Mine wet type conveying pipeline interchanging device

By designing the wet conveying pipeline interchange device in the mine, the production interruption problem caused by the failure of the conveying pipeline in the prior art is solved, and the interchange and interconnection between the two conveying pipelines is achieved without stopping, ensuring the continuity of production.

CN222543604UActive Publication Date: 2025-02-28TONGHUA IRON & STEEL GRP BANSHI MINING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422017597.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Priority Date
2023-10-07
Filing Date
2024-08-20
Publication Date
2025-02-28
Estimated Expiration
2034-08-20

AI Technical Summary

Technical Problem

The existing mine wet conveying pipelines are prone to stop at the same time during failure or maintenance, resulting in interruption of production and difficulty in achieving continuous production.

Method used

A mining wet conveying pipeline interchange device was designed, and the ore container made of welded on both sides of the ceramic pipe was sealed and welded, and two conveying pipelines were symmetrically welded on both sides of the ore container, and electric valves and sewage valves were installed to realize the interchange and interconnection between the two conveying pipelines.

Benefits of technology

Without shutting down, equipment failures in the conveying pipeline can be handled, interchange and connect between the two conveying pipelines, ensuring smooth transportation operations, reducing downtime, and ensuring continuous production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of mine transportation equipment, in particular to a mine wet type conveying pipeline interchanging device. Two conveying pipelines, namely an ore feeding pipe, an ore discharging pipe, a second ore feeding pipe and a second ore discharging pipe, are symmetrically welded on two sides of an ore collecting box; on the two conveying pipelines, an ore feeding electric valve, an ore discharging electric valve, a second ore feeding electric valve and a second ore discharging electric valve are installed on the two sides of the ore collecting box respectively. An ore feeding blow-down valve and a second ore feeding blow-down valve are mounted at the front ends of the ore feeding electric valve and the second ore feeding electric valve and at the bottoms of the ore feeding pipe and the second ore feeding pipe; an ore discharge blow-down valve and a second ore discharge blow-down valve are mounted at the rear ends of the ore discharge electric valve and the second ore discharge electric valve and at the bottoms of the ore discharge pipe and the second ore discharge pipe; a dispersing water pipe is arranged at the upper part of the ore collecting box and is vertical to the center; according to the utility model, under a non-stop state, equipment faults in the conveying pipelines can be handled, interchange and communication between the two conveying pipelines are realized, and smooth conveying operation is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of mine transportation equipment, in particular to a mine wet conveying pipeline interchange device. Background Art

[0002] In the prior art, the transportation of wet materials in the mine sorting process is achieved by a pipeline composed of equipment and components such as pumps, pipelines, and valves. In general, in order to facilitate equipment maintenance and troubleshooting and ensure the continuity of production, the pipelines are one working and one spare. When a working pipeline fails or needs to be repaired and maintained, the spare pipeline can be started. However, in the actual production operation process, when there are human operating errors, pipeline leaks, pipeline freezing damage due to natural factors, and extremely rare sudden equipment failures, etc., the running pipeline needs to be stopped for maintenance and inspection, and individual equipment failures in the spare pipeline also occur and cannot be started or are being maintained, then the two pipelines will stop at the same time, causing production interruption. Utility Model Content

[0003] The purpose of the utility model is to provide a mine wet conveying pipeline interchange device to address the above shortcomings. The device has a simple structure, is easy to manufacture and install, has good use effect, and can minimize the downtime caused by conveying pipeline failure and ensure the continuity of production.

[0004] The technical solution of the utility model is: a mine wet conveying pipeline interchange device, which is characterized in that a ore collecting box is made of ceramic tubes with both sides blocked and welded; two conveying pipelines are symmetrically welded on both sides of the ore collecting box, namely, an ore feeding pipe and an ore discharging pipe, a second ore feeding pipe and a second ore discharging pipe; on the two conveying pipelines, an ore feeding electric valve, an ore discharging electric valve and a second ore feeding electric valve and a second ore discharging electric valve are respectively installed on both sides of the ore collecting box; at the front ends of the ore feeding electric valve and the second ore feeding electric valve, an ore feeding sewage valve and a second ore feeding sewage valve are installed at the bottoms of the ore feeding pipe and the second ore feeding pipe; at the rear ends of the ore discharging electric valve and the second ore discharging electric valve, an ore discharging sewage valve and a second ore discharging sewage valve are installed at the bottoms of the ore discharging pipe and the second ore discharging pipe; and a flushing water pipe is installed at the upper part of the ore collecting box and at the vertical center position.

