Method for moving heavy objects using a heavy object moving device and a heavy object moving device

The telescopic frame mechanism of the heavy object moving device addresses space and transportation challenges in bridge deck slab replacement by enabling easy installation and transportation, enhancing work efficiency and reducing costs.

JP7568805B2Active Publication Date: 2024-10-16OHBAYASHI GUMI LTD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023144141
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-09-06
Publication Date
2024-10-16
Estimated Expiration
2039-10-31

AI Technical Summary

Technical Problem

Existing methods for removing and replacing bridge deck slabs face challenges due to the large size and complexity of erection girder type lifting devices, which require significant space, multiple trucks for transportation, and complex assembly, leading to increased costs and prolonged construction periods.

Method used

A heavy object moving device with a telescopic frame mechanism, comprising expandable and retractable gate-shaped frames and a lifting mechanism, allows for easy installation and transportation, reducing the need for multiple trucks and assembly work, and enabling efficient loading and unloading of heavy objects.

Benefits of technology

The device facilitates efficient and cost-effective removal and replacement of bridge deck slabs by minimizing space requirements, reducing transportation costs, and improving workability, while ensuring safety and work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007568805000001
    Figure 0007568805000001
  • Figure 0007568805000002
    Figure 0007568805000002
  • Figure 0007568805000003
    Figure 0007568805000003
Patent Text Reader

Abstract

To provide a heavy object movement device and a heavy object movement method using the heavy object movement device that allows easy transportation to a construction site and installation at the site.SOLUTION: A heavy object movement device comprises: traverse rails; a pair of gantry frames provided facing each other near both ends of the traverse rails; and a lifting mechanism that runs along the traverse rails. A heavy object movement method using the heavy object movement device to move heavy objects includes the steps of: deploying and installing gantry frames having shortened braces and connecting beams, in which the gantry frames comprise a pair of braces that can be expanded and contracted in the height direction, and the connecting beam that connects the upper ends of the braces and can be expanded and contracted in the longitudinal direction; lifting and moving a heavy object by making a heavy mechanism run along the traverse rails while the heavy object is suspended; and minimizing the unfolded gantry frames by shortening both the braces and the connecting beams.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present invention relates to a method for moving a heavy object using a heavy object moving device for lifting and moving a heavy object. and a heavy load moving device. [Background technology]

[0002] Conventionally, bridge deck installation involves replacing the existing deck installed on the I-type main girder with a new deck. In the replacement method, when removing the existing deck, first, the shape must be such that it can be loaded onto the loading platform of a transport vehicle. After this, the existing deck is cut into pieces using a lifting device such as a crane. A method is known in which the cut pieces are lifted and moved to the loading platform of a transport vehicle.

[0003] In this situation, in Patent Document 1, a removal member that is part of the existing deck is lifted by an erection girder type lifting device. The method of removing the erection girder type lifting device is disclosed. First, a lifter is supported at the four corners of a rectangular platform by four columns. These are then loaded one by one onto the back of a truck and transported to the construction site. The lifters are placed at intervals with the removal material in between, and the erection girders are placed on the platforms of each lifter. The lifting mechanism is installed on the erection girder so that it can move freely sideways.

[0004] The lifting mechanism of the erection girder type lifting device thus assembled is used to lift the existing deck slab, which is part of the existing deck slab. The removal member is removed from the road bridge by lifting it up, and the removal member is also lifted up. The lifting mechanism moves horizontally along the erection girder. Meanwhile, one of the two lifters A transport vehicle is placed under one of the platforms, and the lifting mechanism moves along the erection girder to the platform. At this point, the member to be removed that is suspended by the hoisting mechanism is lowered onto the bed of the transport vehicle. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Japanese Patent Application Publication No. 2018-204427 Summary of the Invention [Problem to be solved by the invention]

[0006] The erection girder type lifting device described in Patent Document 1 is a common device traded on the market. The lifter is used to assemble the structure, and the erection girder equipped with a lifting mechanism is hung across it. This eliminates the time and cost of manufacturing a dedicated device and makes it possible to easily remove the parts to be removed. It is possible to implement it.

