Construction fence
By integrating the spray mechanism in the construction fence, water mist is sprayed with motor-driven gears and adjustment arm systems, the problem of dust pollution during construction is solved, and the cleaning of the connecting plate and air is achieved.
Patent Information
- Application Number
- CN202420980111.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-08
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2034-05-08
AI Technical Summary
The existing construction fence will produce a lot of dust during the construction process, which will affect the external environment.
A construction fence consisting of a connecting plate, a spray mechanism and a fixing frame is designed. The spray mechanism sprays water mist to clean the mud and dust on the connecting plate and the air through the motor-driven gears and adjusting arm system. Dust reduction treatment.
Effectively reduce dust, reduce pollution to the external environment, and improve the cleanliness of construction fences to prevent dust pollution.
Smart Images

Figure CN222436052U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of fences, in particular to a construction fence. Background Art
[0002] Construction fences are a series of common fences on construction sites, mainly used for the isolation of engineering sites. Through the use of construction fences, the construction site is isolated from the outside world, reducing the environmental pollution of the construction site to the outside world.
[0003] In the prior art, a construction fence disclosed in the patent with publication number CN220267368U realizes the plug-in connection effect between the connecting plate and the base through the connection between the base and the slot, and the connection between the slot and the abutment plate. Under the connection between the connecting plate and the connecting rod, the connecting rod and the screw ring are connected to achieve the connection and fixing effect between the connecting plate and the base, and it is convenient to disassemble and separate it, and improve the convenience of transportation. Although the above method can achieve the effect of disassembly and separation to facilitate transportation, it will generate a lot of dust during the construction process, which will affect the external environment.
[0004] In order to solve the above problems, a new type of construction fence is proposed to solve the above problems. Utility Model Content
[0005] The utility model aims to provide a construction fence, aiming to solve the problem in the prior art that a lot of dust is generated during the construction process, thus affecting the external environment.
[0006] To achieve the above object, the utility model provides a construction fence, comprising a connecting plate and a base, wherein the connecting plate is fixedly connected to the base and is located above the base.
[0007] It also includes a connecting component, a spray mechanism, a fixing component and a fixing frame, wherein the fixing frame is fixedly connected to the connecting plate and sleeved on the connecting plate, the spray mechanism is located on one side of the fixing frame, the connecting component is located on one side of the spray mechanism, the fixing component is located on one side of the spray mechanism, the spray mechanism includes an adjusting frame, a motor, an output shaft, an output gear, a gear ring, an adjusting arm and a spray component, the motor is fixedly connected to the fixing frame and is located on a side of the fixing frame away from the connecting plate, the output shaft is fixedly connected to the motor and is located on one side of the motor, the output gear is fixedly connected to the output shaft and is located on the outer wall of the output shaft, the output gear is meshed with the gear ring, the adjusting arm is fixedly connected to the gear ring and is located on the outside of the gear ring, the adjusting frame is fixedly connected to the fixing frame and is located on the outside of the fixing frame, and the spray component is located on one side of the adjusting arm.
[0008] Wherein, the spray assembly includes a spray nozzle, a spray pipe, a first connecting pipe and a water pipe, the spray pipe is fixedly connected to the adjusting arm and is located on one side of the adjusting arm, the spray nozzle is fixedly connected to the spray pipe and is located on one side of the spray pipe, the first connecting pipe is communicated with the spray pipe and is located on one side of the spray pipe, and the water pipe is communicated with the first connecting pipe and is located on a side of the first connecting pipe away from the spray pipe.
[0009] Among them, the fixing assembly includes a clamping ring, a bolt and a nut. The clamping ring is fixedly connected to the adjusting arm and is located on one side of the adjusting arm. The bolt is slidably connected to the clamping ring and passes through the clamping ring. The nut is threadedly connected to the bolt and is located on the outer wall of the bolt.
