A multi-stage gas equalization plate structure for a flooded evaporator

By designing a multi-stage gas equalization plate structure in a flooded evaporator, and utilizing the vibration function of the telescopic spring and connecting plate, the problem of difficult liquid discharge is solved, the gas-liquid separation efficiency is improved, and the high-efficiency operation of the evaporator is ensured.

CN224956973UActive Publication Date: 2026-11-10NANJING JINDIAN REFRIGERANT IND
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522376518.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-10
Publication Date
2026-11-10
Estimated Expiration
2035-11-10

AI Technical Summary

Technical Problem

The existing multi-stage perforated plate structure of flooded evaporators makes it difficult to effectively discharge liquid, which affects working efficiency.

Method used

A multi-stage gas equalization orifice plate structure is designed, including a first, second, and third gas equalization orifice plate. By setting auxiliary structures such as telescopic springs and connecting plates, the gas equalization orifice plate assembly can vibrate, prolonging the contact time between the gas and the orifice plate, and achieving rapid liquid drainage and cleaning by fastening bolts.

Benefits of technology

This enables rapid dripping and discharge of liquid during gas-liquid separation, improving gas-liquid separation efficiency and ensuring the efficient operation of the evaporator.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224956973U_ABST
    Figure CN224956973U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of flooded evaporator technology, and provides a multi-stage gas equalization plate structure for a flooded evaporator. It includes a flooded evaporator shell, a first support mounted on the top of one side of the interior of the shell, and a second support mounted on the top of the other side of the interior of the shell. Gas equalization plate assemblies are mounted on the first and second supports, and each assembly consists of a first, second, and third gas equalization plate. Auxiliary structures are provided inside the frame. Through these auxiliary structures, during gas-liquid separation, the gas and liquid collide with the first, second, and third gas equalization plates. A telescopic spring causes the connecting plate to move, vibrating the first, second, and third gas equalization plates, causing the liquid to drip down rapidly, achieving rapid liquid drainage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of flooded evaporator technology, and in particular to a multi-stage gas equalization plate structure for a flooded evaporator. Background Technology

[0002] Flooded evaporators are a type of shell-and-tube heat exchanger. Their core feature is that the evaporator is filled with liquid refrigerant, which is in full contact with the heat transfer surface. Efficient heat exchange is achieved through heat absorption and vaporization. There are many types, including horizontal shell-and-tube and water tank straight tube types. A multi-stage perforated plate structure is installed inside the flooded evaporator to prevent gas from carrying refrigerant droplets into the evaporator.

[0003] To address this, patent CN208804910U discloses a multi-stage gas equalization perforated plate structure and a flooded evaporator designed to prevent liquid carryover during gas intake. In the multi-stage gas equalization perforated plate structure, the diameter of the through holes on each layer of the perforated plate gradually changes with distance from the external equipment's intake port; the further away from the intake port, the larger the diameter of the through holes. When the airflow enters the baffle structure from the lower perforated plate, the liquid substances mixed in the airflow are progressively blocked and separated outside the intake port by the multi-stage gas equalization perforated plate structure. The combination of multiple gas equalization plates can better achieve a uniform flow field, thereby eliminating the high-speed flow field concentration area below the gas equalization structure, reducing the airflow velocity, and mechanistically preventing droplets from being carried away by the gas. When the gas-liquid two-phase flow passes through the multi-stage gas equalization perforated plate, the droplets have a short acceleration time and low velocity, making them less likely to break when colliding with the next level of gas equalization plate during gas-liquid separation, thus preventing smaller diameter droplets from continuing to follow the gas through the multi-stage gas equalization perforated plate structure.

[0004] In existing flooded evaporators, the multi-stage gas equalization plate structure is mostly fixed during use. During gas-liquid separation, liquid residue remains on the gas equalization plate and is difficult to discharge, affecting working efficiency. Utility Model Content

[0005] The purpose of this invention is to provide a multi-stage gas equalization plate structure for a flooded evaporator, in order to solve the defect that the existing multi-stage gas equalization plate structure of a flooded evaporator is difficult to discharge liquid.