[0007] However, as mentioned above, the lifter is supported by four columns at the four corners of a rectangular platform in plan view. When two lifters are installed with the removal material sandwiched between them, a total of eight support columns are installed. This means that the area occupied by the erection girder type lifting device at the construction site will be Since the installation space is large, it may be difficult to secure the installation space depending on the construction site. occurs.

[0008] In addition, two lifters were installed at the construction site, and the erection girders equipped with lifting mechanisms were installed on them. The assembly work of transferring these components is complicated, and the number of trucks required to transport them to the construction site is also high. Since multiple trucks are required, securing a place for these trucks to park and transportation costs will increase. This will create issues in terms of construction time, construction costs, and workability, such as increasing the size of the work.

[0009] The present invention has been made in consideration of such problems, and its main purpose is to It is easy to move the heavy object using a heavy object moving device that is easy to install at the construction site. The present invention provides a method for moving an object and a device for moving a heavy object. [Means for solving the problem]

[0010] In order to achieve this object, the method for moving a heavy object using the heavy object moving device of the present invention is a pair of gate-shaped frames provided opposite each other near both ends of the lateral rail; A heavy object is lifted using a heavy object moving device equipped with a lifting mechanism that travels along the horizontal rail. A method for moving a heavy object, comprising: The structure comprises a support column and a connecting beam that connects the upper ends of the support columns and is extendable and contractible in the longitudinal direction, a step of unfolding and installing the portal frame in a state in which the columns and the connecting beams are shortened; The lifting mechanism, with the heavy object suspended therefrom, is caused to travel along the lateral rail. By this, the process of lifting and moving the heavy object and the process of shortening both the support columns and the connecting beams can be carried out. and a step of minimizing the deployed portal frame by

[0011] The heavy object moving device of the present invention also includes a lateral rail and two opposing rails in the vicinity of both ends of the lateral rail. and a lifting mechanism that travels along the lateral rail. The gate-shaped frame is a pair of support columns that are extendable in the height direction. and a connecting beam that connects the upper ends of the support columns and is extendable and contractible in the longitudinal direction. do.

[0012] According to the method for moving a heavy object using the heavy object moving device and the heavy object moving device of the present invention, The frame is made up of a pair of support columns that are expandable in the height direction and the upper ends of the support columns are connected to each other to expand in the longitudinal direction. This allows the shortest length of the support to be adjusted to the trailer height. The minimum length of the connecting beam is set to a height that allows road traffic when the pair of supports is By setting the length so that it can be connected at intervals that fit within the width that can be loaded on the trailer, it is possible to move heavy objects. The equipment can be loaded onto a trailer and transported to the construction site without disassembly.

[0013] On the other hand, when lifting heavy objects, they are transported to the construction site by trailer and then The gate frame can be constructed as desired by extending the support columns and connecting beams without any assembly work. Simply unfold it to the desired size and install it.

[0014] Therefore, assembly and disassembly work is required every time the heavy object moving device is carried in or out of the construction site. This eliminates the need for a single trailer, which significantly improves workability. This reduces transportation costs compared to when multiple transport vehicles are required. This will contribute to shortening the construction period and reducing construction costs.

[0015] Furthermore, in the prior art, two lifters, which are common devices available on the market, were used. While a total of eight support columns are required, the present invention uses a portal frame with only two support columns. The structure has pillars, so only four pillars are needed, making it suitable for small spaces. Also, when installing a heavy object moving device at a construction site, a gate-type The frame's support columns and connecting beams can be extended to the desired length, creating an inner space that serves as a work area. This allows for a desired amount of space to be secured.

[0016] In the heavy object moving device of the present invention, one end of the lateral rail is provided with a pair of opposing gate-shaped A loading hoist is provided at one end of the cross-rail, projecting outward from the frame. is provided.

[0017] According to the heavy load moving device of the present invention, a loading hoist is provided at one end of the traverse rail. Therefore, the lifting mechanism that lifts the heavy load is run along the horizontal rail, and the heavy load is After moving it to one end of the traverse rail, transfer it to the loading hoist and load the heavy object again. This allows the loading hoist to be used to lift heavy objects onto the transport vehicle. While loading work is being carried out, the lifting mechanism can be used to move new heavy objects, improving work efficiency. It is possible to improve significantly.

