Fabricated building guardrail
By using the assembly mechanism of sliding connection and threaded connection in the building guardrail, the problem of insufficient durability of the guardrail assembly in the prior art is solved, the rapid assembly and disassembly of the guardrail is realized, and the stability and safety of the guardrail are improved.
Patent Information
- Application Number
- CN202421193398.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-29
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-05-29
AI Technical Summary
The assembly and use of existing prefabricated building guardrails is poor, and the reset spring may cause a decrease in elastic performance or damage under the influence of external environment, affecting the stability and safety of the guardrails.
Using an assembly mechanism including horizontal railing, assembly seat, elastic connecting sleeve, assembly screw, threaded sleeve, anti-detachment casing, vertical rod and fixture, the fast assembly and disassembly of the guardrail is achieved through sliding connections and threaded connections, and through a combination mechanism Achieve combined connection and adjustment between guardrails.
It improves the durability of the assembly and use of guardrails, facilitates the separate replacement and disassembly of guardrails, enhances the stability and safety of guardrails, and improves the protection and warning effect.
Smart Images

Figure CN222457062U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building guardrails, and in particular to an assembled building guardrail. Background Art
[0002] Building guardrails are structures used to define and protect buildings, sites or areas. They can be used for a variety of purposes, including safety, aesthetics, isolation and traffic guidance. During construction, guardrails are usually required to separate the construction area.
[0003] As disclosed in Chinese Patent Publication No. (CN212958008U), an assembled building guardrail includes a first support column, a horizontal rail, a vertical rail and a mounting sleeve, a second support column is arranged on one side of the first support column, and the bottom ends of the first support column and the second support column are fixed with a shock-absorbing base, four corners of the bottom of the shock-absorbing base are fixed with fixing piles, and barbs are evenly distributed on the fixing piles, both ends of both sides of the first support column and the second support column are fixed with mounting clips, and both ends between the first support column and the second support column are provided with horizontal rails, both ends of the horizontal rails are connected to the mounting clips by fixing bolts, and vertical rails are evenly arranged between the horizontal rails, the utility model is convenient for installation and disassembly of the building guardrail by installing the first support column, the second support column, the mounting clips, the fixing bolts, the horizontal rails, the vertical rails, the mounting sleeves, the grooves, the reset springs, the reserved holes and the pressing beads, so as to facilitate replacement when a single vertical rail is damaged.
[0004] However, as in the above-mentioned patent, there is still a problem of poor durability in the assembly and use of the building guardrail. For example, in the above-mentioned patent, the pressing bead is pushed out by the telescopic force of the return spring and stuck in the reserved hole, thereby fixing the vertical railing with the mounting sleeve. However, this method mainly relies on the elastic force of the support spring as the supporting force to ensure the firm connection between the guardrail components, and the return spring is a mechanical part. Long-term use and the influence of the external building environment may cause its elastic performance to decline or be damaged, thereby affecting the stability and safety of the guardrail. Utility Model Content
[0005] In view of the shortcomings of the prior art, the present application provides an assembled building guardrail, which has the advantages of high durability in assembly and use, and solves the problem of poor durability in assembly and use of building guardrails in the prior art.
[0006] To achieve the above-mentioned purpose, the present application provides the following technical solutions: an assembled building guardrail, comprising two guardrail posts, an assembly mechanism is provided between opposite sides of the two guardrail posts, and a combination mechanism is provided on the left and right sides of the guardrail;
[0007] The assembly mechanism includes two horizontal bars, a plurality of assembly seats, an elastic connection sleeve, an assembly screw, a threaded sleeve, an anti-slip sleeve, a vertical rod and a fixing piece. The two horizontal bars are slidably connected between opposite sides of two guardrail posts. The plurality of assembly seats are respectively fixed to opposite sides of the two horizontal bars. The elastic connection sleeve is fixed to a side of the assembly seat away from the horizontal bar. The assembly screw is slidably connected to the inner wall of the elastic connection sleeve. The threaded sleeve is threadedly connected to the outer side of the assembly screw. The anti-slip sleeve is fixed to a side of the threaded sleeve relative to the assembly seat. The vertical rod is fixed to an end of the assembly screw facing away from the assembly seat. The fixing piece is arranged at the left and right ends of the two horizontal bars for assembly and fixing between the horizontal bars and the guardrail posts.
[0008] By adopting this technical solution, when the guardrail is damaged, it can be replaced individually according to the damaged location, without wasting resources, and it can be disassembled into different individual parts for easy transportation during transportation, thereby improving the convenience of using the guardrail. The corresponding warning signs can be glued to the front of the vertical pole to improve the protective warning effect of the building guardrail.
