Seismic reinforcement method of electrification pole
Patent Information
- Application Number
- JP2023043075
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-17
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-03-17
AI Technical Summary
【0010】 第1発明~第3発明によれば、鋼管ユニットと電化柱との間に充填材を充填する充填工程と、電化柱との間に充填材が充填された鋼管ユニットの外周側面と上面とを覆うように、中空体の断熱ユニットを設置する断熱ユニット設置工程と、を備える。このため、断熱ユニット内部の充填材が外気温の影響を受けにくくなり、充填材を要求される強度まで十分に硬化させることができる。これにより、寒冷環境における耐震補強工事の施工性向上を図ることができる。
Smart Images

Figure 2024132350000001_ABST
Abstract
Description
[Technical field]
[0001] This invention relates to a method for seismic reinforcement of utility poles that is effective in cold environments. [Background technology]
[0002] In the past, in response to the frequent occurrence of damage caused by the collapse of electricity poles during large earthquakes, research has been conducted into reinforcement structures to improve the earthquake resistance of existing electricity poles.
[0003] As an example of an earthquake-resistant reinforcement structure for reinforcing an existing electricity pole, Patent Document 1 discloses a technology for an earthquake-resistant reinforcement structure in which the outer periphery of the electricity pole is surrounded by an earthquake-resistant reinforcement steel pipe unit and mortar is filled between the electricity pole and the earthquake-resistant reinforcement steel pipe unit. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent No. 7203268 Summary of the Invention [Problem to be solved by the invention]
[0005] According to the earthquake-resistant reinforcement structure of an electricity pole disclosed in Patent Document 1, the compressive strength of the cast non-shrinkage mortar is 24 N / mm 2 After confirming that the above strength has been reached, the non-shrink mortar and PC steel wire are cut at the cutting position with a wire saw to form a plastic hinge portion, thereby preventing brittle fracture of the utility pole. On the other hand, in a cold environment where the environmental temperature is below freezing, the moisture contained in the mortar freezes, the hydration reaction of the mortar does not proceed, and hardening may stop before the required strength is reached. As a result, there is a problem that it is difficult to carry out earthquake-resistance reinforcement work using mortar or concrete, especially in winter. Patent Document 1 does not mention or suggest this point.
[0006] The present invention has been devised in consideration of the above-mentioned problems, and an object of the present invention is to provide a method for seismic reinforcement of an electric pole which improves the ease of carrying out seismic reinforcement work in a cold environment. [Means for solving the problem]
[0007] The seismic reinforcement method for an electrification pole in the first invention is characterized by comprising a steel pipe unit installation process for installing a cylindrical steel pipe unit on the outer periphery of an existing electrification pole, a filling process for filling a filler material between the steel pipe unit installed in the steel pipe unit installation process and the electrification pole, and an insulation unit installation process for installing a hollow insulation unit so as to cover the outer periphery side and top surface of the steel pipe unit between the electrification pole and the steel pipe unit filled with the filler material in the filling process.
[0008] The earthquake-resistant reinforcement method for an electricity pole in the second invention is characterized in that in the first invention, the steel pipe unit installation process installs a steel pipe unit composed of an upper steel pipe unit of a cylindrical body, a lower steel pipe unit of a cylindrical body spaced apart from the upper steel pipe unit in the vertical direction, and a plurality of steel bars joined to the outer periphery of the upper steel pipe unit and the outer periphery of the lower steel pipe unit, and after the filling material has hardened, removes the insulation unit installed in the insulation unit installation process, and further includes a dividing process for dividing the electricity pole into upper and lower parts between the upper steel pipe unit and the lower steel pipe unit.
[0009] The third invention is a method for seismic reinforcement of an electricity pole in the first or second invention, characterized in that the insulation unit installation process includes installing the insulation unit including a first insulation material covering the outer side surface of the steel pipe unit, the first insulation material having a thermal conductivity of 0.040 W / (m·K) or less and a thickness of 10 mm or more, and covering the upper surface of the steel pipe unit, the second insulation material having a thermal conductivity of 0.040 W / (m·K) or less and a thickness of 60 mm or more. Effect of the Invention
[0010] According to the first to third inventions, the method includes a filling step of filling the gap between the steel pipe unit and the electrification pole with a filler, and an insulation unit installation step of installing a hollow insulation unit so as to cover the outer peripheral side and upper surface of the steel pipe unit with the filler filled between the steel pipe unit and the electrification pole. Therefore, the filler inside the insulation unit is less susceptible to the effects of the outside temperature, and the filler can be sufficiently hardened to the required strength. This improves the workability of earthquake-resistance reinforcement work in cold environments.
[0011] In particular, according to the second invention, the steel pipe unit installation step installs a steel pipe unit composed of an upper steel pipe unit of a cylindrical body, a lower steel pipe unit of a cylindrical body, and a plurality of steel bars joined to the outer periphery of the upper steel pipe unit and the outer periphery of the lower steel pipe unit. The method further includes a dividing step of removing the insulation unit after the filling material has hardened and dividing the electrification pole into upper and lower parts between the upper steel pipe unit and the lower steel pipe unit. As a result, a plastic hinge is formed between the upper steel pipe unit and the lower steel pipe unit, and energy due to vibration applied to the electrification pole is easily absorbed by the plastic deformation of the bars. In addition, all the bars are exposed to the outside, and the presence or absence of plastic deformation in all the bars can be easily visually confirmed. This makes it easy to determine whether the electrification pole needs to be replaced.
[0012] According to the second invention, the steel pipe unit installation step installs a steel pipe unit composed of an upper steel pipe unit of a cylindrical body, a lower steel pipe unit of a cylindrical body, and a plurality of steel bars joined to the outer periphery of the upper steel pipe unit and the outer periphery of the lower steel pipe unit. In other words, compared to the case where the bars are provided on the inner periphery, it is easier to ensure a wide interval for removing the wire saw used to cut the electrification pole. This makes it possible to avoid an increase in frictional resistance in part of the wire saw and reduce the risk of the electrification pole becoming impossible to cut. This improves workability.
[0013] In particular, according to the third invention, the insulation unit installation step installs an insulation unit including a first insulation material having a thermal conductivity of 0.040 W / (m K) or less and a thickness of 10 mm or more, and a second insulation material having a thermal conductivity of 0.040 W / (m K) or less and a thickness of 60 mm or more. As a result, the temperature of the filler filled between the electrification pole and the steel pipe unit is maintained at 0°C or more for 72 hours, allowing the filler to completely harden. This makes it possible to stabilize the strength of the earthquake-resistant reinforcement structure constructed in earthquake-resistant reinforcement work in cold environments. [Brief description of the drawings]
[0014] [Figure 1] FIG. 1 is a schematic diagram showing an example of a seismic reinforcement structure for an electricity pole in the first embodiment. [Diagram 2] FIG. 2 is a cross-sectional view taken along line AA in FIG. 1, showing an example of the earthquake-resistant reinforcement structure for an electricity pole in the first embodiment. [Diagram 3] Figures 3(a) and 3(b) are schematic diagrams showing a first reinforcing member of a steel pipe unit, where (a) is a plan view and (b) is a side view, and Figures 3(c) and 3(d) are diagrams showing a second reinforcing member of a steel pipe unit, where (c) is a plan view and (d) is a side view. [Figure 4] FIG. 4 is a flowchart showing an example of a construction method for a seismic reinforcement structure for an electricity pole in the first embodiment. [Diagram 5] FIG. 5 is a schematic diagram showing an example of a heat insulating unit installed during construction of a seismic reinforcement structure for an electricity pole in the first embodiment. [Figure 6] 6(a) to 6(d) are schematic diagrams showing a heat insulating unit, where (a) is a plan view, (b) is a side view, and (c) and (d) are schematic cross-sectional views showing the details of the upper end. [Figure 7] FIG. 7 is a schematic diagram showing an example of a part of a heat insulating unit installed during construction of a seismic reinforcement structure for an electricity pole in the first embodiment. [Figure 8] FIG. 8 is a plan view showing an example of a part of a heat insulating unit installed during construction of a seismic reinforcement structure for an electricity pole in the first embodiment. [Figure 9]9(a) to 9(d) are schematic plan views showing an example of a construction method for a heat insulating unit installed during construction of a seismic reinforcement structure for an electricity pole in the first embodiment. [Figure 10] FIG. 10 is a schematic diagram showing an example of an earthquake-resistant reinforcement structure for an electricity pole in the second embodiment. [Figure 11] FIG. 11 is a cross-sectional view taken along line BB in FIG. 11, showing an upper-stage earthquake-resistant reinforcement structure and a lower-stage earthquake-resistant reinforcement structure of an earthquake-resistant reinforcement structure for an electricity pole in the second embodiment. [Figure 12] FIG. 12 is a cross-sectional view taken along line CC in FIG. 10, showing a division position of the middle-stage earthquake-resistant reinforcement structure of the earthquake-resistant reinforcement structure for an electricity pole in the second embodiment. [Figure 13] FIG. 13 is a schematic diagram showing a first reinforcing member of a steel pipe unit constituting a seismic reinforcement structure for an electricity pole in the second embodiment, where (a) is a plan view and (b) is a side view. [Figure 14] FIG. 14 is a schematic diagram showing a second reinforcing member of a steel pipe unit constituting a seismic reinforcement structure for an electricity pole in the second embodiment, where (a) is a plan view and (b) is a side view. [Figure 15] FIG. 15 is a flowchart showing an example of a construction method for a seismic reinforcement structure for an electricity pole in the second embodiment. [Figure 16] Figure 16 is a diagram showing the division position of the middle-stage earthquake-resistant reinforcement structure before the division process is performed in the construction method of the earthquake-resistant reinforcement structure of an electricity pole in the second embodiment, where (a) is a cross-sectional view of the present invention and (b) is a cross-sectional view of the comparative example. [Figure 17] FIG. 17 is a schematic plan view showing an example of a construction method for a heat insulating unit installed during construction of a seismic reinforcement structure for an electricity pole in the second embodiment. [Figure 18] Figure 18 is a diagram showing the separation position of the middle-stage earthquake-resistant reinforcement structure during the separation process in the construction method of the earthquake-resistant reinforcement structure of an electricity pole in the second embodiment, where (a) is a cross-sectional view of the present invention and (b) is a cross-sectional view of the comparative example. [Figure 19]FIG. 19 is a diagram showing the results of a comparison of the effects between a comparative example of a seismic reinforcement structure for an electricity pole that does not have the insulation unit of this embodiment installed and an example of the present invention in which the insulation unit of this embodiment is installed. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] Hereinafter, an example of a method for seismic reinforcement of an electric pole as an embodiment of the present invention will be described in detail with reference to the drawings. Note that the components in each drawing are shown diagrammatically for the purpose of explanation, and the size of each component, the size comparison between components, etc. may differ from those shown in the drawings.