[0018] The heavy object moving device of the present invention is provided with a side panel on a side surface parallel to the lateral rail. It is characterized by the fact that

[0019] According to the heavy object moving device of the present invention, the heavy object moving device can be used as a protector for the work area set in the inner space. Therefore, for example, when applying the heavy load moving device to road construction, While ordinary vehicles are allowed to pass beside the heavy load moving device, road construction work is carried out in the work area inside the device. Even if the work speed is increased, the safety of the work can be improved.

[0020] The heavy object moving device of the present invention is a floor lifting device that lifts the existing deck slab from the main girder of the bridge. It is characterized by the installation of a plate removal device.

[0021] According to the heavy object moving device of the present invention, since the deck removal device is supported by the lifting mechanism, When removing the existing deck from the main girder of the bridge, the cut pieces are cut into pieces that can be loaded onto a transport vehicle. The cut pieces are then removed from the main girder using a removal device. Next, the cut pieces and the deck removal device are lifted. The cut pieces are lifted by the mechanism, and the lifting machine is run along the horizontal rail to remove the cut pieces together with the deck removal device. Then, by removing the cut pieces from the deck removal device, the cut pieces can be removed from the construction site. Can be carried out.

[0022] This allows the heavy object moving device to be used to carry out a series of operations from removing the cut pieces to transporting them away. This allows for a significant improvement in work efficiency. In addition, the deck removal device is always supported by a lifting mechanism. This eliminates the need for a temporary storage area for the deck removal device, expanding the work area. This makes it possible to secure sufficient [Effects of the Invention]

[0023] According to the present invention, a pair of portal frames provided near both ends of the traverse rail are The structure is made up of a pair of support columns that are extensible in the forward and backward directions and a connecting beam that is extensible in the longitudinal direction. The shortest connecting beams are made large enough to be loaded onto a trailer, reducing the weight. The mass material moving device can be loaded onto a trailer and transported to and from the construction site. There is no need to carry out assembly or disassembly work, so there is no need to carry it in and out of the construction site or install it. This makes it possible to easily implement the above. [Brief explanation of the drawings]

[0024] [Figure 1] 1 is a diagram showing a state in which a heavy object moving apparatus according to an embodiment of the present invention is loaded onto a trailer. [Figure 2]FIG. 2 is a view showing the rear surface of the heavy object moving apparatus according to the embodiment of the present invention. [Figure 3] 1 is a side cross-sectional view (cross-section AA) of a heavy object moving device according to an embodiment of the present invention. [Figure 4] 1 is a diagram showing a lifting mechanism according to an embodiment of the present invention; [Figure 5] 1 is a diagram showing a swivel rail and a swivel trolley according to an embodiment of the present invention. FIG. [Figure 6] 1 is a diagram showing a deck slab removal device according to an embodiment of the present invention. [Figure 7] FIG. 1 is a diagram showing the procedure for removing and moving a cut piece of an existing deck slab from a main girder using a heavy object moving device in an embodiment of the present invention (part 1). [Figure 8] FIG. 10 is a diagram showing the procedure for removing and moving the cut pieces of the existing deck slab from the main girder using the heavy object moving device in the embodiment of the present invention (part 2). [Figure 9] 10A and 10B are diagrams showing the procedure for placing a new deck piece in the space left after the cut piece of the existing deck has been removed using a heavy object moving device in an embodiment of the present invention. DETAILED DESCRIPTION OF THE INVENTION

[0025] The heavy load moving device of the present invention is a device for lifting and moving a heavy load, and is loaded onto a trailer. It has a structure that can be expanded to the desired height and width at the construction site. In this embodiment, the existing deck slab installed on the I-shaped main girder of the road bridge is replaced with a new deck slab. As an example, we will use a heavy object moving device to replace the deck of a bridge. The details are explained below.

[0026] In the deck replacement method, when replacing the existing deck with a new deck, The heavy object moving device cuts the material into pieces that can be loaded onto the bed of a transport vehicle. The work involves moving the fragments from the main girder and loading them onto a transport vehicle.

