Foundation pile detection fixing device for constructional engineering detection
By designing a foundation pile detection fixing device with a moving roller and a clamping mechanism, the problem of manual pile handling in the prior art is solved, automatic clamping and sampling are realized, and working efficiency and practicality of the equipment are improved.
Patent Information
- Application Number
- CN202421414280.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2034-06-20
AI Technical Summary
During the use of the existing foundation pile inspection fixture for construction engineering inspection, staff are required to assist in handling the pile body, resulting in low working efficiency and high labor intensity, which reduces the practicality of the equipment.
A foundation pile detection fixing device including a equipment base and a sampling device is designed. The automatic clamping fixing and sampling operation of the pile body is realized through four moving rollers and a clamping mechanism in the positioning groove, reducing the need for manual handling.
It realizes convenient sampling operation of pile bodies, without the need for staff to carry pile bodies, reduces labor intensity, and improves the working efficiency and practicality of the equipment.
Smart Images

Figure CN222666896U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pile foundation detection, in particular to a pile foundation detection fixing device for construction engineering detection. Background Art
[0002] After searching, application number 202321175035.X discloses a foundation pile detection and fixing device for construction engineering inspection, including a main body and an operating panel installed on the main body, the upper surface of the operating panel is fixedly connected to two symmetrically arranged support plates, the inner walls of the two support plates are connected to sliding plates, and the adjacent sides of the two sliding plates are fixedly connected to a limiting ring.
[0003] During use, the pile detection and fixing device for construction engineering inspection in this patent application can form a circular ring structure through the top buckle ring and the bottom buckle ring to fix the pile body, and then the pile body is moved to the machine platform along the landslide on the front side of the machine platform through the pulley, and the pulley is inserted into the wheel groove to complete the position fixation of the pile body, and finally the sampling cone is driven by the driving motor to rotate to perform drilling and sampling operations on the pile body. However, during such use, staff assistance is required to carry the pile body, and the pile body needs to be carried to the machine platform for sampling operations first. At this time, the pulley is stuck in the wheel groove, which is not convenient for the staff to subsequently carry the pile body from the machine platform. Not only does it reduce the working efficiency of the equipment, but it also increases the labor intensity of the staff and reduces the practicality of the equipment. For this reason, we propose a pile detection and fixing device for construction engineering inspection. Utility Model Content
[0004] The utility model mainly solves the technical problems existing in the above-mentioned prior art and provides a foundation pile detection and fixing device for construction engineering detection.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a pile detection and fixing device for construction engineering detection, including an equipment base and a sampling device, four movable rollers are rotatably connected at the four corners of the bottom wall of the equipment base, a positioning groove is provided on the left wall of the equipment base, two adjusting slide grooves are provided in the middle of the front and rear side walls of the positioning groove, a clamping mechanism is provided inside the positioning groove, the clamping mechanism includes two adjusting slide rods slidably connected to the inside of the two adjusting slide grooves and two positioning clamping plates fixedly connected to one end of the two adjusting slide rods close to each other, a movable groove connected to the positioning groove is provided at the right side of the top wall of the equipment base, a sampling mechanism is provided inside the movable groove, the sampling mechanism includes a sampling slide fixedly installed on the bottom wall of the inner cavity of the movable groove, and the sampling device is slidably installed on the top end of the sampling slide.
[0006] Furthermore, an operating handle is fixedly mounted on the right wall surface of the equipment base.
[0007] Furthermore, two adjusting threaded holes are provided at one end of the two adjusting slide rods which are away from each other, and two adjusting threaded rods which are rotatably connected to the inner wall surfaces of the two adjusting slide grooves are internally threadedly connected to the two adjusting threaded holes.
[0008] Furthermore, one end of the two adjusting threaded rods that is away from each other passes through the corresponding positions of the inner side walls of the two adjusting slide grooves and extends to the outside and is fixedly mounted with two adjusting hand wheels.
[0009] Furthermore, two rubber pads are fixedly mounted on the mutually adjacent sides of the two positioning clamping plates.
[0010] Furthermore, the front and rear side walls of the positioning groove are symmetrically provided with limiting sliding grooves on the left and right sides, and four limiting sliding rods are slidably connected inside the four limiting sliding grooves and fixedly installed on a side away from the two positioning clamping plates.
