Switch-off overtime fault detection device for mining elevator

By designing a fault detection device including a gate shoe monitoring cabinet and a gate shoe detection box, using PLC programs and touch screens to monitor and analyze the operating parameters of the elevator in real time, the problem that the existing technology cannot effectively detect the gate shoe gap and operating status of the elevator is solved, and the safe and reliable operation of the elevator is achieved.

CN222647390UActive Publication Date: 2025-03-21ANHUI ZHONGMEI SANJIAN EXPERIMENTAL & CHECKING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421080622.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2025-03-21
Estimated Expiration
2034-05-17

AI Technical Summary

Technical Problem

The existing mining elevator opening timeout fault detection device cannot test the lift braking system, cannot ensure the working condition of the brake pad clearance, and cannot reflect the operating status of the elevator in real time.

Method used

A fault detection device including a gate shoe monitoring cabinet and a gate shoe detection box is designed. The detection data is analyzed using the PLC program, and the parameters are monitored in real time through the touch screen, and the fault signal is output and voice alarm is performed when the detection data exceeds the protection setting value.

Benefits of technology

Real-time acquisition and monitoring of the actual operating parameters of the hoist is realized, the timeliness of fault alarms and the accuracy of data acquisition are improved, and the safety performance of the hoist is greatly improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222647390U_ABST
    Figure CN222647390U_ABST
Patent Text Reader

Abstract

The utility model discloses a mining elevator switch-off overtime fault detection device, which comprises a brake shoe monitoring cabinet, a touch screen and a power supply for supplying power to the touch screen are arranged above the brake shoe monitoring cabinet, and one end of the power supply is connected with a relay; the brake shoe detection box comprises a data acquisition module and a detection sensor; the brake shoe monitoring cabinet analyzes and calculates detection data through a PLC program and compares the detection data with a touch screen detection parameter protection setting value. The mining elevator brake-opening overtime fault detection device is based on PLC acquisition of values of the displacement sensor, the oil pressure sensor and the temperature sensor, realizes acquisition monitoring and fault alarm of actual operation parameters of the elevator through technologies of touch screen real-time monitoring and the like, clearly reflects the real-time operation state of the elevator, and has functions of acquisition and monitoring of brake overtime parameters. The accuracy of data acquisition and the timeliness of fault alarm are improved, and the safety performance of the elevator is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of hoist failure, in particular to a mine hoist gate opening timeout failure detection device. Background Art

[0002] Mining hoists are key equipment for coal mining and transportation. Their transfer and transportation involve the joint production efficiency of the entire production series of equipment. Whether the hoist is operating normally or in the event of a fault, it needs to rely on hydraulic control to brake and stop the disc brake group. The disc brake provides sufficient positive pressure value during the braking of the hoist, which is the key to ensuring that the hoist stops in accordance with the deceleration setting requirements of the electrical and hydraulic control systems during high-speed operation.

[0003] The commonly used mine hoist gate opening timeout fault detection device currently has the following defects: it cannot test the hoist braking system, cannot ensure the safe and reliable operation of the hoist brake, and cannot reflect the working condition of the brake shoe gap in real time when the hoist is running. Therefore, we propose a mine hoist gate opening timeout fault detection device to solve the above problems. Utility Model Content

[0004] The purpose of the utility model is to provide a mine hoist gate opening timeout fault detection device to solve the problem that the currently commonly used mine hoist gate opening timeout fault detection device proposed in the above background technology cannot test the hoist braking system, cannot ensure the safe and reliable operation of the hoist braking gate, and cannot reflect the working condition of the brake shoe gap in real time when the hoist is running.

[0005] To achieve the above purpose, the utility model provides the following technical solution: a mine hoist gate opening timeout fault detection device, comprising:

[0006] A brake shoe monitoring cabinet, wherein a touch screen and a power supply for supplying power to the touch screen are arranged above the brake shoe monitoring cabinet, and one end of the power supply is connected to a relay;

[0007] A brake shoe detection box, the brake shoe detection box comprising a data acquisition module and a detection sensor;

[0008] The brake shoe monitoring cabinet analyzes and calculates the detection data through the PLC program and compares it with the protection setting value of the touch screen detection parameter, and outputs a fault signal and issues a voice alarm when the detection data exceeds the protection setting value;

[0009] The detection sensors include a displacement sensor, a temperature sensor and an oil pressure sensor installed in a brake shoe detection box. The displacement sensor, the temperature sensor and the oil pressure sensor convert the collected signals into voltage and current signals receivable by the PLC in real time and transmit them to the PLC for data processing.