[0027] ≪≪Heavy object moving device≫≫ As shown in Figs. 1(a) and 1(b), the size of the heavy object moving device 100 is the same as that of a trailer T. The length L, width W, and height H of the loadable container can be adjusted. The telescopic frame mechanism 10 includes a pair of portal frames 12, and a frame 13 is hung on the pair of portal frames 12. A lifting mechanism 20 that moves along the horizontal rail 11 and a floor mounted on the lifting mechanism 20 It is equipped with a plate removal device 30.

[0028] <Extendable frame mechanism> As shown in FIGS. 2 and 3, the telescopic frame mechanism 10 comprises a pair of gate-shaped frames 12 and a gate A pair of connecting trusses 15 connect the mold frames 12 together, and a pair of connecting trusses 15 are arranged parallel to the connecting trusses 15. The gate-shaped frame 12 is provided with two horizontal rails 11 spaced apart as shown in FIG. A pair of support columns 13 are arranged with the above-mentioned arrangement, and a connecting beam 1 is connected to the vicinity of the upper end of the pair of support columns 13. It consists of 4.

[0029] The support 13 may be any lifting device having an extension mechanism. In this configuration, a hydraulic jack is used, and as shown in FIG. 2, the cylinder 131 is positioned above the piston. The support rod 132 is positioned downward. As shown in Figure 1(b), the height H is set to allow traffic on the road when loaded onto the trailer T. It has been done.

[0030] As shown in FIG. 2, the connecting beam 14 has a telescopic mechanism at both ends that allows the length to be adjusted. The shortest length is as shown in FIG. 1(b) when a pair of support poles 13 is attached to the trailer. The length is set so that they can be connected at intervals that fit within the width W that can be loaded on T.

[0031] As shown in FIG. 2, a brace material 121 is used to connect the support column 13 and the connecting beam 14. The brace material 121 is provided to reinforce the gate frame 12 as described above. It is configured with screw-type expansion members and hydraulic jacks to follow the expansion when deployed. The both ends of the support 13 and the connecting beam 14 are rotatably connected to the support 13 and the connecting beam 14. It is being done.

[0032] The connecting trusses 15 are arranged in parallel at intervals shorter than the length L that can be loaded onto the trailer T. It connects a pair of portal frames 12 together, and as shown in FIG. The two poles are arranged in parallel at the same interval as the pair of support poles 13 that make up the 12. Between the connecting trusses 15, two lateral rails 11 are arranged parallel to the connecting trusses 15 at a predetermined interval. are placed.

[0033] As shown in FIG. 3, each of the two traverse rails 11 has a pair of gate-shaped frames 12 suspended therefrom. The vicinity of each end is installed on the underside of the connecting beam 14 so as to bridge the two ends. , longer than the connecting truss 15, and formed to a length L that can be loaded onto a trailer T at the maximum, Each of them protrudes outward from the space formed between the pair of portal frames 12. Two loading hoists 112 are arranged adjacent to each other at one end of each of the traverse rails 11. A chain block 111 is installed at the other end.

[0034] The loading hoist 112 lifts the cut pieces P, which have been moved by the lifting mechanism 20 (described later), into the loading hoist 112. As shown in b), it is used when loading onto a transport vehicle C, and is mounted on a traverse rail 11. Two units are installed so that they can be passed over each other. The chain block 111 has one traverse rail. A total of two units are installed as auxiliary lifting mechanisms, one on each of the 11 That's fine.

[0035] The two horizontal rails 11, each made of an I-shaped steel material, are provided with a lower flange. The traverse trolley 21 of the lifting mechanism 20 runs on the flange as a rail.

[0036] ≪Lifting mechanism≫ As shown in Figures 4(a) and 4(b), the lifting mechanism 20 is mounted along the lower flange of the traverse rail 11. a horizontal trolley 21 that travels along the horizontal rail 22 suspended from the horizontal trolley 21; An orthogonal trolley 23 running along the orthogonal rail 22 and a rotating shaft supported by the orthogonal trolley 23. It is equipped with a rotating rail 24.