[0009] Furthermore, the fixing parts include four connecting plates, four fixed columns and four pulling blocks. The four connecting plates are respectively fixed to the left and right ends of the two horizontal bars. The opposite sides of the connecting plates on the left and right sides are provided with movable openings, and the four fixed columns are respectively slidably connected to the inner walls of the four movable openings. The four pulling blocks are respectively fixed to the sides of the four fixed columns facing away from the connecting plates. The opposite sides of the two guardrail columns are provided with sliding grooves, and the four fixed columns are respectively slidably connected to the inner walls of the two sliding grooves.
[0010] By adopting this technical solution, the horizontal bar is placed between two guardrail posts, and then the two fixing posts are respectively inserted into the two sliding grooves for quick assembly.
[0011] Furthermore, the front walls of the inner cavities of the two sliding grooves are each provided with two fixing grooves having the same diameter as the fixing column.
[0012] By adopting this technical solution, the two horizontal bars are pulled down along the sliding groove to the two fixed groove positions, and then the user moves the pulling block to drive the fixed column to slide horizontally left and right along the inner wall of the sliding opening, so as to move the fixed column horizontally from the sliding groove to the fixed groove. At this time, the two horizontal bars can be quickly assembled and fixed to the two guardrail columns.
[0013] Furthermore, a rotating handle is fixed to the outer side of the threaded sleeve, and the cross-sectional shape of the elastic connecting sleeve is C-shaped.
[0014] By adopting this technical solution, the elastic connecting sleeve is C-shaped and its front notch can facilitate the assembly screw to be inserted into it, so as to facilitate the disassembly and assembly of a single vertical rod after the assembly between the horizontal rail and the guardrail column.
[0015] Furthermore, limit rings are fixed on both upper and lower sides of the outer surface of the vertical rod, and the diameter of the limit ring is greater than the diameter of the threaded sleeve.
[0016] By adopting this technical solution, the limiting ring can prevent the threaded sleeve from falling off from the vertical rod.
[0017] Furthermore, the combination mechanism includes four combination arms, four docking sleeves, four rotating pins, four locking studs and four locking nuts. The four combination arms are respectively fixed to the left and right sides of the guardrail column, the four docking sleeves are respectively fixed to the outer sides of the four combination arms, the four rotating pins are respectively slidably connected to the inner walls of the four docking sleeves, the four locking studs are respectively fixed to the bottom ends of the four rotating pins, and the four locking nuts are respectively threadedly connected to the outer surfaces of the four locking studs.
[0018] By adopting this technical solution and setting up a combination mechanism, when the guardrail is in use, the combination arms on multiple guardrails are fitted together and the positions of the docking sleeves are made to correspond, and then the rotating pin is inserted into the two fitted docking sleeves. At this time, multiple building guardrails can be combined and connected.
[0019] Furthermore, a limiting cap larger than the diameter of the rotating pin is fixed to the top end of the rotating pin.
[0020] By adopting this technical solution, the opening and closing angles of adjacent guardrails can be adjusted by rotating the combined arms in a circle along the rotating pins, so that guardrail nets of different sizes can be combined according to needs.
[0021] Furthermore, a rotating lever is fixed to both the left and right sides of the locking nut.
[0022] By adopting this technical solution, the locking nut and the locking stud can be threadedly connected after the adjustment combination, and then the locking nut is driven by the rotating lever to tighten along the locking stud to abut the docking sleeve, applying pressure to it to prevent it from rotating freely, thereby achieving the effect of a free locking adjustment combination.
[0023] Compared with the prior art, the technical solution of this application has the following beneficial effects:
[0024] 1. The assembled building guardrail is provided with an assembly mechanism, and the horizontal rail is placed between two guardrail posts. The fixed post is driven to slide horizontally left and right along the inner wall of the sliding opening by moving the pulling block, and the fixed post is moved horizontally from the sliding groove to the fixed groove. At this time, the two horizontal rails and the two guardrail posts can be quickly assembled and fixed, and then the assembly screws at both ends of the vertical rod are respectively inserted into the two elastic connecting sleeves to seal the notch position of the elastic connecting sleeve. When the guardrail is damaged, it can be replaced separately according to the damaged position without causing waste of resources. It can also be disassembled into different separate parts for easy transportation during transportation, thereby improving the convenience of the guardrail when in use. The front of the vertical rod can be bonded with a corresponding warning sign to improve the protective warning effect of the building guardrail.