[0006] To solve the above-mentioned technical problems, this utility model provides the following technical solution: a multi-stage gas equalization plate structure for a flooded evaporator, including a flooded evaporator shell, a first support installed at the top of one side of the interior of the flooded evaporator shell, and a second support installed at the top of the other side of the interior of the flooded evaporator shell. Gas equalization plate assemblies are provided on the first and second supports. The gas equalization plate assembly consists of a first gas equalization plate, a second gas equalization plate, and a third gas equalization plate. The first, second, and third gas equalization plates are sequentially installed on the first and second supports from bottom to top. A frame is installed on the outer side of each of the first, second, and third gas equalization plates. An auxiliary structure is provided inside each frame. The auxiliary structure includes a positioning groove opened inside the frame, telescopic springs symmetrically installed at the top and bottom of the positioning groove, and a connecting plate installed between the telescopic springs.

[0007] Preferably, the first gas equalization plate is provided with a first gas equalization body, the second gas equalization plate is provided with a second gas equalization body, the first gas equalization body and the second gas equalization body are both located at a position away from the air intake of the full liquid evaporator, and the third gas equalization plate is provided with a third gas equalization body.

[0008] Preferably, the first bracket has evenly spaced limit grooves, and fastening bolts are symmetrically installed at the bottom of the first bracket, while the second bracket has evenly spaced slots on its side wall.

[0009] Through the above structure, the slot and the limiting slot can play a certain limiting role in the air distribution plate assembly, thereby improving its installation stability.

[0010] Preferably, the thickness of the connecting plate is less than the thickness of the first uniform vent plate, the second uniform vent plate, and the third uniform vent plate.

[0011] Preferably, the connecting plate and the telescopic spring form a telescopic structure.

[0012] The above structure can drive the air distribution plate assembly to vibrate, causing the liquid to drip down quickly for rapid drainage.

[0013] Preferably, the first uniform pore body, the second uniform pore body, and the third uniform pore body are composed of a first hole and a second hole, with the first hole located below the second hole.

[0014] Preferably, the diameter of the first hole is smaller than the diameter of the second hole.

[0015] The above structure can extend the contact time between the gas and the gas equalization plate assembly, thereby improving the gas-liquid separation efficiency.

[0016] The present invention provides a multi-stage gas equalization plate structure for a flooded evaporator, the advantages of which are:

[0017] During gas-liquid separation, the auxiliary structure drives the gas equalization plate assembly to vibrate, causing the liquid to drip down quickly for rapid drainage. Tighten the bolts and pull out the gas equalization plate assembly for cleaning. By arranging the gas equalization holes with a smaller diameter at the bottom and a larger diameter at the top, the contact time between the gas and the gas equalization plate assembly can be extended, thereby improving the gas-liquid separation efficiency.

[0018] With the auxiliary structure set up, during gas-liquid separation, the gas and liquid collide with the first, second, and third equalizing vent plates. The extension spring acts on the connecting plate to move, causing the first, second, and third equalizing vent plates to vibrate, so that the liquid drips down quickly, achieving the purpose of rapid liquid drainage.

[0019] By removing the fastening bolts, the fixing restriction on the air distribution plate assembly is released, and the air distribution plate assembly is pulled out of the slot and limit slot, thus achieving the purpose of cleaning it.

[0020] By configuring the first, second, and third gas equalization plates with a smaller diameter at the bottom and a larger diameter at the top, the contact time between the gas and the first, second, and third gas equalization plates can be extended, thereby improving the gas-liquid separation efficiency. Attached Figure Description

[0021] Figure 1 This is a front view structural diagram of the present utility model;

[0022] Figure 2 This is a side view of the structure of this utility model;

[0023] Figure 3 This is a partial frontal cross-sectional view of the present invention.