[0016] (First embodiment: Earthquake-resistance reinforcement method for power poles) First, with reference to Figs. 1 to 3, an example of an earthquake-resistant reinforcement structure 1 installed by the earthquake-resistant reinforcement method for an electricity pole EP in this embodiment will be described.
[0017] The method for earthquake-resistance reinforcement of an electricity pole EP is, for example, as shown in FIG. 1, to construct an earthquake-resistance reinforcement structure 1 by installing a steel pipe unit 10 on the outer periphery of an existing electricity pole EP.
[0018] The electrification pole EP is assumed to be a PC electrification pole with a diameter of 400 mm, for example. In a conventional PC electrification pole, the outer periphery of the electrification pole EP is surrounded by a steel pipe unit 10, and the first filler M1 is injected and filled into the gap between the electrification pole EP and the steel pipe unit 10. In addition, in a conventional PC electrification pole, the second filler M2 is injected and filled into the internal cavity EPa through an injection hole IN and a discharge confirmation hole OUT that are drilled in the hollow electrification pole EP and communicate with the internal cavity EPa. Here, for example, non-shrink mortar is used as the first filler M1 and the second filler M2. Each of these fillers M1 and M2 begins to harden by a hydration reaction after filling, but if the temperature becomes 0°C or lower before the hydration reaction is completed, the moisture necessary for the hydration reaction may freeze, and the hardening of the filler may be incomplete. As a result, the hardness of the filler becomes insufficient, and the quality of the reinforcement structure 1 of the electrification pole is deteriorated.
[0019] In the earthquake-resistance reinforcement method for an electricity pole EP described in this embodiment, a heat insulating unit 2 is installed so as to surround the outer periphery of the reinforcement structure 1 of the electricity pole until the hydration reaction of each filler M1, M2 is completed, as described below. This makes each filler M1, M2 less susceptible to the influence of the outside temperature, and each filler M1, M2 can be sufficiently hardened to the required strength. This improves the workability of earthquake-resistance reinforcement work in a cold environment.
[0020] <Steel pipe unit 10> The steel pipe unit 10 is made of steel material such as a general structural rolled steel plate (SS400) that has been subjected to rust prevention treatment such as hot-dip galvanization. As shown in Fig. 2, for example, the steel pipe unit 10 is divided into two parts: a first reinforcing member 10a having an arc-shaped cross section, and a second reinforcing member 10b having an arc-shaped cross section.
[0021] The first reinforcing member 10a is a member having as its base a tubular body 100 that is bent from a steel material such as a general structural rolled steel plate (SS400) having a thickness of 9 mm into a cross-sectional arc shape with an inner circumferential radius of curvature of 245 mm, as shown in FIG. 3(a).
[0022] As shown in Fig. 3(b), for example, the cylindrical body 100 has lifting holes h1 (five holes in Fig. 3) drilled along the edge of the upper end. The lifting holes h1 are holes for inserting a shackle or the like used to attach a hook bolt for lifting the cylindrical body 100 to the mounting position of the utility pole EP. The lifting holes h1 are holes with a diameter of, for example, 10 mm.
[0023] The cylindrical body 100 has a plurality of bolt holes 102 drilled therein, as shown in FIG. 3(b), for example. The plurality of bolt holes 102 are holes for bolting the cylindrical body 100 and the cylindrical body 101 of the second reinforcing member 10b together. In addition, a nut 103 that screws onto a bolt m1 is welded to the inner peripheral surface of the cylindrical body 100, which is inside the bolt hole 112. Therefore, in the steel pipe unit 10, the second reinforcing member 10b and the first reinforcing member 10a can be easily joined together in a short time by simply screwing the bolt m1 into the bolt hole 105 from the outside of the cylindrical body 101 of the second reinforcing member 10b.
[0024] 2, the cylindrical body 100 may have a spacer 104 protruding from the center line of the inner circumferential surface of the cylindrical body 100 to ensure a gap s1 for filling the first filler M1. The spacer 104 is made of a steel flat bar having a height of 10 mm and a thickness of 16 mm, for example.
[0025] The steel pipe unit 10 has a gap s1 between it and, for example, an electricity pole EP and the first filler M1 filled in. In this case, the energy caused by vibration applied to the electricity pole EP is easily dispersed throughout the entire earthquake-resistant reinforcement structure 1 via the first filler M1.
[0026] In addition, at this time, for example, as shown in Fig. 1, the second filler M2 may be filled into the internal cavity EPa of the utility pole EP up to a position above the first filler M1. In this case, the energy due to the vibration applied to the utility pole EP is easily dispersed throughout the entire earthquake-resistant reinforcement structure 1 via the second filler M2 and the first filler M1.
[0027] On the other hand, the second reinforcing member 10b is a member having as its base a tubular body 101 which is made by bending a steel material such as a general structural rolled steel plate (SS400) having a thickness of 9 mm into a cross-sectional arc shape with an inner circumferential surface having a radius of curvature of 254 mm, as shown in FIG. 3(c).
[0028] As shown in FIG. 3(d), for example, like the cylindrical body 100, the cylindrical body 101 has lifting holes h1 drilled along the edge of the upper end (three holes in FIG. 3).
[0029] For example, a plurality of bolt holes 105 are formed in the cylindrical body 101. The plurality of bolt holes 105 are holes for bolting the cylindrical body 101 and the cylindrical body 100 of the first reinforcing member 10a together.
[0030] Next, a method for seismic reinforcement of an electricity pole EP according to an embodiment of the present invention will be described. The method for seismic reinforcement of an electricity pole EP includes a steel pipe unit installation step S11, a filling step S12, and a heat insulation unit installation step S13, as shown in Fig. 4, for example.
[0031] <Advance preparation> As a preparatory work for carrying out the construction method for electric pole earthquake-resistance reinforcement work according to the embodiment of the present invention, the type of foundation on which the existing electric pole EP, which is the target of the earthquake-resistance reinforcement work, is planted and the presence or absence of obstacles are confirmed in advance. Of course, if there are any splices or the like that impede the construction, they are removed before construction if they can be removed. In addition, in the steel pipe unit installation process S11 described later, holes are drilled to inject and fill the second filler M2 into the internal cavity EPa. Specifically, as shown in FIG. 1, for example, at a predetermined height of the electric pole EP, an injection hole IN and a discharge confirmation hole OUT that communicate with the internal cavity EPa from the outer circumferential surface of the electric pole EP are drilled. The discharge confirmation hole OUT is provided, for example, at a position 1D (diameter of the outer circumferential cross section of the electric pole EP) above the upper end of the upper steel pipe unit 11. The second filler M2 may be filled in the internal cavity EPa in advance, or may be filled after filling the first filler M1 described later.
