Precise positioning device for pre-embedded steel pipe of anchoring pile
By pre-embedding steel pipe components in the anchor piles and fixing them with clamping grooves and locking screws, the problem of damage to the steel bars during the anchor cable implantation process is solved, the precise positioning of the anchor cables and the protection of the anchor piles are achieved, and the construction quality is improved.
Patent Information
- Application Number
- CN202422693056.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2025-09-19
- Estimated Expiration
- 2034-11-05
AI Technical Summary
During the construction of anchor piles, the anchor cables are likely to touch the original steel bars in the anchor piles during implantation, causing damage and affecting their function.
Anchor piles are embedded with steel pipes for precise positioning, including external steel pipes and internal support steel pipe components, which are fixed to the steel bars of the anchor piles through clamping grooves and locking screws, providing accurate guidance and protection to avoid damage to the steel bars when the anchor cables are implanted.
The accuracy of anchor cable implantation is improved, the integrity of the anchor pile is protected, steel bar damage is avoided, and construction quality is ensured.
Smart Images

Figure CN223358261U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building construction, and particularly relates to a precise positioning device for pre-buried steel pipes of anchor piles. Background Art
[0002] Anchor piles are a type of anti-slide pile. They reinforce soil or rock by tightening the steel bars in reinforced concrete piles. Their use requires that the reinforced concrete piles are already anchored underground. The application of tension improves the stability of the soil or rock mass. Anchor piles can be designed based on site needs and are commonly used to stabilize building foundations and reinforce rock slopes.
[0003] In existing technologies, the anchor cable of an anchor pile must be inserted from the top beam of the pile body, through the window, and into the slope. During this insertion process, the anchor cable can easily come into contact with the existing steel bars in the anchor pile, damaging them during the insertion process and thus weakening the anchor pile's function.
[0004] Therefore, pre-buried steel pipes also play an important role in anchor pile construction. They serve as a reserve for the anchor rod holes, providing accurate positioning and guidance for subsequent anchor rod installation. This prevents the anchor cable from damaging the anchor pile during the implantation process. Utility Model Content
[0005] The purpose of the utility model is to provide a precise positioning device for pre-buried steel pipes of anchor piles, which can effectively improve the accuracy during the implantation of anchor cables, penetrate the anchor cables into the predetermined positions, and protect the anchor piles from being damaged.
[0006] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is as follows:
[0007] A precise positioning device for embedded steel pipes of anchor piles, comprising an anchor pile, wherein the anchor pile comprises an buried section and an exposed section, and further comprises a steel pipe assembly embedded in the exposed section, and a plugging mechanism connected to both ends of the steel pipe assembly; the steel pipe assembly comprises a hollow outer steel pipe, an inner support steel pipe arranged within the outer steel pipe, the inner support steel pipe being a solid piece, and one end of the inner support steel pipe passing through the plugging mechanism; a clamping groove is provided on the outer side of the outer steel pipe, and the clamping groove is clamped on the steel bar of the anchor pile.
[0008] Furthermore, the end surface of the outer steel pipe is provided with a plurality of locking holes.
[0009] Furthermore, the locking hole is connected to the outermost side of the clamping groove, and a locking screw is connected in the locking hole.
[0010] Furthermore, the plurality of locking holes are evenly spaced along the arc-shaped surface of the outer steel pipe.
[0011] Furthermore, the plugging mechanism includes a first plug and a second plug respectively connected to the two ends of the external steel pipe, and a connecting thread adapted to the plugging mechanism is provided in the external steel pipe.
[0012] Furthermore, a through hole adapted to the inner supporting steel pipe is provided in the middle of the first plug.
[0013] Compared with the existing technology, the advantages of the present invention are: First, the present invention adopts a steel pipe assembly arranged at the exposed section of the anchor pile. By pre-embedding the steel pipe assembly and connecting it to the anchor pile before pouring, a reserved passage can be provided for the anchor cable after pouring, and the steel bars of the anchor pile will not be damaged when the anchor cable is inserted.
