Pipeline mounting device for water conservancy and hydropower engineering
By designing a water conservancy and hydropower pipeline installation device with height adjustment and stability improvement functions, the installation limitations caused by the height fixation of existing devices are solved, and a more flexible and stable pipeline installation process is achieved.
Patent Information
- Application Number
- CN202421081602.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-17
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2034-05-17
AI Technical Summary
The height of the existing water conservancy and water power pipeline installation devices is fixed and cannot be adjusted according to the installation height requirements of the pipeline, resulting in limitations when installing the pipeline.
A pipe mounting device including a base, a support seat, a bracket, a slide chute, a dual-axis motor, a screw, a clamping rod and a curved clamp are designed. The height of the device can be adjusted by the arrangement of the second biaxial motor, the second screw, the screw sleeve and the support rod; the arrangement of the first biaxial motor, the first screw, the clamping rod and the arc-shaped clamping plate can be improved Installation stability.
It realizes flexible adjustment of the device height, reduces the limitations when installing pipes, and improves the stability of pipe installation.
Smart Images

Figure CN222430691U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of pipeline installation, and in particular relates to a pipeline installation device for water conservancy and hydropower engineering. Background Art
[0002] Water conservancy and hydropower are basic industries for national economic and social development. Water conservancy and hydropower projects have a long construction period, large investment, and many cooperating departments. They are greatly affected by natural resources, topography, geology, and hydrological and meteorological conditions. Currently, in the installation process of water conservancy and hydropower pipelines, pipelines need to be spliced in multiple sections to complete the installation. Currently, pipeline installation devices are often used to complete the splicing and installation of multiple sections of pipelines.
[0003] The existing Chinese patent with announcement number CN215763679U discloses a pipeline installation device for water conservancy and hydropower, including a device body, the device body includes a base, an inspection door is installed on one side of the base through bolt connection, support seats are provided at the top of the base and at both ends along the length direction, the top of the support seat is provided with an anti-slip structure that can effectively prevent the pipeline from slipping during installation, the top of the base and at both ends of the support seat along the width direction are provided with adjustment grooves, the inside of the base is provided with a clamping structure that facilitates the device to install pipelines of different diameters, the clamping structure includes a slide rod, the top of the slide rod passes through the adjustment groove and extends out of the base to be connected and installed with a clamping block, and a rubber pad for protecting the pipeline is provided on the side of the clamping block close to the support seat.
[0004] With respect to the above-mentioned related technology, the inventors found that there are at least the following problems in the technology: the installation of the pipeline usually has a specific height, but the height of the above-mentioned device is fixed and cannot be adjusted according to the installation height requirements of the pipeline, resulting in limitations when installing the pipeline. Utility Model Content
[0005] The purpose of the utility model is to provide a pipeline installation device for water conservancy and hydropower engineering to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pipeline installation device for water conservancy and hydropower engineering, comprising a base and a support base arranged above the base, both sides of the top of the support base are fixedly connected with a bracket, and the support base is provided with slide grooves on both sides of the bracket, a first double-axis motor is fixedly installed inside the slide groove, both output ends of the first double-axis motor are fixedly connected with a first screw, a clamping rod is threadedly connected to the first screw, an arc-shaped clamping plate is fixedly connected to the upper end of the clamping rod, a groove is provided inside the base, a second double-axis motor is fixedly installed inside the groove, both output ends of the second double-axis motor are fixedly connected with a second screw, a screw sleeve is threadedly connected to the second screw, and a support rod is hinged between the screw sleeve and the bottom of the support base.
[0007] As a preferred embodiment, the surfaces of the bracket and the arc-shaped clamping plate are fixedly connected with anti-skid pads, and the anti-skid pads are rubber pads.
[0008] As a preferred embodiment, inspection doors are hinged on both sides of the support seat close to the two slide slots.
[0009] As a preferred embodiment, the inner bottom wall of the groove is fixedly connected with a slide rail, the bottom of the screw sleeve is fixedly connected with a slider, and the slider is slidably connected to the slide rail.
[0010] As a preferred embodiment, guide grooves are provided at four corners of the upper surface of the base, the top of the guide groove is slidably connected to a guide rod, and the upper end of the guide rod is fixedly connected to the support seat.
