System and method for the purification, collection and processing of methane isotope samples and their application
The system addresses methane isotope purification and analysis challenges by integrating a multi-trap and valve system for high precision detection, enabling accurate methane isotope analysis with improved purity and handling of varying sample sizes.
Patent Information
- Application Number
- DE112020007223
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2019-09-24
- Filing Date
- 2020-01-21
- Publication Date
- 2024-10-24
- Estimated Expiration
- 2040-01-21
AI Technical Summary
Current methods for purifying and analyzing methane isotopes, particularly CH3D and CH2D2, face challenges due to low abundance and interference from other substances, leading to inaccurate mass spectrometry results, and lack of systems that can handle both large and small sample quantities effectively.
A system and method combining an injection unit, VOC trap, adsorption traps, liquid nitrogen cold traps, chromatography columns, and sample collection lines, with switching valves to manage different sample types, ensuring high purity and enrichment before mass spectrometry analysis.
Achieves high precision in methane isotope detection with internal precision of Δ18 at 0.3‰ and Δ13CH3D at 0.4‰, supporting applications in petroleum exploration, climate change evaluation, and greenhouse gas monitoring.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical area
[0001] The present invention relates to the technical field of isotope detection, in particular to a System and method for purification, collection and processing of methane isotope samples and their application. State of the art
[0002] The development of isotope theory and the mass spectrometer from one-dimensional to multidimensional isotope determination has become a milestone in the method of stable single-element isotope systems and is used to research many disciplines such as astrochemistry and geochemistry, geology and biology. At the beginning of this century, a new perspective in isotope research, cluster isotope geochemistry, It investigates the geochemical behavior of isotopic bodies from the perspective of isotope binding and can obtain information that conventional isotopes do not provide for the study of the overall composition It is a revolutionary technology with great potential after conventional stable isotopes. In particular With the introduction of the MAT 253-Ultra (Thermo Fisher) and Panoroma (Nu Instruments) analyzers, the Isotope analysis technology has evolved from the determination of simple molecules to the analysis of molecular isotopes, such as e.g. the determination of molecular cluster isotope ratios and molecular special sites.
[0003] However, advanced mass spectrometers must also analyze the original samples (substances in inorganic form or complex organic substances) using various methods into pure gases such as N , O , H , CO , SO , NO, CH , etc. 2 2 2 2 2 2 4 prepare or convert to enter the mass spectrometry for the corresponding isotope detection, so that The sample pretreatment technology and the supporting pretreatment device are the key to a successful mass spectrometry. The extraction of pure gas requires not only complicated procedures for Removal of contaminants, but also the enrichment and separation of trace gases as well as the collection and Conversion of target gas.
[0004] The collection of samples from different sources and different target gases corresponds to different 13 12 Pretreatment methods. The international analysis technology of methane cluster isotopes ( CH D and CH D ) is 3 2 2 for carbonate has become an important detection method for natural gas research. 13 12 binary methane isotopes mainly targets two isotopic bodies ( CH D and CH D ) with a mass-charge 3 2 2 ratio of 18 in methane isotope bodies. Since these two isotope bodies of methane are two heavy Isotopic substitutions (also called cluster isotopes), their relative abundance is very low (6.92* 10-6 or 1.44* 10-7). To obtain its abundance accurately, it is therefore first necessary that the mass spectrometer has a extremely high sensitivity and accuracy. At the same time, the sample must be of extremely high purity, to avoid interference from other substances and to achieve a good mass spectrometric separation effect.
[0005] Currently, large-scale high-resolution stable isotope dual-focus mass spectrometry has a high resolution, such as MAT253 Ultra (Thermo Scientific) and Panorama (NU), the former having a resolution of 13 12 27000, with which the total concentration (denoted as Δ18) of CH D and CH D in methane cluster isotopes 3 2 2 13 12 can be tested, the latter having a resolution of 40,000, allowing the concentrations of CH D and CH D 3 2 13 12 in binary methane isotopes. Since the integer molecular weights of CH D and CH D 2 3 2 with very low natural abundance in methane at 18 amu, after the methane sample enters the 2 mass spectrometer and their ionization to ionize the atoms in the ion source with a certain probability corresponding ions. If the sample contains components with a mass number of about 18 um, such as water molecules, oxygen atoms (derived from oxygen and oxygen-containing compounds), nitrogen atoms (derived from nitrogen and nitrogen-containing compounds), hydrogen atoms other than methane (which combine with carbon, nitrogen and oxygen atoms to form interfering ions), carbon atoms other than methane and 36 13 12 Argon atoms (doubly charged ions in the isotope Ar), the exact test gas purity of CH D and CH D is determined in binary 3 2 2 Methane isotopes seriously disturbed.
[0006] Since the relative abundance of methane cluster isotope molecules is very low and there are many disturbances from other substances, precise identification is a challenge. Currently, Imperial College and the company Protium has developed an automatic cleaning system (Imperial Batch Extraction, IBEX) which mainly works as follows works: It uses an extremely low-temperature helium cooling pump. In the temperature range of 10K up to 320K, impurity gases such as H , He, CO , O , N and the like are converted into methane in a liquid 2 2 2 2 The frozen methane is then heated and released. The methane is mixed with liquid nitrogen into a sample tube with a 5A molecular sieve for Sealing the combustion. After that, it is heated again and released, and the measurement is mass spectrometry. Since the liquid helium cooling pump used in this system is expensive to Maintenance and the system is not commercially produced, this system also gives after methane cleaning only one index that has an internal accuracy of 0.4 ‰ of Δ18.
[0007] In addition, the injection and collection processes for different sample quantities have different Requirements. For large sample volumes (e.g. oil and gas) and small sample volumes (e.g. rare samples from cold areas (Antarctica or Arctic)) a distinction must be made between injection methods and collection methods. Existing systems for cleaning, collection and treatment cannot meet the needs of both simultaneously fulfill.
[0008] Therefore, it is necessary to develop a system for cleaning, collecting and preparing samples for binary Isotope detection to ensure that all possible interfering ions are removed and rare samples are enriched before the sample gas enters the mass spectrometry analysis. Therefore, accurate detection of 13 12 Isotopic compounds and can be applied to the detection of binary methane isotopes CH D and CH D 3 2 2 become. Contents of the present invention
[0009] An object of the present invention is to provide a system for cleaning, collecting and processing To provide isotope samples for the problem that isotope samples available in the prior art have a require higher purity in mass spectrometry. The corresponding device for purification and enrichment of isotopes is combined with an isotope mass spectrometer online. For a small sample quantity, the sample injected through the injection unit and then enriched after passing through the GC, in a sample bottle enriched and then fed into a mass spectrometer for analysis and then tested in batches. If necessary, the sample bottle is introduced into the mass spectrometry. For a large sample volume, the sample can be injected into a natural gas sample bottle and then, after passing through the GC, directly into the mass spectrometer for analysis be entered.