[0010] Wherein, the connecting assembly includes an inner tube, an elastic clip, a second connecting tube and a fixing ring, the inner tube is connected to the spray tube and is located on one side of the spray tube, the elastic clip is fixedly connected to the spray tube and is located on one side of the inner tube, the fixing ring is threadedly connected to the elastic clip and is sleeved on the outer wall of the elastic clip, and the second connecting tube is sleeved between the inner tube and the elastic clip.
[0011] Wherein, the construction fence also includes a protective cover, which is fixedly connected to the gear ring and is located on one side of the gear ring.
[0012] Wherein, the construction fence further comprises a grip assembly, and the grip assembly is located on a side of the base away from the connecting plate.
[0013] Wherein, the gripping assembly includes a support column and a gripping spike, the support column is fixedly connected to the base and is located on a side of the base away from the connecting plate, and the gripping spike is fixedly connected to the support column and is located on a side of the support column away from the base.
[0014] The utility model discloses a construction fence, comprising a connecting plate, a spray mechanism and a fixed frame, wherein the fixed frame is fixedly connected to the connecting plate and sleeved on the connecting plate, the spray mechanism is located at one side of the fixed frame, the spray mechanism comprises an adjusting frame, a motor, an output shaft, an output gear, a gear ring, an adjusting arm and a spray assembly, wherein the output shaft is rotated by starting the motor, and since the output gear is fixedly connected to the output shaft, the output gear on the output shaft is driven to rotate, and then the output gear is meshed with the gear ring, thereby driving the gear ring to rotate, and at the same time, the adjusting arm is fixedly connected to the gear ring, and the gear ring drives the adjusting arm to rotate along the through hole on the adjusting frame, so as to achieve the effect that the spray assembly cleans the mud and dust on the connecting plate and performs dust reduction treatment on the dust in the air. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 The utility model is a structural schematic diagram of a construction fence provided by the utility model.
[0017] Figure 2 The utility model provides Figure 1 A partial enlarged view of point A in the middle.
[0018] Figure 3 The utility model provides Figure 1 A partial enlarged view of point D in the middle
[0019] Figure 4 It is another structural schematic diagram of a construction fence provided by the utility model.
[0020] Figure 5 The utility model provides Figure 4 A partial enlarged view of point B in the middle.
[0021] Figure 6 It is a front view of a construction fence provided by the utility model.
[0022] Figure 7 The utility model provides Figure 6 Cross-sectional view along CC direction.
[0023] Figure 8 The utility model provides Figure 7A partial enlarged view of the middle W.
[0024] Fig. 9 It is a structural schematic diagram of the second embodiment provided by the utility model.
[0025] 101-connecting plate, 102-base, 103-connecting assembly, 104-fixing assembly, 105-fixing frame, 106-protective shell, 107-adjusting frame, 108-motor, 109-output shaft, 110-output gear, 111-gear ring, 112-adjusting arm, 113-spraying assembly, 114-spraying nozzle, 115-spraying pipe, 116-first connecting pipe, 117-water pipe, 118-clamping ring, 119-bolt, 120-nut, 121-inner pipe, 122-elastic clip, 123-second connecting pipe, 124-fixing ring, 125-through hole, 201-support column, 202-gripping nail. DETAILED DESCRIPTION
[0026] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0027] First embodiment:
[0028] See also Figures 1 to 8 ,in Figure 1 This is a structural schematic diagram of a construction fence provided by the utility model. Figure 2 The utility model provides Figure 1 A partial enlarged view of point A in the middle. Figure 3 The utility model provides Figure 1 A partial enlarged view of point D in the middle. Figure 4 This is another structural schematic diagram of a construction fence provided by the utility model. Figure 5 The utility model provides Figure 4 A partial enlarged view of the B in the middle (the second connecting pipe 123 is shown in an assembled manner), Figure 6 This is a front view of a construction fence provided by the utility model. Figure 7 The utility model provides Figure 6 Cross-sectional view in CC direction, Figure 8 The utility model provides Figure 7 A partial enlarged view of the middle W.