[0032] <Steel pipe unit installation process S11> In the steel pipe unit installation process S11, the steel pipe unit 10 is constructed so that its positional relationship with the electrification pole EP to be reinforced is a predetermined position. More specifically, the steel pipe unit 10 is installed on the outer periphery of the electrification pole EP.
[0033] First, the first reinforcing member 10a is lifted up along the electrification pole EP. Specifically, for example, the first reinforcing member 10a is lifted up by connecting a hook bolt provided on a hanger member fixed to the electrification pole EP in advance with a shackle inserted into the lifting hole h1. When lifting up the first reinforcing member 10a, the distance between the hanger member and the first reinforcing member 10a may be adjusted using another length adjustment tool such as a chain block without adjusting the length with the hook bolt.
[0034] The second reinforcing member 10b is also installed in the same manner. Thereafter, the second reinforcing member 10b and the first reinforcing member 10a are joined together with bolts to construct the steel pipe unit 10.
[0035] When the spacer 104 is provided on the first reinforcing member 10a, the spacer 104 contacts the electrification pole EP, forming a gap s1 between the first reinforcing member 10a and the electrification pole EP, as shown in Fig. 2, for example. Although not shown, the above-mentioned hanger member may be used to support a portion of the upper steel pipe unit 11 so that the gap s1 is constant.
[0036] This completes the installation of the steel pipe unit 10.
[0037] <Filling process S12> After the steel pipe unit 10 is installed in the steel pipe unit installation step S11, the filling step S12 is performed. In the filling step S12, the first filler M1 is injected into the gap s1 in the steel pipe unit 10 from the top of the steel pipe unit 10, and the first filler M1 is filled up to the top of the steel pipe unit 10. When injecting the first filler M1, as shown in FIG. 1, it is preferable to interpose a rubber material 5 having a concave cross section in which a concave groove into which the lower end of the cylindrical body 100, 101 of the steel pipe unit 10 is inserted, between the lower end of the steel pipe unit 10 and the foundation of the existing electrification pole EP. In this case, it is possible to prevent the first filler M1 filled in the steel pipe unit 10 from leaking out from the lower end. The rubber material 5 refers to a rubber elastic body that has a property (elastic deformation) of greatly expanding and contracting in the direction of an applied force and returning to its original shape when the force is removed.
[0038] <Insulation unit installation process S13> In the filling step S12, the first filler M1 is injected to fill the gap s1 with the first filler M1 up to the top of the steel pipe unit 10, and then the insulation unit installation step S13 is performed. In the insulation unit installation step S13, an insulation unit 2 is installed on the outer periphery of the steel pipe unit 10, for example, as shown in FIG.
[0039] <Insulation unit 2> The insulation unit 2 is a hollow body and is installed to cover the steel pipe unit 10. The insulation unit 2 has a first insulation material 21 that covers the outer peripheral side surface of the steel pipe unit 10 and a second insulation material 22 that covers the upper surface of the steel pipe unit 10. In this case, the first filler M1 inside the insulation unit 2 is less susceptible to the influence of the outside air temperature, and the first filler M1 can be sufficiently hardened to the required strength. This improves the workability of earthquake-resistance reinforcement work in cold environments. In addition, in the earthquake-resistance reinforcement method for electric poles, it is preferable to keep the temperature of the first filler M1 at 0°C or higher, at which water does not freeze, for about 72 hours in order to completely harden the first filler M1 by completing the hydration reaction and obtain a higher compressive strength.
[0040] The heat insulating unit 2 has, for example, a protective material 20 as a base, and a first heat insulating material 21 provided on an inner peripheral surface of the protective material 20. The first heat insulating material 21 is provided by being adhered to the inner peripheral surface of the protective material 20 with, for example, a known adhesive for metals.
[0041] The protective material 20 and the first insulating material 21 have, for example, a cylindrical shape, but may have any shape that covers the steel pipe unit 10. The second insulating material 22 has, for example, a circular shape in a plan view provided along the outer periphery of the electricity pole EP, but may have any shape that closes the upper surface of the protective material 20 so as to cover the upper surface of the steel pipe unit 10.
[0042] The protective material 20 is made of a material having excellent weather resistance, such as steel material, such as rolled steel plate for general structure (SS400) that has been subjected to rust prevention treatment, such as hot-dip galvanizing, or known synthetic resin, such as fluororesin or acrylic resin. When the protective material 20 made of steel is used, it has a higher density than the protective material 20 made of synthetic resin, so it is less susceptible to wind pressure, for example, when a vehicle runs near the earthquake-resistant reinforcement structure 1. In addition, it has better processability than the protective material 20 made of synthetic resin, so it is easier to join various members and it is easier to ensure strength. On the other hand, when the protective material 20 made of synthetic resin is used, it tends to have a lower thermal conductivity than the protective material 20 made of steel, so it is easier to improve the insulation performance. In addition, it has a lower density and is lighter than the protective material 20 made of steel, so it is easier to improve the workability.
[0043] The first insulating material 21 may be made of, for example, a foamed plastic formed into a planar shape in advance, such as polyethylene foam, polystyrene foam, hard urethane foam, phenol foam, etc. The second insulating material 22 may be made of, for example, the same material as the first insulating material 21.
[0044] As shown in Figure 6(a), for example, the insulation unit 2 has a first insulation member 20a having an arc-shaped cross section, a second insulation member 20b having an arc-shaped cross section, and a hinge 20c that rotatably joins each of the insulation members 20a, 20b.
[0045] Each of the heat insulating members 20a, 20b is a member having as its base a cylindrical body 200, 201 which is bent from a face material having a thickness of, for example, 1.2 mm into a cross-sectional arc shape with a radius of curvature of the inner peripheral surface of 310 mm. Each of the heat insulating members 20a, 20b may be bent from a face material having a thickness of, for example, 2.3 mm. The thickness of each of the heat insulating members 20a, 20b is, for example, 1.0 mm to 20.00 mm. If the thickness of each of the heat insulating members 20a, 20b is less than 1.0 mm, there are concerns that the workability is reduced, such as poor weldability to the hinge 20c, that durability is low and there is a risk of scattering due to wind pressure, and that it is difficult to obtain the expected heat insulating performance. If the thickness of each of the heat insulating members 20a, 20b exceeds 20 mm, it will not fit within the heat insulating unit 2 and installation will be difficult. On the inner peripheral surface of the cylindrical body 200, a heat insulating material 210 having a cross-sectional arc shape which constitutes a part of the first heat insulating material 21 of the cylindrical body is provided. Further, an insulating material 211 having an arc-shaped cross section is provided on the inner peripheral surface of the cylindrical body 201, which constitutes a part of the first insulating material 21 of the cylindrical body. By joining the end of the first insulating member 20a on which the hinge 20c is not provided and the end of the second insulating member 20b on which the hinge 20c is not provided, the protective material 20 of the cylindrical body is formed, and the first insulating material 21 of the cylindrical body can be formed on the inner peripheral surface of the protective material 20.
[0046] In particular, when using a first insulating material 21 having a thermal conductivity of 0.040 W / (m K) or less and a thickness of 10 mm or more, and a second insulating material 22 having a thermal conductivity of 0.040 W / (m K) or less and a thickness of 60 mm or more, the heat transmission resistance of the first insulating material 21 is set to 0.01 m ÷ 0.040 W / (m K) = 0.25 m 2 ·K / W or more, the thermal resistance of the second insulating material 22 is 0.06m÷0.040W / (m·K)=1.5m 2 In this case, the temperature of the filler M1 filled in the gap s1 between the electrification pole EP and the steel pipe unit 10 is maintained at 0°C or higher for 72 hours, allowing the filler M1 to completely harden. This makes it possible to stabilize the strength of the earthquake-resistant reinforcement structure 1 that is constructed in earthquake-resistant reinforcement work in a cold environment. Note that the heat transfer resistance of the first insulating material 21 is 0.25 m 2 ·K / W or less, or the thermal resistance of the second insulating material 22 is 1.5m 2 If the thermal insulation coefficient is less than 1.5 K / W, the temperature of the filler M1 filled in the gap s1 may not be maintained at 0° C. or higher for 72 hours. The effectiveness of the thermal insulation performance according to the materials and thicknesses of the first insulating material 21 and the second insulating material 22 will be explained in the examples based on experimental data.
