Fixing device for concrete pump pipe penetrating through floor
By designing a concrete pump pipe through floor fixing device including a clamping holder, a buffer layer and a lower clamping member, the problem of unfixed pump pipe and great impact on vibration in the prior art is solved, effective fixation and vibration absorption of the pump pipe are achieved, and safety and operation convenience are improved.
Patent Information
- Application Number
- CN202421022479.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-11
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2034-05-11
AI Technical Summary
The existing concrete pump pipe fixing method on the floor slab cannot effectively limit the longitudinal movement of the pump pipe, and cannot reduce the harm to the floor structure due to vibration of the pump pipe, which is cumbersome and is not conducive to the reuse of square wood.
A concrete pump pipe through floor slab fixing device is designed, including a clamping card holder, a buffer layer and a lower clamping member. The clamping card holder realizes clamping and fixing of the pump pipe through a semicircular tube and a butt ear plate. The buffer layer absorbs vibration, and the lower clamping member prevents the upper movement of the clamping card holder.
The horizontal and longitudinal fixed limits of the pump pipe on the floor slab are realized, which reduces the impact of pump pipe vibration on the floor structure, improves the safety of pump pipe use, and simplifies operation, which facilitates the reuse of square wood.
Smart Images

Figure CN222616218U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a fixing device for a concrete pump pipe passing through a floor slab. Background Art
[0002] With the continuous development of my country's economic level, there are more and more tall and large buildings. Concrete pump pipes are usually used to transport concrete in the construction of high-rise buildings. During the concrete pumping process, the pump pipe will produce greater vibration. At present, the main way to fix the pump pipe on the floor is to use wooden wedges or square timber wedging. The wooden wedge fixing method is mainly to achieve the lateral movement limit of the pump pipe, and has little effect on the longitudinal movement limit of the pump pipe. At the same time, it cannot reduce the damage caused by the vibration of the pump pipe to the floor structure; the square timber wedging method is cumbersome to operate and is not conducive to the reuse of square timber. In pumping concrete, after the pump pipe is fixed by wooden wedges, if the lower pump pipe needs to be removed due to pipe blockage, the upper pump pipe may slide freely, posing a safety hazard. Utility Model Content
[0003] The utility model aims to provide a fixing device for a concrete pump pipe passing through a floor slab, by means of which the horizontal and vertical fixing and limiting of the pump pipe on the floor slab can be effectively achieved, and at the same time, the influence of the vibration of the pump pipe on the floor slab structure can be reduced.
[0004] The technical solution adopted by the utility model to solve its technical problems is: a concrete pump pipe through the floor fixing device, including a clamping seat, a buffer layer, and a lower clamping member, the clamping seat includes two symmetrically arranged clamping fasteners, each of the clamping fasteners includes a semicircular tube, a supporting plate is fixedly arranged on the upper rear side of the semicircular tube, a docking ear is respectively arranged on the left and right sides of the semicircular tube, and the corresponding docking ears on the two semicircular tubes are fixedly connected by bolt connection. When the two semicircular tubes are docked to form a circular tube, the outer wall of the circular tube is fitted with the inner wall of the pump pipe through hole arranged on the floor, and a buffer layer is arranged on the inner wall of each semicircular tube. The lower clamping member is used to clamp and fix the lower part of the two docked semicircular tubes, and when the clamping seat is sleeved in the pump pipe through hole, the lower clamping member can prevent the clamping seat from moving upward.
[0005] Preferably, the buffer layer is a rubber sheet.
[0006] Preferably, two through holes are provided on the docking lug.
[0007] Furthermore, the lower clamping member includes two arc-shaped clamping plates, and both ends of the two arc-shaped clamping plates are fixedly connected by bolt connection.
[0008] Preferably, an arc-shaped clamping groove for realizing the clamping and limiting of the arc-shaped clamping plate is provided on the outer side of the lower part of the semicircular tube.
