AI Technical Summary

Technical Problem

In dust-free factories, due to foundation settlement, the traditional drilling rig grouting process will cause dust to enter the factory through grouting holes and repair gaps, increasing dust removal costs and possibly damaging underground facilities.

Method used

Adopting precise horizontal lifting reinforcement technology, through drilling curve design and pilot hole drilling, the grouting channel is connected, and rubber bladders are used for grouting to control the flow rate and pressure of the slurry to ensure that the floor returns to its original elevation before exiting the grouting channel to avoid damaging the factory building. Integrity.

Benefits of technology

It effectively prevents external dust from entering the factory building, improves the use efficiency of grouting fluid, reduces later dust removal costs, and significantly improves the economy and effect of the process.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

Disclosed in the present invention is a lifting and reinforcing process for a dust-free factory floor, comprising: reinforcing a soft foundation and precisely lifting a settlement range. The present invention has the following beneficial effects: since the integral integrity of a factory is not destroyed, the possibility that external dust enters the factory can be avoided, and since a rubber bag is adopted for grouting, the use efficiency of a grouting slurry is improved, and the situation that the elevation of an upper terrace is affected due to inefficient diffusion of the grouting slurry in foundation soil is prevented. Although the process can increase the construction cost, compared with the sum of the cost of a conventional grouting process and the overall cost of later-period overall plant dust removal, the process is lower in cost and more remarkable in effect.
Need to check novelty before this filing date? Find Prior Art

Description

A dust-free factory floor lifting and reinforcement process Technical Field

[0001] The present invention relates to a factory building lifting and reinforcement process, specifically a precise horizontal lifting and reinforcement process for a dust-free factory building floor, and belongs to the technical field of factory building lifting construction. Background Art

[0002] Among various industrial plants, one type is known as a dust-free plant. To ensure dust-free operation, the roof, walls, and floors of these plants are treated using special processes. If such a plant experiences subsidence due to foundation problems, using a traditional drilling and grouting machine will inevitably require drilling holes and injecting grout. Even after the plant is lifted, the holes must be repaired later.

[0003] However, during construction, due to the disturbance of the grouting equipment, the probability of dust from outside the factory entering the factory through the grouting holes and grouting pipes, or through the gaps in the repaired grouting holes, will be greatly increased. If the settlement area is large or there are many settlement points, the number of grouting equipment and grouting holes will also increase, and the contact area with the factory foundation soil will also increase. The presence of cracks in the foundation soil itself or the presence of groundwater will increase the probability of grouting holes and cracks penetrating into the foundation soil and coming into contact with groundwater, which will greatly increase the amount of dust entering the dust-free factory. Although it is possible to remove dust from the factory afterwards, the cost increase cannot be ignored.

[0004] Summary of the Invention

[0005] The purpose of the present invention is to provide a precise horizontal lifting and reinforcement process for the floor of a dust-free factory in order to solve the problem, which ensures that the floor is precisely lifted without damaging the factory floor.

[0006] The present invention achieves the above-mentioned purpose through the following technical solutions: a precise horizontal lifting and reinforcement process for the dust-free factory floor, comprising:

[0007] Step 1: Strengthen the soft foundation, which specifically includes:

[0008] ① Determine the depth of the soft soil layer under the settlement area inside the powerhouse, and design a drilling curve from the construction point outside the powerhouse to the settlement area inside the powerhouse;

[0009] ② Drilling a pilot hole from the construction point outside the plant so that the pilot hole reaches the designated location in the settlement area inside the plant and the grouting point at the designated depth;

[0010] ③ Connect and penetrate the grouting channel from the construction point outside the factory building to the grouting point inside the factory building;

[0011] ④ Start grouting from the designated grouting point, and adopt backward or forward grouting;

[0012] Step 2: Accurately elevate the settlement range, which specifically includes

[0013] ① Determine the depth range between the reinforced soft foundation and the floor, and design the drilling curve from the construction point outside the factory building to the settlement area inside the factory building;

[0014] ② Drill a pilot hole from the construction point outside the plant so that the pilot hole reaches the designated location in the settlement area inside the plant and the grouting point at the designated depth.