[0047] Each of the cylindrical bodies 200 and 201 constituting the protective material 20 has a plurality of bolt holes 202 drilled therein, as shown in FIG. 6(b), for example. Each of the cylindrical bodies 200 and 201 is joined by screwing a bolt m2 into the bolt holes 230 in the fastener 23, as shown in FIG. 7, for example. In addition, a nut 203 that screws into the bolt m2 is welded to the inner circumferential surface of each of the cylindrical bodies 200 and 201, which is inside the bolt hole 202, as shown in FIG. 6(a), for example. For this reason, the thermal insulation unit 2 can easily join the thermal insulation members 20a and 20b in a short time by simply screwing the bolt m2 into the bolt hole 202 from the outside of each of the cylindrical bodies 200 and 201.
[0048] At the upper end of the protective material 20, as shown in FIG. 5, for example, a first fitting portion 204 and a second fitting portion 205 for fitting the second insulating material 22 therein are provided.
[0049] As shown in FIG. 6(c), the first fitting portion 204 is provided at the upper end of the second heat insulating member 20b. The first fitting portion 204 is provided, for example, by welding to the inner circumferential surface of the cylindrical body 201. The first fitting portion 204 is formed, for example, by welding a plurality of angles (angle irons) 204a and 204b having an L-shaped cross section to have a U-shaped cross section. The first fitting portion 204 may be formed, for example, by welding an extension member 204c to the angle 204b welded above the angle 204a. That is, the upper surface of the first fitting portion 204 having a U-shaped cross section is extended toward the utility pole EP. In this case, the second heat insulating material 22 is less likely to come off the first fitting portion 204 due to external forces such as weather. This makes it possible to suppress a decrease in the heat insulating performance of the heat insulating unit 2. Moreover, by providing the extension member 204c larger along the second insulating material 22, in this case, the exposed surface area of the second insulating material 22 can be reduced, making it easier to prevent damage to the second insulating material 22 due to external forces such as weather. This makes it possible to suppress a decrease in the insulating performance of the insulating unit 2. The extension member 204c may be made of the same steel material as the angles 204a and 204b.
[0050] As shown in FIG. 6(d), for example, a second fitting portion 205 is provided at the upper end of the first heat insulating member 20a. The second fitting portion 205 is provided, for example, by welding to the inner circumferential surface of the cylindrical body 200. The second fitting portion 205 is formed, for example, by welding a plurality of angles (angle irons) 205a and 205b having an L-shaped cross section to have a U-shaped cross section, similar to the first fitting portion 204. Note that the second fitting portion 205 does not need to be provided with a member such as an expansion member 204c in order to press down and fit the second heat insulating material 22 from the top of the protective material 20 as described later.
[0051] The second heat insulating material 22 is fitted into each fitting portion 204, 205 as shown in FIG. 5, and is provided at the upper end of the protective material 20. The second heat insulating material 22 is composed of, for example, a third heat insulating member 22a and a fourth heat insulating member 22b. As shown in FIG. 8, each heat insulating member 22a, 22b has a shape in which a semicircle having a diameter approximately equal to the outer diameter of the electric pole EP is cut out from a semicircle having a diameter approximately equal to the inner diameter of the protective material 20 in a plan view, and is used in combination as shown in FIG. The thickness of each heat insulating member 22a, 22b may be designed according to the properties of the filler M1, and is, for example, 60 mm to 100 mm. If the thickness of each heat insulating member 22a, 22b is less than 60 mm, the temperature of the filler M1 filled in the gap s1 may not be maintained at 0° C. or higher for 72 hours. If the thickness of each heat insulating member 22a, 22b is more than 100 mm, a taller protective material 20 is required, which may increase the manufacturing cost. In addition, it may be difficult to fit the upper portion of the protective material 20, which may reduce workability.
[0052] The insulation unit installation step S13 is performed, for example, in the procedure shown in Figures 9(a) to 9(c). First, as shown in Figure 9(a), only the first insulation member 20a is installed on the outer periphery of the steel pipe unit 10 with the hinge 20c connecting the first insulation member 20a and the second insulation member 20b folded. When the space for installing the first insulation member 20a is limited, the first insulation member 20a may be installed on the outer periphery of the steel pipe unit 10 by rotating the first insulation member 20a along the circumferential direction of the electricity pole EP (clockwise direction in Figure 9).
[0053] Next, as shown in FIG. 9(b), the third insulating member 22a and the fourth insulating member 22b are installed so as to cover the upper surface of the steel pipe unit 10 and to be fitted into the second fitting portion 205. At this time, as a method of fitting each insulating member 22a, 22b, for example, each insulating member 22a, 22b is pushed down from above the cylindrical body 200 while being elastically deformed in a direction toward the electrification pole EP, and fitted into the second fitting portion 205. In addition, as another method, each insulating member 22a, 22b may be fitted into the second fitting portion 205 while rotating it along the circumferential direction of the electrification pole EP. In addition, each insulating member 22a, 22b may be temporarily fixed to the electrification pole EP in advance, and then the first insulating member 20a may be installed on the outer periphery of the steel pipe unit 10, or the first insulating member 20a may be temporarily shifted in a direction away from the electrification pole EP only when each insulating member 22a, 22b is installed.
[0054] Next, as shown in Fig. 9(c), the hinge 20c is rotated to install the second insulating member 20b on the outer periphery of the steel pipe unit 10. At this time, the second insulating member 20b is installed while adjusting the positions of the insulating members 22a, 22b so that the installed insulating members 22a, 22b are fitted into the first fitting portion 204. Thereafter, as shown in Fig. 7, the fastener 23 is screwed with the bolt m2 into the bolt hole 202 provided in each of the insulating members 20a, 20b.
[0055] As shown in Fig. 9(d), for example, a spacer 206 for adjusting the distance from the utility pole EP may be fitted to the upper part of the steel pipe unit 10. In this case, a groove 206a may be formed in each of the heat insulating members 20a, 20b, 22a, 22b so as not to impede the installation of the spacer 206. The spacer 206 is, for example, plate-shaped.
[0056] This completes the installation of the insulation unit 2.
[0057] After the heat insulating unit 2 is installed and the first filler M1 is hardened, the heat insulating unit 2 is removed from the earthquake-resistant reinforcement structure 1. In detail, when the compressive strength of the first filler M1 is, for example, 24 N / mm 2After confirming that the above strength has been reached, the insulation unit 2 is removed from the earthquake-resistant reinforcement structure 1.
[0058] This completes the installation of earthquake-resistant reinforcement structure 1 for the electricity pole.
[0059] According to this embodiment, the method includes a filling step S12 for filling the gap between the electrification pole EP and the steel pipe unit 10 with the filler M1, and a heat insulation unit installation step S13 for installing the hollow heat insulation unit 2 so as to cover the outer circumferential side and upper surface of the steel pipe unit 10 filled with the filler M1 between the electrification pole EP. Therefore, the filler M1 inside the heat insulation unit 2 is less susceptible to the influence of the outside air temperature, and the filler M1 can be sufficiently hardened to the required strength. This improves the workability of earthquake-resistance reinforcement work in a cold environment.
[0060] According to this embodiment, the insulation unit installation step S13 installs an insulation unit 2 including a first insulation material 21 having a thermal conductivity of 0.040 W / (m·K) or less and a thickness of 10 mm or more, and a second insulation material 22 having a thermal conductivity of 0.040 W / (m·K) or less and a thickness of 60 mm or more. Therefore, the temperature of the filler material M1 filled between the utility pole EP and the steel pipe unit 10 is maintained at 0°C or more for 72 hours, and the filler material M1 can be completely hardened. This makes it possible to stabilize the strength of the earthquake-resistant reinforcement structure 1 constructed in earthquake-resistant reinforcement work in a cold environment.
[0061] (Second embodiment: Earthquake-resistance reinforcement method for power poles) An example of a seismic reinforcement structure 1 installed by the seismic reinforcement method for an electricity pole EP in this embodiment will be described with reference to Fig. 10 to Fig. 14. This embodiment differs from the first embodiment in that the steel pipe unit 10 is composed of an upper steel pipe unit 11 having a cylindrical body, a lower steel pipe unit 13 having a cylindrical body, and a plurality of steel bars 14 joined to the outer periphery of the upper steel pipe unit 11 and the outer periphery of the lower steel pipe unit 13, and the electricity pole EP is divided into upper and lower parts between the upper steel pipe unit 11 and the lower steel pipe unit 13. Note that a description of the same configuration as that described above will be omitted.
[0062] A method for seismic reinforcement of an electricity pole EP, as shown in Fig. 10, involves installing a steel pipe unit 10 consisting of an upper steel pipe unit 11 and a lower steel pipe unit 13 spaced apart in the vertical direction from the upper steel pipe unit 11, on the outer periphery of an existing electricity pole EP to construct a seismic reinforcement structure 1. Here, the upper steel pipe unit 11 constitutes a part of the upper seismic reinforcement structure, and the lower steel pipe unit 13 constitutes a part of the lower seismic reinforcement structure.
