Pile foundation and retaining wall transverse steel bar connecting structure
By pre-buried horizontally embedded pipes in the pile foundation, and passing the transverse steel bars through the embedded pipe and filling grout during the construction of the retaining wall, the workload of the transverse steel bars between the pile foundation and the retaining wall in the existing technology is solved. The problem of low efficiency achieves efficient and reliable connection effect.
Patent Information
- Application Number
- CN202421222154.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-29
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-05-29
AI Technical Summary
In the plate-mounted retaining wall project, the existing cross-directional reinforcement connection methods of pile foundation and retaining wall have problems such as large drilling and welding workload and low efficiency.
A cross-bar connection structure between pile foundation and retaining wall is adopted. By burying the transverse embedded pipe in the pile foundation, the transverse reinforcement passes through the embedded pipe, and filling the grout material between the steel bar and the embedded pipe to form an integral structure to avoid Processes such as planting tendon drilling and steel bar welding are carried out.
This method simplifies the connection process, improves construction efficiency, ensures the overall structure and reliable stress state of the transverse steel bars, and is suitable for large-scale promotion and application.
Smart Images

Figure CN222456567U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of plate-mounted retaining walls, in particular to a pile foundation and a retaining wall transverse steel bar connection structure. Background Art
[0002] The steel bar connection between different components must meet one of the following conditions: ① The steel bars on both sides must be overlapped for a certain length and welded on one side or both sides. ② The steel bars on both sides must be butt-jointed and connected by a connecting sleeve; ③ The steel bars on both sides must be overlapped for a sufficient length and tied.
[0003] At present, in the actual engineering of plate-mounted retaining wall, it is generally adopted to drill holes and plant short steel bars after pile foundation construction, and then weld them to the transverse steel bars of the retaining wall. This method has the problems of large drilling and welding workload and low efficiency. Utility Model Content
[0004] Based on this, it is necessary to provide a pile foundation and retaining wall transverse reinforcement connection structure to address the problems of large drilling and welding workload and low efficiency in the connection of existing retaining wall transverse reinforcement.
[0005] A pile foundation and a retaining wall transverse reinforcement connection structure, comprising:
[0006] A pile foundation, wherein a pre-buried pipe is transversely pre-buried in the pile foundation, and the pre-buried pipe transversely penetrates the side walls of the pile foundation on opposite sides; and
[0007] The retaining wall has transverse reinforcements, which pass through the embedded pipes. The gap between the transverse reinforcements and the inner wall of the embedded pipes is poured with slurry. After the slurry solidifies, the retaining wall concrete is poured to form a whole.
[0008] In one embodiment, the embedded pipe is a corrugated pipe.
[0009] In one of the embodiments, the embedded pipe is arranged to be inclined relative to a horizontal plane so that two ends of the embedded pipe have a height difference.
[0010] In one embodiment, the inner diameter of the embedded pipe is a multiple of the diameter of the transverse steel bar.
[0011] In one embodiment, the inner diameter of the embedded pipe is 2-5 times the diameter of the transverse steel bar.
[0012] In one of the embodiments, the embedded pipes are provided in a plurality of groups, the plurality of groups of embedded pipes are arranged at intervals along the height direction in the pile foundation, and the plurality of groups of transverse steel bars are correspondingly passed through the plurality of groups of embedded pipes.
[0013] In the above-mentioned pile foundation and retaining wall transverse reinforcement connection structure, the embedded pipe is buried during the pile foundation construction. When the retaining wall is subsequently constructed, the transverse reinforcement can be directly passed through the embedded pipe, and grouting is performed in the gap between the embedded pipe and the transverse reinforcement to complete the transverse reinforcement connection of the pile foundation and the retaining wall, avoiding the processes of embedding reinforcement drilling and reinforcement welding, and solving the problems of large workload and low efficiency of the existing method. The transverse reinforcement is an integral structure, there is no discontinuity in the middle, the stress state is reliable, the structure is simple, the on-site implementation efficiency is high, and it can be promoted and applied on a large scale. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the specific implementation of the utility model, the following will briefly introduce the drawings required for use in the specific implementation. In all the drawings, each element or part is not necessarily drawn according to the actual scale.
[0015] Figure 1 A schematic diagram of a structure of a pile foundation and a transverse reinforcement connection structure of a retaining wall in one embodiment;
[0016] Figure 2 for Figure 1 Large-scale drawing of the connection structure of the middle pile foundation and the transverse reinforcement of the retaining wall;
[0017] Figure 3 for Figure 2 The cross-sectional drawing of the middle transverse reinforcement connection;
[0018] Figure 4 for Figure 3 Schematic diagram of the transverse reinforcement passing through the embedded pipe.
[0019] Reference numerals:
[0020] 10-pile foundation, 12-embedded pipe, 122-gap, 124-height difference, 20-retaining wall, 22-transverse reinforcement, 221-pile foundation reinforcement, 222-retaining wall reinforcement. DETAILED DESCRIPTION
[0021] In order to make the above-mentioned purposes, features and advantages of the utility model more obvious and easy to understand, the specific implementation of the utility model is described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the utility model. However, the utility model can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the utility model, so the utility model is not limited by the specific implementation disclosed below.
[0022] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only and do not represent the only implementation method.
[0023] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention.
[0024] See also Figures 1 to 4 The pile foundation and retaining wall transverse reinforcement connection structure in one embodiment includes a pile foundation 10 and a retaining wall 20.