[0014] Secondly, the steel pipe assembly used in this invention has a double-layer structure, and the inner supporting steel pipe can provide good internal support for the outer steel pipe, preventing the outer steel pipe from deforming during the pouring process. The outer steel pipe is connected to the steel bar of the anchor pile through a locking screw and a clamping groove, which makes the position of the steel pipe less prone to deviation and achieves a good positioning effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying any creative work.
[0016] Figure 1 It is a structural schematic diagram of the precise positioning device for pre-buried steel pipes of anchor piles provided by the utility model.
[0017] Figure 2 It is a structural schematic diagram of the steel pipe assembly of the anchor pile pre-buried steel pipe precise positioning device provided by the utility model.
[0018] Figure numerals: 1. crown beam; 2. anchor cable; 3. buried section; 4. exposed section; 5. external steel pipe; 6. internal support steel pipe; 7. clamping groove; 8. locking hole. DETAILED DESCRIPTION
[0019] To make the purpose, technical solutions, and advantages of the embodiments of the present invention more clear, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts shall fall within the scope of protection of the present invention.
[0020] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, it does not need to be further defined or explained in subsequent drawings.
[0021] In the description of the present invention, it should be noted that if the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the accompanying drawings, or is the orientation or position relationship in which the utility model product is usually placed when in use. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0022] In addition, the terms "first", "second", "third", etc., if used, are merely used to distinguish and describe, and should not be understood as indicating or implying relative importance.
[0023] Furthermore, the use of terms such as "horizontal," "vertical," and "overhanging" does not necessarily imply that the component must be absolutely horizontal or overhanging, but rather that it can be slightly tilted. For example, "horizontal" simply means that its direction is more horizontal than "vertical," and does not mean that the structure must be completely horizontal, but rather that it can be slightly tilted.
[0024] It should also be noted that, in the description of this utility model, unless otherwise expressly specified or limited, the terms "disposed," "installed," "connected," and "connected" should be understood in a broad sense. For example, they can refer to fixed connections, detachable connections, or integral connections; mechanical connections, electrical connections; direct connections, indirect connections through an intermediate medium, and internal connections between two components. Those skilled in the art will understand the specific meanings of the above terms in this utility model based on the specific circumstances.
[0025] It should be noted that, in the absence of conflict, the features in the embodiments of the present invention can be combined with each other.
[0026] like Figure 1-Figure 2 As shown, a precise positioning device for embedded steel pipes of anchor piles includes an anchor pile, and the anchor pile includes an buried section 3 and an exposed section 4, and also includes a steel pipe assembly embedded in the exposed section 4, and a plugging mechanism connected to both ends of the steel pipe assembly; the steel pipe assembly includes a hollow external steel pipe 5, an internal support steel pipe 6 arranged in the external steel pipe 5, the internal support steel pipe 6 is a solid piece, and one end of the internal support steel pipe 6 passes through the plugging mechanism; a clamping groove 7 is provided on the outside of the external steel pipe 5, and the clamping groove 7 is clamped on the steel bar of the anchor pile.
[0027] Compared with the prior art, in the prior art, the embedded steel pipe also plays an important role. It can be used as a reserve for the anchor rod channel, providing accurate positioning and guidance for the later installation of the anchor rod. Specifically, the production and installation of the embedded steel pipe need to follow certain process requirements. The main problem with the embedded steel pipe method is that the position of the embedded steel pipe may be offset when the anchor pile is cast, which causes the position of the anchor cable 2 to be offset when the anchor cable 2 is passed in the later stage, which is inconsistent with the designed position. In the present utility model, the embedded steel pipe is set as a steel pipe assembly, and the steel pipe assembly includes an external steel pipe 5 and an internal support steel pipe 6. On the one hand, the internal support steel pipe 6 is a solid piece that can play the role of internal support for the external steel pipe 5 during casting, avoiding deformation of the external steel pipe 5 during the casting process. When the anchor cable 2 is passed through in the later stage, the internal support steel pipe 6 can be taken out, and the overall structure is simple. At the same time, a clamping groove 7 is provided on the external steel pipe 5, and the clamping groove 7 is used to fix the steel pipe assembly, so that the subsequent anchor cable 2 can provide more accurate positioning.
