Ice and snow melting structure of building curtain wall
By installing a building curtain wall melting structure with cable heating companions in the gutters, eaves and outer lifting components of the building's outer layer components, the safety hazards caused by the freezing of the building's outer layer components and the low efficiency and high cost of conventional deicing methods are solved, and a safe and energy-saving deicing effect is achieved.
Patent Information
- Application Number
- CN202421167051.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-27
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2034-05-27
AI Technical Summary
In cold climates, the ice and snow accumulated in the gutters and outer lifting components of the building will freeze, resulting in the hindrance of melt water discharge, causing the formation of melt water cross flow and ice hanging, posing safety hazards, and conventional deicing methods are inefficient, costly, and have a destructive impact on the appearance of the building.
A structure for melting ice and snow on the curtain wall of the building is designed. By installing hollow decorative components in the gutters, cornices and outer picking components of the outer layer of the building, and installing cable heating companions inside it, the cable heating companions are used to heat and melt snow and ice.
It realizes physical heat melting and deicing of the outer components of the building, eliminates the risk of falling ice and snow at high altitudes, has low energy consumption, reduces energy waste, is conducive to energy conservation and environmental protection, and does not affect or damage the outer components of the building.
Smart Images

Figure CN222558001U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of ice and snow melting for building curtain walls, in particular to an ice and snow melting structure for building curtain walls. Background Art
[0002] The roof gutter system of high-rise buildings, the roof eaves, and the horizontally and vertically protruding parts of the exterior wall shapes. In cold climates, the melted ice and snow that melted due to sunlight during the day will refreeze at the bottom of the gutter. In order to prevent the melted ice and snow from freezing in the gutter, the discharge of the melted ice and snow is prevented, causing the melted water to flow across the roof and overflow the gutter to form icicles, posing a potential danger.
[0003] The conventional solution is manual de-icing, which may even require the use of engineering machinery at the risk of damaging the building. Conventional de-icing methods have low de-icing efficiency and high de-icing costs. There is a risk of ice fragments falling during the de-icing process, which will affect the use of the building, and the de-icing process will cause certain damage to the building's appearance, and the effect is not satisfactory. Utility Model Content
[0004] The utility model aims to provide a building curtain wall ice-melting and snow-melting structure to solve the problems mentioned in the above background technology.
[0005] In order to solve the above technical problems, the utility model provides an ice-melting and snow-melting structure for a building curtain wall, which is arranged in the gutter, the eaves of the roof and the cantilevered components of the outer layer components of the building, and includes a distribution box, a controller and a junction box. Hollow decorative components are installed in the gutter, the eaves and the cantilevered components, and cable heating cables are installed in the decorative components.
[0006] Furthermore, a cable clip is installed in the decorative component, and the cable clip is used to limit the position of the cable heating wire inside the decorative component.
[0007] Furthermore, both ends of the decorative component are equipped with closed fasteners, and the closed fasteners are provided with openings, and the openings are adapted to the heating cable companion wires.
[0008] Furthermore, the outer surfaces of the gutter, the eaves and the cantilevered member are all installed with temperature sensors for sensing the corresponding nearby temperatures, and the temperature sensors are electrically connected to the controller.
[0009] Furthermore, the cross section of the decorative component is U-shaped, and the cable heating wire and the cable clip are arranged on both sides of the decorative component.
[0010] Furthermore, the cross section of the decorative component is U-shaped, and the cable heating cable and the cable buckle are arranged on both sides of the decorative component. Both sides of the closed fastener are provided with openings, and the closed fastener is in the shape of an "I".
[0011] The beneficial effects of the utility model are as follows: the utility model can remove ice and snow from the outer components of the building by physically melting the outer components through the provision of hollow decorative components and the heating cable installed inside the decorative components, thereby eliminating the risk of ice and snow falling from the building surface, and has low energy consumption, reduces energy waste, and is beneficial to energy conservation and environmental protection. The heating temperature of the cable during the deicing process is controllable, and will not affect or damage the outer components of the building, and will not affect the appearance of the building while meeting the deicing and snow melting functions. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a schematic diagram of the installation arrangement of an embodiment of the utility model.