[0025] 2. The assembled building guardrail is provided with a combination mechanism. When the guardrail is used, the combination arms on multiple guardrails are fitted together to make the positions of the docking sleeves correspond, and then the rotating pin is inserted into the two fitted docking sleeves. At this time, multiple building guardrails can be combined and connected, and the opening and closing angles of adjacent guardrails can be adjusted by rotating the combination arms along the rotating pin in a circle, so as to be combined into guardrail nets of different sizes according to needs. At the same time, after the adjustment combination, the locking nut and the locking stud can be threadedly connected, and then the locking nut is driven by the rotating lever to tighten along the locking stud to abut the docking sleeve, and pressure is applied to it to prevent it from rotating freely, thereby achieving the effect of free locking and adjustment combination. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of the structure of this application;
[0027] Figure 2 A schematic diagram of the assembly mechanism for this application;
[0028] Figure 3 For this application Figure 2 A schematic diagram of the structure enlargement in the middle;
[0029] Figure 4 This is a three-dimensional schematic diagram of the fixing parts of this application;
[0030] Figure 5 This is a schematic diagram of the combined structure of this application.
[0031] In the figure: 1. guardrail column; 2. assembly mechanism; 21. crossbar; 22. assembly seat; 23. elastic connecting sleeve; 24. assembly screw; 25. threaded sleeve; 26. anti-drop sleeve; 27. vertical rod; 28. fixing piece; 281. connecting plate; 282. fixing column; 283. pulling block; 284. sliding groove; 285. fixing groove; 29. turning handle; 3. combination mechanism; 31. combination arm; 32. docking sleeve; 33. turning pin; 34. locking stud; 35. locking nut; 36. turning lever. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0033] See also Figure 1 An assembled building guardrail in this embodiment includes two guardrail posts 1, an assembly mechanism 2 is provided between opposite sides of the two guardrail posts 1, and a combination mechanism 3 is provided on the left and right sides of the guardrail.
[0034] See also Figure 2-4 In order to improve the durability of the assembly of the building guardrail, the assembly mechanism 2 in this embodiment includes two horizontal bars 21, a plurality of assembly seats 22, an elastic connection sleeve 23, an assembly screw 24, a threaded sleeve 25, an anti-drop sleeve 26, a vertical rod 27 and a fixing member 28. The two horizontal bars 21 are slidably connected between the opposite sides of the two guardrail posts 1, and the plurality of assembly seats 22 are respectively fixed to the opposite sides of the two horizontal bars 21. The elastic connection sleeve 23 is fixed to the side of the assembly seat 22 away from the horizontal bar 21. By placing the horizontal bar 21 between the two guardrail posts 1, and then inserting the two fixing posts 282 into the two sliding grooves 284 respectively, the assembly screw 24 is slidably connected to the inner wall of the elastic connection sleeve 23, and the threaded sleeve 25 is threadedly connected to the outer side of the assembly screw 24, the vertical rod 27 is taken out, and the vertical rod The assembly screws 24 at both ends of 27 are respectively inserted into the two elastic connecting sleeves 23, the anti-dropping sleeve 26 and the threaded sleeve 25 are fixed to one side of the assembly seat 22, the vertical rod 27 is fixed to the end of the assembly screw 24 facing away from the assembly seat 22, and the fixing parts 28 are arranged at the left and right ends of the two horizontal rails 21 for assembly and fixing between the horizontal rails 21 and the guardrail column 1. After the assembly screws 24 are respectively inserted into the two elastic connecting sleeves 23, the user turns the rotating handle 29 to drive the threaded sleeve 25 to rotate upward along the outer side of the assembly screw 24, and then pushes the anti-dropping sleeve 26 to be inserted into the outer side of the elastic connecting sleeve 23, so as to block the notch position of the elastic connecting sleeve 23, avoid separation between the vertical rod 27 and the elastic connecting sleeve 23, and realize rapid assembly, and when the guardrail is damaged, it can be replaced separately according to the damaged position.
[0035] The fixing member 28 includes four connecting plates 281, four fixing columns 282 and four pulling blocks 283. The four connecting plates 281 are respectively fixed to the left and right ends of the two horizontal bars 21. The opposite sides of the left and right connecting plates 281 are provided with moving openings, and the four fixing columns 282 are respectively slidably connected to the inner walls of the four moving openings. The four pulling blocks 283 are respectively fixed to the sides of the four fixing columns 282 facing away from the connecting plates 281. The opposite sides of the two guardrail columns 1 are provided with sliding grooves 284, and the four fixing columns 282 are respectively slidably connected to the inner walls of the two sliding grooves 284.