[0029] The utility model provides a construction fence, including a connecting plate 101, a base 102, a connecting assembly 103, a spray mechanism, a fixing assembly 104, a fixing frame 105 and a protective shell 106, the spray mechanism includes an adjusting frame 107, a motor 108, an output shaft 109, an output gear 110, a gear ring 111, an adjusting arm 112 and a spray assembly 113, the spray assembly 113 includes a spray nozzle 114, a spray pipe 115, a first connecting pipe 116 and a water pipe 117, the fixing assembly 104 includes a clamping ring 118, a bolt 119 and a nut 120, and the connecting assembly 103 includes an inner tube 121, an elastic clip 122, a second connecting pipe 123 and a fixing ring 124. The above-mentioned scheme solves the problem in the prior art that a lot of dust generated during the construction process is not subjected to dust reduction treatment, resulting in an impact on the external environment. It can be understood that the above-mentioned scheme can also solve the problem that the connecting plate 101 is sticky with mud and dust during the construction process, affecting the appearance. By rotating the adjusting arm 112, the spray nozzle 114 is driven to rotate along the adjusting frame 107, so that the water sprayed by the spray nozzle 114 is concentrated on the connecting plate 101, thereby facilitating the cleaning of the connecting plate 101.
[0030] According to this specific embodiment, the connecting plate 101 is fixedly connected to the base 102 and is located above the base 102. The fixing frame 105 is fixedly connected to the connecting plate 101 and is sleeved on the connecting plate 101. The spray mechanism is located on one side of the fixing frame 105. The connecting component 103 is located on one side of the spray mechanism. The fixing component 104 is located on the side of the spray mechanism away from the connecting component 103. The spray mechanism is used to reduce dust generated during the construction process and to clean the connecting plate. The connecting component 103 is used to connect the connecting component 103 on the spray pipe 115 of the adjacent construction fence. The fixing component 104 is used to fix the position of the water pipe 117.
[0031] At the same time, the motor 108 is fixedly connected to the fixed frame 105 and is located on a side of the fixed frame 105 away from the connecting plate 101. The output shaft 109 is fixedly connected to the motor 108 and is located on one side of the motor 108. The output gear 110 is fixedly connected to the output shaft 109 and is located on the outer wall of the output shaft 109. The output gear 110 is meshed with the gear ring 111. The adjusting arm 112 is fixedly connected to the gear ring 111 and is located on the outer side of the gear ring 111. The adjusting frame 107 is fixedly connected to the fixed frame 105 and is located on the outer side of the fixed frame 105. The adjusting frame 107 is fan-shaped. At the same time, a through hole 125 is provided on the adjusting frame 107. The spray assembly 113 is located on one side of the adjusting arm 112. On the other hand, the adjusting arm 112 is used to make the spray assembly 113 reciprocate along the through hole 125 on the adjusting frame 107, and the adjusting frame 107 is used to limit the position of the adjusting arm 112. The output shaft 109 is rotated by starting the motor 108, thereby driving the output gear 110 on the output shaft 109 to rotate. Since the output gear 110 is meshed with the gear ring 111, the gear ring 111 is driven to rotate. The adjusting arm 112 is fixedly connected to the gear ring 111, and the adjusting arm 112 is driven to reciprocate along the through hole 125 on the adjusting frame 107, so that the spray assembly 113 can clean the mud and dust on the connecting plate 101 and reduce the dust in the air.
[0032] At the same time, the spray pipe 115 is fixedly connected to the adjusting arm 112 and is located on one side of the adjusting arm 112. The spray nozzle 114 is fixedly connected to the spray pipe 115 and is located on one side of the spray pipe 115. The first connecting pipe 116 is communicated with the spray pipe 115 and is located on one side of the spray pipe 115. The water pipe 117 is communicated with the first connecting pipe 116 and is located on the side of the first connecting pipe 116 away from the spray pipe 115. The spray nozzle 114 is used to spray water mist to clean the connecting plate 101 and to reduce dust in the air. The water pipe 117 is used to provide a water source. The water pipe 117 is connected to the first connecting pipe 116 to provide a water source. The water then flows along the spray pipe 115 and is converted into water mist by the spray nozzle 114 on the spray pipe 115, so as to reduce dust in the air and prevent the external environment from being affected.
