Debugging cabinet of GIS control system
By designing the debugging cabinet of the GIS control system, the controlled loop is used to simulate the mechanism loop of the GIS device body and the display loop is used to simulate the equipment status, which solves the problem of large workload and low efficiency during debugging of the GIS control system, and achieves efficient and intuitive debugging The effect improves product reliability.
Patent Information
- Application Number
- CN202421295872.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2034-06-06
AI Technical Summary
In the prior art, the equipment body and the transmission control cabinet of the GIS control system are arranged separately, resulting in large workload and low efficiency during debugging.
A debugging cabinet for GIS control system is designed, including a connection unit, a controlled loop and a display loop. The connection unit is used to connect the controlled circuit with the control cabinet to be detected. The controlled circuit simulates the GIS equipment main mechanism circuit to be controlled by the control cabinet to be detected. The display circuit is linked to the controlled circuit through a relay to simulate and display the status of the GIS equipment.
By simulating the energy storage process, closing process, opening process and position status of the switch module mechanism of the GIS equipment body, the workload of the connecting cables of the equipment body is reduced, the debugging efficiency is improved, and intuitive and efficient inspection of GIS control is achieved. The cabinet function quality improves product reliability.
Smart Images

Figure CN222439853U_ABST
Abstract
Description
Technical Field
[0001] The utility model embodiment relates to the field of GIS control technology, in particular to a debugging cabinet of a GIS control system. Background Art
[0002] When the main body of the GIS (Gas Insulated Switchgear) high-voltage switchgear and the control cabinet are arranged separately, there are two ways to debug the GIS control system:
[0003] One way is to use cables to connect the control cabinet and the mechanism circuit on the equipment body first, and then remove the cables after debugging. Due to the large size of the equipment, the high installation position of the mechanism, and the long and heavy cables, the installation workload of the cables is large and the efficiency is low; and the cables occupy a large amount of installation space, which will also affect production turnover.
[0004] Another method is to use a multimeter to measure the electrical circuit in the control cabinet. However, this method has problems such as poor contact of the probe, incomplete circuit function verification, and low efficiency due to point-by-point testing. Utility Model Content
[0005] The embodiment of the utility model provides a debugging cabinet for a GIS control system, which solves the technical problems of heavy workload and low efficiency in the prior art when debugging a GIS control system in which a device body and a control cabinet are separately arranged.
[0006] The utility model embodiment provides a debugging cabinet of a GIS control system, the debugging cabinet comprising a connection unit, a controlled loop and a display loop;
[0007] The connecting unit is used to connect the controlled loop with the control cabinet to be tested;
[0008] The controlled loop is used to simulate the main mechanism loop of the GIS equipment to be controlled by the control cabinet to be tested;
[0009] The relays in the display circuit are linked with the contactors in the controlled circuit to simulate and display the status of the GIS equipment to be controlled by the control cabinet to be tested.
[0010] Furthermore, the controlled circuit at least includes a closing sub-circuit, an opening sub-circuit and a closing and opening position sub-circuit;
[0011] The closing sub-circuit is connected to the closing circuit of the circuit breaker of the control cabinet to be tested through the connecting unit;
[0012] The switch-off sub-circuit is connected to the switch-off circuit of the circuit breaker of the control cabinet to be tested through the connection unit;
[0013] The closing and opening position sub-circuit is connected to the closing and opening position circuit of the circuit breaker of the control cabinet to be detected through the connecting unit.
[0014] Furthermore, the controlled circuit also includes an energy storage control subcircuit and a motor subcircuit; the energy storage control subcircuit is connected to the circuit breaker energy storage control circuit of the control cabinet to be tested through the connection unit;
[0015] The motor sub-circuit is connected to the circuit breaker motor circuit of the control cabinet to be tested through the connecting unit.
[0016] Further, the closing sub-circuit includes a first contact group of a first relay, a first contact group of a second relay, and a coil of a first contactor connected in sequence;
[0017] The switch-off subcircuit comprises a second contact group of a second relay and a coil of a second contactor connected in sequence;
[0018] The closing and opening position sub-circuit includes a third contact set of the second relay.
[0019] Further, the energy storage control subcircuit includes a second contact group of the first relay;
[0020] The motor subcircuit comprises a coil of a timing relay.
