Quickly-mounted polyurethane modular insulation board
By using the linkage components and magnetic parts of the polyurethane modular insulation board, the problems of labor-intensive installation and difficult dismantling of the insulation board are solved, enabling rapid installation and dismantling, improving construction efficiency and enhancing insulation performance.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-17
- Publication Date
- 2026-03-31
AI Technical Summary
The installation of existing insulation boards consumes a lot of manpower and time, and they are difficult to remove, increasing maintenance and time costs.
The system uses modular polyurethane insulation panels and incorporates first and second linkage components. A rotating shaft drives the clamping plate and sealing strip for quick installation and disassembly. Magnetic components are used for pre-positioning, and polyurethane insulation and fireproof/waterproof layers enhance performance.
It enables rapid installation and disassembly of insulation boards, reducing labor and time costs, improving construction efficiency, and enhancing insulation, fireproofing, and waterproofing performance.
Smart Images

Figure CN224063703U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of insulation board technology, specifically to a quick-installation polyurethane modular insulation board. Background Technology
[0002] In the field of building insulation, insulation boards are widely used and play a crucial role in improving the energy efficiency of buildings and reducing energy consumption. As the construction industry continues to demand higher insulation performance, the installation process and sealing technology of insulation boards are receiving increasing attention.
[0003] Currently, to enhance the sealing performance between adjacent insulation boards, a sealing strip is typically installed between two adjacent insulation boards during installation, with the sealing strip and the insulation board forming an interference fit. This method can indeed effectively prevent heat loss and improve the insulation effect to a certain extent.
[0004] However, the existing installation method has significant drawbacks. Traditional installation relies on manual force to insert the sealing strip of one insulation board into the other. This method is not only labor-intensive and time-consuming during actual construction, but also demands a high level of physical strength and skill from the workers. Furthermore, subsequent repairs, replacements, or adjustments to the insulation boards are difficult due to the tight fit between the sealing strip and the insulation board, easily damaging both the insulation board and the sealing strip, thus increasing maintenance and time costs. Utility Model Content
[0005] The purpose of this invention is to address the aforementioned shortcomings in the existing technology by providing a quick-installation polyurethane modular insulation board.
[0006] The purpose of this utility model is achieved through the following technical solution: a quick-installation polyurethane modular insulation board, including a protective layer and an insulation body disposed within the protective layer; a first rotating shaft is rotatably provided on the top of one side of the protective layer; the first rotating shaft is connected to a first clamping plate;
[0007] The top of one side of the protective layer is provided with a first receiving groove; a first slider is provided in the first receiving groove; the first slider is telescopically movable in the first receiving groove along the length direction of the protective layer; a first sealing strip is provided on the side of the first slider away from the bottom wall of the first receiving groove; a first linkage component is provided between the first slider and the first rotating shaft.
[0008] The top of the other side of the protective layer is provided with a first fixing rod that engages with the first card plate; the top of the other side of the protective layer is provided with a first sealing groove that cooperates with the first sealing strip.
[0009] The present invention is further configured such that the first linkage component includes a first rack fixedly disposed on the first slider and a first gear fixedly disposed on the first rotating shaft; the top of the first rack meshes with the top of the first gear.
[0010] The present invention is further configured such that the first card plate is provided with a first fixing groove that engages with the first fixing rod.
[0011] The present invention is further provided that a second rotating shaft is rotatably provided at the bottom of the other side of the protective layer; the second rotating shaft is connected to a second clamping plate;
[0012] A second receiving groove is provided at the bottom of the other side of the protective layer; a second slider is provided in the second receiving groove; the second slider is movably and telescopically disposed in the second receiving groove along the length direction of the protective layer; a second sealing strip is provided on the side of the second slider away from the bottom wall of the second receiving groove; a second linkage assembly is provided between the second slider and the second rotating shaft;
[0013] The bottom of one side of the protective layer is provided with a second fixing rod that engages with the second card plate; the bottom of one side of the protective layer is provided with a second sealing groove that cooperates with the second sealing strip.
[0014] The present invention is further configured such that the second linkage component includes a second rack fixedly disposed on the second slider and a second gear fixedly disposed on the second rotating shaft; the top of the second rack meshes with the top of the second gear.
[0015] The present invention is further configured such that the second card plate is provided with a second fixing groove that engages with the second fixing rod.
[0016] The present invention is further configured such that a first limiting boss is provided on the top of one side of the protective layer; and a second limiting boss that cooperates with the first limiting boss is provided on the bottom of the other side of the protective layer.