[0011] Beneficial Effects
[0012] The utility model provides a pile detection and fixing device for construction engineering detection. It has the following beneficial effects:
[0013] The two adjusting handles are used to drive the two adjusting threaded rods to rotate, forcing the two adjusting slide bars threadedly connected with the outer wall surfaces of the two adjusting threaded rods through the adjusting threaded holes to drive the two positioning clamping plates to approach each other to clamp and fix the outer wall surface of the pile body, so that the position between the equipment base and the pile body is fixed. At this time, the sampling device on the sampling slide table can be moved to perform drilling and sampling operation on the pile body. After the sampling operation on the pile body is completed, the two adjusting hand wheels are rotated in the opposite direction to drive the two positioning clamping plates to move away from each other, so that the position fixation between the equipment base and the pile body can be released. The above operation is simple and practical, and the structure is reasonable and compact, which realizes the convenient sampling operation of the equipment on the pile body, and there is no need for the staff to carry the pile body, which reduces the labor intensity of the staff and improves the working efficiency of the equipment.
[0014] 2. The foundation pile detection and fixing device for construction engineering detection is provided with limit slide bars. The four limit slide bars are slidably connected with the inside of four limit slide grooves to form a supporting and limiting effect on the two positioning clamping plates, so that the two positioning clamping plates can move horizontally smoothly, thereby improving the stability of the equipment structure.
[0015] 3. The foundation pile detection and fixing device for construction engineering detection is provided with a rubber pad. When two positioning clamping plates clamp and fix the pile body, the two rubber pads enhance the clamping effect of the two positioning clamping plates on the pile body by deformation, so that the connection between the equipment base and the pile body is more stable, so that the equipment can better perform sampling operations on the pile body, thereby improving the practicability of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the conditions under which the utility model can be implemented, so they have no substantial technical significance.
[0017] Figure 1 This is a schematic diagram of the structure of the foundation pile detection and fixing device for construction engineering detection of the utility model;
[0018] Figure 2 It is a cross-sectional view of the foundation pile detection and fixing device for construction engineering detection of the utility model;
[0019] Figure 3 for Figure 1 A is an enlarged schematic diagram.
[0020] Legend:
[0021] 10. Equipment base; 11. Moving roller; 12. Operating handle; 13. Positioning groove; 14. Adjusting slide groove; 15. Adjusting slide rod; 16. Positioning clamping plate; 17. Adjusting threaded hole; 18. Adjusting threaded rod; 19. Adjusting handwheel; 20. Rubber pad; 21. Limiting slide groove; 22. Limiting slide rod; 23. Movable groove; 24. Sampling slide; 25. Sampling device. DETAILED DESCRIPTION
[0022] Pile testing fixtures for construction engineering testing, such as Figure 1-3As shown, it includes an equipment base 10 and a sampling device 25. The sampling device 25 is a prior art and is not described in detail. Four movable rollers 11 are rotatably connected at the four corners of the bottom wall of the equipment base 10. An operating push handle 12 is fixedly installed on the right wall of the equipment base 10. A positioning groove 13 is provided on the left wall of the equipment base 10. Two adjusting slide grooves 14 are provided in the middle of the front and rear side walls of the positioning groove 13. A clamping mechanism is provided inside the positioning groove 13. The clamping mechanism includes two adjusting slide rods 15 slidably connected to the two adjusting slide grooves 14 and two positioning clamping plates 16 fixedly connected to one end of the two adjusting slide rods 15 close to each other. Two adjusting threaded holes 17 are provided at one end of the two adjusting slide rods 15 away from each other. The two adjusting threaded holes 17 are internally threadedly connected to the inner wall of the two adjusting slide grooves 14. Two adjusting threaded rods 18, the ends of the two adjusting threaded rods 18 that are away from each other pass through the corresponding positions of the inner wall surfaces of the two adjusting slides 14, extend to the outside and are fixedly installed with two adjusting hand wheels 19, two rubber pads 20 are fixedly installed on the sides of the two positioning clamping plates 16 that are close to each other, a movable groove 23 connected to the positioning groove 13 is provided at the right side of the top wall surface of the equipment base 10, and a sampling mechanism is arranged inside the movable groove 23, the sampling mechanism includes a sampling slide 24 fixedly installed on the bottom wall surface of the inner cavity of the movable groove 23, and the sampling device 25 is slidably installed on the top of the sampling slide 24, and the front and rear side walls of the positioning groove 13 are symmetrically provided with limiting slides 21 on the left and right sides, and four limiting slides 21 are slidably connected inside with four limiting slides 22 fixedly installed on the sides of the two positioning clamping plates 16 that are away from each other.
