Mine underground roadway steel arch support structure

By designing a steel arch support structure for underground tunnels of mines with adjustable height, combining the adjustment mechanism of screws and adjustment rods, as well as the fixing mechanism of support components and springs, the problem of height fixation of existing support devices is solved, and flexible adjustment and enhanced support effect is achieved.

CN222576689UActive Publication Date: 2025-03-07ANHUI JINAN MINING CO LTD +1

Patent Information

Application Number
CN202323551214.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2025-03-07
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

When used, the existing mine support device has a fixed height of the support structure, which is inconvenient to adjust according to the height of the ore duct, resulting in an impact on support protection.

Method used

A steel arch support structure in the mine underground tunnel is designed, using an adjustable frame height, and the upward adjustment of the arc plate is achieved through the combination of screws and adjustment rods, and the fixation of the top of the mine channel is enhanced through the cooperation of support components and springs.

Benefits of technology

The height of the support structure is adjusted according to the height of the mine duct, reducing the impact on support protection, and reducing the risk of ore dropping through enhanced resistance and friction, improving the mining safety of staff.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222576689U_ABST
    Figure CN222576689U_ABST
Patent Text Reader

Abstract

The utility model discloses a mine underground roadway steel arch support structure, and relates to the technical field of mine mining. A mine underground roadway steel arch support structure comprises four support bodies which are symmetrically arranged, supporting rods are arranged in the four support bodies, arc-shaped plates are fixed to the upper ends of the supporting rods through bolts, a plurality of protection plates are fixed to the side faces of the arc-shaped plates, the inclination angles of the protection plates are different, and supporting plates are fixed to the lower ends of the support bodies. A supporting mechanism is arranged between the arc-shaped plate and the protection plate, and an adjusting mechanism is arranged between the frame body and the arc-shaped plate. The top of the open channel is fixed through the supporting mechanism, the risk of ore falling is reduced, mining of workers is facilitated, the workers can conveniently adjust the height of the frame body according to the height of the mine channel through the adjusting mechanism, and the influence on supporting protection is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of mine mining technology, and in particular to a steel arch support structure for an underground mine tunnel. Background Art

[0002] During the mining process, in order to ensure the safety of personnel and shovel loaders when leaving the mine and consider the support costs, a certain horizontal mine exit tunnel is arranged in the nearest adjacent stable rock layer, and the mine exit route is arranged as a single-sided mine exit. The mine exit route is arranged as much as possible in the bottom column of the original bottom structure. Objects such as ore are prone to fall from the top of the mine tunnel, and its top is prone to collapse. Therefore, the mine tunnel under the mine needs to be supported.

[0003] A mine support device mentioned in an existing Chinese public patent (authorization announcement number: CN214062999U) includes a plurality of steel arch frames, which are arranged at intervals and in parallel and are all in contact with the side wall of the mine. A plurality of drill rods are arranged between adjacent steel arch frames, and both ends of each drill rod are respectively connected to adjacent steel arch frames. The steel arch frames fit the side walls of the mine and can support the side walls of the mine. The side walls of the top of the mine are most affected by gravity. A plurality of drill rods are arranged between two adjacent steel arch frames and connected to the steel arch frames, so that the top of the mine is jointly supported by the steel arch frames and the drill rods, thereby improving the protection strength.

[0004] When the support structure is in use, it is to support and protect the mine tunnel of the mine, reduce the risk of top ore falling during mining, and protect underground workers. However, when the support structure mentioned in the above background technology is in use, the height of the support structure is fixed by welding, and the fixed height is fixed, which is not convenient for the staff to adjust according to the height of the mine tunnel, which will cause inconvenience to the staff when using it and affect the support and protection. Utility Model Content

[0005] The purpose of the present application is to solve the problem that the height of the support device is inconvenient to adjust, and to provide a steel arch support structure for an underground mine tunnel.

[0006] In order to achieve the above-mentioned purpose, this application specifically adopts the following technical solutions:

[0007] A steel arch support structure for an underground mine tunnel comprises a frame body, wherein the frame bodies are four and symmetrically arranged, each of the four frames is provided with a support rod, an arc plate is fixed to the upper end of the support rod by bolts, and a plurality of protective plates are fixed to the side of the arc plate, and the protective plates have different inclination angles, a support plate is fixed to the lower end of the frame body, a supporting mechanism is provided between the arc plate and the protective plate, and an adjustment mechanism is provided between the frame body and the arc plate.

[0008] By adopting the above technical solution, the support mechanism fixes the top of the mine tunnel, reduces the risk of ore falling, and facilitates mining for workers. The adjustment mechanism allows workers to adjust the height of the frame according to the height of the mine tunnel, reducing the impact on support protection.

