Boiler machining device with waste heat recovery function
By designing a boiler machining device with the function of waste heat recovery, using the exhaust pipe and a fan to absorb and recycle the heat in the drainage of boiler drainage, solve the problem of waste of water resources and water heat in the drainage process of traditional boiler, and realize energy saving and energy conservation and energy saving and energy saving and energy saving and energy saving and energy saving and realizing energy saving and achieving energy saving and energy saving. Reduce the effect of cost.
Patent Information
- Application Number
- CN202421185351.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-28
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2034-05-28
AI Technical Summary
Traditional boilers are discharged directly to the cooling pool or recycled to the raw pool during the drainage process, resulting in waste of water resources and water heat.
Design a boiler machining device with the function of residual heat recovery. By the pipeline, the main heat of the boiler is cited to the hotter imported heat exchanger, absorbing fixed drainage heat, increased the air temperature, and recovered the calories through a fixed drainage pump to the original to the original to the original to the original to the original. pool.
Effectively save coal resources, reduce the loss of fixed drainage heat, improve boiler combustion efficiency, reduce company costs, and achieve efficient recovery and utilization of waste heat.
Smart Images

Figure CN222392922U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of boiler waste heat recovery, in particular to a boiler processing device with a waste heat recovery function. Background Art
[0002] With the development of society, industrial production technology is also constantly improving. Industrial boilers are commonly used devices in industrial production processes. Industrial boilers can provide steam for power generation or gas supply. They are important thermal power equipment.
[0003] The traditional technology is that the boiler fixed and continuous water is directly discharged into the cooling water pool, or recycled into the original water pool for recycling, which greatly wastes water resources and water heat, thus a boiler processing device with waste heat recovery function is proposed. Utility Model Content
[0004] The purpose of the utility model is to provide a boiler processing device with a waste heat recovery function. The traditional technology is that the boiler fixed and continuous water is directly discharged into a cooling water pool, or recovered into a raw water pool for recycling, which greatly wastes water resources and water heat, thus providing a boiler processing device with a waste heat recovery function.
[0005] An embodiment of the present application provides a boiler processing device with a waste heat recovery function, including a boiler body, a delivery pipe is installed at the lower end of the boiler body, a cooling water pool is arranged on the side of the delivery pipe away from the boiler body, a discharge pipe is installed on the outer wall of the middle part of the delivery pipe, a heat exchange pipe and a circulation pipe are installed at the lower end of the discharge pipe, a heat exchanger is installed on the side of the circulation pipe and the heat exchange pipe away from the discharge pipe, a primary fan is installed on one side of the heat exchanger, a raw water pool is arranged on the side of the discharge pipe away from the delivery pipe, and a fixed drainage pump is installed inside the discharge pipe.
[0006] By adopting the above technical scheme, the heat of the boiler body is led to the heat exchanger at the inlet of the primary fan through the discharge pipe, and the primary fan absorbs the excess discharge heat to increase the primary air temperature and increase the boiler combustion efficiency. The excess discharge heat absorbed by the primary fan is then recovered to the original water pool, saving coal resources, reducing the loss of excess discharge heat, increasing the boiler combustion efficiency and reducing the company's costs.
[0007] Optionally, a first valve is installed inside the delivery pipe below the discharge pipe.
[0008] By adopting the above technical solution, the delivery pipe can be closed and opened through the first valve, so that the heat in the delivery pipe can be transported to the cooling water pool.
[0009] Optionally, a second valve and a third valve are installed inside the exhaust pipe, and the third valve is located between the heat exchange pipe and the circulation pipe.
[0010] By adopting the above technical solution, the discharge pipe can be closed and opened through the second valve and the third valve.
[0011] Optionally, a fourth valve is installed inside the heat exchange tube, and a fifth valve is installed inside the circulation tube.
[0012] By adopting the above technical solution, the fourth valve can close and open the heat exchange tube, and the fifth valve can close and open the circulation tube.
[0013] Optionally, the fixed drainage pump is located between the second valve and the third valve.
[0014] By adopting the above technical solution, the heat inside the discharge pipe can be discharged in a fixed manner by setting a fixed drainage pump.
[0015] Optionally, an exhaust pipe is installed at the upper end of the boiler body, a first connecting pipe is installed at one side of the boiler body, and a first row of pipes and a second row of pipes are installed inside the first connecting pipe.
[0016] By adopting the above technical solution, the first connecting pipe can connect the first row of pipes, the second row of pipes and the boiler body, and the exhaust pipe adopts a water seal method.
[0017] Optionally, a second connecting pipe is installed on a side of the boiler body away from the first connecting pipe, and a first furnace-fixed row pipe and a second furnace-fixed row pipe are installed inside the second connecting pipe.