[0010] A further object of the present invention is to provide an application of the system for cleaning, collection and processing of isotope samples for isotope detection. It can not only 13 13 13 13 13 Isotope detection of methane CD ( CH D, CH D , CHD , CD ) but also technical 3 2 2 3 4 Support in oil exploration, deep mineral exploration, global climate change and evaluation of water resources and can also be used for the purification and collection of other types of isotopes This technology is also used to monitor cluster isotopes of several greenhouse gases in the tripolar region (Antarctica, Arctic and Qinghai-Tibet Plateau).
[0011] Another object of the present invention is to provide a process for cleaning, collecting and To provide isotope sample preparation, with which methane purification can provide the most important technical indicators for the internal accuracy of methane can achieve: The internal accuracy of Δ18 is 0.3 ‰, the internal Accuracy of Δ13CH3D is 0.4 ‰ and the external accuracy of methane Δ18 is 2 ‰ and Δ13CH3D is 2.5 ‰.
[0012] The technical solutions to achieve the purpose of the present invention are: System for cleaning, collecting and processing isotope samples, characterized in that it comprises a injection unit, a VOC trap, an adsorption trap group, a liquid nitrogen cold trap, a Liquid nitrogen enrichment trap, a chromatography column, a purification and re-enrichment trap and a sample collection line which are sequentially connected via a pipeline, wherein a supply line of the carrier gas He1 is connected to the inlet of the VOC trap and a Drain line is connected to the outlet to remove the cooled water and the VOC components in the VOC trap to drain; wherein the pipeline connecting the adsorption trap group and the liquid nitrogen cold trap is provided with a Carrier gas purge line, wherein the carrier gas purge line is a supply line of the carrier gas He0 to the inlet of the adsorption trap group and a drain line for impurity gas to the outlet of the Liquid nitrogen cold trap includes; wherein the outlet of the liquid nitrogen enrichment trap is connected to a discharge line for permanent gas is to discharge permanent gases (such as nitrogen, oxygen, hydrogen, argon and other gas components), which cannot be condensed in the liquid nitrogen enrichment trap; wherein the inlet of the liquid nitrogen enrichment trap is connected to a supply line of the carrier gas He2 is connected, whereby the carrier gas passed into the supply line of the carrier gas He2 is enriched sample in the liquid nitrogen enrichment trap during sampling into the inlet of the Chromatography column, whereby the outlet of the chromatography column is connected to a Heavy gas discharge line and a cleaning and re-enrichment trap, whereby the Heavy gas discharge line for discharging impurity gas with a retention time after the target gas used, for example, ethane and ethylene, which are doped into methane after methane purification can, the retention time after methane purification, and the rest is after completion of methane extraction discharged via the heavy gas discharge line; wherein the inlet of the cleaning and re-enrichment trap is connected to a supply line of the carrier gas He3 is connected, whereby the outlet of the cleaning and re-enrichment trap is each connected to a sample collection line and a sample drain line, with the sample collection line in the Sample collection trap is arranged, wherein the outlet of the sample collection line is connected to a vacuum line to Removal of impurity gas and carrier gas.
[0013] In the above technical solution it is provided that the supply line of the He0 carrier gas is connected to the inlet the adsorption trap group or the supply line of the carrier gas He0 is connected to the injection unit is connected, wherein the injection unit is connected to the inlet of the adsorption trap group via a pipeline.
[0014] In the above technical solution, it is provided that the injection unit is an injection unit and / or a bottle injection unit.
[0015] In the above technical solution, it is provided that the injection unit comprises an injection injector, which is connected to a VOC trap via a pipeline, with the supply line of the carrier gas He0 connected to the Injection injector, wherein the bottle injection unit comprises a natural gas sample bottle which is connected via a connecting line is connected to the VOC trap, whereby the connecting line is connected to a equipped with a cylinder decompression gauge.
[0016] In the above technical solution, it is provided that the adsorption trap group contains at least one CO- Oxidation trap and an acid gas adsorption trap.
[0017] In the above technical solution, it is provided that the pipeline between the liquid nitrogen enrichment trap and the chromatography column is provided with a verification and enrichment trap in order to Check whether the sample is fully enriched in the liquid nitrogen enrichment trap. Especially for unknown samples to be tested can be verified by the verification and enrichment trap whether the length of the Pipeline connected by the previous liquid nitrogen cold trap and the liquid nitrogen enrichment trap, coincides with the carrier gas flow, and adjusted in time until it is verified that no Methane target gas release is present in the enrichment trap, indicating that the parameters of the Liquid nitrogen cold trap and liquid nitrogen enrichment trap are reasonable.
[0018] In the above technical solution, it is provided that the vacuum line comprises a primary vacuum line, which connected to the dry pump and a secondary vacuum line connected to the molecular pump.
[0019] In another aspect of the present invention, it is provided that a system for cleaning, collecting and 13 13 13 13 13 Preparation of isotope samples for the detection of methane isotopes CD ( CH D, CH D , CHD , CD ) 3 2 2 3 4 is applied.
[0020] In another aspect of the present invention, a method for cleaning, collecting and preparation of isotope samples includes the following steps: I. Purification and enrichment process: Step 1: After the sample has been introduced through the injection unit, the gas sample introduced into the VOC trap one after the other to remove water and VOC components; it is introduced into the adsorption trap group to remove impurity gases, is introduced into the Liquid nitrogen cold trap was introduced to remove contaminants with higher boiling points than the Target gas is removed and finally the liquid nitrogen enrichment trap is used for enrichment. Other non-condensable pollutant gases are removed by the Drain line for permanent gas diverted; Step 2: The carrier gas passed into the supply line of the carrier gas He2 carries the Sample in the liquid nitrogen enrichment trap into the GC chromatography column. The separation is used in chromatography column GC according to different retention times of the different components of gases The separated target gas is collected in the purification and re-enrichment trap enriched, and the impurities other than the target gas are removed by the Heavy gas discharge line drained; II. Transfer, replenishment and collection process: Step 1: The purification and reconcentration trap and the chromatography column connected pipeline is cut off, and the one in the supply line of the carrier gas He3 passed through the carrier gas is, after passing through the cleaning and Reconstitution trap and its connecting line are drained from the sample drain line, to flush the cleaning and replenishment trap and its connecting line; Step 2: The cleaning and replenishment trap and the connecting line of the Sample collection line are vacuum pumped through the vacuum line to to vent impurity gas and carrier gas; Step 3: The target gas enriched in the cleaning and re-enrichment trap is fed into the Sample collection line diffuses.
[0021] In the above technical solution it is provided that in step 1 of the transmission, re-enrichment and Collection process, the carrier gas He3 ensures complete transfer and enrichment of the target gas during the flushing of the pipeline and is stored in the cleaning and enrichment trap.
[0022] In the above technical solution it is provided that when vacuuming the connecting line, the cleaning and re-enrichment trap and the sample collection line, the vacuum is first applied by a dry pump to extract of the impurity gas and then by a molecular pump to extract the carrier gas.