[0009] Furthermore, the adjustment mechanism includes an adjustment rod 2 fixed to the side of the frame, the adjustment rod 2 is rotatably connected to a screw rod 1, the screw rod 1 is threadedly connected to the adjustment rod 1, both ends of the adjustment rod 1 are fixedly connected to the support rod, the screw rod 1 penetrates the adjustment rod 1, a handle 1 is fixed to the lower end of the screw rod, and a support assembly is provided at the end of the arc plate away from the screw rod 1.

[0010] By adopting the above technical solution, handle one drives screw one to rotate, screw one rotates on adjusting rod two, driving adjusting rod one to move on screw one, and when moving, driving the supporting rod to move, so that the arc plate rises, making it convenient for the staff to adjust the height of the frame according to the height of the mine tunnel.

[0011] Furthermore, the support assembly includes a fixing rod 1 fixed to the side of the frame body, a guide rod is fixed to the fixing rod 1, a fixing rod 2 slides through the guide rod, and fixing parts are provided on the frame body and the support rod.

[0012] By adopting the above technical solution, the second fixing rod slides on the guide rod, restricting the second fixing rod and the arc plate, so that the arc plate contacts the top of the mine tunnel, reducing the impact on support protection.

[0013] Furthermore, the fixing member includes bolt holes opened on the frame and the support rod and distributed in an array, and the frame and the support rod are slidably arranged.

[0014] By adopting the above technical solution, the support rod slides in the frame body, and then the bolts are fixed into the bolt holes at the similar positions for fixing.

[0015] Furthermore, the support assembly includes a second screw rod threadedly connected to the protective plate, the second screw rod passes through the protective plate and is fixedly connected to a fixing column, a second handle is fixed to the lower end of the second screw rod, and the support assembly is arranged on the fixing column.

[0016] By adopting the above technical solution, the screw rod 2 moves on the protective plate, and the contact plate contacts the top of the mine tunnel.

[0017] Furthermore, the support assembly includes a spring sleeved on a fixed column, the upper end of the fixed column is rotatably connected to a resistance plate, and the spring is fixedly connected to the protective plate and the resistance plate.

[0018] By adopting the above technical solution, the spring is compressed so that the elastic force of the spring contacts the top of the mine tunnel. The spring limits the contact plate and fixes the top of the mine tunnel, thereby reducing the risk of ore falling.

[0019] Furthermore, the abutment plate is fixed with abutment blocks, and the abutment blocks are distributed in a straight-line array.

[0020] By adopting the above technical solution, the abutment block increases the friction between the abutment plate and the top of the mine tunnel.

[0021] Furthermore, a protective net is provided between the arc-shaped plates, and the protective net is fixedly connected to the side surfaces of the arc-shaped plates.

[0022] By adopting the above technical solution, the protective net protects the frame and curved plates in the mine tunnel, reducing the risk of ore falling.

[0023] In summary, the present application includes at least one of the following beneficial effects:

[0024] 1. When starting support, the staff turns handle 1, which drives screw 1 to rotate, and screw 1 rotates on adjusting rod 2, driving adjusting rod 1 to move on screw 1. When moving, it drives the support rod to move, so that the arc plate rises. At the same time, fixed rod 2 slides on the guide rod to restrict fixed rod 2 and the arc plate, so that the arc plate contacts the top of the mine road. The support rod slides in the frame body, and then the bolts are fixed to the bolt holes in the similar position for secondary fixation, which is convenient for the staff to adjust the height of the frame body according to the height of the mine road and reduce the impact on the support protection.

[0025] 2. When the arc plate is adjusted, you can turn the second handle again to drive the second screw to rotate, so that the second screw moves on the protective plate. When moving, the spring restricts the contact plate, driving the fixed column to move, so that the spring is compressed, and the contact plate contacts the top of the mine channel, fixing the top of the mine channel, reducing the risk of ore falling, and facilitating mining for the staff. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a three-dimensional structural schematic diagram of the support structure in this application.

[0027] Figure 2 It is a side structural schematic diagram of the support structure in this application.

[0028] Figure 3 This application Figure 2 Enlarged structural diagram at A in the middle.

[0029] Description of reference numerals:

[0030] 1. Frame; 2. Support plate; 3. Support rod; 4. Arc plate; 5. Protective plate; 6. Adjustment rod 1; 7. Bolt hole; 8. Screw rod 1; 9. Guide rod; 10. Adjustment rod 2; 12. Handle 1; 13. Screw rod 2; 14. Fixed column; 15. Spring; 16. Resistance plate; 17. Handle 2; 18. Protective net; 19. Resistance block; 20. Fixed rod 1; 21. Fixed rod 2. DETAILED DESCRIPTION

[0031] The following is combined with Figures 1 to 3 This application is described in further detail.

[0032] The embodiment of the present application discloses a steel arch support structure for an underground mine tunnel.