[0021] Further, the display circuit includes a control unit and a display unit;
[0022] In the control unit:
[0023] The first contact group of the first contactor, the contact group of the time relay, and the coil of the first relay are connected in sequence and form a loop with the first power supply;
[0024] The third contact group of the first relay is connected in parallel to both ends of the contact group of the time relay;
[0025] The second contact group of the first contactor, the first contact group of the second contactor, and the coil of the second relay are connected in sequence to form a first branch, and the first branch is connected in parallel with the first power supply;
[0026] The fourth contact group of the second relay is connected in parallel to both ends of the second contact group of the first contactor;
[0027] The coil of the third relay is connected in parallel to both ends of the coil of the second relay;
[0028] The first contact group of the third relay is connected to the display unit to form a second branch, and the second branch is connected in parallel with the first branch;
[0029] The fourth contact group of the first relay is connected to the display unit to form a third branch, and the third branch is connected in parallel with the second branch.
[0030] Further, the display unit includes a first indicator light and a second indicator light;
[0031] The first contact group of the third relay is connected to the first indicator light to form the second branch;
[0032] The fourth contact group of the first relay is connected to the second indicator light to form the third branch.
[0033] Furthermore, the connection unit includes a plurality of pluggable connectors and corresponding wires, and the connection unit utilizes the pluggable connectors to achieve connection between the controlled loop and the control cabinet to be detected.
[0034] Furthermore, the debugging cabinet also includes an interface module, which is arranged between the connection unit and the controlled loop, and the connection unit is connected to the controlled loop through the interface module.
[0035] Furthermore, the display circuit also includes the first power supply forming a loop with the first contact group of the first contactor, the contact group of the time relay, and the coil of the first relay.
[0036] The embodiment of the utility model discloses a debugging cabinet for a GIS control system, including a connection unit, a controlled circuit and a display circuit; the connection unit is used to connect the controlled circuit with the control cabinet to be tested; the controlled circuit is used to simulate the mechanism circuit of the GIS equipment body to be controlled by the control cabinet to be tested; each relay in the display circuit is linked with each contactor in the controlled circuit to simulate and display the state of the GIS equipment to be controlled by the control cabinet to be tested. The utility model uses a controlled circuit to simulate the energy storage process, closing process, opening process and position state of the mechanism energy storage spring of the switch module of the GIS equipment body, and solves the technical problems of large workload and low efficiency in debugging the GIS control system with the equipment body and the control cabinet arranged separately in the prior art by connecting the controlled circuit, and realizes the technical effect of intuitively and efficiently checking the functional quality of the GIS control cabinet, and improves the test efficiency and product reliability of the factory debugging of the GIS control system. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a structural block diagram of a debugging cabinet of a GIS control system provided by an embodiment of the utility model;
[0038] Figure 2It is a structural diagram of a debugging cabinet of a GIS control system provided by an embodiment of the utility model. DETAILED DESCRIPTION
[0039] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0040] It should be noted that the terms "first", "second", etc. in the specification, claims and drawings of the utility model are used to distinguish different objects, rather than to limit a specific order. The following embodiments of the utility model can be implemented separately, and the embodiments can also be implemented in combination with each other, and the embodiments of the utility model are not specifically limited to this.
[0041] Figure 1 This is a structural block diagram of a debugging cabinet of a GIS control system provided by an embodiment of the utility model. Figure 2 This is a structural diagram of a debugging cabinet of a GIS control system provided by the embodiment of the utility model. Figure 1 and Figure 2 As shown, the debugging cabinet of the GIS control system specifically includes a connecting unit 10, a controlled loop 20 and a display loop 30; the connecting unit 10 is used to connect the controlled loop 20 with the control cabinet 40 to be tested; the controlled loop 20 is used to simulate the main mechanism loop of the GIS equipment to be controlled by the control cabinet 40 to be tested; each relay in the display loop 30 is linked with each contactor in the controlled loop 20 to simulate and display the status of the GIS equipment to be controlled by the control cabinet 40 to be tested.
[0042] Specifically, one end of the connection unit 10 is connected to the control cabinet 40 to be tested, and the other end is connected to the controlled circuit 20 of the debugging cabinet; the controlled circuit 20 includes contactors, relays, time relays, miniature circuit breakers, terminal blocks and wires, which can constitute the energy storage process, closing process, opening process and status alternative circuits of the mechanism energy storage springs of each switch module; the display circuit 30 is connected to the controlled circuit 20 to display the status of the alternative circuits of each switch module after the control cabinet 40 to be tested is operated.