[0005] The feed pipe and the discharge pipe, the second feed pipe and the second discharge pipe should be at the same horizontal position on both sides of the ore collecting box.

[0006] The advantages of the utility model are: 1. It can handle equipment failures in the conveying pipeline without stopping the machine, realize the interchange and connection between the two conveying pipelines, and ensure smooth conveying operations. 2. It has a reasonable design, simple and compact structure, is easy to install, low price, and saves materials. 3. It ensures the continuity of production and reduces the production cost of the enterprise. BRIEF DESCRIPTION OF THE DRAWINGS

[0007] Figure 1 It is a schematic diagram of the structure of the utility model.

[0008] Figure 2 yes Figure 1 Schematic diagram of the structure viewed from above. DETAILED DESCRIPTION

[0009] See also Figure 1 , 2 The names of the parts are as follows: ore collecting box 1, ore feeding pipe 2, pump 3, ore feeding electric valve 4, ore discharging electric valve 5, ore discharging pipe 6, second ore feeding pipe 7, second pump 8, second ore feeding electric valve 9, second ore discharging electric valve 10, second ore discharging pipe 11, flushing water pipe 12, ore feeding sewage valve 13, ore discharging sewage valve 14, second ore feeding sewage valve 15, second ore discharging sewage valve 16.

[0010] See also Figure 1 , 2 , a mine wet conveying pipeline interchange device, a ore collecting box 1 made of ceramic tubes with both sides blocked and welded; two conveying pipelines, namely, a feed pipe 2 and a discharge pipe 6, a second feed pipe 7 and a second discharge pipe 11, are symmetrically welded on both sides of the ore collecting box 1; on the two conveying pipelines, a feed electric valve 4, a discharge electric valve 5, a second feed electric valve 9, and a second discharge electric valve 10 are installed on both sides of the ore collecting box 1 respectively; at the front end of the feed electric valve 4 and the second feed electric valve 9, a feed sewage valve 13 and a second feed sewage valve 15 are installed at the bottom of the feed pipe 2 and the second feed pipe 7; at the rear end of the discharge electric valve 5 and the second discharge electric valve 10, a discharge sewage valve 14 and a second discharge sewage valve 16 are installed at the bottom of the discharge pipe 6 and the second discharge pipe 11; a flushing water pipe 12 is installed at the upper part of the ore collecting box 1 and the vertical center position. The ore feeding pipe 2 and the ore discharging pipe 6 , the second ore feeding pipe 7 and the second ore discharging pipe 11 should be at the same horizontal position on both sides of the ore collecting box 1 .

[0011] The mine wet conveying pipeline interchange device is a 1.2m long φ480mm ceramic tube, which is sealed and welded on both sides to form a collection box 1; on both sides of the collection box, two φ159mm conveying pipelines are symmetrically welded in a horizontal position, namely, the feed pipe 2 and the discharge pipe 6, the second feed pipe 7 and the second discharge pipe 11; on the two conveying pipelines, the distance between the two sides of the collection box 1 is 500mm, and the feed electric valve 4, the discharge electric valve 5 and the second feed electric valve 9, the second discharge electric valve 10 are installed respectively. Electric valve 10; 500mm from the front end of the feeding electric valve 4 and the second feeding electric valve 9, a feeding sewage valve 13 and a second feeding sewage valve 15 are installed at the bottom of the feeding pipe 2 and the second feeding pipe 7; 500mm from the rear end of the discharge electric valve 5 and the second discharge electric valve 10, a discharge sewage valve 14 and a second discharge sewage valve 16 are installed at the bottom of the discharge pipe 6 and the second discharge pipe 11; a flushing water pipe 12 is installed at the upper part of the ore collecting box 1 and at the vertical center.

[0012] The electric valve is mainly used to prevent liquid leakage or liquid backflow. You can purchase electric valves of corresponding sizes according to the diameter of the pipeline.

[0013] The purpose of the flushing water pipe is to prevent the accumulation of mineral materials and to avoid the blockage of the ore collecting box when the pipeline is interchanged. The pipe diameter is generally DN25, and DN20 can also be used. The selection standard is to ensure that the deposited mineral materials in the ore collecting box can be quickly dispersed when the system is shut down.