[0023] In the above technical solution, it is provided that the front pipe of the chromatography column during or can be cleaned after transfer, re-enrichment and collection, comprising: (1) Functional recovery of the VOC trap: When the temperature of the VOC trap T1 is increased, the The carrier gas passing through the supply line of the carrier gas He1 and the remaining in the VOC trap T1 Water and VOC components discharged through the drain line; (2) Flushing of the adsorption trap group and the liquid nitrogen cold trap: Into the supply line of the The carrier gas He0 passed through the adsorption trap group, the liquid nitrogen cold trap Drain any remaining impurities from the impurity gas discharge line.
[0024] System for cleaning, collecting and processing isotope samples, characterized in that it comprises a Injection unit, a first switching valve, a VOC trap, an adsorption trap group, a liquid nitrogen cold trap, a second switching valve, a chromatography column, a third switching valve and a cleaning and Replenishment trap includes wherein the injection unit is connected to a supply line of the carrier gas He0; wherein the connection of the first switching valve is connected to a sample injection line, a sample inlet of the VOC Trap, a sample outlet of the VOC trap, a sample inlet of the adsorption trap group, a supply line of the carrier gas He1 and a discharge line via a pipeline, the injection line being connected to the Injection unit, whereby the injection line, the VOC trap and the adsorption trap group are sequentially are connected when the first switching valve is in a sampling state, with the supply line of the carrier gas He1 is connected to the discharge line, whereby the injection line is connected to the adsorption trap group connected, with the supply line of the carrier gas He1, the VOC trap and the drain line sequentially are connected when the first switching valve is in a sample injection state, wherein a A supply line of the carrier gas He1 is connected to the inlet of the VOC trap and a drain line is connected to the outlet is connected; wherein the sample outlet of the adsorption trap group is connected to the sample inlet of the liquid nitrogen cold trap via a pipeline, whereby the connection of the second switching valve is connected to the sample outlet of the Liquid nitrogen cold trap, the sample inlet and the sample outlet of the liquid nitrogen enrichment trap, the Supply line of the carrier gas He2, the sample inlet of the chromatography column and the drain line for Contaminant gas is connected via a pipeline, whereby the liquid nitrogen cold trap, the liquid nitrogen Enrichment trap and the impurity gas discharge line are connected sequentially when the second Switching valve is in a sampling state, with the supply line of the carrier gas He2 connected to the Sample inlet of the chromatography column, with the sample outlet of the liquid nitrogen cold trap is connected to the contaminant gas discharge line when the second switching valve is in a Sample injection state, with the supply line of the carrier gas He2 connected to the liquid nitrogen enrichment trap and the sample inlet of the chromatography column are sequentially connected, whereby the The supply line of the carrier gas He2 is connected to the sample inlet of the liquid nitrogen enrichment trap, where the sample outlet of the liquid nitrogen enrichment trap is connected to the sample inlet of the chromatography column is connected; wherein the connection of the third switching valve is connected to the sample outlet of the chromatography column, the Sample inlet of the cleaning and re-enrichment trap, the supply line of the carrier gas He3 and the Heavy gas discharge line is connected via a pipeline, with the sample outlet of the chromatography column connected to the Sample inlet of the cleaning and replenishment trap when the third switching valve is in a sampling condition, with the supply line of the He3 carrier gas connected to the heavy gas discharge line is connected, with the sample outlet of the chromatography column being connected to the heavy gas discharge line when the third switching valve is in a sample injection state, with the carrier gas supply line He3 is connected to the sample inlet of the cleaning and re-enrichment trap; The sample outlet of the cleaning and re-enrichment trap is connected to the sample outlet line and the Sample collection line is connected via a pipe, whereby the sample collection line in the sample collection trap which provides a low temperature environment, wherein the sample collection line is provided with a Vacuum line for removing carrier gas and impurity gas.
[0025] In the above technical solution, it is provided that the injection unit comprises an injection injector, a Natural gas sample bottle and a switching valve, wherein the switching valve is connected to a sample outlet of the Injection injector, a sample outlet of the natural gas sample bottle, an exhaust pipe and an inlet of the first switching valve, with the sample outlet of the injection injector connected to the injection line, if the sample quantity is small, the sample outlet of the natural gas sample bottle is connected to the exhaust pipe, the sample outlet of the natural gas sample bottle is connected to the injection line if the sample quantity is large, where the sample outlet of the injection injector is connected to the exhaust line. In the above technical solution, It is provided that the adsorption trap group comprises at least one CO adsorption trap and one acid gas adsorption trap includes.
[0026] In the above technical solution, it is provided that the pipeline between the liquid nitrogen enrichment trap and the chromatography column is provided with a verification and enrichment trap in order to Check whether the sample is fully enriched in the liquid nitrogen enrichment trap, with the sample outlet the liquid nitrogen enrichment trap is connected to the sample inlet of the verification and enrichment trap, where the sample outlet of the verification and enrichment trap is connected to the sample inlet of the liquid nitrogen enrichment trap.
[0027] In the above technical solution, it is provided that the vacuum line comprises a primary vacuum line, which connected to the dry pump, and a secondary vacuum line connected to the molecular pump to To remove impurity gas and carrier gas from the pipeline.
[0028] In another aspect of the present invention, it is provided that a system for cleaning, collecting and 13 13 13 13 13 Preparation of isotope samples for the detection of methane isotopes CD ( CH D, CH D , CHD , CD ) 3 2 2 3 4 is applied.
[0029] In another aspect of the present invention, it is provided that a method for cleaning, collecting and preparation of isotope samples includes the following steps: I. Purification and enrichment process: Step 1: If the first switching valve and the second switching valve are in a sampling state, the gas sample is introduced into the VOC trap one by one to to remove water and VOC components; it is introduced into the adsorption trap group to To remove impurity gases, is introduced into the liquid nitrogen cold trap to To remove impurities with higher boiling points than the target gas, and finally the liquid nitrogen enrichment trap was introduced for enrichment. Other non-condensable Contaminant gases are discharged through the permanent gas discharge line; Step 2: When the second switching valve is in a sample injection state, The carrier gas passed into the supply line of the carrier gas He2s, the sample in the Liquid nitrogen enrichment trap into the GC chromatography column. The separation is carried out in the Chromatography column GC according to different retention times of the various components of gases When the target gas flows out, the third switching valve is in a Sampling condition, and the separated target gas is in the cleaning and Re-enrichment trap. If the heavy gas is enriched with a retention time after the The third switching valve is located in a Sample injection state and is discharged through the heavy gas discharge line; II. Transfer, replenishment and collection process: The third switching valve is in a sample injection state: Step 1: The carrier gas passed into the supply line of the carrier gas He3 is after passing through the cleaning and re-enrichment trap and its Connecting line drained from the sample drain line to facilitate cleaning and to flush the replenishment trap and its connecting line; Step 2: The cleaning and replenishment trap and the connecting line of the Sample collection line are vacuum pumped through the vacuum line to to vent impurity gas and carrier gas; Step 3: The target gas enriched in the cleaning and re-enrichment trap is diffused into the sample collection line.
[0030] In the above technical solution it is provided that in step 1 of the transmission, re-enrichment and Collection process, the carrier gas He3 ensures complete transfer and enrichment of the target gas during the flushing of the pipeline and is stored in the cleaning and enrichment trap.