[0043] The utility model displays the energy storage process, closing process, opening process and position status of the energy storage spring of the switch module of the GIS equipment body such as the circuit breaker, disconnector and earthing switch through the display circuit 30, and uses the connection controlled circuit 20 to replace the connection of the actual equipment body, thereby reducing the workload and space occupied by the equipment body connection cable, solving the technical problems of large workload and low efficiency in debugging the GIS control system in which the equipment body and the control cabinet are separately arranged in the prior art, achieving the technical effect of intuitively and efficiently checking the functional quality of the GIS control cabinet, and improving the test efficiency and product reliability of the factory debugging of the GIS control system.
[0044] Alternatively, if Figure 2 As shown, the controlled circuit 20 at least includes a closing sub-circuit L1, an opening sub-circuit L2 and a closing / opening position sub-circuit L5.
[0045] The closing sub-circuit L1 is connected to the closing circuit of the circuit breaker of the control cabinet 40 to be tested through the connecting unit 10; the opening sub-circuit L2 is connected to the opening circuit of the circuit breaker of the control cabinet 40 to be tested through the connecting unit 10; the closing and opening position sub-circuit L5 is connected to the closing and opening position circuit of the circuit breaker of the control cabinet 40 to be tested through the connecting unit 10.
[0046] Alternatively, if Figure 2 As shown, the controlled loop 20 further includes an energy storage control sub-circuit L3 and a motor sub-circuit L4.
[0047] The energy storage control sub-circuit L3 is connected to the circuit breaker energy storage control circuit of the control cabinet 40 to be tested through the connection unit 10; the motor sub-circuit L4 is connected to the circuit breaker motor circuit of the control cabinet 40 to be tested through the connection unit 10.
[0048] Optionally, the connection unit 10 includes a plurality of pluggable connectors and corresponding wires, and the connection unit 10 utilizes the pluggable connectors to achieve the connection between the controlled loop 20 and the control cabinet 40 to be detected.
[0049] Specifically, see Figure 2 Each sub-circuit in the controlled loop 20 is connected to the corresponding circuit in the control cabinet 40 to be tested by using two pairs of pins in the pluggable connector, so that each control circuit in the control cabinet 40 to be tested can control the sub-circuit in the controlled loop 20.
[0050] Alternatively, see Figure 2 The closing sub-circuit L1 includes a first contact group of a first relay KDCK connected in sequence (ie Figure 2 11, 12, 14 contact groups of KDCK), the first contact group of the second relay KDDL1 (i.e. Figure 2The contact group 11, 12, 14 of KDDL1 in the middle), the coil K1 of the first contactor KDHQ; the switch sub-circuit L2 includes the second contact group of the second relay KDDL1 connected in sequence (ie Figure 2 The contact group 21, 22, 24 of KDDL1), the coil K2 of the second contactor KDTQ; the closing position sub-circuit L5 includes the third contact group of the second relay KDDL1 (i.e. Figure 2 (the contact group 31, 32, and 34 of KDDL1).
[0051] Specifically, see Figure 2 , the 14th contact of the first relay KDCK in the closing sub-circuit L1 is connected to the circuit breaker closing circuit of the control cabinet 40 to be tested through a pair of pins of the pluggable connector in the connecting unit 10, the 11th contact of the first relay KDCK is connected to the 12th contact of the second relay KDDL1, the 11th contact of the second relay KDDL1 is connected to the coil K1 of the first contactor KDHQ, and the coil K1 of the first contactor KDHQ is connected to the circuit breaker closing circuit of the control cabinet 40 to be tested through another pair of pins of the pluggable connector in the connecting unit 10, wherein the 12th and 14th contacts of the first relay KDCK are static contacts, and the 11th contact is a moving contact, and the 12th and 14th contacts of the second relay KDDL1 are static contacts, and the 11th contact is a moving contact.