[0024] Figure 4 For the present utility model Figure 3 Enlarged structural diagram at point A in the middle;

[0025] Figure 5 This is a front view cross-sectional structural diagram of the uniform pore body of this utility model.

[0026] The reference numerals in the figure are as follows: 1. Flooded evaporator shell; 2. First support; 201. Limiting groove; 3. Fastening bolt; 4. Gas equalization plate assembly; 401. First gas equalization plate; 4011. First gas equalization body; 402. Second gas equalization plate; 4021. Second gas equalization body; 403. Third gas equalization plate; 4031. Third gas equalization body; 5. Second support; 501. Slot; 6. Frame; 7. Auxiliary structure; 701. Positioning groove; 702. Telescopic spring; 703. Connecting plate; 8. First hole; 9. Second hole. Detailed Implementation

[0027] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0028] Please see Figures 1-5 The present invention provides a multi-stage gas equalization plate structure for a flooded evaporator, including a flooded evaporator shell 1.

[0029] Reference Figures 1-5 As shown, a first support 2 is installed at the top of one side of the interior of the flooded evaporator shell 1, and a second support 5 is installed at the top of the other side of the interior of the flooded evaporator shell 1. A gas equalization plate assembly 4 is provided on the first support 2 and the second support 5. The gas equalization plate assembly 4 is composed of a first gas equalization plate 401, a second gas equalization plate 402 and a third gas equalization plate 403. The first gas equalization plate 401, the second gas equalization plate 402 and the third gas equalization plate 403 are installed on the first support 2 and the second support 5 from bottom to top. The first gas equalization plate 401 has a first gas equalization hole 4011 evenly distributed, the second gas equalization plate 402 has a second gas equalization hole 4021 evenly distributed, and the first gas equalization hole 4011 and the second gas equalization hole 4021 are both located away from the air intake of the flooded evaporator. The third gas equalization plate 403 has a third gas equalization hole 4031 evenly distributed.

[0030] The first uniform pore body 4011, the second uniform pore body 4021, and the third uniform pore body 4031 are composed of a first hole 8 and a second hole 9. The first hole 8 is opened below the second hole 9, and the diameter of the first hole 8 is smaller than the diameter of the second hole 9.

[0031] The first bracket 2 has evenly spaced limiting grooves 201, and fastening bolts 3 are symmetrically installed at the bottom of the first bracket 2. The second bracket 5 has evenly spaced slots 501 on its side wall. The outer sides of the first air distribution plate 401, the second air distribution plate 402, and the third air distribution plate 403 are all equipped with frame 6. The inside of the frame 6 is provided with auxiliary structure 7. The auxiliary structure 7 includes a positioning groove 701 inside the frame 6, a telescopic spring 702 symmetrically installed at the top and bottom of the positioning groove 701, and a connecting plate 703 installed between the telescopic springs 702. The thickness of the connecting plate 703 is less than the thickness of the first air distribution plate 401, the second air distribution plate 402, and the third air distribution plate 403. The connecting plate 703 and the telescopic spring 702 form a telescopic structure.

[0032] When an airflow carrying droplets at a certain velocity passes through the first uniform gas distribution plate 4011 and the second uniform gas distribution plate 4021, due to the staggered arrangement of the first and second uniform gas distribution plates 4011 and 4021, the two-phase flow will directly impact the unopened positions of the second uniform gas distribution plate 402. Because the gas density is relatively low, it will flow along the channel between the first and second uniform gas distribution plates 401 and 402 and seek the nearest second uniform gas distribution plate 4021 to exit. However, the droplets have a relatively high density and greater inertia, and upon impacting the next stage uniform gas distribution plate, they change their velocity direction and fall back into the liquid refrigerant region, making it difficult for them to pass through the flow channels between stages. The gas flowing out of the third uniform gas distribution plate 4031 is almost unentrained. The presence of liquid droplets allows for gas-liquid separation of the refrigerant. During gas-liquid separation, the gas and liquid collide with the first equalizing orifice plate 401, the second equalizing orifice plate 402, and the third equalizing orifice plate 403. The extension spring 702 acts on the connecting plate 703, causing the first equalizing orifice plate 401, the second equalizing orifice plate 402, and the third equalizing orifice plate 403 to vibrate, resulting in rapid liquid dripping. By arranging the first equalizing orifice plate 401, the second equalizing orifice plate 402, and the third equalizing orifice plate 403 with a smaller diameter at the lower end and a larger diameter at the upper end, the contact time between the gas and the first equalizing orifice plate 401, the second equalizing orifice plate 402, and the third equalizing orifice plate 403 can be extended, thereby improving the gas-liquid separation efficiency.

