Movable hopper for concrete road barrier pouring

By designing a movable concrete isolation pier pouring hopper and using moving components and material discharge components, the problem of multiple people handling hoppers in the prior art is solved, and construction efficiency and cost-effectiveness are improved.

CN222472903UActive Publication Date: 2025-02-14SOUTH TO NORTH WATER SHANDONG LINE CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421082483.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2025-02-14
Estimated Expiration
2034-05-17

AI Technical Summary

Technical Problem

In the on-site construction of concrete isolation piers, the hopper used to pour concrete isolation piers in the prior art requires two to three people to carry it back and forth, resulting in inefficient construction and waste of labor.

Method used

A movable concrete isolation piers casting hopper is designed, using moving components and feeding components. The moving components include four angle steel brackets, universal wheels and fixing frames. The feeding components include hinges, snaps and handles, through These components are designed to be moved on site and enable automated concrete pouring.

Benefits of technology

The construction efficiency of long-distance strip casting of concrete isolation piers is improved, construction costs are reduced, labor is saved, and dependence on labor is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222472903U_ABST
    Figure CN222472903U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of concrete pouring, and particularly relates to a movable hopper for concrete road barrier pouring, which comprises a hopper main body and a discharge pipe fixedly connected to an opening at the lower end of the hopper main body, and further comprises a moving component arranged on the surface of the hopper main body, the moving assembly comprises four angle steel supports arranged on the surface of the hopper body, the angle steel supports correspond to each other in a pairwise mode, the upper end of each angle steel support is fixedly connected with a fixing plate, and the fixing plates are arranged at the four corners of an opening in the upper end of the hopper body and connected through bolts. The lower end of each angle steel support is fixedly connected with a universal wheel, and a fixing frame is fixedly connected between every two corresponding angle steel supports. The device is suitable for long-distance strip-shaped concrete pouring construction, the construction efficiency is improved, and the labor cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of concrete pouring, and in particular relates to a movable hopper for pouring concrete isolation piers. Background Art

[0002] Isolation piers are also called water barriers, which can be divided into concrete isolation piers, fiberglass isolation piers, and plastic isolation piers. They are the main type of transportation facilities, mainly used for transportation facilities to play a protective role. During the production process of concrete isolation piers, a hopper for casting isolation piers is often required;

[0003] After checking, the public announcement number: CN211899686U discloses a hopper for on-site pouring of building concrete. This technology discloses "a hopper for on-site pouring of building concrete, including a hopper body, the hopper body includes a prism section and a prism section arranged below the prism section, and other technical solutions, which has the effect of reducing the effect of concrete arching on the pouring construction efficiency and other technical effects";

[0004] In this prior art, a telescopic rod and a first spring are used to cooperate with a baffle plate to facilitate breaking the arch when the concrete arch is retained, thereby reducing the influence of the concrete arch on the pouring construction efficiency. However, during the on-site construction of the concrete isolation pier, the hopper used for pouring the concrete isolation pier needs two to three people to carry back and forth, which greatly affects the efficiency of concrete pouring and wastes labor.

[0005] Therefore, a movable concrete isolation pier pouring hopper is designed to solve the above problems. Utility Model Content

[0006] In order to solve the problems raised in the above background technology, the utility model provides a movable concrete isolation pier pouring hopper, which is suitable for long-distance strip concrete pouring construction, improves construction efficiency and saves labor costs.

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a movable concrete isolation pier pouring hopper, comprising a hopper body and a discharge pipe fixedly connected to the lower end opening of the hopper body, and also comprising a moving component arranged on the surface of the hopper body;

[0008] The moving assembly includes four angle steel brackets arranged on the surface of the hopper body, and the angle steel brackets correspond to each other in pairs. The upper end of each of the angle steel brackets is fixedly connected to a fixing plate, and the fixing plates are arranged at the four corners of the upper end opening of the hopper body and are connected by bolts. The lower end of each of the angle steel brackets is fixedly connected to a universal wheel, and a fixing frame is fixedly connected between the corresponding two angle steel brackets.

[0009] As a preferred embodiment of the movable concrete isolation pier casting hopper of the utility model, a support plate is fixedly connected to the surface of each angle steel bracket.

[0010] As a preferred embodiment of the movable concrete isolation pier casting hopper of the utility model, threaded holes are provided on the surface of the hopper body, and the number of the threaded holes is consistent with the number of the bolts.