[0052] Contact 24 of the second relay KDDL1 in the disconnecting sub-circuit L2 is connected to the circuit breaker disconnecting circuit of the control cabinet 40 to be tested through a pair of pins of the pluggable connector in the connecting unit 10, contact 21 of the second relay KDDL1 is connected to the coil K2 of the second contactor KDTQ, and the coil K2 of the second contactor KDTQ is connected to the circuit breaker disconnecting circuit of the control cabinet 40 to be tested through another pair of pins of the pluggable connector in the connecting unit 10, wherein contacts 22 and 24 of the second relay KDDL1 are static contacts, and contact 21 is a moving contact.
[0053] Contacts 34, 32 and 31 of the second relay KDDL1 in the closing and opening position sub-circuit L5 are respectively connected to the closing and opening position circuit of the circuit breaker of the control cabinet 40 to be tested through a pair of pins of the pluggable connector in the connecting unit 10, wherein contacts 34 and 32 of the second relay KDDL1 are static contacts, and contact 31 is a moving contact.
[0054] Alternatively, see Figure 2 The energy storage control sub-circuit L3 includes a second contact group of the first relay KDCK (ie Figure 2 21, 22, 24 contact group of KDCK); motor sub-circuit L4 includes coil K3 of time relay KDM.
[0055] Specifically, contact 22 of the first relay KDCK in the energy storage control sub-circuit L3 is connected to the energy storage control circuit of the circuit breaker of the control cabinet 40 to be tested through a pair of pins of the pluggable connector in the connecting unit 10, and contact 21 of the first relay KDCK is connected to the energy storage control circuit of the circuit breaker of the control cabinet 40 to be tested through another pair of pins of the pluggable connector in the connecting unit 10, wherein contacts 22 and 24 of the first relay KDCK are static contacts, and contact 21 is a moving contact.
[0056] The two ends of the coil K3 of the time relay KDM in the motor sub-circuit L4 are respectively connected to the circuit breaker motor circuit of the control cabinet 40 to be detected through a pair of pins of a pluggable connector 1 in the connection unit 10.
[0057] Alternatively, see Figure 2 The display circuit 30 includes a control unit 301 and a display unit 302 .
[0058] In the control unit 301:
[0059] The first contact group (21, 22) of the first contactor KDHQ, the contact group (15, 16, 18) of the time relay KDM, and the coil K4 of the first relay KDCK are connected in sequence and form a loop with the first power supply.
[0060] The third contact group (31, 32, 34) of the first relay KDCK is connected in parallel to both ends of the contact group (15, 16, 18) of the time relay KDM.
[0061] The second contact group (01, 02) of the first contactor KDHQ, the first contact group (21, 22) of the second contactor KDTQ, and the coil K5 of the second relay KDDL1 are connected in sequence to form a first branch, and the first branch is connected in parallel with the first power supply.
[0062] The fourth contact group (41, 42, 44) of the second relay KDDL1 is connected in parallel to both ends of the second contact group (01, 02) of the first contactor KDHQ.
[0063] The coil K6 of the third relay KDDL2 is connected in parallel across the coil K5 of the second relay KDDL1.
[0064] The first contact group (11, 12, 14) of the third relay KDDL2 is connected to the display unit 302 to form a second branch, and the second branch is connected in parallel with the first branch. The fourth contact group (41, 42, 44) of the first relay KDCK is connected to the display unit 302 to form a third branch, and the third branch is connected in parallel with the second branch.
[0065] Alternatively, if Figure 2As shown, the display unit 302 includes a first indicator light DW1 and a second indicator light DWCK; the first contact group (11, 12, 14) of the third relay KDDL2 is connected to the first indicator light DW1 to form a second branch; the fourth contact group (41, 42, 44) of the first relay KDCK is connected to the second indicator light DWCK to form a third branch.
[0066] Specifically, contact 11 of the third relay KDDL2 is connected to coil K6 of the third relay KDDL2, contact 12 of the third relay KDDL2 is connected to contact X2 of the first indicator light DW1, contact 14 of the third relay KDDL2 is connected to contact X1 of the first indicator light DW1, and contact X0 of the first indicator light DW1 is connected to contact 44 of the second relay KDDL1.
[0067] Contact 41 of the first relay KDCK is connected to contact 11 of the third relay KDDL2, contact 42 of the first relay KDCK is connected to contact X2 of the second indicator light DWCK, contact 44 of the first relay KDCK is connected to contact X1 of the second indicator light DWCK, and contact X0 of the second indicator light DWCK is connected to contact X0 of the first indicator light DW1.