[0009] The beneficial effects of the utility model are as follows: the utility model has a simple structure and is easy to manufacture; the docking ear plate and the lower clamping member can be used to clamp the two semicircular tubes close to each other, thereby fixing and clamping the pump tube; the outer side of the semicircular tube fits with the outer side wall of the through hole on the floor slab, thereby realizing the lateral movement limitation of the pump tube; the buffer layer has a vibration buffering effect, thereby absorbing a part of the vibration of the pump tube, thereby reducing the influence of the vibration of the pump tube on the floor slab structure; the supporting plate and the lower clamping member are distributed on the upper and lower sides of the floor slab, which can realize the up and down movement limitation of the semicircular tube; when the two semicircular tubes realize the clamping of the pump tube, the supporting plate and the lower clamping member are used to realize the up and down movement limitation of the pump tube; at the same time, when the lower pump tube is disassembled, there is no problem of the upper pump tube falling off, thereby improving the safety of the pump tube. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some preferred embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0011] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0012] Figure 2 It is a schematic diagram of the overall structure of the clamping fastener;
[0013] Figure 3 This is a longitudinal cross-sectional view of the utility model for fixing the pump pipe in the floor slab;
[0014] In the figure: 1 clamping base, 11 semicircular tube, 12 supporting plate, 13 docking ear, 131 through hole, 2 buffer layer, 3 lower clamping member, 31 arc-shaped clamping plate, 311 connecting ear, 4 pump pipe, 5 concrete. DETAILED DESCRIPTION
[0015] The following will be combined with specific embodiments and attached Figure 1-3 , the technical solutions in the embodiments of the utility model are clearly and completely described. Obviously, the described embodiments are only part of the preferred embodiments of the utility model, not all of the embodiments. Those skilled in the art can make similar modifications without violating the connotation of the utility model, so the utility model is not limited by the specific embodiments disclosed below.
[0016] The utility model provides a concrete pump pipe through the floor fixing device (such as Figure 1 As shown), it includes a clamping seat 1, a buffer layer 2, and a lower clamping member 3. The clamping seat 1 includes two symmetrically arranged clamping fasteners, each of which includes a semicircular tube 11, a supporting plate 12 is fixedly arranged on the upper rear side of the semicircular tube 11, and a docking ear 13 is respectively arranged on the left and right sides of the semicircular tube 11. In actual application, the semicircular tube 11, the supporting plate 12 and the docking ear 13 are all made of steel plates welded and processed, and the corresponding docking ears 13 on the two semicircular tubes 11 are fixedly connected by bolt connection. Specifically, two through holes 131 are arranged on the docking ear 13, and the screws are screwed in place. After the bolt is passed through the two corresponding through holes 131, the nut on the bolt is tightened to achieve the fixed connection of the two docking ears 13, and then the docking clamping of the upper parts of the two semicircular tubes 11 can be achieved. When the two semicircular tubes 11 are docked to form a circular tube, the outer wall of the circular tube fits with the inner wall of the pump pipe through hole set on the floor 5, that is, the outer diameter of the formed circular tube is adapted to the inner diameter of the pump pipe through hole. A buffer layer 2 is provided on the inner wall of each of the semicircular tubes 11. In this specific embodiment, the buffer layer 2 can be a rubber sheet. The rubber sheet has a certain elasticity. When the two semicircular tubes 11 are used to press the rubber sheet against the top After being put on the pump pipe 4, the rubber sheet is compressed, thereby achieving effective clamping of the pump pipe 4. At the same time, when the pump pipe 4 vibrates, the rubber sheet has a certain vibration absorption function, thereby reducing the influence of the vibration of the pump pipe 4 on the floor structure. The rubber sheet is compressed and the side wall of the circular tube fits with the side wall of the pump pipe through hole, so that there is no moving gap between the side wall of the pump pipe 4 and the side wall of the pump pipe through hole, and then when the pump pipe 4 moves laterally, the lateral movement of the pump pipe 4 is limited; the lower clamping member 3 is used to clamp and fix the lower part of the two semicircular tubes 11 after docking. The upper parts of the two semicircular tubes 11 are docked and clamped by docking ear plates 13, and the lower parts are The lower clamping member 3 is used to achieve docking clamping, so that the upper and lower parts of the semicircular tube 11 can effectively clamp and fix the pump tube 4. When the clamping base 1 is placed in the through hole of the pump tube 4, the lower clamping member 3 can prevent the clamping base 1 from moving upward, that is, when the pump tube 4 is fixed on the floor slab by using this device, the size of the lower clamping member 3 is larger than the diameter of the pump tube through hole on the floor slab. Therefore, during the upward movement of the pump tube 4, the lower clamping member 3 is blocked by the floor slab 5, thereby realizing the upward movement of the pump tube 4. Furthermore, during the downward movement of the pump tube 4, the support plate 12 is clamped on the upper plane of the floor slab 5, thereby realizing the downward movement limit of the pump tube 4.