[0033] Among them, the clamping ring 118 is fixedly connected to the adjusting arm 112 and is located on one side of the adjusting arm 112, the bolt 119 is slidably connected to the clamping ring 118 and passes through the clamping ring 118, the nut 120 is threadedly connected to the bolt 119 and is located on the outer wall of the bolt 119, the clamping ring is used to fix the water pipe 117, the bolt 119 and the nut 120 are used to clamp the water pipe 117 tightly by the clamping ring 118 to prevent the water pipe 117 from affecting the reciprocating rotation of the adjusting arm 112 when it rotates with the adjusting arm 112.
[0034] Secondly, the inner tube 121 is communicated with the spray tube 115 and is located on one side of the spray tube 115. The elastic clip 122 is fixedly connected to the spray tube 115 and is located on one side of the inner tube 121. The fixing ring 124 is threadedly connected to the elastic clip 122 and sleeved on the outer wall of the elastic clip 122. The second connecting tube 123 is sleeved between the inner tube 121 and the elastic clip 122. The second connecting tube 123 is inserted between the inner tube 121 and the elastic clip 122, and then the fixing ring 124 is rotated to achieve the clamping and fixing of the second connecting tube 123 by the elastic clip 122. Then, the other end of the second connecting tube 123 is connected to the connecting component 103 on another adjacent construction fence (both ends of the spray tube on the construction fence are connected to the connecting component, which is located in the middle position of the construction fence) in the above manner.
[0035] In addition, the protective cover 106 is fixedly connected to the gear ring 111 and is located on one side of the gear ring 111. The protective cover 106 is used to protect the output gear 110 to prevent the gear from rusting.
[0036] When using a construction fence of the present embodiment, the water pipe 117 is first connected to the first connecting pipe 116, and then the water pipe 117 is clamped in the clamping ring 118 by the bolt 119 and the nut 120, wherein the water source is provided by the water pipe on the connecting plate 101 at the first end, and then the second connecting pipe 123 is inserted between the inner pipe 121 and the elastic clip 122, and then the fixing ring 124 is rotated to achieve the clamping and fixing of the second connecting pipe 123 by the elastic clip 122, and then the other end of the second connecting pipe 123 is connected to the connecting assembly 103 on another adjacent construction fence by the above method, and then the water source is turned on to flow along the water pipe 117 and the spray pipe 115, and then through the connecting The second connecting pipe 123 in the connecting assembly 103 is connected to the spray pipe of another adjacent construction fence, and at the same time, the spray nozzle 114 on the spray pipe 115 converts it into water mist to achieve dust reduction treatment for dust in the air. Then, the motor 108 is started to rotate the output shaft 109, thereby driving the output gear 110 on the output shaft 109 to rotate, and then the output gear 110 is meshed with the gear ring 111, thereby driving the gear ring 111 to rotate, and then the adjusting arm 112 is fixedly connected to the gear ring 111, driving the adjusting arm 112 to reciprocate along the through hole 125 on the adjusting frame 107, so that the spray nozzle 114 can clean the mud and dust on the connecting plate 101.
[0037] Second embodiment:
[0038] Based on the first embodiment, please refer to Fig. 9 , Fig. 9 It is a structural schematic diagram of the second embodiment provided by the utility model.
[0039] The utility model provides a construction fence further comprising a gripping assembly, wherein the gripping assembly is located at a side of the base 102 away from the connecting plate 101 , and the gripping assembly comprises a supporting column 201 and a gripping spike 202 .