[0068] Alternatively, if Figure 1 and Figure 2 As shown, the debugging cabinet further includes an interface module 50 , which is disposed between the connection unit 10 and the controlled loop 20 , and the connection unit 10 is connected to the controlled loop 20 via the interface module 50 .
[0069] For example, Figure 2 Only schematic diagrams of the circuit breaker closing circuit and the circuit breaker opening circuit are given, and schematic diagrams of the closing circuit and the opening circuit of the disconnector and the earthing switch are not given.
[0070] Specifically, see Figure 2 After the control cabinet 40 to be tested and the debugging cabinet are connected to the power supply respectively, first adjust the action time of the time relay KDM to be equal to the spring energy storage time of the actual circuit breaker, wherein the spring energy storage time of the actual circuit breaker is determined by the GIS device body correspondingly controlled by the control cabinet 40 to be tested, and then close the miniature circuit breakers of the control cabinet 40 to be tested and the debugging cabinet respectively ( Figure 2 The schematic diagram of the miniature circuit breaker is not given in the figure) to power it on.
[0071] When the control cabinet 40 to be tested and the debugging cabinet are just powered on, the coil K4 of the first relay KDCK, the coil K5 of the second relay KDDL1, and the coil K6 of the third relay KDDL2 in the display circuit 30 are all de-energized, the contacts 41-42 of the first relay KDCK are closed, the contacts 11-12 of the third relay KDDL2 are closed, the contacts X2-X0 of the first indicator light DW1 are connected, and the first color is displayed, and the contacts X2-X0 of the second indicator light DWCK are connected, and the first color is displayed. Usually, the first color can be set to green, which is used to indicate that each mechanism is open and the circuit breaker closing spring has not stored energy. At the same time, in the controlled circuit 20, the contacts 21-22 of the first relay KDCK are closed, and the "no energy storage" signal is fed back to the control cabinet 40 to be tested, so that the circuit breaker energy storage control circuit in the control cabinet 40 to be tested is connected, and the circuit breaker mechanism motor of the debugging cabinet is started to replace the coil K3 of the time relay KDM of the controlled circuit 20, which is equivalent to the closing spring storing energy.
[0072] When the time relay KDM reaches the set spring energy storage time, the contacts 15-18 of the time relay KDM are closed, the coil K4 of the first relay KDCK is energized, and in the third contact group of the first relay KDCK, the contacts 31-32 are closed and then 31-34 are closed, and the first relay KDCK realizes energized self-holding, and the contacts 41-44 of the first relay KDCK are closed, so that the contacts X1-X0 of the second indicator light DWCK are turned on, and the color of the second indicator light DWCK is changed from the first color to the second color, and the second color is usually set to red. The display unit 302 displays "energy stored" and feeds back the "energy stored" signal to the control cabinet 40 to be detected, and the contacts 21-22 of the first relay KDCK in the controlled loop 20 are disconnected, and the contacts 21-24 are closed, and the relay energy storage control loop is disconnected.
[0073] Subsequently, the contacts of the first relay KDCK change from 11-12 closed to 11-14 closed, and the closing sub-circuit L1 meets the closing conditions. At this time, if the control cabinet 40 to be detected sends a closing command to the closing sub-circuit L1, the coil K1 of the first contactor KDHQ is energized, and the contacts 01-02 of the first contactor KDHQ are closed, so that the coil K5 of the second relay KDDL1 on the first branch is energized, and the coil K6 of the third relay KDDL2 is energized. In the fourth contact group of the second relay KDDL1, the contacts 41-42 are closed and changed to 41-44. Closed, the second relay KDDL1 and the third relay KDDL2 are energized and self-holding, the contacts 11-14 of the third relay KDDL2 are closed, the contacts X1-X0 of the first indicator light DW are turned on, the color of the first indicator light DW changes from the first color to the second color, usually the second color is set to red, the display unit 302 displays the "circuit breaker closing" signal, the contacts 31-34 of the second relay KDDL1 in the controlled loop 20 are closed, and the "circuit breaker closing" signal is fed back to the control cabinet 40 to be tested, which is equivalent to the GIS equipment body completing the circuit breaker closing operation.
