Steel pipe sliding rail facilitating material transportation
By designing steel pipe slides that are easy to transport materials, the problem of low material transportation efficiency on construction sites is solved, and more efficient transportation and shorter process connection time is achieved, reducing costs and improving safety.
CN222630289UActive Publication Date: 2025-03-18THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
0 Cites 0 Cited by
Patent Information
- Application Number
- CN202420444753.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2034-03-08
AI Technical Summary
Technical Problem
At construction sites, the floor transportation efficiency of materials is low, resulting in high labor costs and long process connection time.
Method used
Design a steel pipe slide rail for easy transportation of materials, including two steel pipes arranged in parallel, with both ends of the steel pipe fixed to the ground, with oblique braces and wooden square pads in the middle, and a spring is installed at the end of the steel pipe to reduce shock.
Benefits of technology
It improves the efficiency of material transportation, shortens the process connection time, reduces transportation costs, and enhances the safety and stability of the slide rails.
✦ Generated by Eureka AI based on patent content.
Abstract
The utility model discloses a steel pipe slide rail convenient to transport materials, which comprises two steel pipes arranged in parallel as slide rails, the front ends and the rear ends of the two steel pipes are fixedly connected with the ground, a batten is padded at the bottom of the rail and separates the steel pipes from the ground, the middle parts of the two steel pipes are outwards inclined and extend to form inclined struts, and the inclined struts are fixedly connected with the rail. The inclined struts are fixedly connected with the ground, springs are installed at the ends, located on the same side, of the two steel pipes, the impact borne by the rail is relieved through the elastic force of the springs, and the elastic coefficients of the two springs are the same. The process connection duration can be better shortened, the transportation efficiency can be improved, and the transportation cost can be controlled and reduced.
Need to check novelty before this filing date? Find Prior Art