[0017] The present invention is further configured such that the bottom surface of the first limiting boss is provided with a first magnetic element; and the top surface of the second limiting boss is provided with a second magnetic element that cooperates with the first magnetic element.
[0018] The present invention is further configured such that the heat insulation body includes a polyurethane heat insulation layer, a first fireproof layer disposed on top of the polyurethane heat insulation layer, a second fireproof layer disposed at the bottom of the polyurethane heat insulation layer, a first waterproof layer disposed on top of the first fireproof layer, and a second waterproof layer disposed at the bottom of the second fireproof layer.
[0019] The present invention is further configured such that the polyurethane insulation layer contains a plurality of spherical air bladders; the spherical air bladders contain inert gas.
[0020] The beneficial effects of this utility model are as follows: By setting a first linkage component, this utility model can simultaneously drive the first clamping plate and the first sealing strip to move when the first rotating shaft is rotated, thereby completing the clamping and sealing of the two sealing plates and facilitating quick installation; in addition, by setting a telescopic first sealing strip, after the two sealing plates are aligned, the first sealing strip is driven to be embedded into the first sealing groove by rotating the first rotating shaft, which facilitates disassembly and assembly. Attached Figure Description
[0021] The utility model will be further described with reference to the accompanying drawings, but the embodiments in the drawings do not constitute any limitation on the present utility model. For those skilled in the art, other drawings can be obtained based on the following drawings without creative effort.
[0022] Figure 1 This is a cross-sectional view of the present invention;
[0023] The components are as follows: 1. Protective layer; 2. First rotating shaft; 21. First gear; 3. First clamping plate; 31. First fixing groove; 32. First fixing rod; 4. First receiving groove; 41. First slider; 42. First sealing strip; 43. First rack; 44. First sealing groove; 5. Second rotating shaft; 51. Second gear; 6. Second clamping plate; 61. Second fixing groove; 62. Second fixing rod; 7. Second receiving groove; 71. Second slider; 72. Second sealing strip; 73. Second rack; 74. Second sealing groove; 81. First limiting boss; 82. Second limiting boss; 83. First magnetic component; 84. Second magnetic component; 9. Polyurethane insulation layer; 91. First fireproof layer; 92. Second fireproof layer; 93. First waterproof layer; 94. Second waterproof layer; 95. Spherical airbag. Detailed Implementation
[0024] The present invention will be further described in conjunction with the following embodiments.
[0025] Depend on Figure 1 As can be seen, the quick-installation polyurethane modular insulation board described in this embodiment includes a protective layer 1 and an insulation body disposed within the protective layer 1; a first rotating shaft 2 is rotatably provided on the top of one side of the protective layer 1; the first rotating shaft 2 is connected to a first clamping plate 3;
[0026] The top of one side of the protective layer 1 is provided with a first receiving groove 4; a first slider 41 is provided in the first receiving groove 4; the first slider 41 is telescopically movably disposed in the first receiving groove 4 along the length direction of the protective layer 1; a first sealing strip 42 is provided on the side of the first slider 41 away from the bottom wall of the first receiving groove 4; a first linkage component is provided between the first slider 41 and the first rotating shaft 2.
[0027] The top of the other side of the protective layer 1 is provided with a first fixing rod 32 that engages with the first card plate 3; the top of the other side of the protective layer 1 is provided with a first sealing groove 44 that cooperates with the first sealing strip 42.
[0028] Specifically, in this embodiment, the quick-installation polyurethane modular insulation board involves aligning the two insulation boards during installation. Then, by rotating the first rotating shaft 2 of the first insulation board, the first clamping plate 3 of the first insulation board is locked to the first fixing rod 32 of the second insulation board. Simultaneously, as the first rotating shaft 2 of the first insulation board rotates, the first sliding block 41 of the first insulation board is moved by the first linkage component, causing the first sealing strip 42 of the first insulation board to extend out of the first receiving groove 4 and embed into the first sealing groove 44 of the second insulation board, thereby completing the installation of the two insulation boards.
[0029] In this embodiment, by setting a first linkage component, when the first rotating shaft 2 is rotated, the first clamping plate 3 and the first sealing strip 42 can be moved simultaneously, thereby completing the clamping and sealing of the two sealing plates, which facilitates quick installation; in addition, by setting a telescopic first sealing strip 42, after the two sealing plates are aligned, the first sealing strip 42 is driven to be embedded into the first sealing groove 44 by rotating the first rotating shaft 2, which facilitates disassembly and assembly.