[0017] In the above embodiment, the specific implementation of the lower clamping member 3 is as follows: the lower clamping member 3 includes two arc-shaped clamping plates 31, and the two ends of the two arc-shaped clamping plates 31 are fixedly connected by bolt connection. Specifically, a connecting lug 311 is fixedly arranged on both sides of each arc-shaped clamping plate 31, and a through hole for the bolt to penetrate is arranged on the connecting lug 311. When the two arc-shaped clamping plates 31 are docked, the bolt is penetrated into the through hole of the two connecting lugs 311, and then the nut on the bolt is tightened to achieve docking and clamping of the arc-shaped clamping plates 31. Further, in order to improve the stable limit of the arc-shaped clamping plate 31 at the lower part of the semicircular tube 11, an arc-shaped slot 111 for achieving the clamping limit of the arc-shaped clamping plate 31 is arranged on the outer side of the lower part of the semicircular tube 11. When installing the arc-shaped clamping plate 31, the arc-shaped clamping plate 31 is first clamped in the arc-shaped slot 111, and then the docking and clamping operation of the two arc-shaped clamping plates 31 is performed.
[0018] When the present device is used to clamp and fix the pump tube 4, the pump tube 4 can be first passed through the pump tube through hole pre-opened on the floor 5. After the pump tube is passed through, the two clamping fasteners are first inserted into the pump tube through hole. Then, after the semicircular tube 11 is inserted into place, the two corresponding docking ears 13 are fixed and clamped by bolts, and then the upper part of the two semicircular tubes 12 is clamped on the pump tube 4. Then, the two arc-shaped clamping plates 31 are correspondingly placed in the arc-shaped clamping grooves 111. Then, the two corresponding connecting ear plates 311 are fixed and clamped by bolts, and then the lower part of the two semicircular tubes 12 is clamped on the pump tube 4, and finally the present device clamps and fixes the pump tube 4 on the floor.
[0019] In the present invention, "upper" and "lower" are relative positions used to conveniently describe positional relationships, and therefore cannot be understood as absolute positions to limit the scope of protection.
[0020] Except for the technical features described in the specification, all other technical features are known technologies to those skilled in the art.
[0021] The above description in combination with the accompanying drawings has detailed the preferred implementation modes and embodiments of the utility model, but the utility model is not limited to the above implementation modes and embodiments. For ordinary technicians in this technical field, several improvements and modifications can be made without departing from the concept of the utility model, and these improvements and modifications should also be regarded as the protection scope of the utility model.
Claims
1. A concrete pump pipe through the floor fixing device, characterized in that: It includes a clamping seat, a buffer layer, and a lower clamping member. The clamping seat includes two symmetrically arranged clamping fasteners, each of which includes a semicircular tube, a supporting plate is fixedly arranged on the upper rear side of the semicircular tube, and a docking ear is respectively arranged on the left and right sides of the semicircular tube. The corresponding docking ears on the two semicircular tubes are fixedly connected by bolt connection. When the two semicircular tubes are docked to form a circular tube, the outer wall of the circular tube fits with the inner wall of the pump pipe through hole arranged on the floor slab, and a buffer layer is arranged on the inner wall of each semicircular tube. The lower clamping member is used to clamp and fix the lower part of the two docked semicircular tubes. When the clamping seat is sleeved in the pump pipe through hole, the lower clamping member can prevent the clamping seat from moving upward.
2. A concrete pump pipe through floor fixing device according to claim 1, characterized in that: The buffer layer is a rubber plate.
3. A concrete pump pipe through floor fixing device according to claim 1, characterized in that: Two through holes are arranged on the butt joint lug.
4. A concrete pump pipe through-floor fixing device according to claim 2 or 3, characterized in that: The lower clamping member includes two arc-shaped clamping plates, and two ends of the two arc-shaped clamping plates are fixedly connected by bolt connection.
5. A concrete pump pipe through floor fixing device according to claim 4, characterized in that: An arc-shaped clamping groove for clamping and limiting the arc-shaped clamping plate is arranged on the outer side of the lower part of the semicircular tube.