Drainage device capable of avoiding blockage for tunnel civil engineering

By designing a drainage device including a rectangular box and an anti-blocking mechanism, the problem of blockage caused by the inability to filter silt and sand in the prior art is solved, and effective drainage and maintenance requirements are achieved.

CN222526362UActive Publication Date: 2025-02-25SHIJIAZHUANG CONSTRUCTION PROJECT QUALITY SUPERVISION & MANAGEMENT STATION (SHIJIAZHUANG CONSTRUCTION PROJECT QUALITY & BUILDING ENERGY SAVING TESTING CENTER)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421502939.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2025-02-25
Estimated Expiration
2034-06-28

AI Technical Summary

Technical Problem

When the existing drainage device is drained, it cannot effectively filter the silt and sand in the water, resulting in blockage of the drainage device and requires subsequent maintenance.

Method used

A drainage device including a rectangular box and an anti-blocking mechanism is designed. The anti-blocking mechanism consists of a first loading box, a filter net, a telescopic rod and a clamp. The gas flow is driven by the pump, and the telescopic rod is used to push the clamp to clean the filter net. The mud and sand inside.

Benefits of technology

It effectively avoids the problem of poor drainage effect caused by mud and sand blockage during use, and reduces the need for later maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222526362U_ABST
    Figure CN222526362U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of tunnel civil engineering, and discloses an anti-blocking drainage device for tunnel civil engineering, which comprises a rectangular box, an anti-blocking mechanism is arranged above the rectangular box, the anti-blocking mechanism comprises a first loading box, the inner wall of the first loading box is fixedly connected with two filter screens, and the inner wall of the first loading box is fixedly connected with a second loading box. A telescopic rod is fixedly connected to the inner top wall of the first loading box, a clamping block is fixedly connected to the telescopic end of the telescopic rod, and a second loading box is fixedly connected to the right side face of the first loading box. According to the drainage device capable of avoiding blockage for tunnel civil engineering, the telescopic characteristic of a telescopic rod pushes a clamping block to block the position, communicated with a water pumping pipe, of a first loading box, gas entering the first loading box can flow out through a filter screen, and then silt blocked in meshes of the filter screen is removed; and the problem of later maintenance caused by poor anti-blocking effect when the drainage device is used is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel civil construction, in particular to a drainage device for tunnel civil construction which can avoid blockage. Background Art

[0002] Tunnel civil construction refers to the construction of underground tunnel projects. During the underground civil construction, a large number of drainage devices are needed to discharge the industrial wastewater generated during the tunnel civil construction to prevent the wastewater from accumulating and soaking the land around the tunnel, making it soft, and avoiding the problem of unstable land around the tunnel in the later stage.

[0003] At present, the existing drainage devices are unable to filter a large amount of sediment in the water during drainage. The sediment will follow the water flow into the interior of the drainage device, causing blockage inside the drainage device, making it impossible to perform normal drainage work. The drainage device needs to be subsequently repaired, which will cause some inconveniences.

[0004] Therefore, those skilled in the art provide a drainage device for tunnel civil construction that can avoid blockage, so as to solve the problems raised in the above background technology. Utility Model Content

[0005] The utility model aims to provide a drainage device for tunnel civil construction which can avoid blockage, so as to solve the problems raised in the above-mentioned background technology.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A drainage device for tunnel civil construction that can avoid blockage, comprising a tunnel body, a drainage channel is opened below the tunnel body, a rectangular box is arranged inside the tunnel body, and an anti-blockage mechanism is arranged above the rectangular box;

[0008] The anti-blocking mechanism includes a first loading box, an inner wall of the first loading box is fixedly connected to two filter screens, an inner top wall of the first loading box is fixedly connected to a telescopic rod, a telescopic end of the telescopic rod is fixedly connected to a clamping block, the right side of the first loading box is fixedly connected to the second loading box, the front of the second loading box and the back of the second loading box are both fixedly connected to a floating plate, the right side of the first loading box is fixedly connected to two fixed blocks, the inner walls of the two fixed blocks are commonly fixedly connected to an air pump, the input end of the air pump is fixedly connected to an air extraction pipe, the bottom end of the air extraction pipe passes through the second loading box and extends to the bottom of the second loading box, the output end of the air extraction pump is fixedly connected to an air outlet pipe, the left end of the air outlet pipe passes through the first loading box and extends to the inside of the first loading box.