[0036] In this embodiment, the front walls of the inner cavities of the two sliding grooves 284 are provided with two fixing grooves 285 of the same diameter as the fixing posts 282. The two horizontal bars 21 are pulled down along the sliding grooves 284 to the positions of the two fixing grooves 285. Then, the user drives the fixing posts 282 to slide horizontally left and right along the inner wall of the sliding opening by moving the pulling block 283, so as to move the fixing posts 282 horizontally from the sliding grooves 284 to the fixing grooves 285. At this time, the two horizontal bars 21 can be quickly assembled and fixed to the two guardrail posts 1. A rotating handle 29 is fixed to the outer side of the threaded sleeve 25. The cross-sectional shape of the elastic connecting sleeve 23 is C-shaped. The elastic connecting sleeve 23 is C-shaped and its front notch can facilitate the assembly screw 24 to be inserted into it, so as to facilitate the disassembly and assembly of the single vertical rod 27 after the assembly between the horizontal bar 21 and the guardrail post 1. Limiting rings are fixed on the upper and lower sides of the outer surface of the vertical rod 27, and the diameter of the limiting ring is larger than the diameter of the threaded sleeve 25.
[0037] See also Figure 5 In order to improve the combined adjustment effect of the building guardrail, the combined mechanism 3 in this embodiment includes four combined arms 31, four docking sleeves 32, four rotating pins 33, four locking studs 34 and four locking nuts 35. The four combined arms 31 are respectively fixed to the left and right sides of the guardrail column 1, and the four docking sleeves 32 are respectively fixed to the outer sides of the four combined arms 31. When the guardrail is in use, the combined arms 31 on multiple guardrails are fitted to make the positions of the docking sleeves 32 correspond, and then the rotating pin 33 is inserted into the two fitted docking sleeves 32. At this time, multiple building guardrails can be combined and connected, and the adjacent guardrails can be adjusted to open and close angles by rotating the combined arms 31 along the rotating pins 33 in a circle, so as to be combined into combined guardrails of different sizes according to needs. The four rotating pins 33 are respectively slidably connected to the inner walls of the four docking sleeves 32, the four locking studs 34 are respectively fixed to the bottom ends of the four rotating pins 33, and the four locking nuts 35 are respectively threadedly connected to the outer surfaces of the four locking studs 34.
[0038] In this embodiment, a limit cap larger than the diameter of the rotating pin 33 is fixed to the top of the rotating pin 33, and a rotating lever 36 is fixed on both sides of the locking nut 35. After the adjustment combination, the locking nut 35 and the locking stud 34 can be threadedly connected, and then the locking nut 35 is driven by the rotating lever 36 to be tightened along the locking stud 34 to abut the docking sleeve 32, and pressure is applied to it to prevent it from rotating freely, thereby achieving the effect of the free locking adjustment combination.
[0039] The working principle of the above embodiment is:
[0040] (1) When improving the durability of the assembly of a building guardrail, first place the horizontal rail 21 between the two guardrail posts 1, then insert the two fixing posts 282 into the two sliding grooves 284 respectively, and further pull the two horizontal rails 21 down along the sliding grooves 284 to the positions of the two fixing grooves 285. Then, the user moves the pull block 283 to drive the fixing posts 282 to slide horizontally left and right along the inner wall of the sliding opening, thereby moving the fixing posts 282 from the sliding grooves 284 to the fixing grooves 285. At this time, the two horizontal rails 21 can be quickly assembled and fixed to the two guardrail posts 1, and then the vertical rod 27 is taken out, and the assembly screws 24 at both ends of the vertical rod 27 are respectively inserted into the fixing grooves 285. The two elastic connecting sleeves 23 are C-shaped and the notch on the front side can facilitate the insertion of the assembly screw 24, so as to facilitate the disassembly and assembly of the single vertical rod 27 after the assembly between the horizontal rail 21 and the guardrail column 1. After the assembly screw 24 is respectively inserted into the two elastic connecting sleeves 23, the user turns the rotating handle 29 to drive the threaded sleeve 25 to rotate upward along the outer side of the assembly screw 24, and then pushes the anti-drop sleeve 26 to be inserted into the outer side of the elastic connecting sleeve 23, so as to block the notch position of the elastic connecting sleeve 23, avoid separation between the vertical rod 27 and the elastic connecting sleeve 23, and realize rapid assembly. When the guardrail is damaged, it can be replaced separately according to the damaged position.