[0015] ③ Connect and penetrate the grouting channel from the construction point outside the factory building to the grouting point inside the factory building;

[0016] ④ Start grouting into the rubber bag from the designated grouting point, and the settled floor of the factory building will begin to return to its original floor elevation;

[0017] ⑤ After the settled floor of the factory building begins to recover to the original floor elevation, stop injecting the slurry. After the slurry in the rubber bag solidifies, use backward grouting to fill the grouting channel and exit the grouting channel.

[0018] As a further solution of the present invention: in the step one, for the drilling curve, the drilling curve is calculated and set according to the specific stratum conditions, groundwater conditions, foundation settlement, the drilling rod's penetration angle, the drill rod's allowable curvature radius and other parameters from the construction point outside the factory building to the grouting point, and the design of the drilling curve should ensure that there is no interference or damage to underground facilities, and comply with technical parameters such as the minimum bending radius of the horizontal directional drilling rig used.

[0019] As a further solution of the present invention: in the steps one and two, for drilling the guide hole, it is necessary to select appropriate drilling rigs, drilling tools and drilling methods according to different geological conditions and specific project conditions to complete the drilling of the guide hole. The selection of horizontal directional drilling rigs needs to be determined according to project requirements, formation conditions and drilling tool size. Monitoring and control during the drilling process can provide real-time information for the horizontal directional drilling to ensure the accuracy of the guide hole. The monitoring and control can be completed by using a geomagnetic wired direction control system and a ground beacon system.

[0020] As a further solution of the present invention: in the steps one and two, when the grouting channels of the grouting points are connected and penetrated, first all the drill rods of the guide hole are pulled out, the guide drill bit is removed, and then a hollow drill rod with a diameter smaller than the inner diameter of the guide hole is replaced, a grouting drill bit is installed in front of the hollow drill rod, and finally the hollow drill rod and the grouting drill bit are lowered along the guide hole to the grouting point.

[0021] As a further embodiment of the present invention, after the grouting channel is established in step 1, cement slurry prepared according to a specific slurry ratio is injected into the designated grouting points through the grouting channel using a grouting pump. Simultaneously with the grouting operation, the hollow drill rod driven by the drill head is rotated, advanced, and retracted, enabling grouting at various designated points in the pilot hole.

[0022] As a further solution of the present invention: in the step 2, for the drilling curve, the drilling curve is calculated and set according to the specific stratum conditions, groundwater conditions, foundation settlement conditions, the drilling rod's entry angle, the drill rod's allowable curvature radius and other parameters from the depth range of the grouting soil layer in the first part and the construction point outside the factory building to the grouting point. The design of the drilling curve should ensure that there is no interference or damage to underground facilities, and comply with technical parameters such as the minimum bending radius of the horizontal directional drilling rig used.

[0023] As a further solution of the present invention: in the step 2, after the operation of establishing the grouting channel is completed, the rubber bag is first injected into the designated grouting point using a hollow drill rod, and then the grouting pump starts to grout into the rubber bag. At the same time, in conjunction with the floor elevation monitoring system, as the slurry increases, the rubber bag begins to squeeze the soil toward the surrounding area. Since the first part of the soft soil layer has been reinforced, the space for the rubber bag to expand downward is smaller than the space for upward expansion. The upward expansion of the rubber bag will drive the floor of the dust-free factory to rise. During the grouting process, the slurry flow rate and grouting pressure are controlled to control the lifting rate.

[0024] As a further solution of the present invention: in the step 2, according to the ground elevation monitoring system, after the floor has been raised to the original elevation, the grouting can be stopped, and after the slurry hardens, the reverse grouting can be started. The purpose of the reverse grouting is to fill the grouting channel. During the filling process, the floor elevation monitoring system monitors in real time to ensure that the floor above the grouting channel does not bulge due to the filling grouting.