[0011] As a preferred embodiment of the movable concrete isolation pier pouring hopper of the utility model, a connecting plate is fixedly connected between two adjacent angle steel brackets.

[0012] As a preferred embodiment of the movable concrete isolation pier pouring hopper of the utility model, it also includes a discharge assembly arranged below the hopper body;

[0013] The discharge assembly includes a hinge seat fixedly connected to the surface of the discharge pipe, the rotating shaft of the hinge seat is fixedly connected to a cover plate, the end of the cover plate away from the hinge seat is fixedly connected to a buckle, the surface of the discharge pipe is fixedly connected to a clamping plate corresponding to the buckle, and handles are fixedly connected to both ends of the rotating shaft of the hinge seat.

[0014] As a preferred embodiment of the utility model for a movable concrete isolation pier casting hopper, a spring pin is inserted into the upper surface of the connecting plate near the handle, and the upper end of the spring pin is rotatably connected to a baffle, and a side of the baffle near the connecting plate is fixedly connected to four locating pins, and four locating holes are opened on the surface of the connecting plate near the locating pins, and the locating holes and the locating pins correspond one to one, and a side of the baffle away from the locating pins is fixedly connected to a handle.

[0015] Compared with the prior art, the beneficial effects of the utility model are: a mobile component is added to the present application, which is suitable for long-distance strip concrete pouring construction, improves construction efficiency, and saves labor costs. At the same time, a discharge component is added to control the amount of concrete pouring. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0018] Figure 2 This is a schematic diagram of the structure of the angle steel bracket in the utility model;

[0019] Figure 3 It is a structural schematic diagram of the support plate in the utility model;

[0020] Figure 4 It is a schematic diagram of the structure of the buckle in the utility model;

[0021] Figure 5 This is a schematic diagram of the structure of the handle in the utility model;

[0022] Figure 6 For the utility model Figure 6 A magnified image;

[0023] In the figure:

[0024] 1. Hopper body;

[0025] 2. Mobile assembly; 21. Angle steel bracket; 22. Fixed plate; 23. Bolt; 24. Threaded hole; 25. Support plate; 26. Fixed frame; 27. Connecting plate; 28. Universal wheel;

[0026] 3. Discharging assembly; 31. Hinge seat; 32. Cover plate; 33. Buckle; 34. Clamp plate; 35. Handle; 36. Spring pin shaft; 37. Baffle; 38. Positioning pin; 39. Positioning hole; 310. Grip;

[0027] 4. Discharge pipe. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0029] Example 1

[0030] like Figure 1 As shown;

[0031] A movable hopper for pouring concrete isolation piers comprises a hopper body 1 and a discharge pipe 4 fixedly connected to an opening at the lower end of the hopper body 1.

[0032] In this embodiment: the existing disclosure (announcement) number: CN211899686U discloses a hopper for on-site pouring of building concrete. In order to solve the existing problems existing in this prior art, as disclosed in the background technology above, "due to the on-site construction of concrete isolation piers, the hopper used for pouring concrete isolation piers requires two to three people to carry back and forth, which greatly affects the efficiency of concrete pouring and wastes manpower". In terms of combined use, this problem is obviously a problem that exists and is difficult to solve. In view of this, in order to solve this technical problem, a moving component 2 and a discharging component 3 are added to this application document.

[0033] More specifically:

[0034] like Figures 1 to 6 As shown:

[0035] In combination with the above content: it also includes a moving component 2 arranged on the surface of the hopper body 1;

[0036] The moving assembly 2 includes four angle steel brackets 21 arranged on the surface of the hopper body 1, and the angle steel brackets 21 correspond to each other in pairs. The upper end of each angle steel bracket 21 is fixedly connected to a fixing plate 22, and the fixing plates 22 are arranged at the four corners of the upper end opening of the hopper body 1 and are connected by bolts 23. The lower end of each angle steel bracket 21 is fixedly connected to a universal wheel 28, and a fixing frame 26 is fixedly connected between two corresponding angle steel brackets 21.

[0037] In this embodiment: because the surface of the hopper body 1 is connected to four angle steel brackets 21 through a fixed plate 22, and the lower end of each angle steel bracket 21 is fixedly connected to a universal wheel 28, and the corresponding two angle steel brackets 21 are fixed by a fixed frame 26, this design can enable the staff to improve the construction efficiency of long-distance concrete isolation pier casting and reduce construction costs.