[0009] As a further solution of the utility model: the upper surface of the rectangular box is fixedly connected with a fixing seat, and the inner wall of the fixing seat is fixedly connected with a water pump.

[0010] As a further solution of the utility model: the output end of the water pump is fixedly connected to a water outlet pipe, and the bottom end of the water outlet pipe penetrates the rectangular box and extends to the inside of the rectangular box.

[0011] As a further solution of the utility model: the input end of the water pump is fixedly connected to a water pumping pipe, and the top end of the water pumping pipe is fixedly connected to the bottom surface of the first loading box.

[0012] As a further solution of the utility model: a fixing plate is fixedly connected to the right side surface of the rectangular box, and the interior of the fixing plate is snap-fitted to the outer surface of the water pumping pipe.

[0013] As a further solution of the utility model: the front side of the rectangular box is fixedly connected with a drainage pipe, the bottom surface of the rectangular box is fixedly connected with two sets of universal wheels, and the left side of the rectangular box is fixedly connected with a pushing handle.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] The utility model is provided with a first loading box, a filter screen, a telescopic rod and a card block which cooperate with each other. The filter screen can filter the water source entering the first loading box to prevent mud and sand from entering the first loading box. The vacuum pump is then operated to drive the vacuum pipe to draw external air into the air pump, and the air enters and exits the first loading box through the air outlet pipe. The telescopic characteristic of the telescopic rod is used to push the card block to block the position where the first loading box is connected to the water suction pipe. The gas entering the first loading box will flow out to the outside through the filter screen, and then the mud and sand clogging the mesh of the filter screen can be cleaned, effectively avoiding the problem that the anti-blocking effect of the drainage device is poor when it is in use, resulting in the need for later maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 The overall structural diagram of a drainage device for tunnel civil construction that can avoid blockage;

[0017] Figure 2 It is a schematic diagram of the three-dimensional structure of a universal wheel in a drainage device for tunnel civil construction that can avoid blockage;

[0018] Figure 3 It is a schematic diagram of the three-dimensional structure of a water pumping pipe in a drainage device for tunnel civil construction that can avoid blockage;

[0019] Figure 4 It is a schematic diagram of the three-dimensional structure of a telescopic rod in a drainage device for tunnel civil construction that can avoid blockage;

[0020] Figure 5 The present invention is a schematic diagram of the three-dimensional structure of an air pump in a drainage device for tunnel civil construction which can avoid blockage.

[0021] In the figure: 1. rectangular box; 2. anti-clogging mechanism; 201. filter screen; 202. first loading box; 203. telescopic rod; 204. block; 205. second loading box; 206. floating plate; 207. air outlet pipe; 208. air suction pipe; 209. air suction pump; 210. fixing block; 3. pushing handle; 4. water outlet pipe; 5. water pump; 6. fixing seat; 7. water suction pipe; 8. drainage pipe; 9. universal wheel; 10. fixing plate; 11. tunnel body; 12. drainage channel. DETAILED DESCRIPTION

[0022] See also Figure 1-5 A drainage device for tunnel civil construction that can avoid blockage includes a tunnel body 11, a drainage channel 12 is opened below the tunnel body 11, a rectangular box 1 is arranged inside the tunnel body 11, and an anti-blocking mechanism 2 is arranged above the rectangular box 1;