[0025] The beneficial effects of the present invention are:

[0026] 1. Since the overall integrity of the factory building is not damaged, the possibility of external dust entering the factory building can be eliminated;

[0027] 2. The second step adopts rubber bag grouting, which improves the efficiency of grouting fluid and prevents the inefficient diffusion of grouting fluid in the foundation soil, thus affecting the upper floor elevation;

[0028] 3. Although this process will increase the construction cost, compared with the sum of the cost of traditional grouting process and the overall cost of dust removal of the entire factory building in the later stage, this process is cheaper and more effective. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] FIG1 is a schematic diagram of the first horizontal grouting of the present invention;

[0030] FIG2 is a schematic diagram of the second horizontal grouting process of the present invention. DETAILED DESCRIPTION

[0031] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0032] Example 1

[0033] Please refer to Figure 1, a precise horizontal lifting and reinforcement process for the dust-free factory floor, including

[0034] Strengthening weak foundations includes:

[0035] ① Determine the depth of the soft soil layer under the settlement area inside the powerhouse, and design a drilling curve from the construction point outside the powerhouse to the settlement area inside the powerhouse;

[0036] ② Drilling a pilot hole from the construction point outside the plant so that the pilot hole reaches the designated location in the settlement area inside the plant and the grouting point at the designated depth;

[0037] ③ Connect and penetrate the grouting channel from the construction point outside the factory building to the grouting point inside the factory building;

[0038] ④ Start grouting from the designated grouting point, and adopt backward or forward grouting.

[0039] In an embodiment of the present invention, for the drilling curve, the drilling curve is calculated and set based on the specific geological conditions, groundwater conditions, foundation settlement, and the drilling rod's entry angle, the drill rod's allowable curvature radius and other parameters from the construction point outside the factory building to the grouting point. The design of the drilling curve should ensure that there is no interference or damage to underground facilities, and comply with technical parameters such as the minimum bending radius of the horizontal directional drilling rig used. Since the sinking of the dust-free factory floor is caused by the existence of a weak soil layer in the foundation of the dust-free factory, the first step to solve the settlement problem is to reinforce this weak soil layer to increase its bearing capacity, thereby providing a solid bearing capacity foundation for the rubber bag to lift the floor and provide an upward reaction force.

[0040] In an embodiment of the present invention, for drilling a guide hole, it is necessary to select a suitable drilling rig, drilling tools and drilling methods according to different geological conditions and the specific circumstances of the project to complete the drilling of the guide hole. The selection of a horizontal directional drilling rig needs to be determined according to the project requirements, formation conditions and the size of the drilling tools. The monitoring and control during the drilling process can provide real-time information for the horizontal directional drilling to ensure the accuracy of the guide hole. The geomagnetic wired direction control system and the ground beacon system can be used to complete the monitoring and control to ensure that the subsequent grouting pipeline can accurately deliver the slurry to the designated grouting point.

[0041] In an embodiment of the present invention, when the grouting channel of the grouting point is connected and penetrated, the drill rod of the guide hole is first pulled out completely, the guide drill bit is removed, and then a hollow drill rod with a diameter smaller than the inner diameter of the guide hole is replaced, and a grouting drill bit is installed in front of the hollow drill rod. Finally, the hollow drill rod and the grouting drill bit are lowered along the guide hole to the grouting point.

[0042] In the embodiment of the present invention, after the grouting channel is established, cement slurry prepared according to a specific slurry ratio is injected into the designated grouting points through the grouting channel using a grouting pump. Simultaneously, the hollow drill rod driven by the drill head is rotated, advanced, and retracted to allow grouting at various designated points in the pilot hole.

[0043] Example 2

[0044] Please refer to Figure 2, a precise horizontal lifting and reinforcement process for the dust-free factory floor, including

[0045] Accurate lifting and subsidence range, including

[0046] ① Determine the depth range between the reinforced soft foundation and the floor, and design the drilling curve from the construction point outside the factory building to the settlement area inside the factory building;

[0047] ② Drill a pilot hole from the construction point outside the plant so that the pilot hole reaches the designated location in the settlement area inside the plant and the grouting point at the designated depth.