[0063] In this embodiment, an example will be described in which the earthquake-resistant reinforcement structure 1 for an electricity pole includes a middle-stage earthquake-resistant reinforcement structure composed of a middle-stage steel pipe unit 12 that is adjusted to have lower strength by being thinner than the upper-stage steel pipe unit 11 and the lower-stage steel pipe unit 13, but this is not limited as long as the portion between the upper-stage steel pipe unit 11 and the lower-stage steel pipe unit 13 functions as a plastic hinge portion. For example, the middle-stage earthquake-resistant reinforcement structure may be composed of a protective sheet material or the like that has lower strength than steel material instead of the middle-stage steel pipe unit 12, and installation of the protective sheet material or the like may be omitted.
[0064] Conventional PC electrification poles are reinforced with PC steel wires PC1 installed inside, but there is a risk that the concrete constituting the electrification pole EP will collapse due to the input of an unexpected horizontal load caused by a major earthquake or the like, causing the electrification pole EP to exhibit a brittle fracture mode. For this reason, in the pole earthquake reinforcement work according to the present invention, as described below, the outer periphery of the electrification pole EP is surrounded by a steel pipe unit 10 including an upper steel pipe unit 11 and a lower steel pipe unit 13, each having a plurality of rods 14 all joined to the outer periphery, and then the electrification pole EP is cut with a wire saw together with the buried PC steel wires PC1 at a position between the upper steel pipe unit 11 and the lower steel pipe unit 13.
[0065] In addition, in the earthquake-resistant reinforcement structure 1 for an electric pole, for example, a third filler M3 is injected and filled into gaps generated by the separation of the PC steel wire PC1 and the electric pole EP (see FIG. 12). As a result, the earthquake-resistant reinforcement structure 1 for an electric pole is configured so that the rods 14 provided on the outer periphery of the steel pipe unit 10 undergo plastic deformation to absorb input energy during a major earthquake and prevent brittle fracture. As the third filler M3, a filling material capable of bearing the compressive force in the vertical direction of the separated electric pole EP is used, and for example, a known synthetic resin, non-shrink cement milk, etc. are used.
[0066] <Steel pipe unit 10> As shown in FIG. 10, the steel pipe unit 10 includes an upper steel pipe unit 11 and a lower steel pipe unit 13. Each steel pipe unit 11, 13 is made of steel such as a general structural rolled steel plate (SS400) that has been subjected to rust prevention treatment such as hot-dip galvanization. A plurality of reinforcing bars 14 are welded and attached to the outer periphery of the upper steel pipe unit 11 and the lower steel pipe unit 13, and protective steel materials 15 are also attached to prevent the bars 14 from peeling off from each steel pipe plate when absorbing earthquake energy. The upper steel pipe unit 11 and the lower steel pipe unit 13 are vertically separated, and a middle steel pipe unit 12 to which no bars 14 are attached is provided between the upper steel pipe unit 11 and the lower steel pipe unit 13 (see FIG. 10 and FIG. 12).
[0067] The upper steel pipe unit 11 and the lower steel pipe unit 13 are a pair of upper and lower, symmetrical members connected by a plurality of (eight in the illustrated embodiment) rods 14. Therefore, in the following, the lower steel pipe unit 13 will be described as being substituted for the upper steel pipe unit 11 by indicating only the reference numeral, and a detailed description will be omitted.
[0068] <Upper steel pipe unit 11, lower steel pipe unit 13> The upper steel pipe unit 11 (lower steel pipe unit 13) is divided into two parts: a first reinforcing member 11a (13a) having an arc-shaped cross-section, and a second reinforcing member 11b (13b) also having an arc-shaped cross-section, as shown in Figure 11.
[0069] The first reinforcing member 11a (13a) is a member having as its base a tubular body 110 (130) that is bent from a steel material such as a general structural rolled steel plate (SS400) having a thickness of 9 mm into a cross-sectional arc shape with an inner circumferential surface having a radius of curvature of 245 mm, as shown in Figure 13(a), for example.
[0070] The cylindrical body 110 has lifting holes h1 drilled along the edge of the upper end, as shown in Fig. 13(b), for example (five holes in Fig. 4). The lifting holes h1 are holes for inserting a shackle or the like, which is used to attach a hook bolt for lifting the cylindrical body 110 to the mounting position of the utility pole EP. The lifting holes h1 are holes with a diameter of, for example, 10 mm.
[0071] The cylindrical body 110 (130) is provided with a plurality of bolt holes 112 (132), as shown in FIG. 13(b), for example. The plurality of bolt holes 112 (132) are holes for bolting the cylindrical body 110 (130) to the cylindrical body 111 (131) of the second reinforcing member 11b (13b). In addition, a nut 113 that screws onto the bolt m1 is welded to the inner peripheral surface of the cylindrical body 110, which is inside the bolt hole 112. Therefore, in the upper steel pipe unit 11 (lower steel pipe unit 13), the second reinforcing member 11b (13b) and the first reinforcing member 11a (13a) can be easily joined in a short time by simply screwing the bolt m1 into the bolt hole 115 from the outside of the cylindrical body 111 of the second reinforcing member 11b (13b) described later.
[0072] 11, the cylindrical body 110 (130) may have a spacer 114 (134) protruding above the center line of the inner circumferential surface of the cylindrical body 110 (below the center line of the inner circumferential surface of the cylindrical body 130) to ensure a gap s1 for filling the first filler M1. The spacer 114 (134) is made of a steel flat bar having a height of 10 mm and a thickness of 16 mm, for example.
[0073] The upper steel pipe unit 11 (lower steel pipe unit 13) has a first filler M1 filled in the gap s1 between it and the electrification pole EP, for example. In this case, the energy caused by vibration applied to the electrification pole EP is easily transmitted to each bar 14 via the first filler M1 and the steel pipe unit 10. This makes it possible to more reliably absorb earthquake energy and prevent brittle fracture of the electrification pole EP.
[0074] At this time, the second filler M2 may be filled into the internal cavity EPa of the electricity pole EP up to a position above the first filler M1, as shown in Fig. 10. In this case, when the third filler M3 is injected into the gap caused by the division of the electricity pole EP, the internal cavity EPa below the division position is already filled with the second filler M2, so that the third filler M3 is prevented from falling into the internal cavity EPa, and the third filler M3 can be efficiently filled.
[0075] On the other hand, the second reinforcing member 11b (13b) is a member having as its base a tubular body 111 (131) which is made by bending a steel material such as a general structural rolled steel plate (SS400) having a thickness of 9 mm into a cross-sectional arc shape with an inner radius of curvature of 254 mm, as shown in Figure 14(a), for example.
[0076] As shown in FIG. 14(b), for example, the cylindrical body 111 has lifting holes h1 drilled along the edge of the upper end, similar to the cylindrical body 110 (three holes in FIG. 14).
[0077] The cylindrical body 111 (131) is formed with, for example, a plurality of bolt holes 115 (135). The plurality of bolt holes 115 (135) are holes for bolting the cylindrical body 111 (131) to the cylindrical body 110 (130) of the first reinforcing member 11a (13a).
[0078] The cylindrical body 111 and the cylindrical body 131 are joined together via a bar 14 that is provided in advance on the outer periphery.
[0079] <Middle section earthquake-resistant reinforcement structure> The mid-level earthquake-resistant reinforcement structure refers to the structure between the upper steel pipe unit 11 and the lower steel pipe unit 13.
[0080] In the middle-stage earthquake-resistant reinforcement structure, the electric pole EP is divided at the position of at least one of the slits 126 shown in FIG. 10, for example. This division position functions as a plastic hinge part of the electric pole EP. That is, the earthquake-resistant reinforcement structure 1 of the electric pole includes a plurality of rods 14 that vertically connect the upper steel pipe unit 11 and the lower steel pipe unit 13, as described later, and all of the rods 14 are provided on the outer peripheral surfaces of the upper steel pipe unit 11 and the lower steel pipe unit 13. In addition, the electric pole EP is reinforced by the steel pipe unit 10 and is divided vertically between the upper steel pipe unit 11 and the lower steel pipe unit 13. In this case, the space between the upper steel pipe unit 11 and the lower steel pipe unit 13 becomes a plastic hinge, and the energy due to the vibration applied to the electric pole EP is easily absorbed by plastic deformation. In addition, the presence or absence of plastic deformation of all the rods 14 exposed to the outside can be easily visually confirmed. This makes it easy to determine whether or not the utility pole EP needs to be replaced.
[0081] 12, the middle stage earthquake-resistant reinforcement structure is composed of a middle stage steel pipe unit 12, a first filler M1, a third filler M3, and bars 14. The middle stage steel pipe unit 12 is divided into two parts, for example, a first reinforcing member 12a having an arc-shaped cross section similar to the first reinforcing member 11a, and a second reinforcing member 12b having an arc-shaped cross section similar to the second reinforcing member 11b.