[0041] (2) When the building guardrail is used to improve the combination adjustment effect, when the guardrail is used, the combination arms 31 on the multiple guardrails are fitted together to make the positions of the docking sleeves 32 correspond, and then the rotating pin 33 is inserted into the two fitted docking sleeves 32. At this time, the multiple building guardrails can be combined and connected, and the opening and closing angles of adjacent guardrails can be adjusted by rotating the combination arms 31 along the rotating pin 33 in a circle, so as to be combined into combined guardrails of different sizes according to needs. At the same time, after the adjustment combination, the locking nut 35 and the locking stud 34 can be threadedly connected, and then the locking nut 35 can be driven by the rotating lever 36 to tighten along the locking stud 34 to abut the docking sleeve 32, and pressure is applied to it to prevent it from rotating freely, thereby achieving the effect of free locking and adjustment combination.
Claims
1. An assembled building guardrail, comprising two guardrail posts (1), characterized in that: An assembly mechanism (2) is provided between opposite sides of two guardrail posts (1), and a combination mechanism (3) is provided on the left and right sides of the guardrail; The assembly mechanism (2) comprises two horizontal bars (21), a plurality of assembly seats (22), an elastic connection sleeve (23), an assembly screw (24), a threaded sleeve (25), an anti-drop sleeve (26), a vertical rod (27) and a fixing member (28), wherein the two horizontal bars (21) are slidably connected between opposite sides of two guardrail posts (1), the plurality of assembly seats (22) are respectively fixed to opposite sides of the two horizontal bars (21), and the elastic connection sleeve (23) and the assembly seat (22) are away from the horizontal bars (21). One side is fixed, the assembly screw (24) is slidably connected to the inner wall of the elastic connection sleeve (23), the threaded sleeve (25) is threadedly connected to the outer side of the assembly screw (24), the anti-drop sleeve (26) is fixed to the threaded sleeve (25) on one side relative to the assembly seat (22), the vertical rod (27) is fixed to the end of the assembly screw (24) facing away from the assembly seat (22), and the fixing member (28) is arranged at the left and right ends of the two horizontal rails (21) for assembly and fixing between the horizontal rails (21) and the guardrail column (1).
2. The assembled building guardrail according to claim 1, characterized in that: The fixing member (28) comprises four connecting plates (281), four fixing columns (282) and four pulling blocks (283); the four connecting plates (281) are respectively fixed to the left and right ends of the two horizontal bars (21); the connecting plates (281) on the left and right sides opposite to each other are provided with moving openings, and the four fixing columns (282) are respectively slidably connected to the inner walls of the four moving openings; the four pulling blocks (283) are respectively fixed to the sides of the four fixing columns (282) opposite to the connecting plates (281); the two guardrail uprights (1) are provided with sliding grooves (284) on the opposite sides, and the four fixing columns (282) are respectively slidably connected to the inner walls of the two sliding grooves (284).
3. The assembled building guardrail according to claim 2 is characterized in that: Two fixing grooves (285) having the same diameter as the fixing column (282) are formed on the front walls of the inner cavities of the two sliding grooves (284).
4. The assembled building guardrail according to claim 1, characterized in that: A rotating handle (29) is fixed to the outer side of the threaded sleeve (25), and the cross-sectional shape of the elastic connection sleeve (23) is C-shaped.
5. The assembled building guardrail according to claim 1, characterized in that: Limiting rings are fixed on both upper and lower sides of the outer surface of the vertical rod (27), and the diameter of the limiting ring is greater than the diameter of the threaded sleeve (25).
6. The assembled building guardrail according to claim 1, characterized in that: The combination mechanism (3) comprises four combination arms (31), four docking sleeves (32), four rotating pins (33), four locking studs (34) and four locking nuts (35); the four combination arms (31) are respectively fixed to the left and right sides of the guardrail column (1); the four docking sleeves (32) are respectively fixed to the outer sides of the four combination arms (31); the four rotating pins (33) are respectively slidably connected to the inner walls of the four docking sleeves (32); the four locking studs (34) are respectively fixed to the bottom ends of the four rotating pins (33); and the four locking nuts (35) are respectively threadedly connected to the outer surfaces of the four locking studs (34).
7. The assembled building guardrail according to claim 6, characterized in that: A limiting cap having a diameter larger than that of the rotating pin (33) is fixed to the top end of the rotating pin (33).
8. The assembled building guardrail according to claim 6, characterized in that: A rotating lever (36) is fixed to both the left and right sides of the locking nut (35).
Citation Information
Patent Citations
Assembly type building guardrail
CN212958008U