[0011] As a preferred embodiment, a Foma wheel is provided at the bottom of the base, and there are four Foma wheels, which are evenly distributed at the four corners of the bottom of the base.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] The pipeline installation device for water conservancy and hydropower engineering, through the arrangement of the second double-axis motor, the second screw rod, the screw sleeve and the support rod, when installing pipelines of different heights, the second double-axis motor can be started to drive the two second screw rods to rotate, so that the second screw rod drives the two screw sleeves to move closer to or away from each other, and the screw sleeve drives the support seat to rise and fall through the support rod, so that the height of the device can be adjusted, reducing the limitations when installing pipelines;
[0014] The pipeline installation device for water conservancy and hydropower engineering, through the arrangement of a support seat, a slide groove, a first double-axis motor, a first screw rod, a clamping rod and an arc-shaped clamping plate, can place the pipeline on the support seat when installing the pipeline, start the first double-axis motor to drive the two first screw rods to rotate, so that the first screw rod drives the two clamping rods to approach each other, and the clamping rod drives the arc-shaped clamping plate to clamp and fix the pipeline, thereby improving the stability of the pipeline during installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0016] Figure 2 This is a schematic diagram of the main cross-sectional structure of the utility model;
[0017] Figure 3 It is a schematic diagram of the side cross-sectional structure of the support seat of the utility model;
[0018] Figure 4 It is a structural schematic diagram of the clamping rod of the utility model.
[0019] In the figure: 1. base; 2. support seat; 3. bracket; 4. slide groove; 5. first double-axis motor; 6. first screw; 7. clamping rod; 8. arc-shaped clamping plate; 9. groove; 10. second double-axis motor; 11. second screw; 12. screw sleeve; 13. support rod; 14. anti-slip pad; 15. inspection door; 16. slide rail; 17. slider; 18. guide groove; 19. guide rod; 20. Fomar wheel. DETAILED DESCRIPTION
[0020] The present invention will be further described below in conjunction with the embodiments.
[0021] The following examples are used to illustrate the present invention, but cannot be used to limit the scope of protection of the present invention. The conditions in the examples can be further adjusted according to specific conditions, and simple improvements to the method of the present invention under the premise of the concept of the present invention are all within the scope of protection claimed by the present invention.
[0022] See also Figure 1-4 The utility model provides a pipeline installation device for water conservancy and hydropower engineering, including a base 1 and a support base 2 arranged above the base 1, both sides of the top of the support base 2 are fixedly connected with a bracket 3, and the inside of the support base 2 is provided with a slide groove 4 on both sides of the bracket 3, and a first double-axis motor 5 is fixedly installed inside the slide groove 4, and both output ends of the first double-axis motor 5 are fixedly connected with a first screw 6, the first screw 6 is arranged horizontally, and a clamping rod 7 is threadedly connected to the first screw 6, and an arc-shaped clamping plate 8 is fixedly connected to the upper end of the clamping rod 7, through the bracket 3, the slide groove 4, the first double-axis motor 5, the first screw 6, the clamping rod 7 and the arc-shaped clamping plate 8. The arrangement of the clamping plate 8 means that when installing the pipeline, the pipeline can be placed on the bracket 3, and the first dual-axis motor 5 is started to drive the two first screws 6 to rotate, so that the first screws 6 drive the two clamping rods 7 to approach each other, and the clamping rods 7 drive the arc-shaped clamping plate 8 to clamp and fix the pipeline, thereby improving the stability of the pipeline during installation. The surfaces of the bracket 3 and the arc-shaped clamping plate 8 are fixedly connected with anti-skid pads 14, and the anti-skid pads 14 are rubber pads. Through the arrangement of the anti-skid pads 14, the friction between the bracket 3 and the arc-shaped clamping plate 8 and the pipeline can be improved, and the pipeline is prevented from sliding during installation. At the same time, it can play a buffering role on the pipeline to prevent the pipeline from being worn due to excessive force.
[0023] Among them, refer to Figure 1 and Figure 2 The support seat 2 is hinged with inspection doors 15 on both sides close to the two slide slots 4. The inspection doors 15 are arranged to facilitate the inspection and maintenance of the parts in the slide slots 4.
[0024] Reference Figure 2A groove 9 is provided inside the base 1, and a second dual-axis motor 10 is fixedly installed inside the groove 9. Both output ends of the second dual-axis motor 10 are fixedly connected with second screws 11, and the second screw 11 is arranged horizontally. A screw sleeve 12 is threadedly connected to the second screw 11, and a support rod 13 is hinged between the screw sleeve 12 and the bottom of the support seat 2. Through the arrangement of the second dual-axis motor 10, the second screw 11, the screw sleeve 12 and the support rod 13, when installing pipes of different heights, the second dual-axis motor 10 can be started to drive the two second screws 11 to rotate, so that the second screw 11 drives the two screw sleeves 12 to approach or move away from each other, and the screw sleeve 12 drives the support seat 2 to rise and fall through the support rod 13, so that the height of the device can be adjusted, reducing the limitations when installing pipes.