[0014] The function of the blowdown valve is to discharge the wet materials in the pipeline in time when the system is shut down to prevent the materials from settling or freezing of the outdoor pipelines in winter. For the selection of the blowdown valve size, take the φ159mm conveying pipeline as an example, select DN100, which is the standard for quickly discharging the accumulated ore in the pipeline.

[0015] Working principle:

[0016] When transporting materials through pipelines:

[0017] The feed sewage valve 13, the discharge sewage valve 14, the second feed sewage valve 15, the second discharge sewage valve 16, and the flushing water pipe 12 are in closed state.

[0018] Case 1: Close the second feeding electric valve 9 and the second discharging electric valve 10, open the feeding electric valve 4 and the discharging electric valve 5, start the pump 3, and the wet material enters the collecting box 1 through the feeding pipe 2, and enters the next process after passing through the discharging pipe 6.

[0019] Interchange of pipelines in case of failure:

[0020] ① When pump 3 fails and cannot continue to operate, pump 3 is stopped, the electric valve 4 for feeding is closed, the second electric valve 9 for feeding is opened, the second pump 8 is opened, and the wet material enters the collecting box 1 through the second feeding pipe 7, and enters the next process after passing through the discharge pipe 6.

[0021] ② When the discharge pipe 6 leaks or other failures occur and the material transportation needs to be stopped, the second discharge electric valve 10 is opened and the discharge electric valve 5 is closed. The wet material enters the next process after passing through the second discharge pipe 11.

[0022] Case 2: Close the electric valve 4 for feeding and the electric valve 5 for discharging, open the second electric valve 9 for feeding and the second electric valve 10 for discharging, start the second pump 8, and the wet material enters the collecting box 1 through the second feeding pipe 7, and enters the next process after passing through the second discharging pipe 11.

[0023] Interchange of pipelines in case of failure:

[0024] When the second pump 8 fails and cannot continue to operate, the second pump 8 is stopped, the second ore feeding electric valve 9 is closed, the ore feeding electric valve 4 is opened, the pump 3 is turned on, and the wet material enters the ore collecting box 1 through the ore feeding pipe 2, and enters the next process after passing through the second ore discharge pipe 11.

[0025] When the second ore discharge pipe 11 leaks or has other faults and needs to stop transporting materials, the ore discharge electric valve 5 is opened and the second ore discharge electric valve 10 is closed. The wet materials enter the next process after passing through the ore discharge pipe 6.

[0026] Use of flushing water pipe: When the system is shut down for a long time and there may be material deposits in the ore collecting box 1 and it cannot be guaranteed to be unobstructed, open the flushing water pipe 12, open the ore feeding and discharge valves on the prepared conveying pipeline, flush out the deposited materials, close the drain valves of each part, and then start the equipment.

[0027] Use of drain valve: When the system is shut down, open the corresponding feed drain valve 13 or 15 and discharge drain valve 14 or 16 according to the pipeline route before shutdown, and discharge the accumulated ore in the running pipeline in time to prevent wet materials from depositing and clogging in the pipeline, and freezing of the pipeline in winter.

Claims

1. Mine wet conveying pipeline interchange device, characterized by A ore collecting box (1) is manufactured by welding and sealing both sides of a ceramic tube; two conveying pipelines, namely, an ore feeding pipe (2) and an ore discharging pipe (6), a second ore feeding pipe (7) and a second ore discharging pipe (11) are symmetrically welded on both sides of the ore collecting box (1); an ore feeding electric valve (4), an ore discharging electric valve (5) and a second ore feeding electric valve (9) and a second ore discharging electric valve (10) are respectively installed on both sides of the ore collecting box (1); an ore feeding sewage valve (13) and a second ore feeding sewage valve (15) are installed at the front ends of the ore feeding electric valve (4) and the second ore feeding electric valve (9) and at the bottoms of the ore feeding pipe (2) and the second ore feeding pipe (7); a ore discharging sewage valve (14) and a second ore discharging sewage valve (16) are installed at the rear ends of the ore discharging electric valve (5) and the second ore discharging electric valve (10) and at the bottoms of the ore discharging pipe (6) and the second ore discharging pipe (11); and a flushing water pipe (12) is installed at the upper part of the ore collecting box (1) and at the vertical center position.

2. The mine wet conveying pipeline interchange device according to claim 1, characterized in that The ore feeding pipe (2) and the ore discharging pipe (6), the second ore feeding pipe (7) and the second ore discharging pipe (11) should be at the same horizontal position on both sides of the ore collecting box (1).