[0028] The end surface of the outer steel tube 5 is provided with a plurality of locking holes 8. The locking holes 8 are connected to the outermost side of the clamping groove 7, and a locking screw is connected in the locking hole 8. The plurality of locking holes 8 are evenly spaced along the curved surface of the outer steel tube 5.
[0029] The plugging mechanism includes a first plug and a second plug connected to both ends of the external steel pipe 5, and a connecting thread adapted to the plugging mechanism is provided in the external steel pipe 5. A through hole adapted to the inner support steel pipe 6 is provided in the middle of the first plug.
[0030] In actual use, anchor piles are constructed using C30 concrete, with a steel reinforcement layer thickness of no less than 7 cm. Pile wells should be excavated in sections, with each pile separated. Mechanical drilling or rotary drilling is recommended for the pile bodies. During excavation, detailed records of stratum lithology, water content, and contact surfaces must be kept. Any discrepancies with geological data should be promptly notified to the survey and design firm and other relevant parties.
[0031] Cast-in-place concrete retaining plates are installed between the exposed sections of the pile body. The required strength is no less than C30, and the plates are 40cm thick. Drain holes are reserved within the plates. The retaining plate's reinforcement is anchored within the anti-slip pile concrete using embedded reinforcement technology. Construction of the crown beam 1 and retaining plates can only begin after the pile construction is completed and qualified. The precise positioning device provided by the utility model is embedded within the crown beam 1 during its construction. A Φ146 steel pipe is embedded before the crown beam 1 is cast, and both ends of the steel pipe must be sealed. The incident angle of the anchor cable 2 is set at 15 to 30 degrees, depending on the specific situation.
[0032] When pre-embedding the steel pipe assembly, the outer steel pipe 5 is fitted over the reinforcement of the crown beam 1 using the snap-fit groove 7, and the locking screw is inserted into the locking hole 8 to secure the outer steel pipe 5 relative to the crown beam 1. After the crown beam 1 is cast, the inner support steel pipe 6 and the plugging mechanism are removed to reserve a passage for the anchor cable 2.
[0033] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the above embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the above embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.
Claims
1. A precise positioning device for an anchor pile pre-buried steel pipe, comprising an anchor pile, wherein the anchor pile comprises an embedded section (3) and an exposed section (4), characterized in that: It also includes a steel pipe assembly pre-buried in the exposed section (4), and a plugging mechanism connected to both ends of the steel pipe assembly; the steel pipe assembly includes a hollow external steel pipe (5), an internal support steel pipe (6) arranged in the external steel pipe (5), the internal support steel pipe (6) is a solid piece, and one end of the internal support steel pipe (6) passes through the plugging mechanism; a clamping groove (7) is provided on the outer side of the external steel pipe (5), and the clamping groove (7) is clamped on the steel bar of the anchor pile.
2. The precise positioning device for pre-buried steel pipes for anchor piles according to claim 1 is characterized in that: The end surface of the outer steel pipe (5) is provided with a plurality of locking holes (8).
3. The precise positioning device for pre-buried steel pipes for anchor piles according to claim 2 is characterized in that: The locking hole (8) is connected to the outermost side of the clamping groove (7), and a locking screw is connected in the locking hole (8).
4. The precise positioning device for anchor pile embedded steel pipes according to claim 2, characterized in that: A plurality of locking holes (8) are evenly spaced and distributed along the arc-shaped surface of the external steel pipe (5).
5. The precise positioning device for pre-buried steel pipes for anchor piles according to claim 1 is characterized in that: The plugging mechanism comprises a first plug and a second plug respectively connected to both ends of the external steel pipe (5), and a connecting thread adapted to the plugging mechanism is provided in the external steel pipe (5).
6. The precise positioning device for pre-buried steel pipes for anchor piles according to claim 5, characterized in that: A through hole adapted to the inner supporting steel pipe (6) is provided in the middle of the first plug.