[0048] ③ Connect and penetrate the grouting channel from the construction point outside the factory building to the grouting point inside the factory building;

[0049] ④ Start grouting into the rubber bag from the designated grouting point, and the settled floor of the factory building will begin to return to its original floor elevation;

[0050] ⑤ After the settled floor of the factory building begins to recover to the original floor elevation, stop injecting the slurry. After the slurry in the rubber bag solidifies, use backward grouting to fill the grouting channel and exit the grouting channel.

[0051] In an embodiment of the present invention, for drilling a guide hole, it is necessary to select a suitable drilling rig, drilling tools and drilling methods according to different geological conditions and the specific circumstances of the project to complete the drilling of the guide hole. The selection of a horizontal directional drilling rig needs to be determined according to the project requirements, formation conditions and the size of the drilling tools. The monitoring and control during the drilling process can provide real-time information for the horizontal directional drilling to ensure the accuracy of the guide hole. The geomagnetic wired direction control system and the ground beacon system can be used to complete the monitoring and control to ensure that the subsequent grouting pipeline can accurately deliver the slurry to the designated grouting point.

[0052] In an embodiment of the present invention, when the grouting channel of the grouting point is connected and penetrated, the drill rod of the guide hole is first pulled out completely, the guide drill bit is removed, and then a hollow drill rod with a diameter smaller than the inner diameter of the guide hole is replaced, and a grouting drill bit is installed in front of the hollow drill rod. Finally, the hollow drill rod and the grouting drill bit are lowered along the guide hole to the grouting point.

[0053] In an embodiment of the present invention, the drilling curve is calculated and set based on the specific geological conditions, groundwater conditions, foundation settlement conditions, the drilling rod's entry angle, the allowable curvature radius of the drill rod, and other parameters from the depth range of the grouting soil layer in the first part and the construction point outside the factory building to the grouting point. The design of the drilling curve should ensure that there is no interference or damage to underground facilities and comply with technical parameters such as the minimum bending radius of the horizontal directional drilling rig used.

[0054] In an embodiment of the present invention, after the operation of establishing the grouting channel is completed, the rubber bag is first injected into the designated grouting point using a hollow drill rod, and then the grouting pump starts to grout into the rubber bag. At the same time, in conjunction with the floor elevation monitoring system, as the slurry increases, the rubber bag begins to squeeze the soil toward the surrounding area. Since the first part of the soft soil layer has been reinforced, the space for the rubber bag to expand downward is smaller than the space for upward expansion. The upward expansion of the rubber bag will drive the floor of the dust-free factory to rise. During the grouting process, the slurry flow rate and grouting pressure are controlled to control the lifting rate.

[0055] In an embodiment of the present invention, according to the ground elevation monitoring system, after the floor has been raised to the original elevation, grouting can be stopped, and after the slurry hardens, reverse grouting can be started. The purpose of reverse grouting is to fill the grouting channel. During the filling process, the floor elevation monitoring system monitors in real time to ensure that the floor above the grouting channel does not bulge due to the filling grouting.

[0056] Working principle: The first part strengthens the weak foundation; the second part accurately lifts the settlement range. Since it does not damage the overall integrity of the factory building, it can prevent the possibility of external dust entering the factory building. In addition, since the second part adopts rubber bag grouting, the efficiency of grouting fluid is improved, preventing the inefficient diffusion of grouting fluid in the foundation soil, thereby affecting the upper floor elevation.

[0057] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the invention can be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, the embodiments should be considered in all respects as illustrative and non-restrictive, and the scope of the invention is defined by the appended claims, not the foregoing description, and all variations within the meaning and range of equivalents of the claims are intended to be included therein. Any reference sign in a claim should not be construed as limiting the claim to which it relates.