[0023] The anti-blocking mechanism 2 includes a first loading box 202, the inner wall of which is fixedly connected to two filter screens 201, the inner top wall of the first loading box 202 is fixedly connected to a telescopic rod 203, the telescopic end of the telescopic rod 203 is fixedly connected to a block 204, the right side of the first loading box 202 is fixedly connected to a second loading box 205, the front of the second loading box 205 and the back of the second loading box 205 are fixedly connected to a floating plate 206, the right side of the first loading box 202 is fixedly connected to two fixed blocks 210, the inner walls of the two fixed blocks 210 are commonly fixedly connected to an air pump 209, the input end of the air pump 209 is fixedly connected to an air extraction pipe 208, the bottom end of the air extraction pipe 208 passes through the second loading box 205 and extends to the bottom of the second loading box 205, the output end of the air extraction pump 209 is fixedly connected to an air outlet pipe 207, the left end of the air outlet pipe 207 passes through the first loading box 202 and extends to the inside of the first loading box 202.

[0024] Specifically, a fixing seat 6 is fixedly connected to the upper surface of the rectangular box 1 , and a water pump 5 is fixedly connected to the inner wall of the fixing seat 6 .

[0025] Through the above technical solution, by providing the fixing base 6 and the water pump 5, the water pump 5 can be fixed by the fixing base 6, thereby making the operation of the water pump 5 more stable.

[0026] Specifically, the output end of the water pump 5 is fixedly connected to the water outlet pipe 4 , and the bottom end of the water outlet pipe 4 passes through the rectangular box 1 and extends to the interior of the rectangular box 1 .

[0027] Through the above technical solution, by providing the water outlet pipe 4, the water source pumped out by the water pump 5 through the water outlet pipe 4 can be drained out, thereby achieving a better auxiliary effect.

[0028] Specifically, the input end of the water pump 5 is fixedly connected to a water pumping pipe 7 , and the top end of the water pumping pipe 7 is fixedly connected to the bottom surface of the first loading box 202 .

[0029] Through the above technical solution, by providing the water pumping pipe 7, it is possible to contact the substance produced by the operation of the water pump 5 to draw water into the interior of the water pumping pipe 7, thereby facilitating the discharge of the water.

[0030] Specifically, a fixing plate 10 is fixedly connected to the right side surface of the rectangular box 1 , and the interior of the fixing plate 10 is clamped with the outer surface of the water pumping pipe 7 .

[0031] Through the above technical solution, by providing the fixing plate 10, the water pumping pipe 7 can be clamped and fixed by the fixing plate 10, and then the water pumping pipe 7 and the first loading box 202 connected to the top end thereof can be placed.

[0032] Specifically, the front surface of the rectangular box 1 is fixedly connected with a drainage pipe 8 , the bottom surface of the rectangular box 1 is fixedly connected with two sets of universal wheels 9 , and the left side surface of the rectangular box 1 is fixedly connected with a push handle 3 .

[0033] Through the above technical solution, by providing a drain pipe 8, a universal wheel 9 and a push handle 3, the water inside the rectangular box 1 can be discharged, and the universal wheel 9 can drive the device to move, reducing the resistance generated during movement, and the push handle 3 makes it convenient to apply thrust to the device.

