A simple transportation device for photovoltaic modules on steep slopes in mountains, characterized by: The invention comprises a traction device (1) fixed on the top of a slope, the traction device (1) being connected to a transport trolley (2) via a steel cable (11), the transport trolley (2) comprising a rectangular frame structure formed by connecting a main beam (21) and a secondary beam (22), the inner wall of the frame being connected to a plurality of connecting beams (23); the transport trolley (2) being slidably matched with a trolley track (3) laid on the slope, the lower surface of the frame structure being symmetrically connected with four operating mechanisms (4) being matched with the trolley track (3), the track (9) of the trolley track (3) comprising two left and right tracks, the spacing between the tracks (9) being the same as the spacing between the operating mechanisms (4) of the transport trolley (2), the two tracks (9) being connected and reinforced via a connecting piece (91), the operating mechanism (4) comprising a protruding slider, the slider being inserted into a slot provided on the side surface of the track (9) and sliding.

2. A simple transportation device for photovoltaic modules on steep slopes in mountains according to claim 1, characterized in that: A plurality of stop bars (5) are vertically connected to the upper surface of the frame structure for limiting the position of goods.

3. The simple transportation device for photovoltaic modules on steep slopes in mountains according to claim 1 is characterized by: The trolley track (3) comprises a plurality of anchoring mechanisms, the anchoring mechanisms comprising columns (6) symmetrically arranged on both sides, the bottom ends of the columns (6) being plugged into the slope surface, and the top ends of the columns (6) being vertically connected to the two ends of the track crosspiece (8) via steel pipe fasteners (7).

4. The simple transportation device for photovoltaic modules on steep slopes in mountains according to claim 3 is characterized by: The outer surface of the track crosspiece (8) is sleeved with a sleeve (81) connected to the lower surface of the track (9), and the track (9) is connected to the upper surfaces of the sleeves (81) of multiple anchoring mechanisms, thereby connecting the multiple anchoring mechanisms into a whole.