[0038] Going further:

[0039] In an optional embodiment, a support plate 25 is fixedly connected to the surface of each angle steel bracket 21 .

[0040] In this embodiment: because the surface of each angle steel bracket 21 is fixedly connected to the support plate 25, the staff can reinforce the hopper body 1 through the support plate 25 to prevent it from falling. With this design, the staff can further improve the construction efficiency of long-distance concrete isolation pier casting and reduce construction costs.

[0041] It should be noted that a notch matching the funnel of the hopper body 1 is provided on the surface of the support plate 25 .

[0042] Going further:

[0043] In an optional embodiment, threaded holes 24 are provided on the surface of the hopper body 1 , and the number of the threaded holes 24 and the number of the bolts 23 are the same.

[0044] In this embodiment, since the number of threaded holes 24 and bolts 23 is the same, this design can further enable the workers to improve the construction efficiency of long-distance concrete isolation pier casting and reduce construction costs.

[0045] Going further:

[0046] In an optional embodiment, a connecting plate 27 is fixedly connected between two adjacent angle steel brackets 21 .

[0047] In this embodiment: because connecting plates 27 are provided between the angle steel brackets 21, the workers can reinforce the connection between the angle steel brackets 21 through the connecting plates 27. With this design, the workers can further improve the construction efficiency of long-distance concrete isolation pier casting and reduce construction costs.

[0048] It should be noted that among the four connecting plates 27 , the position of one connecting plate 27 is higher than the other three connecting plates 27 .

[0049] Going further:

[0050] In an optional embodiment, it further includes a discharge assembly 3 disposed below the hopper body 1;

[0051] The discharge assembly 3 includes a hinge seat 31 fixedly connected to the surface of the discharge pipe 4, the rotating shaft of the hinge seat 31 is fixedly connected to a cover plate 32, the end of the cover plate 32 away from the hinge seat 31 is fixedly connected to a buckle 33, the surface of the discharge pipe 4 is fixedly connected to a clamping plate 34 corresponding to the buckle 33, and handles 35 are fixedly connected to both ends of the rotating shaft of the hinge seat 31.

[0052] In the present embodiment: since a hinge seat 31 is provided on the surface of the discharge pipe 4, the staff can push the handle 35, and the handle 35 rotates through the rotating axis of the hinge seat 31 to drive the cover plate 32 to rotate, and finally the cover plate 32 is fitted with the surface of the discharge pipe 4. At this time, the connection between the cover plate 32 and the discharge pipe 4 is strengthened by the cooperation of the buckle 33 and the clamping plate 34. With this design, it is convenient for the staff to cast the concrete isolation pier.

[0053] It should be noted that the discharge port of the discharge pipe 4 is an oblique port.

[0054] Going further:

[0055] In an optional embodiment, a spring pin shaft 36 is inserted into the upper surface of the connecting plate 27 near the handle 35, and the upper end of the spring pin shaft 36 is rotatably connected to a baffle plate 37. Four positioning pins 38 are fixedly connected to a side of the baffle plate 37 near the connecting plate 27, and four positioning holes 39 are opened on the surface of the connecting plate 27 near the positioning pins 38, and the positioning holes 39 and the positioning pins 38 correspond one to one, and the side of the baffle plate 37 away from the positioning pins 38 is fixedly connected to a handle 310.

[0056] In the present embodiment: since a spring pin shaft 36 is provided on the surface of the connecting plate 27, and a baffle plate 37 is rotatably connected to the surface of the spring pin shaft 36, the staff can rotate the handle 310, and the rotation of the handle 310 drives the baffle plate 37 to rotate, so that the baffle plate 37 blocks the rotation of the handle 35. During this process, the positioning pin 38 is inserted into the positioning hole 39 through the spring pin shaft 36 to complete the positioning of the handle 35. This design can further facilitate the staff to cast the concrete isolation pier.

[0057] It should be noted that the connection plate 27 close to the handle 35 is located higher than the other three connection plates 27 .