[0031] In the above technical solution it is provided that when vacuuming the connecting line, the cleaning and re-enrichment trap and the sample collection line, the vacuum is first applied by a dry pump to extract of the impurity gas and then by a molecular pump to extract the impurity gas and the carrier gas is extracted.
[0032] In the above technical solution it is provided that there is also a method for cleaning pipelines includes: (1) When the first switching valve is in a sample injection state, the supply line of the carrier gas He1 and the water and VOC remaining in the VOC trap T1 Components drained through the drain line; (2) When the first switching valve is in a sampling state, a sample is added to the supply line of the Carrier gas He0 passed through the adsorption trap group, the liquid nitrogen cold trap and the liquid nitrogen enrichment trap remaining impurities from the drain line for Vent contaminant gas.
[0033] System for cleaning, collecting and processing isotope samples, characterized in that it comprises a two-stage four-way valve A, a two-stage six-way valve B, a two-stage six-way valve C, a two-stage Four-way valve D, a VOC trap T1, an adsorption trap T2, an adsorption trap T3, a chemical trap T4, a Liquid nitrogen cold trap T5, a liquid nitrogen enrichment trap T6, a verification and enrichment trap T7, a cleaning and re-enrichment trap T8, a sample collection trap T9, wherein the two-stage Four-way valve A has four hole positions a1, a2, a3, a4, where a2 is connected via a connecting line to a Natural gas sample bottle, wherein a4 is connected to the injection injector via a pipeline, wherein the Injection injector is provided with a GC sample inlet, wherein the injection injector is connected to a supply line of the carrier gas He0, wherein a1 is connected to an exhaust pipe; wherein the two-stage six-way valve B has six hole positions b1, b2, b3, b4, b5, b6, wherein b2 has a Pipe is connected to a3, where b3 is connected via a pipe to the inlet of the VOC trap T1, where the outlet of the VOC trap T1 is connected to b6 via a pipe, where b1 is connected to the inlet of the liquid nitrogen Cold trap T5 is connected via a pipe for the removal of impurities, the pipe being Removal of contaminants sequentially with adsorption trap T2, adsorption trap T3 and chemical trap T4, wherein b4 is connected to an inlet line of the first load gas, wherein b5 is connected to a drain line is connected; wherein the two-stage six-way valve C has six hole positions c1, c2, c3, c4, c5, c6, wherein the outlet of the Liquid nitrogen cold trap T5 is connected to c2 via a pipe, while c3 is connected to the Inlet of the liquid nitrogen enrichment trap T6, the outlet of the liquid nitrogen enrichment trap T6 is connected via a pipeline to the inlet of the verification and enrichment trap T7, with the outlet of the Verification and enrichment trap T7 is connected to c6 via a pipeline, where c1 is connected to a pipeline for discharging impurity gas, wherein c4 is connected to an inlet line of the second load gas wherein c5 is connected via a pipe to the inlet of the chromatography column GC8; wherein the two-stage four-way valve D has four hole positions d1, d2, d3, d4, wherein d1 is connected via a pipeline to the Outlet of the chromatography column GC, where d2 is connected via an enrichment pipe to the inlet of the Cleaning and re-enrichment trap T8, where d3 is connected to an inlet line of the third load gas is connected, wherein the d4 is connected to a heavy gas discharge line, wherein the enrichment line is connected to a Switching valve V1, whereby the outlet of the cleaning and re-enrichment trap T8 is connected via a pipe with connected to the inlet of the sample trap T9, wherein the sample trap T9 is connected via a communication line each connected to the sample drain line and the collection pipe, whereby the communication line is connected to a switching valve V2, wherein the sample outlet line is provided with a switching valve V3, wherein the Collective pipe is provided with a switching valve V4, whereby the collecting pipe is each provided with a Vacuum branch line and a collecting branch line, wherein the vacuum branch line connected to a vacuum source, the collecting branch line being provided with a switching valve V5 and a Switching valve V10, the end of the collection branch line being connected to a sample collection line wherein the sample collection line is arranged in the sample collection trap.
[0034] In the above technical solution, it is provided that the low vacuum gauge P1 has a first connecting line is connected to the vacuum branch line, wherein the first connecting line is connected to a Switching valve V8, whereby the dry pump is connected to the Vacuum branch line is connected, wherein the second connecting line is provided with a switching valve V6, wherein the high vacuum gauge P2 is connected to the vacuum branch line via a third connecting line, wherein the third connecting line is provided with a switching valve V9, wherein the molecular pump is connected via a fourth connecting line is connected to the vacuum branch line, wherein the fourth connecting line is connected to a Switching valve V7 is provided.
[0035] In the above technical solution, it is provided that the connecting line is connected to a equipped with a cylinder decompression gauge.
[0036] In another aspect of the present invention, it is provided that a system for cleaning, collecting and 13 13 13 13 13 Preparation of isotope samples for the detection of methane isotopes CD ( CH D, CH D , CHD , CD ) 3 2 2 3 4 is applied.