[0033] Reference Figure 1 A steel arch support structure for an underground mine tunnel includes a frame 1. The frame 1 is four and symmetrically arranged. A support rod 3 is arranged in each of the four frames 1. An arc plate 4 is fixed to the upper end of the support rod 3 by bolts. A plurality of protective plates 5 are fixed to the side of the arc plate 4. The protective plates 5 have different inclination angles. A support plate 2 is fixed to the lower end of the frame 1. A supporting mechanism is arranged between the arc plate 4 and the protective plate 5. An adjusting mechanism is arranged between the frame 1 and the arc plate 4.

[0034] At the beginning of support, the staff fixes the arc plate 4 to the frame 1 with bolts, and then moves the frame 1 to the inner wall of the mine tunnel that needs to be supported. The frame 1 supports the inner wall of the mine tunnel, and the arc plate 4 and the protective plate 5 support the top of the mine tunnel. At the same time, the supporting mechanism fixes the top of the tunnel to reduce the risk of ore falling and facilitate mining for the staff. The adjustment mechanism allows the staff to adjust the height of the frame 1 according to the height of the mine tunnel to reduce the impact on support and protection.

[0035] Reference Figure 1 and Figure 2 The adjustment mechanism includes an adjustment rod 10 fixed to the side of the frame 1, a screw rod 8 is rotatably connected to the adjustment rod 10, an adjustment rod 6 is threadedly connected to the screw rod 8, both ends of the adjustment rod 6 are fixedly connected to the support rod 3 plate, the screw rod 8 passes through the adjustment rod 6, a handle 12 is fixed to the lower end of the screw rod 8, and a support assembly is provided at the end of the arc plate 4 away from the screw rod 8. The support assembly includes a fixed rod 20 fixed to the side of the frame 1, a guide rod 9 is fixed to the fixed rod 20, a fixed rod 21 is slidably passed through the guide rod 9, and a fixing member is provided on the frame 1 and the support rod 3. The fixing member includes a bolt hole 7 opened on the frame 1 and the support rod 3, and the bolt holes 7 are arranged in an array, and the frame 1 and the support rod 3 are slidably arranged.

[0036] When starting support, the staff turns handle 12, handle 12 drives screw 8 to rotate, screw 8 rotates on adjusting rod 2 10, drives adjusting rod 6 to move on screw 8, and drives support rod 3 to move during movement, so that arc plate 4 rises. At the same time, fixed rod 21 slides on guide rod 9, restricts fixed rod 21 and arc plate 4, so that arc plate 4 contacts with the top of the mine tunnel, and support rod 3 slides in frame 1, and then fixes bolts to bolt holes 7 at similar positions for secondary fixation. Through the adjustment mechanism, it is convenient for staff to adjust the height of frame 1 according to the height of the mine tunnel, thereby reducing the impact on support and protection.

[0037] Reference Figure 2 and Figure 3 The support assembly includes a screw rod 13 threadedly connected to the protective plate 5, the screw rod 13 penetrates the protective plate 5 and is fixedly connected to a fixing column 14, a handle 17 is fixed to the lower end of the screw rod 13, and a support assembly is arranged on the fixing column 14. The support assembly includes a spring 15 sleeved on the fixing column 14, a contact plate 16 is rotatably connected to the upper end of the fixing column 14, and the spring 15 is fixedly connected to the protective plate 5 and the contact plate 16. The contact plate 16 is fixed with a contact block 19, and the contact blocks 19 are arranged in a straight line array.

[0038] At the beginning of support, when the arc plate 4 rises and moves, it drives the contact plate 16 to contact the top of the mine tunnel, so that the contact plate 16 contacts the top of the mine tunnel at multiple angles, compressing the spring 15 so that the elastic force of the spring 15 contacts the top of the mine tunnel. At the same time, the contact block 19 increases the friction between the contact plate 16 and the top of the mine tunnel to strengthen the contact. The handle 17 can be turned again to drive the screw 13 to rotate, so that the screw 13 moves on the protective plate 5. During movement, the spring 15 restricts the contact plate 16 and drives the fixed column 14 to move, so that the spring 15 is compressed, and the contact plate 16 contacts the top of the mine tunnel to fix the top of the mine tunnel, thereby reducing the risk of ore falling and facilitating mining by the staff.

[0039] Reference Figure 2 A protective net 18 is arranged between the arc plates 4, and the protective net 18 is fixedly connected to the side surfaces of the arc plates 4.

[0040] When support begins, the protective net 18 protects the frame 1 and the curved plate 4 in the mine tunnel to reduce the risk of ore falling.