[0018] By adopting the above technical solution, the first furnace fixed row pipe, the second furnace fixed row pipe and the boiler body can be connected through the second connecting pipe.
[0019] Compared with the prior art, the technical solution of this application has the following beneficial effects:
[0020] The technical solution of this application leads the heat of the boiler main body to the heat exchanger at the inlet of the primary fan through the discharge pipe, and the primary fan absorbs the excess discharge heat, thereby increasing the primary air temperature and the boiler combustion efficiency. The excess discharge heat absorbed by the primary fan is then recovered to the original water tank, saving coal resources, reducing the loss of excess discharge heat, increasing the boiler combustion efficiency and reducing the company's costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:
[0022] Figure 1 It is a front view schematic diagram of a boiler processing device with waste heat recovery function according to the utility model;
[0023] Figure 2 The utility model is a boiler processing device with waste heat recovery function Figure 1 Enlarged view of point A in the middle;
[0024] Figure 3 It is a right side schematic diagram of a primary fan of a boiler processing device with waste heat recovery function according to the utility model.
[0025] In the figure: 1. Boiler body; 2. Cooling water pool; 3. Heat exchanger; 4. Primary fan; 5. Raw water pool; 6. Exhaust pipe; 7. First connecting pipe; 8. First row of pipes; 9. Second row of pipes; 10. Second connecting pipe; 11. First furnace fixed row of pipes; 12. Second furnace fixed row of pipes; 13. Delivery pipe; 14. Exhaust and delivery pipe; 15. Heat exchange pipe; 16. Circulation pipe; 17. First valve; 18. Second valve; 19. Third valve; 20. Fourth valve; 21. Fifth valve; 22. Fixed drainage pump. DETAILED DESCRIPTION
[0026] See also Figure 1-3 The utility model provides a technical solution: a boiler processing device with waste heat recovery function, including a boiler body 1, a delivery pipe 13 is installed at the lower end of the boiler body 1, a cooling water pool 2 is arranged on the side of the delivery pipe 13 away from the boiler body 1, a discharge pipe 14 is installed on the outer wall of the middle part of the delivery pipe 13, a heat exchange pipe 15 and a circulation pipe 16 are installed at the lower end of the discharge pipe 14, a heat exchanger 3 is installed on the side of the circulation pipe 16 and the heat exchange pipe 15 away from the discharge pipe 14, a primary fan 4 is installed on one side of the heat exchanger 3, a raw water pool 5 is arranged on the side of the discharge pipe 14 away from the delivery pipe 13, and a fixed drainage pump 22 is installed inside the discharge pipe 14;
[0027] An exhaust pipe 6 is installed at the upper end of the boiler body 1, a first connecting pipe 7 is installed on one side of the boiler body 1, a first connecting pipe 8 and a second connecting pipe 9 are installed inside the first connecting pipe 7, a second connecting pipe 10 is installed on the side of the boiler body 1 away from the first connecting pipe 7, a first furnace fixed row pipe 11 and a second furnace fixed row pipe 12 are installed inside the second connecting pipe 10.
[0028] In the technical solution of the utility model, the heat of the boiler body 1 is led to the heat exchanger 3 at the inlet of the primary fan 4 through the discharge pipe 14, and the primary fan 4 absorbs the excess discharge heat to increase the primary air temperature and increase the boiler combustion efficiency. The excess discharge heat absorbed by the primary fan 4 is then recovered to the raw water pool 5, saving coal resources, reducing the loss of excess discharge heat, increasing the boiler combustion efficiency and reducing the company's costs.
[0029] In addition, the first connecting pipe 7 can be used to connect the first row of pipes 8, the second row of pipes 9 and the boiler body 1, and the exhaust pipe 6 adopts a water seal method, and the second connecting pipe 10 can be used to connect the first furnace fixed row of pipes 11, the second furnace fixed row of pipes 12 and the boiler body 1.
[0030] In the technical solution of the utility model, if Figure 1 and Figure 2 As shown, a first valve 17 is installed inside the delivery pipe 13 located below the discharge pipe 14, and the first valve 17 can be used to close and open the delivery pipe 13, so that the heat in the delivery pipe 13 can be delivered to the cooling water pool 2. A second valve 18 and a third valve 19 are installed inside the discharge pipe 14, and the third valve 19 is located between the heat exchange pipe 15 and the circulation pipe 16. The discharge pipe 14 can be closed and opened by the second valve 18 and the third valve 19. A fourth valve 20 is installed inside the heat exchange pipe 15, and a fifth valve 21 is installed inside the circulation pipe 16. The fourth valve 20 can be used to close and open the heat exchange pipe 15, and the fifth valve 21 can be used to close and open the circulation pipe 16. A fixed drainage pump 22 is located between the second valve 18 and the third valve 19. The setting of the fixed drainage pump 22 can discharge the heat inside the discharge pipe 14.