[0037] The present invention has the following advantageous effects over the prior art: 1. According to the invention, the cleaning, collection and preparation of samples for the detection binary methane isotopes by the function implemented on the collected gas sample for removing of impurities, enrichment function, cleaning function, transfer function, carrier gas release and collection function and the like. Each component in the system has an appropriate Design and convenient operation and is brought together to clean and collect sample gas to be realized. 2. The invention simultaneously considers two sample injection modes of source samples, injection injector and bottle injection. These two methods can be freely converted through the valve body, which is easily accessible and has strong applicability. 3. The collected methane gas can be injected either manually or automatically online, which is connected to the two-way injection system of the isotope mass spectrometer, which enables the analysis 13 12 and detection of the binary methane isotopes CH D and CH D of Δ18 and Δ13CH3D realized 3 2 2 becomes. 4. The invention has a simple principle and integrates the functions of sampling, adsorption, Separation, enrichment, purification, transfer, collection and the like into the structural design. This makes the sample testing process simple and convenient, the operation is convenient, which makes the Accuracy of the test value can be effectively improved. This is a series of Sample preparation systems with scientific research significance and high relevance and has good usage and advertising value. Short description of the drawing Fig. 1 is a block diagram of a system according to Embodiment 1 of the present invention. Fig. 2 is a connection diagram of a pipeline according to Embodiment 1 of the present Invention. Fig. 3 is a diagram of a sampling and enrichment state of a methane sample according to the Embodiment 2 of the present invention. Fig. 4 is a diagram of a cleaning, transfer and collection state of a methane sample according to the Embodiment 2 of the present invention. Detailed embodiments
[0038] The present invention will be described in more detail below in connection with specific embodiments It should be understood that the specific embodiments described herein are for illustrative purposes only. interpretation of the invention and not used to define the invention. Example 1
[0039] System for cleaning, collecting and processing isotope samples, characterized in that it comprises a Injection unit, a VOC trap T1, an adsorption trap T2, an adsorption trap T3, a chemical trap T4, a Liquid nitrogen cold trap T5, a liquid nitrogen enrichment trap T6, a verification and enrichment trap T7, a chromatography column GC, a cleaning and reconcentration trap T8, a sample collection trap T9, which are connected sequentially via a pipeline, wherein the inlet of the injection unit is connected to a GC sample inlet 1 and a supply line of the carrier gas He0 is connected, the GC sample inlet is provided with a switching valve V24, the supply line of the carrier gas He0 is provided with a switching valve V23; wherein an outlet of the injection unit is connected via a first pipeline to an inlet of the VOC trap T1, wherein the first pipeline is provided with a switching valve V11, wherein the outlet of the injection unit is connected via a second Pipeline is connected to an inlet of the adsorption trap T2, the second pipeline being connected to a switching valve V12 is provided; wherein a supply line of the carrier gas He1 is connected to the inlet of the VOC trap and a drain line connected to the outlet to discharge the cooled water and the VOC components in the VOC trap, whereby the The supply line of the carrier gas He1 is provided with a switching valve V13, while the discharge line is provided with a switching valve V14; where the adsorption trap T2, the adsorption trap T3, the chemical trap T4 and the liquid nitrogen cold trap T5 connecting pipeline is provided with a carrier gas purge line, wherein the carrier gas purge line is Supply line of the carrier gas He0 to the inlet of the adsorption trap group and a drain line for Contaminant gas to the outlet of the liquid nitrogen cold trap T5, wherein the discharge line for contaminant gas is equipped with a switching valve V15; wherein the pipeline between the liquid nitrogen cold trap T5 and the liquid nitrogen enrichment trap T6 is provided with a Switching valve V16, wherein the inlet of the liquid nitrogen enrichment trap T6 is connected to a supply line of the carrier gas He2, whereby the supply line of the carrier gas He2 is provided with a switching valve V17 the supply line of the carrier gas He2 is connected via a third pipe to the inlet of the chromatography column GC, wherein the third pipe is provided with a switching valve V18; wherein the outlet of the verification and enrichment trap T7 is connected to a discharge line for permanent gas is to release permanent gases (such as nitrogen, oxygen, hydrogen, argon and other gas components) that are present in the Liquid nitrogen cold trap and liquid nitrogen enrichment trap cannot be condensed, whereby the Drain line for permanent gas is provided with a switching valve V19; the inlet of the cleaning and re-enrichment trap T8 being connected to a supply line of the carrier gas He3 is connected, wherein the supply line of the carrier gas He3 is provided with a switching valve V20, wherein the Pipeline between the GC chromatography column and the cleaning and reconcentration trap T8 with a valve V1, whereby the outlet of the cleaning and re-enrichment trap is each provided with a heavy gas discharge line, a sample collection line and a sample discharge line, the heavy gas discharge line being connected to a Switching valve V22 is provided, wherein the sample collection line is arranged in the sample collection trap, wherein the outlet the sample collection line is connected to a vacuum line for removing impurity gas and carrier gas, The carrier gas passed into the supply line of the carrier gas He2 enriches the sample in the Liquid nitrogen enrichment trap is introduced into the inlet of the chromatography column during sampling, whereby the Outlet of the chromatography column each with a heavy gas discharge line and a cleaning and re-enrichment trap, wherein the heavy gas discharge line for discharging impurity gas is provided with a Retention time after the target gas is used, for example, ethane, which has been spiked into sample after methane purification can be determined, the retention time after methane purification, and ethane is released after completion of methane extraction via the Heavy gas discharge line discharged.
[0040] It is preferably provided that the injection unit is an injection unit and / or a bottle injection unit, wherein the injection injection unit comprises an injection injector which has a Pipeline is connected to a VOC trap, wherein the bottle injection unit comprises a natural gas sample bottle, the is connected to the VOC trap via a connecting line, whereby the connecting line is connected to a equipped with a cylinder decompression gauge. wherein the pipeline between the liquid nitrogen enrichment trap and the chromatography column is provided with a Verification and enrichment trap to check whether the sample in the liquid nitrogen enrichment trap is fully enriched. Especially for unknown samples to be tested, the Verification and enrichment trap to verify whether the length of the cooling line, which is determined by the previous Liquid nitrogen cold trap and the liquid nitrogen enrichment trap, and whether the cooling temperature appropriate, and be discontinued in a timely manner until it is verified that no methane target gas release in the enrichment trap is present, indicating that the parameters of the liquid nitrogen cold trap and the Liquid nitrogen enrichment traps are reasonable.
[0041] It is preferably provided that the vacuum line comprises a primary vacuum line which is connected to the dry pump, and a secondary vacuum line connected to the molecular pump. In particular It is provided that the low vacuum gauge P1 is connected to the vacuum branch line via a first connecting line is connected, wherein the first connecting line is provided with a switching valve V8, wherein the dry pump 6 is a second connecting line is connected to the vacuum branch line, wherein the second connecting line is provided with a switching valve V6, whereby the high vacuum gauge P2 is connected to the Vacuum branch line is connected, wherein the third connecting line is provided with a switching valve V9, wherein the molecular pump 7 is connected to the vacuum branch line via a fourth connecting line, wherein the fourth connecting line is provided with a switching valve V7. Example 2
[0042] According to embodiment 1, it is provided that a method for cleaning, collecting and processing of isotope samples includes the following steps: I. Enrichment process: Step 1: After the sample has been introduced through the injection unit, the Switching valves V24, V11, V16, V18 and V19 opened and the other switching valves closed, The gas sample is introduced successively into the VOC trap T1 to separate water and VOC components to remove (the temperature control range of the VOC trap T1 is -24°C to -0 °C. HayeSep D or PoraPLOT Q resin or molecular sieve fillers are incorporated to provide a large amount of VOC components from the sample). Then it is placed in the adsorption trap T2 (filled with diiodine pentoxide to oxidize CO to carbon dioxide), the adsorption trap T3 (filled with alkali lime or sodium hydroxide to remove the acid gas carbon dioxide, etc.), the Chemical trap T4 (The replacement trap can specifically remove other contaminants), the Liquid nitrogen cold trap T5 (liquid nitrogen cold trap without filler for the removal of sulphur dioxide and volatile gases), the liquid nitrogen enrichment trap T6 and the Verification and enrichment trap T7 is introduced. The final sample is collected in the Liquid nitrogen enrichment trap T6 and other contaminant gases are discharged through the permanent gas discharge line; Step 2: The switching valves V24, V11, V16, V18 and V19 are opened and the other Switching valves are closed. The He2 gas flowing into the supply line The carrier gas passing through the sample in the liquid nitrogen enrichment trap T6 leads into the The separation is carried out in the GC chromatography column according to different retention times of the various components of gases. If the target gas flows out, V1 is opened and the target gas is released into the cleaning Re-enrichment trap T8. If the heavy gas (gas with a retention time after the target gas), V1 is closed and V22 is opened and the heavy gas is discharged through the heavy gas discharge line. II. Transfer, replenishment and collection process: Step 1: The switching valves V20, V1, V2 and V3 are opened and the other switching valves are closed. The gas passing through the supply line of the carrier gas He3 Carrier gas is taken from the reactor after passing through the cleaning and re-enrichment trap T8. Sample drain line drained. Step 2: The vacuum valves V1, V2 and V5 are closed and the vacuum valves V2, V4, V6, V8 are opened, and the impurity gas in the passage through the operation of the Dry pump 6 is to be emptied. When the vacuum gauge P1 shows a value of 0.1 mbar, the vacuum valve V6 closed and the vacuum valves V7, V9 are opened to discharge the carrier gas contained therein by operating the Molecular pump unit 7 to be further emptied. When the vacuum gauge P2 indicates that the requirements are met, V7 will be closed and V10 will be opened. This will Methane sample released in the cleaning and re-enrichment trap T8 and into the Collection pipe of the pre-pumped sample 5 diffuses and the sample collection line 5 into the Sample collection trap T9 placed.