[0041] The implementation principle of the steel arch support structure of a mine tunnel in this embodiment is as follows: at the beginning of support, the staff fixes the arc plate 4 to the frame 1 by bolts, and then moves the frame 1 to the inner wall of the mine tunnel to be supported. The frame 1 supports the inner wall of the mine tunnel, and the arc plate 4 and the protective plate 5 support the top of the mine tunnel. At the same time;

[0042] The staff rotates the handle 12, and the handle 12 drives the screw 8 to rotate. The screw 8 rotates on the adjusting rod 2 10, driving the adjusting rod 6 to move on the screw 8. When moving, the support rod 3 is driven to move, so that the arc plate 4 rises. At the same time, the fixed rod 21 slides on the guide rod 9, restricting the fixed rod 21 and the arc plate 4, so that the arc plate 4 contacts the top of the mine tunnel. The support rod 3 slides in the frame 1, and then the bolts are fixed to the bolt holes 7 at the adjacent positions for secondary fixing.

[0043] When the curved plate 4 moves upward, it drives the contact plate 16 to contact the top of the mine tunnel, so that the contact plate 16 contacts the top of the mine tunnel at multiple angles, compressing the spring 15 so that the elastic force of the spring 15 contacts the top of the mine tunnel. At the same time, the contact block 19 increases the friction between the contact plate 16 and the top of the mine tunnel to strengthen the contact. The handle 2 17 can be turned again to drive the screw 2 13 to rotate, so that the screw 2 13 moves on the protective plate 5. During the movement, the spring 15 restricts the contact plate 16 and drives the fixed column 14 to move, so that the spring 15 is compressed and the contact plate 16 contacts the top of the mine tunnel to fix the top of the mine tunnel. When the support starts, the protection is performed on the frame 1 and the curved plate 4 in the mine tunnel to reduce the risk of ore falling.

Claims

1. A steel arch support structure for an underground mine tunnel, comprising a frame (1), characterized in that: There are four frames (1) and they are symmetrically arranged. A support rod (3) is arranged in each of the four frames (1). An arc plate (4) is fixed to the upper end of the support rod (3) by bolts. A plurality of protective plates (5) are fixed to the side of the arc plate (4). The protective plates (5) have different inclination angles. A support plate (2) is fixed to the lower end of the frame (1). A support mechanism is arranged between the arc plate (4) and the protective plate (5). An adjustment mechanism is arranged between the frame (1) and the arc plate (4).

2. The steel arch support structure for underground mine tunnel according to claim 1, characterized in that: The adjustment mechanism comprises an adjustment rod 2 (10) fixed to the side of the frame (1), the adjustment rod 2 (10) being rotatably connected to a screw rod 1 (8), the screw rod 1 (8) being threadedly connected to an adjustment rod 1 (6), both ends of the adjustment rod 1 (6) being fixedly connected to a support rod (3), the screw rod 1 (8) passing through the adjustment rod 1 (6), a handle 1 (12) being fixed to the lower end of the screw rod 1 (8), and a support assembly being provided at one end of the arc plate (4) away from the screw rod 1 (8).

3. The steel arch support structure for underground mine tunnel according to claim 2 is characterized by: The support assembly comprises a fixing rod 1 (20) fixed to the side of the frame body (1), a guide rod (9) being fixed to the fixing rod 1 (20), a fixing rod 2 (21) slidingly passing through the guide rod (9), and fixing parts being arranged on the frame body (1) and the support rod (3).

4. The steel arch support structure for underground mine tunnel according to claim 3 is characterized by: The fixing member comprises bolt holes (7) which are opened on the frame body (1) and the support rod (3) and are distributed in an array, and the frame body (1) and the support rod (3) are slidably arranged.

5. The steel arch support structure for underground mine tunnel according to claim 4, characterized in that: The support assembly comprises a second screw rod (13) threadedly connected to the protective plate (5); the second screw rod (13) passes through the protective plate (5) and is fixedly connected to a fixing column (14); a second handle (17) is fixed to the lower end of the second screw rod (13); and the fixing column (14) is provided with a support assembly.

6. The steel arch support structure for underground mine tunnel according to claim 5, characterized in that: The support assembly comprises a spring (15) sleeved on a fixed column (14); the upper end of the fixed column (14) is rotatably connected to a contact plate (16); and the spring (15) is fixedly connected to the protective plate (5) and the contact plate (16).

7. The steel arch support structure for underground mine tunnel according to claim 6, characterized in that: The abutment plate (16) is fixed with abutment blocks (19), and the abutment blocks (19) are distributed in a straight-line array.

8. The steel arch support structure for underground mine tunnel according to claim 1, characterized in that: A protective net (18) is provided between the arc-shaped plates (4), and the protective net (18) is fixedly connected to the side surfaces of the arc-shaped plates (4).

Citation Information

Patent Citations

  • Mine supporting device

    CN214062999U

Cited By

  • Outburst prevention supporting structure for coal roadway tunneling