[0040] According to this specific embodiment, the support column 201 is fixedly connected to the base 102 and is located on a side of the base 102 away from the connecting plate 101. The gripping nail 202 is fixedly connected to the support column 201 and is located on a side of the support column 201 away from the base 102. The gripping nail 203 is used to be inserted into the soil to fix the base 102.
[0041] When using a construction fence of this embodiment, the support column 201 on the base 102 is inserted into the soil, and force is applied to the base 102. Due to the gripping nails 202 on the support column 201, the support column 201 is inserted deeper into the soil, thereby fixing the construction fence.
[0042] The above disclosure is only a preferred embodiment of the present invention, and certainly cannot be used to limit the scope of rights of the present invention. Ordinary technicians in this field can understand that all or part of the processes of the above embodiment and equivalent changes made according to the claims of the present invention still fall within the scope covered by the utility model.
Claims
1. A construction fence, comprising a connecting plate and a base, wherein the connecting plate is fixedly connected to the base and is located above the base, characterized in that: It also includes a connecting component, a spray mechanism, a fixing component and a fixing frame, wherein the fixing frame is fixedly connected to the connecting plate and sleeved on the connecting plate, the spray mechanism is located on one side of the fixing frame, the connecting component is located on one side of the spray mechanism, the fixing component is located on one side of the spray mechanism, the spray mechanism includes an adjusting frame, a motor, an output shaft, an output gear, a gear ring, an adjusting arm and a spray component, the motor is fixedly connected to the fixing frame and is located on a side of the fixing frame away from the connecting plate, the output shaft is fixedly connected to the motor and is located on one side of the motor, the output gear is fixedly connected to the output shaft and is located on the outer wall of the output shaft, the output gear is meshed with the gear ring, the adjusting arm is fixedly connected to the gear ring and is located on the outside of the gear ring, the adjusting frame is fixedly connected to the fixing frame and is located on the outside of the fixing frame, and the spray component is located on one side of the adjusting arm.
2. A construction fence as claimed in claim 1, characterized in that: The spray assembly includes a spray nozzle, a spray pipe, a first connecting pipe and a water pipe. The spray pipe is fixedly connected to the adjusting arm and is located on one side of the adjusting arm. The spray nozzle is fixedly connected to the spray pipe and is located on one side of the spray pipe. The first connecting pipe is communicated with the spray pipe and is located on one side of the spray pipe. The water pipe is communicated with the first connecting pipe and is located on a side of the first connecting pipe away from the spray pipe.
3. A construction fence as claimed in claim 2, characterized in that: The fixing assembly includes a clamping ring, a bolt and a nut. The clamping ring is fixedly connected to the adjusting arm and is located on one side of the adjusting arm. The bolt is slidably connected to the clamping ring and passes through the clamping ring. The nut is threadedly connected to the bolt and is located on the outer wall of the bolt.
4. A construction fence as claimed in claim 3, characterized in that: The connecting assembly includes an inner tube, an elastic clip, a second connecting tube and a fixing ring. The inner tube is connected to the spray tube and is located on one side of the spray tube. The elastic clip is fixedly connected to the spray tube and is located on one side of the inner tube. The fixing ring is threadedly connected to the elastic clip and is sleeved on the outer wall of the elastic clip. The second connecting tube is sleeved between the inner tube and the elastic clip.
5. A construction fence as claimed in claim 4, characterized in that: The construction fence also includes a protective cover, which is fixedly connected to the gear ring and is located on one side of the gear ring.
6. A construction fence as claimed in claim 5, characterized in that: The construction fence further comprises a gripping assembly, and the gripping assembly is located at a side of the base away from the connecting plate.
7. A construction fence as claimed in claim 6, characterized in that: The gripping assembly includes a support column and a gripping spike. The support column is fixedly connected to the base and is located on a side of the base away from the connecting plate. The gripping spike is fixedly connected to the support column and is located on a side of the support column away from the base.
Citation Information
Patent Citations
Construction fence
CN220267368U