[0030] This embodiment describes a quick-installation polyurethane modular insulation board. The first linkage component includes a first rack 43 fixedly mounted on a first slider 41 and a first gear 21 fixedly mounted on a first rotating shaft 2. The first rack 43 meshes with the top of the first gear 21. When the first rotating shaft 2 is rotated, the first gear 21 is driven to rotate. Because the first rack 43 meshes with the top of the first gear 21, the sliding of the first rack 43 and the first slider 41 can be controlled.
[0031] This embodiment describes a quick-installation polyurethane modular insulation board. The first clamping plate 3 is provided with a first fixing groove 31 that engages with the first fixing rod 32. This arrangement facilitates the clamping of the first clamping plate 3 with the first fixing groove 31.
[0032] In this embodiment, a quick-installation polyurethane modular insulation board is provided with a second rotating shaft 5 rotatably mounted on the bottom of the other side of the protective layer 1; the second rotating shaft 5 is connected to a second clamping plate 6.
[0033] A second receiving groove 7 is provided at the bottom of the other side of the protective layer 1; a second slider 71 is provided in the second receiving groove 7; the second slider 71 is movably and telescopically disposed in the second receiving groove 7 along the length direction of the protective layer 1; a second sealing strip 72 is provided on the side of the second slider 71 away from the bottom wall of the second receiving groove 7; a second linkage assembly is provided between the second slider 71 and the second rotating shaft 5.
[0034] The bottom of one side of the protective layer 1 is provided with a second fixing rod 62 that engages with the second card plate 6; the bottom of one side of the protective layer 1 is provided with a second sealing groove 74 that cooperates with the second sealing strip 72.
[0035] Specifically, the structures of the second rotating shaft 5, the second clamping plate 6, the second receiving groove 7, the second slider 71, the second sealing strip 72, the second fixing rod 62, and the second sealing groove 74 are the same as those of the first rotating shaft 2, the first clamping plate 3, the first receiving groove 4, the first slider 41, the first sealing strip 42, the first fixing rod 32, and the first sealing groove 44. Through the above arrangement, the top and bottom of the two insulation boards can be clamped and sealed.
[0036] This embodiment describes a quick-installation polyurethane modular insulation board. The second linkage component includes a second rack 73 fixedly mounted on a second slider 71 and a second gear 51 fixedly mounted on a second rotating shaft 5. The top of the second rack 73 meshes with the top of the second gear 51. When the second rotating shaft 5 is rotated, the second gear 51 is driven to rotate. Because the top of the second rack 73 meshes with the top of the second gear 51, the sliding of the second rack 73 and the second slider 71 can be controlled.
[0037] In this embodiment, a quick-installation polyurethane modular insulation board is provided, wherein the second clamping plate 6 is provided with a second fixing groove 61 that engages with the second fixing rod 62. This arrangement facilitates the clamping of the second clamping plate 6 with the second fixing groove 61.
[0038] This embodiment describes a quick-installation polyurethane modular insulation board. A first limiting boss 81 is provided on the top of one side of the protective layer 1; a second limiting boss 82, which mates with the first limiting boss 81, is provided on the bottom of the other side of the protective layer 1. This arrangement facilitates the alignment of the two insulation boards.
[0039] This embodiment describes a quick-installation polyurethane modular insulation board. The bottom surface of the first limiting boss 81 is provided with a first magnetic element 83; the top surface of the second limiting boss 82 is provided with a second magnetic element 84 that cooperates with the first magnetic element 83. Through this arrangement, after the two insulation boards are aligned, pre-positioning is achieved by the mutual attraction between the first magnetic element 83 and the second magnetic element 84.
[0040] This embodiment describes a quick-installation polyurethane modular insulation board. The insulation body includes a polyurethane insulation layer 9, a first fireproof layer 91 on top of the polyurethane insulation layer 9, a second fireproof layer 92 at the bottom of the polyurethane insulation layer 9, a first waterproof layer 93 on top of the first fireproof layer 91, and a second waterproof layer 94 at the bottom of the second fireproof layer 92. This configuration enables the insulation board to possess insulation, fireproof, and waterproof properties.
[0041] This embodiment describes a quick-installation modular polyurethane insulation panel, in which multiple spherical airbags 95 are provided within the polyurethane insulation layer 9; each spherical airbag 95 contains an inert gas. By providing spherical airbags 95 containing flame-retardant inert gas within the polyurethane insulation layer 9, the overall flame-retardant performance of the insulation panel can be enhanced.