[0033] When the air distribution plate assembly 4 needs to be cleaned, remove the fastening bolts 3 to release the fixing restriction on the air distribution plate assembly 4, pull the air distribution plate assembly 4 to make it exit from the slot 501 and the limiting slot 201, and pull out the air distribution plate assembly 4 for cleaning.

[0034] Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A multi-stage gas equalization plate structure for a flooded evaporator, comprising a flooded evaporator shell (1); Its features are: A first bracket (2) is installed at the top of one side of the interior of the full-liquid evaporator shell (1), and a second bracket (5) is installed at the top of the other side of the interior of the full-liquid evaporator shell (1). A gas equalization plate assembly (4) is provided on the first bracket (2) and the second bracket (5). The air equalization plate assembly (4) is composed of a first air equalization plate (401), a second air equalization plate (402) and a third air equalization plate (403). The first air equalization plate (401), the second air equalization plate (402) and the third air equalization plate (403) are installed on the first support (2) and the second support (5) from bottom to top. The outer sides of the first air-equalizing plate (401), the second air-equalizing plate (402), and the third air-equalizing plate (403) are all equipped with a frame (6), and the interior of the frame (6) is provided with an auxiliary structure (7); The auxiliary structure (7) includes a positioning groove (701) opened inside the frame (6), a telescopic spring (702) symmetrically installed at the top and bottom of the positioning groove (701), and a connecting plate (703) installed between the telescopic springs (702).

2. The multi-stage gas equalization plate structure of a flooded evaporator according to claim 1, characterized in that: The first gas equalization plate (401) is uniformly provided with a first gas equalization body (4011), the second gas equalization plate (402) is uniformly provided with a second gas equalization body (4021), the first gas equalization body (4011) and the second gas equalization body (4021) are both located away from the air intake of the full liquid evaporator, and the third gas equalization plate (403) is uniformly provided with a third gas equalization body (4031).

3. The multi-stage gas equalization plate structure of a flooded evaporator according to claim 1, characterized in that: The first bracket (2) has evenly spaced limit grooves (201) and fastening bolts (3) are symmetrically installed at the bottom of the first bracket (2). The second bracket (5) has evenly spaced slots (501) on its side wall.

4. The multi-stage gas equalization plate structure of a flooded evaporator according to claim 1, characterized in that: The thickness of the connecting plate (703) is less than the thickness of the first uniform vent plate (401), the second uniform vent plate (402), and the third uniform vent plate (403).

5. The multi-stage gas equalization plate structure of a flooded evaporator according to claim 1, characterized in that: The connecting plate (703) and the telescopic spring (702) constitute a telescopic structure.

6. The multi-stage gas equalization plate structure of a flooded evaporator according to claim 2, characterized in that: The first uniform pore body (4011), the second uniform pore body (4021), and the third uniform pore body (4031) are composed of a first hole (8) and a second hole (9), with the first hole (8) located below the second hole (9).

7. The multi-stage gas equalization plate structure of a flooded evaporator according to claim 6, characterized in that: The diameter of the first hole (8) is smaller than the diameter of the second hole (9).

Citation Information

Patent Citations

  • Multistage all gas perforated plate structure and prevent breathing in and take flooded evaporator of liquid

    CN208804910U