[0043] In particular, it is provided that the front pipe of the chromatography column during or after the Transfer, re-enrichment and collection can be cleaned, including: (1) Restoration of the VOC trap T1: The switching valves V13 and V14 are opened and the other Switching valves are closed. When the temperature of the VOC trap T1 is increased (to 100 °C), the The carrier gas passing through the supply line of the carrier gas He1 and the remaining in the VOC trap T1 Water and VOC components discharged through the drain line; (2) Flushing the adsorption trap group, the chemical trap and the liquid nitrogen cold trap: The switching valves V23, V12, V16 and V19 are opened and the other switching valves are closed. The carrier gas He0 passed through the supply line is absorbed in the adsorption trap T2, the Adsorption trap T3, chemical trap T4 and liquid nitrogen cold trap T5 remaining impurities from the impurity gas discharge line. Example 3
[0044] System for cleaning, collecting and processing isotope samples, characterized in that it comprises a two-stage four-way valve A, a two-stage six-way valve B, a two-stage six-way valve C, a two-stage Four-way valve D, a VOC trap T1, an adsorption trap T2, an adsorption trap T3, a chemical trap T4, a Liquid nitrogen cold trap T5, a liquid nitrogen enrichment trap T6, a verification and enrichment trap T7, a cleaning and re-enrichment trap T8, a sample collection trap T9, wherein the two-stage four-way valve A has four hole positions a1, a2, a3, a4, wherein a2 is connected via a connecting line is connected to a natural gas sample bottle 3, wherein the connecting line is connected to a bottle decompression measuring device 4, wherein a4 is connected via a pipeline to the injection injector 2, wherein the injection injector 2 is provided with a GC sample inlet 1, wherein the injection injector 2 is provided with a supply line of the carrier gas He0 is provided; wherein the two-stage six-way valve B has six hole positions b1, b2, b3, b4, b5, b6, wherein b2 has a Pipe is connected to a3, where b3 is connected via a pipe to the inlet of the VOC trap T1, where the outlet of the VOC trap T1 is connected to b6 via a pipe, where b1 is connected to the inlet of the liquid nitrogen Cold trap T5 is connected via a pipe for the removal of impurities, the pipe being Removal of contaminants sequentially with adsorption trap T2, adsorption trap T3 and chemical trap T4, wherein b4 is connected to an inlet line of the first load gas, wherein b5 is connected to a drain line is connected; wherein the two-stage six-way valve C has six hole positions c1, c2, c3, c4, c5, c6, wherein the outlet of the Liquid nitrogen cold trap T5 is connected to c2 via a pipe, while c3 is connected to the Inlet of the liquid nitrogen enrichment trap T6, the outlet of the liquid nitrogen enrichment trap T6 is connected via a pipeline to the inlet of the verification and enrichment trap T7, with the outlet of the Verification and enrichment trap T7 is connected to c6 via a pipeline, where c1 is connected to a pipeline to discharge of impurity gas, wherein c4 is connected to an inlet line of the second load gas, where c5 is connected via a pipe to the inlet of the chromatography column GC8; wherein the two-stage four-way valve D has four hole positions d1, d2, d3, d4, wherein d1 is connected via a pipeline to the Outlet of the chromatography column GC8, where d2 is connected via an enrichment pipe to the inlet of the Cleaning and re-enrichment trap T8, where d3 is connected to an inlet line of the third load gas is connected, wherein the d4 is connected to a heavy gas discharge line, wherein the enrichment line is connected to a Switching valve V1, whereby the outlet of the cleaning and re-enrichment trap T8 is connected via a pipe with connected to the inlet of the sample trap T9, wherein the sample trap T9 is connected via a communication line each connected to the sample drain line and the collection pipe, whereby the communication line is connected to a switching valve V2, wherein the sample outlet line is provided with a switching valve V3, wherein the Collective pipe is provided with a switching valve V4, whereby the collecting pipe is each provided with a Vacuum branch line and a collecting branch line, wherein the vacuum branch line with a Vacuum source is connected, the collecting branch line with a switching valve V5 and a switching valve V10 is provided, wherein the end of the collection branch line is connected to a sample collection line 5, wherein the Sample collection line 5 is arranged in the sample collection trap T9, wherein the low vacuum gauge P1 has a first connecting line is connected to the vacuum branch line, wherein the first connecting line is connected to a switching valve V8, wherein the dry pump 6 is connected via a second connecting line to the Vacuum branch line is connected, wherein the second connecting line is provided with a switching valve V6, wherein the high vacuum gauge P2 is connected to the vacuum branch line via a third connecting line, wherein the third connecting line is provided with a switching valve V9, wherein the molecular pump 7 is connected via a fourth connecting line is connected to the vacuum branch line, wherein the fourth connecting line is connected to a Switching valve V7 is provided.
[0045] In order to reduce the gas diffusion volume, the possible degassing effect of the low vacuum gauge P1 and the safety protection of the high vacuum knife P2 and the effects of ionization of the high vacuum knife P2 To avoid this, the low vacuum gauge P1 and the high vacuum gauge P2 in the vacuum control unit are connected to the system via the vacuum valves V8 and V9 are connected to the vacuum system.
[0046] In the present embodiment, the temperature control range of the VOC trap T1 is between -24 °C and -0 °C. HayeSep D or PoraPLOT Q resin or molecular sieve fillers are incorporated to remove a large amount of VOC components from the sample. Then it is placed in the adsorption trap T2 (filled with diiodine pentoxide to remove CO carbon dioxide), the adsorption trap T3 (filled with alkali lime or sodium hydroxide to oxidize the acid gas carbon dioxide, etc.), the chemical trap T4 (the replacement trap can specifically remove other contaminants), the liquid nitrogen cold trap T5 (liquid nitrogen cold trap without filler for the removal of sulphur dioxide and volatile gases), the liquid nitrogen enrichment trap T6 and the verification and enrichment trap T7. The verification and enrichment trap T6 and the verification and enrichment trap T7 are two completely consistent series liquid nitrogen cold traps with built-in molecular sieve or resin fillers connected in series The switching valves V1, V2, V3, V4, V5, V6, V7, V8, V9 and V10 are manual vacuum valves that can be installed in each pipeline distributed to complete the collection of the target gas.