[0013] Figure 2 This is a schematic diagram of the installation arrangement of the roof cable heating companion line according to an embodiment of the utility model.
[0014] Figure 3 Schematic diagram of the installation nodes of the embodiment of the utility model.
[0015] Figure 4 This is a schematic diagram of the installation completion of an embodiment of the utility model.
[0016] Among them: 1. Outer components of the building; 2. Decorative components; 3. Cable heating wires; 4. Cable clips; 5. Closing fasteners; 6. Temperature sensors. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiment is only one embodiment of the utility model, not all embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the protection scope of the utility model.
[0018] In order to make the objectives, technical solutions and advantages of the present application more clear, the present application is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0019] In the following description, references to "one embodiment", "an embodiment", "an example", "an example", etc. indicate that the embodiment or example described in this way may include specific features, structures, characteristics, properties, elements or limitations, but not every embodiment or example necessarily includes the specific features, structures, characteristics, properties, elements or limitations. In addition, repeated use of the phrase "according to one embodiment of the present application" may refer to the same embodiment, but does not necessarily refer to the same embodiment.
[0020] like Figure 1-4 As shown, the utility model discloses a building curtain wall ice-melting and snow-melting structure, which is arranged in the gutter, the eaves of the roof and the external wall cantilevered components of the building outer layer component 1, and includes a distribution box, a controller and a junction box. The gutter, the eaves and the external cantilevered components are all installed with hollow decorative components 2, and the decorative components 2 are installed with cable heating companion lines 3, that is, the staff can set their number and position according to the area of the building outer layer component 1. The cable heating companion line 3 is installed inside the decorative component 2, the distribution box is installed in the building, the controller is installed on the distribution box, and the junction box is electrically connected to the cable heating companion line 3 and the controller. The distribution box, the controller and the junction box are all existing technologies and will not be repeated here.
[0021] When snow or low temperature in the external environment causes ice and snow to accumulate in the gutter, eaves or cantilever components of the building's outer layer component 1, the controller starts the distribution box and the cable heating companion line 3. The cable heating companion line 3 starts to heat up and transfers heat to the inside of the decorative component 2, and the decorative component 2 conducts heat to melt the snow and ice in the gutter, eaves and cantilever components.
[0022] The utility model can remove ice and snow from the outer layer components 1 of the building by physical thermal melting, eliminate the risk of ice and snow falling from the building surface, have low energy consumption, reduce energy waste, and are beneficial to energy conservation and environmental protection. The heating temperature of the cable wire during the deicing process is controllable, and will not affect or damage the outer layer components 1 of the building, and will not affect the appearance of the building while meeting the deicing and snow melting functions.
[0023] In one embodiment, a cable clip 4 is installed in the decoration component 2 , and the cable clip 4 is used to limit the position of the heating cable 3 inside the decoration component 2 .
[0024] That is, after the cable heating companion line 3 is installed in the decorative component 2, the cable clip 4 is inserted into the interior of the decorative component 2 from the end of the decorative component 2, and the cable clip 4 fixes the cable heating companion line 3 between the cable clip 4 and the inner surface of the decorative component 2. This design can effectively control the position of the cable heating companion line 3, ensure that it is in uniform contact with the surface of the decorative component 2, and avoid displacement or distortion of the cable heating companion line 3 during operation, thereby ensuring uniformity and stability of the heating effect.
[0025] In one embodiment, both ends of the decorative component 2 are equipped with closed fasteners 5, and an opening is provided on the closed fastener 5, and the opening is adapted to the cable heating companion line 3. That is, the opening extends inward along the side of the closed fastener 5 and penetrates longitudinally, so that the staff can further fix the position of the cable heating companion line 3, and at the same time ensure that both ends of the decorative component 2 are sealed, and the internal space of the decorative component 2 is effectively protected.