[0023] The working principle of the utility model is as follows: when in use, the push handle 12 is pushed to drive the device to move to the position of the pile body to be detected through the four moving rollers 11, and the two positioning clamping plates 16 inside the positioning groove 13 are moved to the positions on both sides of the pile body, and the two adjusting hand wheels 19 are rotated to drive the two adjusting threaded rods 18 to rotate, forcing the two adjusting slide bars 15 threadedly connected with the outer wall surfaces of the two adjusting threaded rods 18 through the adjusting threaded holes 17 to drive the two positioning clamping plates 16 to approach each other to clamp and fix the outer wall surface of the pile body, so that the position between the device base 10 and the pile body is fixed, and at this time, the sampling device 25 on the sampling slide 24 can be moved to perform drilling sampling operation on the pile body. When the sampling operation on the pile body is completed, the two adjusting hand wheels 19 are rotated in the opposite direction to drive the two positioning clamping plates 16 to move away from each other, and the device can be released. The position between the base 10 and the pile body is fixed, the above operation is simple and practical, the structure is reasonable and compact, and the convenient sampling operation of the pile body by the equipment is realized. There is no need for the staff to carry the pile body, which reduces the labor intensity of the staff and improves the working efficiency of the equipment; the four limiting slide bars 22 form a supporting and limiting effect on the two positioning clamping plates 16 by slidingly connecting with the four limiting slide grooves 21, so that the two positioning clamping plates 16 can move horizontally smoothly, thereby improving the stability of the equipment structure; when the two positioning clamping plates 16 clamp and fix the pile body, the two rubber pads 20 enhance the clamping effect of the two positioning clamping plates 16 on the pile body by deformation, so that the connection between the equipment base 10 and the pile body is more stably, so that the equipment can better perform sampling operations on the pile body, thereby improving the practicality of the equipment.
[0024] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. The technicians in this industry should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model will have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.
Claims
1. A pile detection fixture for construction engineering inspection, comprising a device base (10) and a sampling device (25), characterized in that: Four movable rollers (11) are rotatably connected at the four corners of the bottom wall of the equipment base (10); a positioning groove (13) is provided on the left wall of the equipment base (10); two adjusting slide grooves (14) are provided in the middle of the front and rear side walls of the positioning groove (13); a clamping mechanism is provided inside the positioning groove (13); the clamping mechanism includes two adjusting slide bars (15) slidably connected to the inside of the two adjusting slide bars (14) and two positioning clamping plates (16) fixedly connected to one end of the two adjusting slide bars (15) close to each other; a movable groove (23) connected to the positioning groove (13) is provided on the right side of the top wall of the equipment base (10); a sampling mechanism is provided inside the movable groove (23); the sampling mechanism includes a sampling slide table (24) fixedly installed on the bottom wall of the inner cavity of the movable groove (23); and the sampling device (25) is slidably installed on the top of the sampling slide table (24).
2. The pile detection and fixing device for construction engineering detection according to claim 1 is characterized in that: An operating handle (12) is fixedly mounted on the right wall surface of the equipment base (10).
3. The pile detection and fixing device for construction engineering detection according to claim 1 is characterized in that: Two adjusting threaded holes (17) are formed at the ends of the two adjusting slide bars (15) that are away from each other. The two adjusting threaded holes (17) are internally threadedly connected with two adjusting threaded rods (18) that are rotatably connected to the inner wall surfaces of the two adjusting slide grooves (14).
4. The pile detection and fixing device for construction engineering detection according to claim 3 is characterized in that: One end of the two adjusting threaded rods (18) that is away from each other passes through the corresponding positions of the inner wall surfaces of the two adjusting slide grooves (14) and extends to the outside and is fixedly mounted with two adjusting hand wheels (19).
5. The pile detection and fixing device for construction engineering detection according to claim 1 is characterized in that: Two rubber pads (20) are fixedly mounted on the mutually adjacent sides of the two positioning clamping plates (16).
6. The pile detection and fixing device for construction engineering detection according to claim 1, characterized in that: The front and rear side walls of the positioning groove (13) are symmetrically provided with limiting sliding grooves (21) on both sides. The four limiting sliding grooves (21) are slidably connected with four limiting sliding rods (22) fixedly installed on a side away from the two positioning clamping plates (16).
Citation Information
Patent Citations
Foundation pile detection fixing device for constructional engineering detection
CN220225471U