[0025] Among them, refer to Figure 2 The inner bottom wall of the groove 9 is fixedly connected with a slide rail 16, and the bottom of the screw sleeve 12 is fixedly connected with a slider 17. The slider 17 is slidably connected to the slide rail 16. Through the cooperation of the slide rail 16 and the slider 17, the screw sleeve 12 can be guided.
[0026] Among them, refer to Figure 2 A guide groove 18 is provided at the four corners of the upper surface of the base 1, and a guide rod 19 is slidably connected to the top of the guide groove 18. The upper end of the guide rod 19 is fixedly connected to the support seat 2. Through the cooperation of the guide groove 18 and the guide rod 19, the four corners of the support seat 2 can be guided to improve the stability of the support seat 2.
[0027] Reference Figure 2 A Foma wheel 20 is provided at the bottom of the base 1. There are four Foma wheels 20. The four Foma wheels 20 are evenly distributed at the four corners of the bottom of the base 1. The arrangement of the Foma wheels 20 facilitates the movement of the device.
[0028] The working principle and use process of the utility model are as follows: first, through the arrangement of the bracket 3, the slide 4, the first double-axis motor 5, the first screw 6, the clamping rod 7 and the arc-shaped clamping plate 8, when installing the pipeline, the pipeline can be placed on the bracket 3, and the first double-axis motor 5 is started to drive the two first screws 6 to rotate, so that the first screw 6 drives the two clamping rods 7 to approach each other, and the clamping rod 7 drives the arc-shaped clamping plate 8 to clamp and fix the pipeline, thereby improving the stability of the pipeline during installation; through the arrangement of the second double-axis motor 10, the second screw 11, the screw sleeve 12 and the support rod 13, when installing pipelines of different heights, the second double-axis motor 10 can be started to drive the two second screws 11 to rotate, so that the second screw 11 drives the two screw sleeves 12 to approach or move away from each other, and the screw sleeve 12 drives the support seat 2 to rise and fall through the support rod 13, thereby adjusting the height of the device and reducing the limitations when installing the pipeline.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A pipeline installation device for water conservancy and hydropower engineering, comprising a base (1) and a support base (2) arranged above the base (1), characterized in that: The top of the support seat (2) is fixedly connected to a bracket (3) on both sides, and the support seat (2) is provided with a slide groove (4) on both sides of the bracket (3). A first double-axis motor (5) is fixedly installed inside the slide groove (4). Both output ends of the first double-axis motor (5) are fixedly connected to a first screw (6). A clamping rod (7) is threadedly connected to the first screw (6). An arc-shaped clamping plate (8) is fixedly connected to the upper end of the clamping rod (7). A groove (9) is provided inside the base (1). A second double-axis motor (10) is fixedly installed inside the groove (9). Both output ends of the second double-axis motor (10) are fixedly connected to a second screw (11). A screw sleeve (12) is threadedly connected to the second screw (11). A support rod (13) is hinged between the screw sleeve (12) and the bottom of the support seat (2).
2. A pipeline installation device for water conservancy and hydropower engineering according to claim 1, characterized in that: The surfaces of the bracket (3) and the arc-shaped clamping plate (8) are both fixedly connected with anti-skid pads (14), and the anti-skid pads (14) are rubber pads.
3. A pipeline installation device for water conservancy and hydropower engineering according to claim 1, characterized in that: Inspection doors (15) are hingedly connected on both sides of the support seat (2) close to the two slide grooves (4).
4. A pipeline installation device for water conservancy and hydropower engineering according to claim 1, characterized in that: The inner bottom wall of the groove (9) is fixedly connected with a slide rail (16), the bottom of the screw sleeve (12) is fixedly connected with a slide block (17), and the slide block (17) is slidably connected to the slide rail (16).
5. A pipeline installation device for water conservancy and hydropower engineering according to claim 1, characterized in that: Guide grooves (18) are provided at the four corners of the upper surface of the base (1), the top of the guide groove (18) is slidably connected to a guide rod (19), and the upper end of the guide rod (19) is fixedly connected to the support seat (2).
6. A pipeline installation device for water conservancy and hydropower engineering according to claim 1, characterized in that: A Foma wheel (20) is provided at the bottom of the base (1), and there are four Foma wheels (20). The four Foma wheels (20) are evenly distributed at the four corners of the bottom of the base (1).
Citation Information
Patent Citations
Pipeline mounting device for water conservancy and hydropower
CN215763679U