[0026] In one embodiment, the outer surfaces of the gutter, eaves and cantilevered components are all equipped with temperature sensors 6 for sensing the corresponding nearby temperature, and the temperature sensors 6 are electrically connected to the controller. When the temperature sensor 6 senses that it is snowing and the temperature drops, the cable heating cable 3 starts to work through the principle of self-control to melt ice and remove snow.
[0027] In one embodiment, the cross section of the decorative component 2 is U-shaped, and the two sides of the decorative component 2 are provided with a cable heating companion line 3 and a cable buckle 4, that is, the two cable heating companion lines 3 are symmetrically arranged, so as to improve the deicing and snow melting efficiency and further cover the entire area of the building where deicing and snow melting are required.
[0028] In one embodiment, openings are provided on both sides of the closing fastener 5 , and the closing fastener 5 is in the shape of an I, which is convenient for fixing the cable heating wires 3 on both sides of the decorative component 2 and facilitating the installation of the closing fastener 5 by the staff.
[0029] The workflow of this embodiment is as follows:
[0030] The staff can set the number and position of the decorative components 2 and the cable heating companion line 3 according to the area of the outer layer component 1 of the building. Then the decorative component 2 with the cable heating companion line 3 is installed in the gutter, eaves and cantilevered components, and then the cable buckle 4 is inserted into the interior of the decorative component 2 from the end of the decorative component 2, and the cable buckle 4 fixes the cable heating companion line 3 between the cable buckle 4 and the inner surface of the decorative component 2. Finally, the cable buckle 4 is installed to the end of the decorative component 2. At the same time, the distribution box, controller, and junction box are installed inside the building, and multiple temperature sensors 6 are respectively installed on the outer surfaces of the gutter, eaves and cantilevered components, and then the above components are electrically connected in sequence. When the temperature sensor 6 senses snow and the temperature drops, the cable heating companion line 3 starts to work through the principle of automatic control to melt ice and remove snow.
[0031] The utility model can remove ice and snow from the outer layer components 1 of the building by physical thermal melting, eliminate the risk of ice and snow falling from the building surface, have low energy consumption, reduce energy waste, and are beneficial to energy conservation and environmental protection. The heating temperature of the cable wire during the deicing process is controllable, and will not affect or damage the outer layer components 1 of the building, and will not affect the appearance of the building while meeting the deicing and snow melting functions.
[0032] The above description of the disclosed embodiments enables a person skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A building curtain wall ice and snow melting structure, which is arranged in the gutter, roof eaves and external wall cantilever components of the building's outer layer components, and includes a distribution box, a controller and a junction box, and is characterized in that: Hollow decorative components are installed in the gutter, the eaves and the cantilevered components, and cable heating cables are installed in the decorative components.
2. The building curtain wall ice-melting and snow-melting structure according to claim 1, characterized in that: A cable clip is installed in the decorative component, and the cable clip is used to limit the position of the cable heating wire inside the decorative component.
3. The building curtain wall ice-melting and snow-melting structure according to claim 2, characterized in that: Both ends of the decorative component are equipped with closed fasteners, and the closed fasteners are provided with openings, and the openings are adapted to the heating companion wires of the cable.
4. The building curtain wall ice-melting and snow-melting structure according to claim 1, characterized in that: The outer surfaces of the gutter, the eaves and the cantilevered member are all equipped with temperature sensors for sensing the corresponding nearby temperatures, and the temperature sensors are electrically connected to the controller.
5. The building curtain wall ice-melting and snow-melting structure according to claim 3, characterized in that: The cross section of the decorative component is U-shaped, and the cable heating wire and the cable buckle are arranged on both sides of the decorative component.
6. The building curtain wall ice-melting and snow-melting structure according to claim 5, characterized in that: Both sides of the closed fastener are provided with openings, and the closed fastener is in the shape of an "I".