[0047] The two positions of the four rotary valves are the injection state when rotated clockwise and the Sampling state when rotating counterclockwise. The functions of removing impurities, Enrichment, purification, separation and transfer of sample gas are achieved by switching and combining Hole positions between the two-stage four-way valve (A), the two-stage six-way valve (B), the two-stage Six-way valve (C) and the two-stage four-way valve (D). The combination of the vacuum switching valves V1, V2, V3, V4, V5, V6, V7, V8, V9 and V10 enables re-enrichment, transfer, collection and online injection analysis of the target gas. It is applied to the combination of the above valve bodies.
[0048] I) Sample injection: 1 For gas samples with relatively high concentration, the sampling state holes a4, a3 of the two-stage four-way valve A and the sampling condition holes b2, b3 of the two-stage six-way valve B with the Injection injector 2 so that the carrier gas He0 is introduced from the GC sample inlet 1, which injects the sample into the injection injector 2 into the system; ② For cylinder gas with a relatively low concentration, the Sampling condition holes a2, a3 of the two-stage four-way valve A and the sampling condition holes b2, b3 of the two-stage six-way valve B with the gas sample with relatively low concentration in the natural gas sample bottle 3 connected so that the carrier gas He0 is introduced into the system from GC sample inlet 1;
[0049] II) Removal of impurity gas: After the sample gas has been introduced into the system, the Carrier gas He0 successively the VOC trap T1 to remove water and VOC components; The hole positions b6 and b1 of the two-stage six-way valve B are connected to the adsorption trap T2, the adsorption trap T3, the chemical trap T4, the liquid nitrogen cold trap T5, the hole positions c2 and c3 of the two-stage six-way valve C and the Liquid nitrogen enrichment trap T6, whereby the arranged chemical traps for the removal of contaminant gas components; The sample is stored in the liquid nitrogen Enrichment trap T6 is cleaned and enriched, and then the enrichment effect of the enriched target gas is the verification and enrichment trap T7 (To adjust the length and carrier gas flow of the Connecting line of the liquid nitrogen cold trap T5 and the liquid nitrogen enrichment trap T6, so that the sample is completely enriched in the liquid nitrogen enrichment trap T6); other impurity gases in the sample gas are controlled by the hole positions c6, c1 of the two-stage six-way valve C and the impurity gas discharge line are separated from the permanent gas;
[0050] III) Chromatographic separation and re-enrichment of methane gas: The carrier gas is removed and methane is collected to complete the transfer and collection of methane gas. The hole positions c4 and c3 of the two-stage six-way valve C, the liquid nitrogen enrichment trap T6, the verification and enrichment trap T7, the hole positions c6 and c5 of the two-stage six-way valve C, the chromatography column 8, the hole positions d1 and d2 of the two-stage four-way valve D, the vacuum valve V1 and the cleaning and replenishment trap T8 are connected to introduce the carrier gas He2 from the hole position c4 of the two-stage six-way valve C. The purified Methane gas stored in the liquid nitrogen enrichment trap T6 is introduced into the chromatography column 8 introduced. The separation of methane is carried out using a separation chromatography column or a capillary column. The separated methane gas is switched and adjusted by the valve body to maintain the To complete methane enrichment in the cleaning and re-enrichment trap T8, thus preparing for the next Transfer and collection is being maintained;
[0051] IV) Carrier gas removal and methane collection: The vacuum valves V1, V3, V5 are closed and the Vacuum valves V2, V4, V6, V8 are opened and the impurity gas in the passage is removed by the operation of the Dry pump 6 is to be emptied. When the vacuum gauge P1 shows a value of 0.1 mbar, the vacuum valve V6 closed and the vacuum valves V5, V7, V9 opened to evacuate the carrier gas contained therein by operating the Molecular pump unit 7 to continue emptying. When the vacuum gauge P2 indicates that the requirements are met -6 (The displayed value is not worse than 1*10 mbar), V7 is closed and V5 and V10 are opened. The methane sample is released in the cleaning and re-enrichment trap T8 and fed into the collecting pipeline of the pre-pumped sample 5 is diffused and the sample collection line 5 is placed in the sample collection trap T9;
[0052] V) Isotope mass spectrometry test for gas stabilization: The sample collection line 5 is connected directly to the Two-way injection system of the isotope mass spectrometer (MAT253 Ultra Thermo Scientific) for gas stabilization connected, or V5 is opened to directly and evenly feed into the two-way injection storage tank of the Isotope mass spectrometer (MAT253 Ultra Thermo Scientific) to enable the analysis and detection of the binary isotopes 13CH3D and 12CH2D2 in methane samples and to complete the analysis and detection of Δ18 and Δ18. 13CH3D of the binary isotopes 13CH3D and 12CH2D2 in methane samples.
[0053] In addition, the system has the following functions: I) Restoring the function of the VOC trap T1: The temperature of the VOC trap T1 is set to 100°C. Hole positions b4, b3 of the two-stage six-way valve B, VOC trap T1 and the hole positions b6, b5 of the two-stage six-way valve B are connected so that the carrier gas He1 from the hole position b4 of the two-stage six-way valve B and the frozen water and other VOC components in the system for reuse; II) Chemical trap flushing mode: The hole positions a4, a3 of the two-stage four-way valve A, the Hole positions b2, b1 of the two-stage six-way valve B, the adsorption trap T2, the adsorption trap T3, the Chemical trap T4, the liquid nitrogen cold trap T5 and the hole positions c2, c1 of the two-stage Six-way valve C are connected so that the carrier gas He0 is introduced from the GC sample inlet 1 and venting is carried out before passing through the pipeline in order to keep the gas path system clean; III) Emptying mode of the permanent gas: The liquid nitrogen cold trap T5, the hole positions c2, c3 of the two-stage six-way valve C and the liquid nitrogen enrichment trap T6, the verification and Enrichment trap T7 and the hole positions c6 and c1 of the two-stage six-way valve C are connected, so that the carrier gas He0 is sequentially supplied from the two-stage four-way valve A and the two-stage six-way valve B is introduced to vent the permanent gas remaining in the connecting line and to to keep clean; IV) Cleaning and replenishment mode: The hole positions d3, d2 of the two-stage four-way valve D, the Vacuum valve V1 and the cleaning and replenishment trap T8, the vacuum valve V2, the vacuum valve V3 are connected so that the carrier gas He3 from the hole positions d3, d2 of the two-stage four-way valve D and is discharged through the vacuum valve V3 to ensure the cleaning and enrichment of the Complete methane sample.