[0031] When in use, firstly, the combustion process can be started by starting the boiler body 1 to generate heat and heat the water in the boiler. The heated water flows to the cooling water pool 2 through the delivery pipe 13. In this process, the water carries a large amount of waste heat. When the water passes through the discharge pipe 14, the amount of water entering the discharge pipe 14 is controlled by adjusting the first valve 17. Inside the discharge pipe 14, the amount of water entering the heat exchange pipe 15 and the circulation pipe 16 is controlled by adjusting the second valve 18 and the third valve 19. When it is necessary to recover the waste heat, the second valve 18 and the third valve 19 are opened to allow part of the water to flow into the heat exchange pipe 15. The hot water in the heat exchange pipe 15 exchanges heat with the medium in the heat exchanger 3, and the heat is transferred to the medium to realize the recovery of the waste heat. The amount of water entering the heat exchange pipe 15 can be controlled by adjusting the fourth valve 20, thereby adjusting the efficiency of the waste heat recovery. The water after the heat exchange flows back to the delivery pipe 13 through the circulation pipe 16 and continues to participate in the circulation of the boiler body. The fifth valve 21 in 16 can be used to adjust the amount of circulating water. When part of the water needs to be discharged, the fixed drainage pump 22 is started. By adjusting the switching status of the second valve 18 and the third valve 19, the water to be discharged flows through the fixed drainage pump 22 into the raw water pool 5 for discharge. At the upper end of the boiler body 1, the exhaust air pipe 6 is responsible for discharging the exhaust gas generated during the combustion process to ensure the gas circulation inside the boiler. Through the first row of pipes 8 and the second row of pipes 9 in the first connecting pipe 7, part of the water and impurities generated inside the boiler can be discharged to keep the inside of the boiler clean. On the other side of the boiler body 1, through the first furnace fixed row pipe 11 and the second furnace fixed row pipe 12 in the second connecting pipe 10, the bottom sediment in the boiler can be discharged regularly to prevent scaling and blockage. Through the above-mentioned working process, the boiler processing device with waste heat recovery function can effectively recover and utilize waste heat, improve energy utilization efficiency, and maintain the normal operation and cleanliness of the boiler.
Claims
1. A boiler processing device with waste heat recovery function, characterized in that: The invention comprises a boiler body (1), a delivery pipe (13) is installed at the lower end of the boiler body (1), a cooling water pool (2) is arranged on the side of the delivery pipe (13) away from the boiler body (1), a discharge pipe (14) is installed on the outer wall of the middle part of the delivery pipe (13), a heat exchange pipe (15) and a circulation pipe (16) are installed at the lower end of the discharge pipe (14), a heat exchanger (3) is installed on the side of the circulation pipe (16) and the heat exchange pipe (15) away from the discharge pipe (14), a primary fan (4) is installed on one side of the heat exchanger (3), a raw water pool (5) is arranged on the side of the discharge pipe (14) away from the delivery pipe (13), and a fixed drainage pump (22) is installed inside the discharge pipe (14).
2. A boiler processing device with waste heat recovery function according to claim 1, characterized in that: A first valve (17) is installed inside the delivery pipe (13) below the discharge pipe (14).
3. The boiler processing device with waste heat recovery function according to claim 2 is characterized in that: A second valve (18) and a third valve (19) are installed inside the exhaust pipe (14), and the third valve (19) is located between the heat exchange pipe (15) and the circulation pipe (16).
4. The boiler processing device with waste heat recovery function according to claim 3 is characterized in that: A fourth valve (20) is installed inside the heat exchange tube (15), and a fifth valve (21) is installed inside the circulation tube (16).
5. The boiler processing device with waste heat recovery function according to claim 3 is characterized in that: The fixed drainage pump (22) is located between the second valve (18) and the third valve (19).
6. The boiler processing device with waste heat recovery function according to claim 1, characterized in that: An exhaust pipe (6) is installed at the upper end of the boiler body (1), a first connecting pipe (7) is installed on one side of the boiler body (1), and a first row of pipes (8) and a second row of pipes (9) are installed inside the first connecting pipe (7).
7. The boiler processing device with waste heat recovery function according to claim 6, characterized in that: A second connecting pipe (10) is installed on a side of the boiler body (1) away from the first connecting pipe (7), and a first furnace fixed row pipe (11) and a second furnace fixed row pipe (12) are installed inside the second connecting pipe (10).