[0010] Preferably, the digital quantity is transmitted to the brake shoe detection system via RS-485 communication.

[0011] Preferably, a method of real-time PLC data collection and touch screen screen monitoring is adopted.

[0012] Preferably, a PLC analog quantity module and an analog quantity acquisition module are used for data acquisition.

[0013] Preferably, the parameter setting method uses a touch screen to set parameters and change the internal program parameter configuration of the PLC.

[0014] Preferably, the fault alarm takes the form of touch screen fault display and recording and external voice alarm to provide timely and effective fault information and warnings.

[0015] Preferably, the relay is connected to the positive electrode or the negative electrode of the control signal source.

[0016] Preferably, the touch screen adopts Kunlun Tongtai TPC1570Gi model.

[0017] Preferably, the PLC adopts Huichuan PLC servo H3U-1616MT-XP programmable driver.

[0018] Preferably, the analog quantity acquisition module adopts the adam-4117 analog quantity input module of Dongsen Lantai Technology.

[0019] Compared with the prior art, the beneficial effects of the utility model are: the mine hoist gate opening timeout fault detection device;

[0020] Based on the PLC acquisition of displacement sensor, oil pressure sensor, temperature sensor values, and touch screen real-time monitoring technologies, the actual operation parameters of the elevator can be collected, monitored, and fault alarms can be set. This can clearly reflect the real-time operation status of the elevator. At the same time, it can collect and monitor brake timeout parameters, which improves the accuracy of data collection, the timeliness of fault alarms, and greatly improves the safety performance of the elevator. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the structure of the utility model;

[0022] Figure 2 This is a rear view structural diagram of the utility model;

[0023] Figure 3 This is the fault detection circuit diagram of the utility model;

[0024] Figure 4 This is a schematic diagram of the principle process structure of the utility model. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] See also Figure 1-4 The utility model provides a technical solution: a mine hoist gate opening timeout fault detection device, comprising:

[0027] A brake shoe monitoring cabinet, wherein a touch screen and a power supply for supplying power to the touch screen are arranged above the brake shoe monitoring cabinet, and one end of the power supply is connected to a relay;

[0028] A brake shoe detection box, the brake shoe detection box comprising a data acquisition module and a detection sensor;

[0029] The brake shoe monitoring cabinet analyzes and calculates the detection data through the PLC program and compares it with the protection setting value of the touch screen detection parameter, and outputs a fault signal and issues a voice alarm when the detection data exceeds the protection setting value;

[0030] The detection sensors include a displacement sensor, a temperature sensor and an oil pressure sensor installed in a brake shoe detection box. The displacement sensor, the temperature sensor and the oil pressure sensor convert the collected signals into voltage and current signals receivable by the PLC in real time and transmit them to the PLC for data processing.

[0031] Preferably, the digital quantity is transmitted to the brake shoe detection system via RS-485 communication.

[0032] Preferably, a method of real-time PLC data collection and touch screen screen monitoring is adopted.

[0033] Preferably, a PLC analog quantity module and an analog quantity acquisition module are used for data acquisition.

[0034] Preferably, the parameter setting method uses a touch screen to set parameters and change the internal program parameter configuration of the PLC.

[0035] Preferably, the fault alarm takes the form of touch screen fault display and recording and external voice alarm to provide timely and effective fault information and warnings.

[0036] Preferably, the relay is connected to the positive electrode or the negative electrode of the control signal source.

[0037] Preferably, the touch screen adopts Kunlun Tongtai TPC1570Gi model.

[0038] Preferably, the PLC adopts Huichuan PLC servo H3U-1616MT-XP programmable driver.

[0039] Preferably, the analog quantity acquisition module adopts the adam-4117 analog quantity input module of Dongsen Lantai Technology.