[0058] In addition, it should be understood that although this specification is described in terms of implementation methods, not every implementation method contains only one independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.

Claims

1. A dust-free factory floor lifting and reinforcement process, characterized by: include Step 1: Strengthen the soft foundation, which specifically includes: ① Determine the depth of the soft soil layer under the settlement area inside the powerhouse, and design a drilling curve from the construction point outside the powerhouse to the settlement area inside the powerhouse; ② Drilling a pilot hole from the construction point outside the plant so that the pilot hole reaches the designated location in the settlement area inside the plant and the grouting point at the designated depth; ③ Connect and penetrate the grouting channel from the construction point outside the factory building to the grouting point inside the factory building; ④ Start grouting from the designated grouting point; Step 2: Lifting and subsidence range, which specifically includes ① Determine the depth range between the reinforced soft foundation and the floor, and design the drilling curve from the construction point outside the factory building to the settlement area inside the factory building; ② Drill a pilot hole from the construction point outside the plant so that the pilot hole reaches the designated location in the settlement area inside the plant and the grouting point at the designated depth. ③ Connect and penetrate the grouting channel from the construction point outside the factory building to the grouting point inside the factory building; ④ Start grouting from the designated grouting point to restore the settled floor of the factory building to its original floor elevation; ⑤ After the settled floor of the factory building returns to its original floor elevation, stop injecting the slurry. After the slurry solidifies, use backward grouting to fill the grouting channel and exit the grouting channel.

2. The dust-free factory floor lifting and reinforcement process according to claim 1 is characterized by: In the step 1, the drilling curve is calculated and set based on parameters such as the specific stratum conditions, groundwater conditions, foundation settlement, drill rod penetration angle, and allowable drill rod curvature radius from the construction point outside the factory building to the grouting point.

3. The dust-free factory floor lifting and reinforcement process according to claim 1 is characterized by: In the steps 1 and 2, a geomagnetic wired steering system and a ground beacon system are used to complete monitoring and control.

4. The process for raising and reinforcing the floor of a dust-free workshop according to claim 1 is characterized in that: In the steps one and two, when the grouting channels of the grouting points are connected and penetrated, first all the drill rods of the guide holes are pulled out, the guide drill bit is removed, and then a hollow drill rod with a diameter smaller than the inner diameter of the guide hole is replaced, a grouting drill bit is installed in front of the hollow drill rod, and finally the hollow drill rod and the grouting drill bit are lowered along the guide hole to the grouting point.

5. The process for raising and reinforcing the floor of a dust-free workshop according to claim 1 is characterized in that: In the step 1, when the grouting operation is performed, the hollow drill rod driven by the drilling rig power head is rotated, advanced, retreated, etc., so that the grouting operation can be performed at different sections set in the guide hole.

6. The process for raising and reinforcing the floor of a dust-free workshop according to claim 1 is characterized in that: In step 2, the drilling curve is calculated and set based on the depth range of the grouting soil layer in the first part and the specific geological conditions, groundwater conditions, foundation settlement, the drilling rod's entry angle, the drill rod's allowable curvature radius and other parameters from the construction point outside the factory building to the grouting point.

7. The process for raising and reinforcing the floor of a dust-free workshop according to claim 1 is characterized in that: In the step 2, after the operation of establishing the grouting channel is completed, the rubber bag is first injected into the designated grouting point using the hollow drill rod, and then the grouting pump starts to grout into the rubber bag. At the same time, in conjunction with the floor elevation monitoring system, during the grouting process, the slurry flow rate and grouting pressure are controlled, thereby controlling the lifting rate.

8. The process for raising and reinforcing the floor of a dust-free workshop according to claim 1 is characterized in that: In the second step, according to the ground elevation monitoring system, grouting is stopped after the floor has been raised to the original elevation. After the slurry hardens, reverse grouting is started. At the same time, the floor elevation monitoring system monitors in real time to ensure that the floor above the grouting channel does not bulge due to the filling grouting.