[0082] The first reinforcing member 12a is a member having as its base a tubular body 120 that is bent from a steel material, such as a general structural rolled steel plate (SS400) having a thickness of 4.5 mm, into a cross-sectional arc shape with an inner circumferential surface having a curvature radius of 245 mm. The first reinforcing member 12a is thinner than the first reinforcing member 11a (13a), and is therefore more susceptible to plastic deformation than the first reinforcing member 11a (13a).
[0083] The cylindrical body 120 has a plurality of bolt holes 122 drilled therein, as shown in FIG. 13(b), for example. The plurality of bolt holes 122 are holes for bolting the cylindrical body 120 and the cylindrical body 121 of the second reinforcing member 12b together. In addition, a nut 113 that screws onto the bolt m1 is welded to the inner peripheral surface of the cylindrical body 120, which is inside the bolt hole 122, as with the first reinforcing member 11a constituting the upper steel pipe unit 11. For this reason, in the middle steel pipe unit 12, the second reinforcing member 12b and the first reinforcing member 12a can be easily joined in a short time by simply screwing the bolt m1 into the bolt hole 125 from the outside of the cylindrical body 121 of the second reinforcing member 12b described below.
[0084] In the middle steel pipe unit 12, for example, a first filler M1 is filled in the gap s1 between the electrification pole EP and the middle steel pipe unit 12. Also, a third filler M3 is filled in the gap created by the cutting of the electrification pole EP so as to fill up to the slit 126 (see FIG. 12). The electrification pole EP is cut into the PC steel wire PC1 and the first filler M1 by, for example, a wire saw inserted into the gap s2 shaped to cover the outer periphery of the electrification pole EP.
[0085] On the other hand, the second reinforcing member 12b is a member having as its base a tubular body 121 that is bent from a steel material such as a general structural rolled steel plate (SS400) having a thickness of 4.5 mm into a cross-sectional arc shape with an inner circumferential surface having a curvature radius of 254 mm. The second reinforcing member 12b is thinner than the first reinforcing member 11b (13b), and is therefore more susceptible to plastic deformation than the second reinforcing member 11b (13b).
[0086] 14(b), for example, a plurality of bolt holes 125 are formed in the cylindrical body 121. The plurality of bolt holes 125 are holes for bolting the cylindrical body 121 and the cylindrical body 120 of the first reinforcing member 12a together.
[0087] The cylindrical body 121 is provided with a slit 126 at, for example, the cutting position for inserting a jig for cutting the electricity pole EP in the middle steel pipe unit 12. Note that, in the present embodiment, an example in which two slits 126 are provided in the vertical direction has been shown, but cutting of the electricity pole EP needs to be performed at the position of at least one of the slits 126, and the other slit 126 is provided as a backup in case the electricity pole EP cannot be cut at one of the slits 126.
[0088] In this embodiment, an example is shown in which a tubular body 120 is provided as a first reinforcing member 12a between tubular body 110 and tubular body 130, and a tubular body 121 is provided as a second reinforcing member 12b between tubular body 111 and tubular body 131, but if the installation of a mid-stage earthquake-resistant reinforcement structure is omitted, tubular body 120 and tubular body 121 do not need to be provided.
[0089] <Bar material 14> The bars 14 are provided on the outer circumferential surfaces of the upper steel pipe unit 11 and the lower steel pipe unit 13 so as to vertically connect the upper steel pipe unit 11 and the lower steel pipe unit 13. The bars 14 are reinforcing bars made of deformed steel bars of, for example, D25 (SD390). The bars 14 have a total length of, for example, 900 mm, and both longitudinal end portions within a range of 200 mm from the upper end and the lower end are joined to the respective cylindrical bodies 110, 130 by welding. The middle portion of the bars 14 is not fixed and is free, and the free section plastically deforms during an earthquake to absorb the energy input to the earthquake-resistant reinforcement structure 1 of the electrification pole. The bars 14 are plastically deformed when an external force is applied due to an earthquake or the like. In this case, when the bars 14 plastically deform, it is possible to prevent the energy absorption performance from being impaired by contact with the electrification pole EP, the steel pipe unit 10, the first filler M1, etc. This makes it possible to reliably absorb earthquake energy and prevent brittle fracture of the utility poles EP.
[0090] As shown in FIG. 13(a), the bar 14 is provided on the outer circumferential surface of each cylindrical body 110, 130 so as to connect the cylindrical bodies 110, 130 in the up-down direction via a gap maintainer 14a that maintains a predetermined gap. The gap maintainer 14a is, for example, a spacer having a thickness of 4.5 mm and a length of 200 mm. The gap maintainer 14a is firmly fixed by K-shaped flare welding to the gap maintainer 14a in a range of 200 mm from the end, while being slightly raised from the outer circumferential surface of each cylindrical body 110, 130, and is integrated with each cylindrical body 110, 130. That is, the bar 14 is further separated from the electrification pole EP by the gap maintainer 14a. In this case, it is possible to further prevent the bar 14 from coming into contact with the electrification pole EP, the steel pipe unit 10, the first filler M1, etc., when the bar 14 is plastically deformed, and thus the energy absorption performance is prevented from being impaired. This makes it possible to more reliably absorb earthquake energy and prevent brittle fracture of the utility pole EP. Note that the gap maintaining body 14a is similarly provided for each of the cylindrical bodies 111, 131, as shown in, for example, FIG.
[0091] Next, a method for seismic reinforcement of an electricity pole EP according to an embodiment of the present invention will be described with reference to Fig. 15 to Fig. 18. The method for seismic reinforcement of an electricity pole EP further includes a cutting step S14, as shown in Fig. 15, for example. The cutting step S14 is performed after the insulation unit installation step S13.
[0092] <Advance preparation> As a preparatory work for carrying out the construction method for electric pole earthquake-resistance reinforcement work according to the embodiment of the present invention, a wire saw pipe 31 having a gap s2 therein for inserting a wire saw 33 (described later) used as a cutting jig at a position where the electric pole EP is to be cut (the position of the slit 126 in Fig. 10) is wound around the outer periphery of the electric pole EP in advance and temporarily placed. Note that the wire saw pipe 31 is made of a material having a strength sufficient to be cut by the wire saw 33, for example, a synthetic resin (plastic).
[0093] The first reinforcing member 11a of the upper steel pipe unit 11 and the first reinforcing member 13a of the lower steel pipe unit 13 are previously joined to the outer periphery by welding a plurality of vertically extending rods 14, as shown in FIG. 13(b), and are integrated together. In order to reduce the number of times the reinforcing members are lifted, the first reinforcing member 12a of the middle steel pipe unit 12 may be temporarily fixed between the first reinforcing members 11a and 13a with adhesive tape or the like. However, in order to allow the reinforcing members 11a and 12a and the reinforcing members 12a and 13a to function as plastic hinges, the first reinforcing member 12a is not previously joined to the reinforcing members 11a and 13a. In addition, the second reinforcing member 11b of the upper steel pipe unit 11 and the second reinforcing member 13b of the lower steel pipe unit 13 are previously joined to the outer periphery by welding a plurality of vertically extending rods 14, as shown in FIG. 14(b), and are integrated together. Also, similar to the first reinforcing member 12a, the second reinforcing member 12b of the middle steel pipe unit 12 may be temporarily fixed between each of the second reinforcing members 11b, 13b with adhesive tape or the like, but the second reinforcing member 12b is not integrated with each of the second reinforcing members 11b, 13b.
[0094] <Steel pipe unit installation process S11> In the steel pipe unit installation process S11, the upper steel pipe unit 11 and the lower steel pipe unit 13 are installed around the outer periphery of the electrification pole EP. In this embodiment, an example has been shown in which the middle steel pipe unit 12 is constructed in conjunction with the installation of the upper steel pipe unit 11 and the lower steel pipe unit 13 using the members of the middle steel pipe unit 12 temporarily fastened to the members of the upper steel pipe unit 11 and the lower steel pipe unit 13, but the interrupted steel pipe unit 12 may be constructed separately before or after the installation of each steel pipe unit 11, 13 using the members of the middle steel pipe unit 12 independent of the members of each steel pipe unit 11, 13.
[0095] First, each of the first reinforcing members 11a, 12a, and 13a is lifted along the electrification pole EP. Specifically, for example, the first reinforcing members are lifted by connecting a hook bolt provided on a hanger member fixed to the electrification pole EP in advance to a shackle inserted into a lifting hole h1. When lifting, the distance between the hanger member and each of the first reinforcing members 11a, 12a, and 13a may be adjusted using another length adjustment jig such as a chain block without adjusting the length with the hook bolt.