[0025] The pile foundation 10 is transversely pre-embedded with an embedded pipe 12, which transversely penetrates the opposite side walls of the pile foundation 10, that is, the pipe openings at both ends of the embedded pipe 12 are exposed outside the pile foundation 10, which is convenient for the subsequent insertion of the transverse steel bars 22. In one embodiment, the embedded pipe 12 is provided in multiple groups, and the multiple groups of embedded pipes 12 are arranged at intervals in the height direction in the pile foundation 10.
[0026] During specific implementation, after the pile foundation steel bars 221 are tied, the embedded pipes 12 are buried at a certain interval, and then the two ends of the embedded pipes 12 are fixed and closed, and then the concrete of the pile foundation 10 is poured to keep the embedded pipes 12 in a hollow state, to prevent concrete from entering the embedded pipes 12 and affecting the transverse steel bars 22 passing through the embedded pipes 12.
[0027] The retaining wall 20 has transverse steel bars 22, and the embedded pipe 12 is a through channel for the transverse steel bars 22. After the concrete of the pile foundation 10 solidifies, the transverse steel bars 22 are passed through the embedded pipe 12, and slurry is poured into the gap 122 between the transverse steel bars 22 and the inner wall of the embedded pipe 12. After the slurry solidifies, the concrete of the retaining wall 20 is poured to form a whole.
[0028] Among them, the pile foundation steel bars 221 and the retaining wall steel bars 222 are composed of a whole transverse steel bar 22, which avoids the problem of steel bar disconnection and discontinuity at the pile foundation 10 and ensures the integrity of the structure. The grouting material can connect the transverse steel bars 22 and the pile foundation 10.
[0029] In one embodiment, multiple groups of transverse steel bars 22 are provided, and the multiple groups of transverse steel bars 22 are evenly distributed in the height direction of the retaining wall 20. The multiple groups of transverse steel bars 22 are correspondingly inserted into multiple groups of embedded pipes 12 to resist external forces according to the force requirements of the retaining wall 20.
[0030] In one embodiment, the embedded pipe 12 is a corrugated pipe, and the corrugated form of the corrugated pipe can achieve a bite effect between the concrete of the pile foundation 10 and the grouting inside, thereby improving the interconnection performance. The diameter of the transverse reinforcement 22 is smaller than the inner diameter of the embedded pipe 12, which facilitates the penetration of the transverse reinforcement 22.
[0031] In one embodiment, the inner diameter of the embedded pipe 12 is a multiple of the diameter of the transverse steel bar 22, so that a certain gap 122 is maintained between the two, so that the grouting slurry reaches the necessary thickness, and ensures reliable bonding between the steel bar and the grouting slurry. Specifically, the inner diameter of the embedded pipe 12 can be 2-5 times the diameter of the transverse steel bar 22.
[0032] In one embodiment, the embedded pipe 12 is tilted relative to the horizontal plane so that the two ends of the embedded pipe 12 have a height difference, one end of the embedded pipe 12 is higher than the other end, and the two ends of the embedded pipe 12 have a height difference 124. After the transverse reinforcement 22 is installed, grout is poured into the embedded pipe 12 from a high position to a low position, so that the gap 122 between the embedded pipe 12 and the transverse reinforcement 22 is filled with grout, thereby enhancing the density of the grouting.
[0033] In the above-mentioned pile foundation and retaining wall transverse reinforcement connection structure, the embedded pipe 12 is buried during the construction of the pile foundation 10, and the transverse reinforcement 22 can be directly passed through the embedded pipe 12 during the subsequent construction of the retaining wall 20. Grouting is performed in the gap between the embedded pipe 12 and the transverse reinforcement 22 to complete the connection of the pile foundation 10 and the retaining wall 20 transverse reinforcement 22, avoiding the processes of embedding reinforcement drilling and reinforcement welding, and solving the problems of large workload and low efficiency of the existing method. The transverse reinforcement 22 is an integral structure, there is no discontinuity in the middle, the stress state is reliable, the structure is simple, the on-site implementation efficiency is high, and it can be widely promoted and applied.
[0034] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. A pile foundation and a retaining wall transverse reinforcement connection structure, characterized in that: include: A pile foundation, wherein a pre-buried pipe is transversely pre-buried in the pile foundation, and the pre-buried pipe transversely penetrates the side walls of the pile foundation on two opposite sides; and The retaining wall has transverse reinforcements, which pass through the embedded pipes. The gap between the transverse reinforcements and the inner wall of the embedded pipes is poured with slurry. After the slurry solidifies, the retaining wall concrete is poured to form a whole.
2. The pile foundation and the transverse reinforcement connection structure of the retaining wall according to claim 1 is characterized in that: The embedded pipe is a corrugated pipe.
3. The pile foundation and the transverse reinforcement connection structure of the retaining wall according to claim 1 is characterized in that: The embedded pipe is arranged to be inclined relative to a horizontal plane so that two ends of the embedded pipe have a height difference.
4. The pile foundation and retaining wall transverse reinforcement connection structure according to claim 1, characterized in that: The inner diameter of the embedded pipe is a multiple of the diameter of the transverse steel bar.
5. The pile foundation and the transverse reinforcement connection structure of the retaining wall according to claim 4, characterized in that: The inner diameter of the embedded pipe is 2-5 times the diameter of the transverse steel bar.
6. The pile foundation and retaining wall transverse reinforcement connection structure according to claim 1, characterized in that: The embedded pipes are provided in a plurality of groups, and the plurality of groups of embedded pipes are arranged at intervals along the height direction in the pile foundation, and the plurality of groups of transverse steel bars are correspondingly passed through the plurality of groups of embedded pipes.