[0058] Working principle: Because the surface of the hopper body 1 is connected with four angle steel brackets 21 through a fixing plate 22, and the lower end of each angle steel bracket 21 is fixedly connected with a universal wheel 28, and the corresponding two angle steel brackets 21 are fixed by a fixing frame 26. With this design, the staff can improve the construction efficiency of long-distance concrete casting isolation piers and reduce construction costs. Because the surface of each angle steel bracket 21 is fixedly connected with a support plate 25, the staff can reinforce the hopper body 1 through the support plate 25 to prevent it from falling. Because the number of threaded holes 24 and bolts 23 is the same, and because a connecting plate 27 is provided between the angle steel brackets 21, the staff can reinforce the connection between the angle steel brackets 21 through the connecting plate 27. With this design, the staff can further improve the construction efficiency of long-distance concrete casting isolation piers and reduce construction costs. Since a hinge seat 31 is provided on the surface of the discharge pipe 4, the staff can push the handle 35, and the handle 35 rotates through the rotating shaft of the hinge seat 31 to drive the cover plate 32 to rotate, and finally the cover plate 32 is fitted with the surface of the discharge pipe 4. At this time, the connection between the cover plate 32 and the discharge pipe 4 is strengthened through the cooperation of the buckle 33 and the clamping plate 34. With this design, it is convenient for the staff to cast concrete isolation piers. Since a spring pin shaft 36 is provided on the surface of the connecting plate 27, and a baffle plate 37 is rotatably connected to the surface of the spring pin shaft 36, the staff can rotate the handle 310, and the handle 310 rotates to drive the baffle plate 37 to rotate, so that the baffle plate 37 blocks the rotation of the handle 35. In this process, the positioning pin 38 is inserted into the positioning hole 39 through the spring pin shaft 36 to complete the positioning of the handle 35. With this design, it is further convenient for the staff to cast concrete isolation piers.

[0059] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A movable concrete isolation pier pouring hopper, comprising a hopper body (1) and a discharge pipe (4) fixedly connected to the lower opening of the hopper body (1), characterized in that: It also includes a moving component (2) arranged on the surface of the hopper body (1); The moving assembly (2) comprises four angle steel brackets (21) arranged on the surface of the hopper body (1), and the angle steel brackets (21) correspond to each other in pairs. The upper end of each angle steel bracket (21) is fixedly connected to a fixing plate (22), and the fixing plates (22) are arranged at the four corners of the upper opening of the hopper body (1) and are connected by bolts (23). The lower end of each angle steel bracket (21) is fixedly connected to a universal wheel (28), and a fixing frame (26) is fixedly connected between two corresponding angle steel brackets (21).

2. The movable concrete isolation pier pouring hopper according to claim 1 is characterized in that: A support plate (25) is fixedly connected to the surface of each angle steel bracket (21).

3. The movable concrete isolation pier pouring hopper according to claim 2 is characterized in that: The surface of the hopper body (1) is provided with threaded holes (24), and the number of the threaded holes (24) and the number of the bolts (23) are the same.

4. The movable concrete isolation pier pouring hopper according to claim 3 is characterized in that: A connecting plate (27) is fixedly connected between two adjacent angle steel brackets (21).

5. The movable concrete isolation pier pouring hopper according to claim 4 is characterized in that: It also includes a material discharge assembly (3) arranged below the hopper body (1); The discharge assembly (3) comprises a hinge seat (31) fixedly connected to the surface of the discharge pipe (4); the rotating shaft of the hinge seat (31) is fixedly connected to a cover plate (32); one end of the cover plate (32) away from the hinge seat (31) is fixedly connected to a buckle (33); the surface of the discharge pipe (4) is fixedly connected to a clamping plate (34) corresponding to the buckle (33); and handles (35) are fixedly connected to both ends of the rotating shaft of the hinge seat (31).

6. The movable concrete isolation pier pouring hopper according to claim 5 is characterized in that: A spring pin shaft (36) is inserted into the upper surface of the connecting plate (27) near the handle (35), and the upper end of the spring pin shaft (36) is rotatably connected to a baffle (37). Four positioning pins (38) are fixedly connected to a surface of the baffle (37) near the connecting plate (27), and four positioning holes (39) are opened on the surface of the connecting plate (27) near the positioning pins (38), and the positioning holes (39) and the positioning pins (38) correspond one to one. A handle (310) is fixedly connected to a surface of the baffle (37) away from the positioning pins (38).

Citation Information

Patent Citations

  • Hopper for building concrete on-site pouring

    CN211899686U