Claims
1. System for cleaning, collecting and processing methane isotope samples, characterized in that it comprises a Injection unit, a first switching valve, a VOC trap T1, an adsorption trap group, a liquid nitrogen cold trap T5, a second switching valve, a chromatography column GC, a third switching valve and a cleaning and Replenishment trap T8 includes wherein the injection unit is connected to a supply line of the carrier gas He0; wherein the connection of the first switching valve is connected to a sample injection line, a sample inlet of the VOC Trap, a sample outlet of the VOC trap, a sample inlet of the adsorption trap group, a supply line of the carrier gas He1 and a discharge line via a pipeline, the injection line being connected to the Injection unit, with the injection line, the VOC trap and the adsorption trap group sequentially are connected when the first switching valve is in a sampling state, with the supply line of the carrier gas He1 is connected to the discharge line, whereby the injection line is connected to the adsorption trap group is connected, whereby the supply line of the carrier gas He1, the VOC trap and the drain line are sequentially are connected when the first switching valve is in a sample injection state; wherein the sample outlet of the adsorption trap group is connected to the sample inlet of the liquid nitrogen cold trap via a pipeline, whereby the connection of the second switching valve is connected to the sample outlet of the Liquid nitrogen cold trap, the sample inlet and the sample outlet of the liquid nitrogen enrichment trap, the Supply line of the carrier gas He2, the sample inlet of the chromatography column and the drain line for Contaminant gas is connected via a pipeline, whereby the liquid nitrogen cold trap, the liquid nitrogen Enrichment trap and the impurity gas discharge line are connected sequentially when the second Switching valve is in a sampling state, with the supply line of the carrier gas He2 connected to the Sample inlet of the chromatography column, with the sample outlet of the liquid nitrogen cold trap connected to the Impurity gas discharge line when the second switching valve is in a Sample injection state, with the supply line of the carrier gas He2 connected to the liquid nitrogen enrichment trap and the sample inlet of the chromatography column are sequentially connected; wherein the connection of the third switching valve is connected to the sample outlet of the chromatography column, the Sample inlet of the cleaning and re-enrichment trap, the supply line of the carrier gas He3 and the Heavy gas discharge line is connected via a pipeline, with the sample outlet of the chromatography column connected to the Sample inlet of the cleaning and replenishment trap when the third switching valve is in a sampling condition, with the supply line of the carrier gas He3 connected to the heavy gas discharge line is connected, with the sample outlet of the chromatography column being connected to the heavy gas discharge line when the third switching valve is in a sample injection state, with the carrier gas supply line He3 is connected to the sample inlet of the cleaning and re-enrichment trap; The sample outlet of the cleaning and re-enrichment trap is connected to the sample outlet line and the Sample collection line is connected via a pipe, whereby the sample collection line in the sample collection trap which provides a low temperature environment, wherein the sample collection line is provided with a Vacuum line for removing carrier gas and impurity gas.
2. System for cleaning, collecting and processing methane isotope samples according to claim 1, characterized characterized in that the injection unit comprises an injection injector, a natural gas sample bottle and a switching valve wherein the switching valve is connected to a sample outlet of the injection injector, a sample outlet of the Natural gas sample bottle, an exhaust pipe and an inlet of the first switching valve, wherein the Sample outlet of the injection injector is connected to the injection line when the sample quantity is small, whereby the Sample outlet of the natural gas sample bottle is connected to the exhaust pipe, whereby the sample outlet of the Natural gas sample bottle is connected to the injection line when the sample quantity is large, with the sample outlet of the Injection injector is connected to the exhaust pipe.
3. System for cleaning, collecting and processing methane isotope samples according to claim 1, characterized characterized in that the adsorption trap group comprises at least one CO adsorption trap and one acid gas adsorption trap includes.
4. System for cleaning, collecting and processing methane isotope samples according to claim 1, characterized characterized in that the pipeline between the liquid nitrogen enrichment trap and the chromatography column is a verification and enrichment trap to check whether the sample in the liquid nitrogen Enrichment trap is fully enriched.
5. System for cleaning, collecting and processing methane isotope samples according to claim 1, characterized in that that the vacuum line comprises a primary vacuum line connected to the dry pump and a secondary vacuum line connected to the molecular pump to remove impurity gas and carrier gas from the to remove the pipeline.
6. Method for cleaning, collecting and processing methane isotope samples by a system for cleaning, Collection and preparation of isotope samples according to claim 1, comprising the following steps: I. Purification and enrichment process: Step 1: When the first switching valve and the second switching valve are in a sampling state, The gas sample is introduced into the VOC trap one after the other to remove water and VOC components; it is introduced into the Adsorption trap group introduced to remove impurity gases, is placed in the liquid nitrogen cold trap introduced to remove impurities with higher boiling points than the target gas, and finally, the Liquid nitrogen enrichment trap is introduced for enrichment. Other non-condensable contaminant gases are discharged through the permanent gas discharge line; Step 2: When the second switching valve is in a sample injection state, this leads to The carrier gas passing through the supply line of the carrier gas He2 enriches the sample in the liquid nitrogen trap in the chromatography column GC. The separation is carried out in the chromatography column GC according to different Retention times of the various components of gases are measured. When the target gas escapes, the third switching valve in a sampling state, and the separated target gas is used in the cleaning and Re-enrichment trap. If the heavy gas is enriched with a retention time after the target gas has escaped flows, the third switching valve is in a sample injection state and is controlled by the Heavy gas discharge line discharged; II. Transfer, replenishment and collection process: The third switching valve is in a sample injection state: Step 1: The carrier gas passed into the supply line of the carrier gas He3 is, after passing through the Cleaning and replenishment trap and its connecting line are drained from the sample outlet line to to flush the cleaning and replenishment trap and its connecting line; Step 2: The cleaning and re-enrichment trap and the connecting line of the sample collection line are vacuum pumped through the vacuum line to discharge the impurity gas and the carrier gas; Step 3: The target gas enriched in the cleaning and re-enrichment trap is fed into the sample collection line diffused.
7. A method for cleaning, collecting and processing methane isotope samples according to claim 6, characterized characterized in that in step 1 of the transfer, re-enrichment and collection process, the carrier gas He3 completes the complete transfer and enrichment of the target gas during the purging of the pipeline and in the Cleaning and enrichment trap is stored.
8. A method for cleaning, collecting and processing methane isotope samples according to claim 6, characterized characterized in that when vacuuming the connecting line of the cleaning and re-enrichment trap and the Sample collection line, the vacuum is first applied by a dry pump to extract the contaminant gas and then is sucked away by a molecular pump to extract the impurity gas and the carrier gas.
9. A method for cleaning, collecting and processing methane isotope samples according to claim 6, characterized characterized in that it also comprises a method for cleaning pipelines: (1) When the first switching valve is in a sample injection state, a sample is injected into the supply line of the The carrier gas He1 passed through the carrier gas and the water and VOC components remaining in the VOC trap T1 are separated by the drain line drained; (2) When the first switching valve is in a sampling state, a sample is added to the supply line of the Carrier gas He0 passed through the adsorption trap group, the liquid nitrogen cold trap and the Liquid nitrogen enrichment trap drains remaining contaminants from the contaminant gas discharge line.
10. Use of the system for cleaning, collecting and processing methane isotope samples according to claim 1, characterized in that the system for cleaning, collecting and processing methane isotope samples at Detection of methane-13CD isotopes.
Citation Information
Patent Citations
CN000103743846A