[0096] Similarly, the second reinforcing members 11b, 12b, 13b are also installed. At this time, the height of each of the second reinforcing members 11b, 12b, 13b or the temporarily placed pipe for wire saw 31 is adjusted so that the slit 126 provided in the second reinforcing member 12b is located at the position of the pipe for wire saw 31 that is temporarily placed by wrapping it around the outer periphery of the electrification pole EP. Thereafter, the second reinforcing members 11b, 12b, 13b and the first reinforcing members 11a, 12a, 13a are bolted together to construct the upper steel pipe unit 11, the middle steel pipe unit 12, and the lower steel pipe unit 13.
[0097] After installing each steel pipe unit 11, 12, 13, the temporary arrangement of the wire saw pipe 31 is released, and both ends of the wire saw pipe 31 are taken out from the slit 126 provided in the second reinforcing member 12b, and in a state where they are exposed to the outside of the middle steel pipe unit 12, masking tape 32 is applied to the slit 126 to fix the wire saw pipe 31. At this time, the wire saw pipe 31 is arranged so as to form a gap s2 as shown in FIG. 16(a). Note that the wire saw pipe 31 needs to be taken out from two points that do not straddle the bar 14 so that the bar 14 is not accidentally cut by the wire saw 33. That is, both ends of the slit 126 are provided at positions that do not straddle the bar 14.
[0098] After the wire saw pipe 31 is fixed with masking tape 32, the first filler M1 is injected from the top of the upper steel pipe unit 11 into the gaps s1 in each steel pipe unit 11, 12, 13, until the first filler M1 fills up to the top of the upper steel pipe unit 11. At this time, the first filler M1 does not penetrate into the gaps s2 in the wire saw pipe 31, and the gaps s2 are maintained in the middle steel pipe unit 12.
[0099] This completes the installation of the steel pipe unit 10.
[0100] <Insulation unit installation process S13> In the insulation unit installation process S13, for example as shown in Fig. 17, the insulation unit 2 is installed on the outer periphery of the steel pipe unit 10. At this time, the first insulation material 21 (210, 211) bites into the rod material 14 provided on the outer periphery of the steel pipe unit 10, making it difficult for the insulation unit 2 to shift from the installation position due to external forces such as weather, and thus reducing the deterioration of the insulation performance.
[0101] <Cutting step S14> After the insulation unit 2 is installed in the insulation unit installation step S13, the first filling material M1 hardens, and then the insulation unit 2 is removed from the earthquake-resistant reinforcement structure 1. More specifically, the insulation unit 2 is removed from the earthquake-resistant reinforcement structure 1 after it is confirmed that the compressive strength of the first filling material M1 has reached a strength of, for example, 24 N / mm2 or more.
[0102] 16(a), for example, a wire saw 33 is inserted into a gap s2 in a wire saw pipe 31 included in the middle steel pipe unit 12, and the wire saw 33 is placed between a main pulley 34 and an auxiliary pulley 35. After that, after confirming that the wire saw is not in contact with the bar 14, the wire saw 33 is rotated to cut the electrification pole EP together with the wire saw pipe 31, the PC steel wire PC1, the first filler material M1, and the second filler material M2.
[0103] In addition, in the earthquake-resistant reinforcement structure 1 for an electric pole in the present invention, since the rods 14 are provided on the outer periphery of the steel pipe unit 10, the interval between the rods 14 is larger than that in the case of providing the rods 14' on the inner periphery of the steel pipe unit 10 as shown in FIG. 16(b), and the wire saw 33 is easily arranged so that the rotation radius is larger. In addition, when the rotation radius of the wire saw 33 is large, for example, as shown in FIG. 18(a), even if the wire saw 33 moves in the cutting direction shown by the arrow, the rotation radius is unlikely to decrease to a radius at which cutting is impossible, and the electric pole EP is unlikely to become completely unable to be cut. On the other hand, when the rotation radius of the wire saw 33 is small, for example, as shown in FIG. 18(b), when the wire saw 33 moves in the cutting direction shown by the arrow in conjunction with cutting, the rotation radius becomes smaller (see the right-sloping diagonal line in FIG. 18(b)), and the frictional resistance that the wire saw 33 receives from the electric pole EP increases, and there is a risk that the electric pole EP will not be completely cut. That is, by providing the rods 14 on the outer periphery of the steel pipe unit 10, it is easier to ensure a wider interval for removing the wire saw 33 than when the rods 14 are provided on the inner periphery of the steel pipe unit 10, so that it is possible to avoid an increase in frictional resistance from the electrification pole EP at a part of the wire saw 33 and reduce the risk of being unable to cut the electrification pole EP completely. This makes it possible to improve workability.
[0104] After the utility pole EP is cut, the gap created by the cutting is filled with the third filler M3, for example, as shown in Fig. 12. Specifically, after collecting the dust in the gap created by the cutting, an injection pipe and an air vent pipe, etc. are installed in the gap, and the third filler M3 is injected and filled using an electric dispenser, etc.
[0105] This completes the installation of earthquake-resistant reinforcement structure 1 for the electricity pole.
[0106] According to this embodiment, the steel pipe unit installation step S11 installs a steel pipe unit 10 composed of an upper steel pipe unit 11 of a cylindrical body, a lower steel pipe unit 13 of a cylindrical body, and a plurality of steel bars 14 joined to the outer periphery of the upper steel pipe unit 11 and the outer periphery of the lower steel pipe unit 13. The method further includes a separation step S14 in which the heat insulating unit 2 is removed after the filling material M1 has hardened, and the electrification pole EP is separated into upper and lower parts between the upper steel pipe unit 11 and the lower steel pipe unit 13. As a result, a plastic hinge is formed between the upper steel pipe unit 11 and the lower steel pipe unit 13, and energy due to vibration applied to the electrification pole EP is easily absorbed by the plastic deformation of the bars 14. In addition, all the bars 14 are exposed to the outside, and the presence or absence of plastic deformation in all the bars 14 can be easily visually confirmed. This makes it easy to determine whether the electrification pole EP needs to be replaced.
[0107] According to the present embodiment, the steel pipe unit installation step S11 installs a steel pipe unit 10 composed of an upper steel pipe unit 11 of a cylindrical body, a lower steel pipe unit 13 of a cylindrical body, and a plurality of steel bars 14 joined to the outer periphery of the upper steel pipe unit 11 and the outer periphery of the lower steel pipe unit 13. That is, compared to the case where the bars 14 are provided on the inner periphery, it is easier to ensure a wide interval for removing the wire saw 33 used to cut the electrification pole EP. This makes it possible to avoid an increase in frictional resistance in a part of the wire saw 33 and reduce the risk that the electrification pole EP becomes impossible to cut. This makes it possible to improve workability. EXAMPLES
[0108] The following describes the results of an experiment on the effect of the earthquake-resistant reinforcement method for utility poles when the above-mentioned embodiment is used. In this experiment, graphs showing the change over time of the internal temperature indicating the temperature of the first filler M1 and the surface temperature indicating the temperature of the steel pipe unit 10 were created for a comparative example using a conventional earthquake-resistant reinforcement method that does not use the heat insulating unit 2 and an example of the present invention using the earthquake-resistant reinforcement method of the present invention, and by comparing these graphs, the effect of the first filler M1 being less susceptible to the influence of the outside air temperature was confirmed.
[0109] First, the conditions of this experiment will be explained.
[0110] As a comparative example, the internal temperature of the first filler M1 and the surface temperature of the steel pipe unit 10 were measured for the steel pipe unit 10 shown in Fig. 10, which was constructed without installing the insulation unit 2 shown in Fig. 5. As an example of the present invention, the internal temperature of the first filler M1 and the surface temperature of the steel pipe unit 10 were measured for the steel pipe unit 10 shown in Fig. 10, which was constructed with the insulation unit 2 shown in Fig. 5 installed.
[0111] The first insulating material 21 and the second insulating material 22 were made of polyethylene foam "Foam Ace (registered trademark)" grade "SN3000" manufactured by Furukawa Electric Co., Ltd. (registered trademark). This polyethylene foam has a thermal conductivity of 0.040 W / (m·K) or less according to "JIS K 6767 (Polyethylene Foam Testing Method)". Among the present invention examples, a combination in which the first insulating material 21 is 10 mm thick and the second insulating material 22 is 60 mm thick was set as present invention example 1, and a combination in which the first insulating material 21 is 20 mm thick and the second insulating material 22 is 60 mm thick was set as present invention example 2.
[0112] In addition, a thermometer for measuring the internal temperature was attached so that its sensor part was located near the middle between the steel pipe unit 10 and the electricity pole EP, and a thermometer for measuring the surface temperature was attached so that its sensor part was in contact with the outer circumferential surface of the steel pipe unit 10. In order to reproduce the effect in a cold environment, the experiment was carried out after adjusting the indoor temperature of the laboratory to about -5°C.