[0034] The working principle of the utility model is as follows: when in use, the universal wheel 9 can be used to push the device into the interior of the tunnel body 11, and then a power supply system adapted thereto is built at a specific location, and then the water pump 7 is removed from the fixing plate 10, and then the first loading box 202 is placed in the drainage channel 12. When we need to change the position of the device, the original method is to move it with some transportation equipment, but now it only needs to be pushed by manpower to move the device, avoiding the tedious deployment of various mobile equipment, and then the air pump 209, the water pump 5 and the telescopic rod 203 are connected to the drainage channel 12. The power supply is turned on. When the power supply is turned on, the device can be used normally. Since one side of the first loading box 202 is connected to the input end of the water pumping pipe 7, the maximum distance between the first loading box 202 and the rectangular box 1 is determined by the water pumping pipe 7. Then, the length of the water pumping pipe 7 can be appropriately increased according to the distance between the device and the accumulated water. Due to the effect of the floating plate 206, the second loading box 205 will float on the water surface, while the second loading box 205 will sink into the water. Then, the water pump 5 is controlled to operate, and the water pump 5 can be used to drive the water pumping pipe 7 to extract water through the first loading box 202. The water pumping pipe 7 is connected to the first loading box 202. The water flow rate that the first loading box 202 can carry can be constructed in advance according to the water flow of different flow rates, so as to ensure that when facing a large flow of tunnel water, the device can still effectively filter the tunnel water, and then the water source passes through the filter 201 into the first loading box 202 and enters the water pumping pipe 7, so the silt will be intercepted outside by the filter 201. When there is too much silt, causing the filter holes inside the filter 201 to be blocked, the first loading box 202 is first placed in the clean water, and then the telescopic rod 203 is controlled to push the block 204 to connect the first loading box 202 with the water pumping pipe 7. The filter screen 201 of the first loading box 202 is blocked by the block, and then the vacuum pump 209 is controlled to operate. The vacuum pump 209 drives the vacuum pipe 208 to draw outside air into the first loading box 202. The excessive gas inside the first loading box 202 can only be discharged to the outside through the filter screens 201 on both sides, thereby pushing the silt accumulated inside the filter screen 201 outward. In addition, the silt is moistened by water to make it soft, which can greatly reduce the difficulty of discharging the silt, solve the problem of silt clogging the filter screen 201, and effectively avoid the problem of silt clogging when the device is in use, resulting in poor drainage effect.

[0035] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A drainage device for tunnel construction that can avoid blockage, comprising a tunnel body (11), characterized in that: A drainage channel (12) is provided below the tunnel body (11), a rectangular box (1) is provided inside the tunnel body (11), and an anti-blocking mechanism (2) is provided above the rectangular box (1); The anti-blocking mechanism (2) comprises a first loading box (202), the inner wall of the first loading box (202) being fixedly connected to two filter screens (201), the inner top wall of the first loading box (202) being fixedly connected to a telescopic rod (203), the telescopic end of the telescopic rod (203) being fixedly connected to a clamping block (204), the right side of the first loading box (202) being fixedly connected to a second loading box (205), the front side and the back side of the second loading box (205) being fixedly connected to a floating plate (206), and the first loading box (2 02), two fixed blocks (210) are fixedly connected to the right side thereof, and an air pump (209) is fixedly connected to the inner walls of the two fixed blocks (210), and an input end of the air pump (209) is fixedly connected to an air extraction pipe (208), and the bottom end of the air extraction pipe (208) passes through the second loading box (205) and extends to the bottom of the second loading box (205), and an output end of the air extraction pump (209) is fixedly connected to an air outlet pipe (207), and the left end of the air outlet pipe (207) passes through the first loading box (202) and extends to the interior of the first loading box (202).

2. A drainage device for tunnel civil construction that can avoid blockage according to claim 1, characterized in that: A fixing seat (6) is fixedly connected to the upper surface of the rectangular box (1), and a water pump (5) is fixedly connected to the inner wall of the fixing seat (6).

3. A drainage device for tunnel civil construction that can avoid blockage according to claim 2, characterized in that: The output end of the water pump (5) is fixedly connected to a water outlet pipe (4), and the bottom end of the water outlet pipe (4) penetrates the rectangular box (1) and extends to the interior of the rectangular box (1).

4. A drainage device for tunnel civil construction that can avoid blockage according to claim 2, characterized in that: The input end of the water pump (5) is fixedly connected to a water pump pipe (7), and the top end of the water pump pipe (7) is fixedly connected to the bottom surface of the first loading box (202).

5. The drainage device for tunnel civil construction that can avoid blockage according to claim 1, characterized in that: A fixing plate (10) is fixedly connected to the right side surface of the rectangular box (1), and the interior of the fixing plate (10) is snap-fitted to the outer surface of the water pumping pipe (7).

6. A drainage device for tunnel civil construction that can avoid blockage according to claim 1, characterized in that: The front surface of the rectangular box (1) is fixedly connected to a drainage pipe (8), the bottom surface of the rectangular box (1) is fixedly connected to two sets of universal wheels (9), and the left side surface of the rectangular box (1) is fixedly connected to a pushing handle (3).