[0074] At this time, in the second contact group of the second relay KDDL1, contacts 21-22 are closed and contacts 21-24 are closed, and the opening sub-circuit L2 meets the opening condition. At this time, if the control cabinet 40 to be detected sends an opening command to the opening sub-circuit L2, the coil K2 of the second contactor KDTQ is energized, and the contacts 21-22 of the second contactor KDTQ are opened, so that the coil K5 of the second relay KDDL1 on the first branch is de-energized and the coil K6 of the third relay KDDL2 is de-energized, and the contacts 11-12 of the third relay KDDL2 are closed, and the contacts X2-X0 of the first indicator light DW are turned on, and the color of the first indicator light DW changes from the second color to the first color, and the first color is usually set to green. The display unit 302 displays the "circuit breaker opening" signal, and the contacts 31-32 of the second relay KDDL1 in the controlled loop 20 are closed, and the "circuit breaker opening" signal is fed back to the control cabinet 40 to be detected, which is equivalent to the GIS equipment body completing the circuit breaker opening operation.
[0075] It should be noted that if after closing the miniature circuit breaker, sending the closing command, and sending the opening command, the debugging cabinet and the control cabinet 40 to be tested have no response or have an abnormal response (for example, the display color of the indicator lights is incorrect or no color is displayed), it means that there is a quality problem with the control circuit in the control cabinet 40 to be tested, and power must be cut off for inspection and repair.
[0076] Alternatively, if Figure 2 As shown, the display circuit 30 also includes a first power supply that forms a loop with the first contact group (21, 22) of the first contactor KDHQ, the contact group (15, 16, 18) of the time relay KDM, and the coil K4 of the first relay KDCK.
[0077] The following is a specific example to illustrate the working process of the debugging cabinet of the GIS control system. Specifically, the debugging cabinet of the GIS control system works using the following control method:
[0078] S1, setting the parameters of the time relay in the debugging cabinet to the preset value, wherein the preset value is determined by the spring energy storage time of the GIS equipment body matched with the control cabinet to be tested;
[0079] S2, controlling the control cabinet to be tested and the debugging cabinet to be powered on, and detecting that the first indicator light and the second indicator light in the display unit of the debugging cabinet both display the first color;
[0080] S3, when the spring energy storage time is reached, detecting whether the second indicator light in the display unit of the debugging cabinet changes from the first color to the second color;
[0081] S4, if yes, the energy storage circuit of the circuit breaker of the control cabinet to be tested is normal, otherwise, S105, the energy storage circuit of the circuit breaker is abnormal;
[0082] S5, obtaining an operation instruction of the control cabinet to be tested, wherein the operation instruction includes one of the following: a circuit breaker closing operation instruction, a circuit breaker opening operation instruction, an isolating switch closing instruction, an isolating switch opening instruction, a grounding switch closing instruction, and a grounding switch opening instruction;
[0083] S6, based on the operation instruction, detecting whether the color change of the indicator light in the display unit of the debugging cabinet is correct;
[0084] S7, if yes, the circuit corresponding to the operation instruction is normal, otherwise, the circuit corresponding to the operation instruction is abnormal.
[0085] Optionally, S6, detecting whether the color change of an indicator light in a display unit of the debugging cabinet is correct based on the operation instruction includes:
[0086] S61, based on the closing operation instruction, detecting whether the first indicator light in the display unit of the debugging cabinet changes from the first color to the second color.
[0087] S62: If yes, the circuit corresponding to the closing operation instruction is normal; otherwise, the circuit corresponding to the closing operation instruction is abnormal.
[0088] S63, based on the opening operation instruction, detecting whether the first indicator light in the display unit of the debugging cabinet changes from the second color to the first color.
[0089] S64, if yes, the circuit corresponding to the opening operation instruction is normal, otherwise, the circuit corresponding to the opening operation instruction is abnormal.
[0090] On the basis of the above technical solutions, in S1, before setting the parameters of the time relay in the debugging cabinet to preset values, the debugging cabinet control method of the GIS control system also includes: detecting that the debugging cabinet is in good condition; and connecting the controlled loop of the debugging cabinet with the control cabinet to be detected by using the connection unit of the debugging cabinet.