[0113] The first filler M1 used was "Denka Hypretascon (registered trademark) TYPE-H" manufactured by Denka Co., Ltd. (registered trademark). The filler is a non-shrink grout material that hardens by kneading water and causing a hydration reaction. In this experiment, the time required for the hydration reaction to complete was set to about 72 hours, and the temperature of the filler was measured 72 hours after the filler was kneaded with water, and a graph was created showing the change in temperature over time. The kneaded temperature of the first filler M1 was about 14.7°C.
[0114] Next, as a result of this experiment, the change over time in the internal temperature and surface temperature of each of the comparative example, invention example 1, and invention example 1 will be described. The results of this experiment are as shown in FIG. 19. In the graph of FIG. 19, the vertical axis indicates the internal temperature or surface temperature, and the horizontal axis indicates the elapsed time from the time of temperature measurement. In detail, graph ST1 indicates the surface temperature of the comparative example, graph IT1 indicates the internal temperature of the comparative example, graph ST2 indicates the surface temperature of invention example 1, graph IT1 indicates the internal temperature of invention example 1, graph ST3 indicates the surface temperature of invention example 2, and graph IT3 indicates the internal temperature of invention example 2. Graph RT indicates the room temperature in the laboratory.
[0115] The temperatures shown in each graph indicate that as the first filler M1 was poured, the internal and surface temperatures rose to close to the mixing temperature of the first filler M1, then reached a temperature peak due to the hydration reaction, and then tended to decrease until the end of measurement.
[0116] Graph IT1 showing the internal temperature of the comparative example reached a temperature peak of 37.0°C, and then dropped below 0°C about 19 hours after the start of the experiment. Graph ST1 showing the surface temperature of the comparative example reached a temperature peak of 21.5°C, and then dropped below 0°C about 15 hours after the start of the experiment. In other words, according to the earthquake-resistance reinforcement method of the comparative example, the temperature of the first filling material M1 cannot be maintained at 0°C or higher for 72 hours. For this reason, there is a risk that the first filling material M1 cannot be completely hardened.
[0117] Graph IT2 showing the internal temperature of Inventive Example 1 maintained a temperature above 0°C for approximately 72 hours from the start of the experiment after reaching a peak temperature of 45.6°C. Graph ST2 showing the surface temperature of Inventive Example 1 maintained a temperature below 0°C approximately 69 hours from the start of the experiment after reaching a peak temperature of 39.5°C. In other words, according to the earthquake reinforcement method of Inventive Example 1, the temperature of the first filling material M1 can be maintained above 0°C for 72 hours. This allows the first filling material M1 to completely harden.
[0118] Graph IT3 showing the internal temperature of Inventive Example 2 maintained a temperature above 0°C for approximately 72 hours from the start of the experiment after reaching a peak temperature of 52.0°C. Graph ST2 showing the surface temperature of Inventive Example 2 maintained a temperature above 0°C for approximately 72 hours from the start of the experiment after reaching a peak temperature of 52.8°C. In other words, according to the earthquake reinforcement method of Inventive Example 2, the temperature of the first filling material M1 can be maintained at 0°C or higher for 72 hours. This allows the first filling material M1 to be completely hardened.
[0119] From the above results, when a first insulating material 21 having a thermal conductivity of 0.040 W / (m K) or less and a thickness of 10 mm or more and a second insulating material 22 having a thermal conductivity of 0.040 W / (m K) or less and a thickness of 60 mm or more are used, that is, when the thermal conductivity of the first insulating material 21 is 0.25 m 2 ·K / W or more, the thermal resistance of the second insulating material 22 is 1.5m 2 At 0.05 K / W or more, the temperature of the filler M1 filled in the gap s1 between the utility pole EP and the steel pipe unit 10 is maintained at 0°C or higher for 72 hours, allowing the filler M1 to completely harden. This makes it possible to stabilize the strength of the earthquake-resistant reinforcement structure 1 constructed in earthquake-resistant reinforcement work in a cold environment.
[0120] Regarding the first insulating material 21, when the thermal conductivity is about 0.040 W / (m·K) and the thickness is less than 10 mm, that is, when the thermal resistance of the first insulating material 21 is 0.25 m 2 If the thickness is less than 1.0 K / W, the surface temperature will be even lower than that of Example 1 of the present invention, and there is a risk that the internal temperature will not be maintained at 0°C or higher for 72 hours. Furthermore, if the thickness of the first insulating material 21 exceeds 20 mm, a larger protective material 20 will need to be procured to contain the first insulating material 21. Furthermore, the greater the thickness of the first insulating material 21, the more likely it is that the workability of bonding it to the inner surface of the protective material 20 will decrease. For this reason, the thickness of the first insulating material 21 is preferably 10 mm or more, and more preferably 10 mm or more and 20 mm or less.
[0121] Regarding the second insulating material 22, when the thermal conductivity is about 0.040 W / (m·K) and the thickness is 60 mm or more, that is, when the heat transfer resistance of the second insulating material 22 is 1.5 m 2It has been confirmed that when the heat insulating property is .K / W or more, the above-mentioned heat insulating performance required for complete hardening of the filler M1 can be exhibited. The second insulating material 22 may be provided above the protective material 20, so long as it is provided so as to cover the upper surface of the protective material 20, and may be adhered to or fitted to the protective material 20 by any method. However, in order to improve weather resistance and mechanical strength, it is preferable that the second insulating material 22 is fitted into each fitting portion 204, 205 provided at the upper end of the protective material 20.
[0122] Although some embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]
[0123] 1. Reinforcement structure of power poles 10: Steel pipe unit 11: Upper steel pipe unit 10a, 11a, 12a, 13a: First reinforcing member 10b, 11b, 12b, 13b: second reinforcing member 100, 101, 100, 101, 120, 121, 130, 131: Cylindrical body 102, 112, 122, 132: Bolt holes 103, 113: Nut 104, 114, 134: Spacer 105, 115, 125, 135: Bolt holes 12: Middle steel pipe unit 126: Slit 13: Lower steel pipe unit 14: Bar material 14a: Gap retainer 15: Protective steel material h1: Lifting hole m1:Bolt s1: Gap s2: Gap 20: Insulation unit 20a: Hinge 200, 201: Cylindrical body 202: Bolt hole 203: Nut 204: Fitting part 205: Bolt hole 21: First insulation material 210, 211: Cylindrical body 22: Second insulation material 23: Clasp 230: Bolt hole m2:Bolt 31: Wire saw piping 32: Masking tape 33: Wire saw 34: Main pulley 35: Auxiliary pulley 5: Rubber material EP: PC electrified pole EPa: internal cavity PC1: PC steel wire S11: Steel pipe unit installation process S12: Filling process S13: Insulation unit installation process IN: Injection hole OUT:Discharge confirmation hole M1: 1st filler M2: 2nd filler M3: Third filler
Claims
1. a steel pipe unit installation process for installing a cylindrical steel pipe unit on an outer periphery of an existing electrification pole; a filling step of filling a filler between the steel pipe unit installed in the steel pipe unit installation step and the electrification pole; an insulation unit installation process in which a hollow insulation unit is installed so as to cover the outer peripheral side surface and the upper surface of the steel pipe unit in which the filler is filled between the electrification poles in the filling process; Having A method for earthquake-resistance reinforcement of an electricity pole, comprising:
2. The steel pipe unit installation process includes installing the steel pipe unit, which is composed of an upper steel pipe unit of a cylindrical body, a lower steel pipe unit of a cylindrical body spaced apart from the upper steel pipe unit in the vertical direction, and a plurality of steel bars joined to the outer periphery of the upper steel pipe unit and the outer periphery of the lower steel pipe unit, The method further comprises a dividing step of removing the insulation unit installed in the insulation unit installation step after the filler has hardened, and dividing the electrification pole into upper and lower parts between the upper steel pipe unit and the lower steel pipe unit. The method for seismic reinforcement of an electricity pole according to claim 1,
3. The heat insulation unit installation step includes installing the heat insulation unit, which includes a first heat insulation material having a thermal conductivity of 0.040 W / (m·K) or less and a thickness of 10 mm or more that covers the outer peripheral side surface of the steel pipe unit, and a second heat insulation material having a thermal conductivity of 0.040 W / (m·K) or less and a thickness of 60 mm or more that covers the upper surface of the steel pipe unit. The method for earthquake-resistance reinforcement of an electricity pole according to claim 1 or 2,
Citation Information
Patent Citations
Construction jigs and construction methods for earthquake-resistant reinforcement of utility poles
JP7203268B1