[0042] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this utility model, and are not intended to limit the scope of protection of this utility model. Although this utility model has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of this utility model without departing from the essence and scope of the technical solutions of this utility model.
Claims
1. A fast installation polyurethane modular insulation panel, characterized in that: The utility model provides a heat -preserving body and the protective layer (1) in protective layer (1) are arranged, the protective layer (1) one side's top rotation is equipped with first rotation axis (2), first rotation axis (2) is connected with first clamping plate (3), The top of the one side of the protective layer (1) is provided with a first accommodating groove (4), the first accommodating groove (4) is provided with a first sliding block (41), the first sliding block (41) is movably arranged in the first accommodating groove (4) along the length direction of the protective layer (1), the side, away from the bottom wall of the first accommodating groove (4), of the first sliding block (41) is provided with a first sealing strip (42), and the first sliding block (41) is provided with a first linkage assembly between the first sliding block (41) and the first rotating shaft (2). The top of the other side of the protective layer (1) is provided with a first fixed rod (32) clamped with the first clamping plate (3), and the top of the other side of the protective layer (1) is provided with a first sealing groove (44) matched with the first sealing strip (42).
2. A quick installation polyurethane modular insulation panel according to claim 1, characterized in that: The first linkage assembly comprises a first rack (43) fixedly arranged on the first sliding block (41) and a first gear (21) fixedly arranged on the first rotating shaft (2), and the top of the first rack (43) is engaged with the first gear (21).
3. A quick installation polyurethane modular insulation panel according to claim 1, characterized in that: The first clamping plate (3) is provided with a first fixed groove (31) clamped with the first fixed rod (32).
4. A quick installation polyurethane modular insulation panel as claimed in claim 1, wherein: The bottom of the other side of the protective layer (1) is rotatably provided with a second rotating shaft (5), and the second rotating shaft (5) is connected with a second clamping plate (6). The bottom of the other side of the protective layer (1) is provided with a second accommodating groove (7), the second accommodating groove (7) is provided with a second sliding block (71), the second sliding block (71) is movably arranged in the second accommodating groove (7) along the length direction of the protective layer (1), the side, away from the bottom wall of the second accommodating groove (7), of the second sliding block (71) is provided with a second sealing strip (72), and the second sliding block (71) is provided with a second linkage assembly between the second sliding block (71) and the second rotating shaft (5). The bottom of the one side of the protective layer (1) is provided with a second fixed rod (62) clamped with the second clamping plate (6), and the bottom of the one side of the protective layer (1) is provided with a second sealing groove (74) matched with the second sealing strip (72).
5. A quick installation polyurethane modular insulation panel according to claim 4, characterized in that: The second linkage assembly comprises a second rack (73) fixedly arranged on the second sliding block (71) and a second gear (51) fixedly arranged on the second rotating shaft (5), and the top of the second rack (73) is engaged with the second gear (51).
6. A quick installation polyurethane modular insulation panel according to claim 4, characterized in that: The second clamping plate (6) is provided with a second fixed groove (61) clamped with the second fixed rod (62).
7. A quick installation polyurethane modular insulation panel as claimed in claim 1, wherein: The top of the one side of the protective layer (1) is provided with a first limiting boss (81), and the bottom of the other side of the protective layer (1) is provided with a second limiting boss (82) matched with the first limiting boss (81).
8. A quick installation polyurethane modular insulation panel according to claim 7, characterized in that: The bottom surface of the first limiting boss (81) is provided with a first magnetic element (83), and the top surface of the second limiting boss (82) is provided with a second magnetic element (84) matched with the first magnetic element (83).
9. A quick installation polyurethane modular insulation panel as claimed in claim 1, wherein: The heat preservation body comprises a polyurethane heat preservation layer (9), a first fireproof layer (91) arranged on the top of the polyurethane heat preservation layer (9), a second fireproof layer (92) arranged on the bottom of the polyurethane heat preservation layer (9), a first waterproof layer (93) arranged on the top of the first fireproof layer (91), and a second waterproof layer (94) arranged on the bottom of the second fireproof layer (92).
10. A quick installation polyurethane modular insulation panel according to claim 9, characterized in that: A plurality of spherical air bags (95) are arranged in the polyurethane heat preservation layer (9); and the spherical air bags (95) are filled with inert gas.