[0040] When using the mine hoist gate opening timeout fault detection device, the brake shoe monitoring cabinet analyzes and calculates the detection data through the PLC program and compares it with the touch screen detection parameter protection setting value, and outputs a fault signal and issues a voice alarm when the detection data exceeds the protection setting value. The displacement sensor, temperature sensor and oil pressure sensor convert the collected signals into voltage and current signals that can be received by the PLC in real time and transmit them to the PLC for data processing. When the gate relay is activated and the corresponding oil pressure sensor pressure is greater than the set "oil pressure threshold for judging the gate opening", after the set "gate opening timeout detection delay" time. If a gate gap value is always less than the set "gap threshold for judging the gate opening" within the set "gate opening fault filtering time", the system reports a gate opening timeout fault. The fault relay outputs a fault signal. When the detection data exceeds the protection setting value, it outputs a fault signal and issues a voice alarm, prompting maintenance personnel to promptly troubleshoot the alarm fault. By real-time monitoring of the gate opening timeout parameters on the touch screen, fault indication, fault recording and historical curve viewing, the operating status of the hoist can be clearly judged, which greatly ensures the normal operation of the hoist braking system and ensures the safety of mine hoisting. This is the entire working process of the mine hoist gate opening timeout fault detection device.

[0041] The contents not described in detail in this specification belong to the prior art known to the professional and technical personnel in this field. The standard parts used in this utility model can be purchased from the market, and the special-shaped parts can be customized according to the description and the drawings. The specific connection methods of each part adopt the conventional means such as bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt the conventional models in the prior art, and the circuit connection adopts the conventional connection method in the prior art, which will not be described in detail here.

[0042] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A mine hoist gate opening timeout fault detection device, characterized in that: include: A brake shoe monitoring cabinet, wherein a touch screen and a power supply for supplying power to the touch screen are arranged above the brake shoe monitoring cabinet, and one end of the power supply is connected to a relay; A brake shoe detection box, the brake shoe detection box comprising a data acquisition module and a detection sensor; The brake shoe monitoring cabinet is connected to the brake shoe detection box circuit through PLC; The detection sensor includes a displacement sensor installed in the brake shoe detection box, which can convert the collected signal into a voltage and current signal that can be received by the PLC in real time; The detection sensor includes a temperature sensor installed in the brake shoe detection box, which can convert the collected signal into a voltage and current signal that can be received by the PLC in real time; The detection sensor includes a displacement sensor and an oil pressure sensor installed in the brake shoe detection box, which can convert the collected signal into a voltage and current signal that can be received by the PLC in real time.

2. The device for detecting the timeout fault of the gate opening of a mine hoist according to claim 1, characterized in that: The digital quantity is transmitted to the brake shoe detection system via RS-485 communication.

3. The device for detecting a timeout fault of a mine hoist when the gate is opened according to claim 1 is characterized in that: It adopts the method of real-time PLC data acquisition and touch screen monitoring.

4. The device for detecting a timeout fault of a mine hoist when the gate is opened according to claim 1 is characterized in that: PLC analog module and analog acquisition module are used for data collection.

5. The device for detecting the timeout fault of the gate opening of a mine hoist according to claim 4 is characterized in that: The PLC analog module parameter setting method uses a touch screen to set parameters and change the PLC internal program parameter configuration.

6. The device for detecting a timeout fault of a mine hoist when the gate is opened according to claim 1 is characterized in that: The fault alarm adopts the form of touch screen fault display and recording and external voice alarm to provide timely and effective fault information and warnings.

7. The device for detecting a timeout fault of a mine hoist when the gate is opened according to claim 1 is characterized in that: The relay is connected to the positive electrode or the negative electrode of the control signal source.

8. The device for detecting a timeout fault of a mine hoist when the gate is opened according to claim 1 is characterized in that: The touch screen adopts Kunlun Tongtai TPC1570Gi model.

9. The device for detecting a timeout fault of a mine hoist when the gate is opened according to claim 1, characterized in that: The PLC adopts Inovance PLC servo H3U-1616MT-XP programmable driver.

10. The device for detecting a gate opening timeout fault of a mine hoist according to claim 4, characterized in that: The analog quantity acquisition module adopts the adam-4117 analog quantity input module of Dongsen Lantai Technology.