[0091] The utility model utilizes a controlled circuit to simulate the energy storage process, closing process, opening process and position status of the energy storage spring of the switch module of the GIS equipment body, and solves the technical problems of large workload and low efficiency in debugging the GIS control system in which the equipment body and the control cabinet are separately arranged in the prior art by connecting the controlled circuit, thereby achieving the technical effect of intuitively and efficiently checking the functional quality of the GIS control cabinet, and improving the test efficiency and product reliability of the factory debugging of the GIS control system.
[0092] In the description of the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0093] Finally, it should be noted that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention is described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.
Claims
1. A debugging cabinet for a GIS control system, characterized in that: The debugging cabinet comprises a connection unit, a controlled circuit and a display circuit; The connecting unit is used to connect the controlled loop with the control cabinet to be tested; The controlled loop is used to simulate the main mechanism loop of the GIS equipment to be controlled by the control cabinet to be tested; The relays in the display circuit are linked with the contactors in the controlled circuit to simulate and display the status of the GIS equipment to be controlled by the control cabinet to be tested.
2. The debugging cabinet of the GIS control system according to claim 1 is characterized in that: The controlled circuit at least includes a closing sub-circuit, an opening sub-circuit and a closing and opening position sub-circuit; The closing sub-circuit is connected to the closing circuit of the circuit breaker of the control cabinet to be tested through the connecting unit; The switch-off sub-circuit is connected to the switch-off circuit of the circuit breaker of the control cabinet to be tested through the connection unit; The closing and opening position sub-circuit is connected to the closing and opening position circuit of the circuit breaker of the control cabinet to be detected through the connecting unit.
3. The debugging cabinet of the GIS control system according to claim 2 is characterized in that: The controlled loop also includes an energy storage control subcircuit and a motor subcircuit; The energy storage control subcircuit is connected to the energy storage control circuit of the circuit breaker of the control cabinet to be tested through the connection unit; The motor sub-circuit is connected to the circuit breaker motor circuit of the control cabinet to be tested through the connecting unit.
4. The debugging cabinet of the GIS control system according to claim 3 is characterized in that: The closing subcircuit comprises a first contact group of a first relay, a first contact group of a second relay, and a coil of a first contactor connected in sequence; The switch-off subcircuit comprises a second contact group of a second relay and a coil of a second contactor connected in sequence; The closing and opening position sub-circuit includes a third contact set of the second relay.
5. The debugging cabinet of the GIS control system according to claim 4 is characterized in that: The energy storage control subcircuit includes a second contact group of the first relay; The motor subcircuit comprises a coil of a timing relay.
6. The debugging cabinet of the GIS control system according to claim 5, characterized in that: The display circuit includes a control unit and a display unit; In the control unit: The first contact group of the first contactor, the contact group of the time relay, and the coil of the first relay are connected in sequence and form a loop with the first power supply; The third contact group of the first relay is connected in parallel to both ends of the contact group of the time relay; The second contact group of the first contactor, the first contact group of the second contactor, and the coil of the second relay are connected in sequence to form a first branch, and the first branch is connected in parallel with the first power supply; The fourth contact group of the second relay is connected in parallel to both ends of the second contact group of the first contactor; The coil of the third relay is connected in parallel to both ends of the coil of the second relay; The first contact group of the third relay is connected to the display unit to form a second branch, and the second branch is connected in parallel with the first branch; The fourth contact group of the first relay is connected to the display unit to form a third branch, and the third branch is connected in parallel with the second branch.
7. The debugging cabinet of the GIS control system according to claim 6, characterized in that: The display unit includes a first indicator light and a second indicator light; The first contact group of the third relay is connected to the first indicator light to form the second branch; The fourth contact group of the first relay is connected to the second indicator light to form the third branch.
8. The debugging cabinet of the GIS control system according to claim 1 is characterized in that: The connection unit includes a plurality of pluggable connectors and corresponding wires, and the connection unit utilizes the pluggable connectors to achieve connection between the controlled loop and the control cabinet to be detected.
9. The debugging cabinet of the GIS control system according to claim 1, characterized in that: The debugging cabinet further includes an interface module, which is disposed between the connection unit and the controlled loop, and the connection unit is connected to the controlled loop via the interface module.
10. The debugging cabinet of the GIS control system according to claim 6, characterized in that: The display circuit also includes the first power supply forming a loop with the first contact group of the first contactor, the contact group of the time relay, and the coil of the first relay.