[0037] Two traverse trolleys 21 are provided for each traverse rail 11 at a distance from each other. A total of four vehicles run in sync along two traverse rails 11. The two orthogonal rails 22 suspended from the rails 21 are spaced apart and are perpendicular to the lateral rails 11. The orthogonal rail 22 extends in the direction of the arrow. Two orthogonal trolleys 23 are connected to one orthogonal rail 22. A total of four vehicles are installed with a gap between them, and run synchronously along two orthogonal rails 22. .

[0038] As shown in FIGS. 4 and 5, the swivel rail 24 is supported by four orthogonal trolleys 23. The rails are circular in plan view. As described above, the four orthogonal trolleys 23 are connected to the traverse trolley 21. The rail 24 runs along the perpendicular rail 22 suspended by the frame mechanism. As shown in FIG. 5, the plan view position of the rail 10 is in the direction of extension of the traverse rail 11 and the perpendicular rail. The adjustment can be performed by moving the bolt 22 in the extending direction.

[0039] The lifting mechanism 20 further includes a swivel trolley 25 that runs along a swivel rail 24; and a lifting hoist 26 mounted on the lorry 25.

[0040] The swivel trolley 25 is rotated at an angle of 45 degrees relative to the swivel rail 24 in a plan view as shown in FIG. Four units are installed at intervals, and adjacent turning trolleys 25 are connected via connecting members 251. This allows the swivel trolley 25 to always move along the swivel rail 2 while maintaining a 45-degree interval. 4 Run on top.

[0041] As shown in Figures 4(a) and 4(b), the lifting hoist 26 is attached to each of the four swivel trolleys 25. Thus, a total of four lifting hoists are installed in the lifting mechanism 20. 6 can also be used to lift heavy objects, but in this embodiment, as shown in FIG. The deck removal device 30 is suspended by the striker 26, and the deck removal device 30 is used to cut the bridge B. The cut piece P of the existing deck slab is removed from the main girder D.

[0042] ≪Floor slab removal device≫ The deck removal device 30 is a device that pulls off the cut piece P from the main girder D of the road bridge B, and is shown in FIG. As shown in a) and (b), a frame formed by a pair of vertical members 31 and a pair of horizontal members 32 The frame 33, the anchor member 34 for lifting the load installed on the frame 33, the reaction jack 35, and a lifting jig 36.

[0043] Both the vertical member 31 and the horizontal member 32 are formed as long steel members each consisting of a pair of channel steel members. By placing the webs of the channel steel back to back with a gap between them, the center of the long steel material A gap parallel to the axis is formed.

[0044] As shown in FIG. 6(a), the frame 33 comprises a pair of horizontal members 32 arranged at a distance from each other, On the upper surface of the frame, a pair of vertical members 31 are arranged at a distance from each other, forming a grid shape in a plan view. At this time, the gaps between the long steel members of both the vertical members 31 and the horizontal members 32 penetrate in the vertical direction. It is positioned in a posture that

[0045] The load anchor member 34 is attached to the frame 33 at the four positions where the horizontal member 32 and the vertical member 31 overlap. As shown in FIG. 6(c), anchor rods 341 are inserted through the frame 33. In this state, the head is attached to the top surface of the vertical member 31 via the anchor plate 342 and the head nut 34 The tip of the anchor rod 341 penetrates the cut piece P and is fixed to the The load anchor member 34 is fixed to the surface with a tip nut 344. The cutting piece P can be connected to the frame 33 .

[0046] As shown in FIG. 6(a), the reaction jacks 35 are attached to the four corners of the frame 33. As shown in FIG. 6(c), the piston rod 351 of the hydraulic jack is disposed at each end. The cylinder 352 is installed inside the cross member 32 in such a manner that the cylinder 352 protrudes downward from the lower surface of the cross member 32. do.

[0047] Here, the cross member 32 of the frame 33 is, as shown in Figs. 6(b) and 6(c), The piston rod 351 of the gear 35 is provided with notches 331 on the underside near both ends thereof. When the reaction jack 35 is fully contracted, the pressure surface of the piston rod 351 However, it is shaped so as not to protrude from the bottom surface of the frame 33.

[0048] Therefore, as shown in FIG. 6(b), the piston rod 351 of the reaction jack 35 is obstructed. The frame 33 can be stacked on the upper surface of the cut piece P without being damaged. In this state, the cut piece P is connected to the frame 33, and the reaction jack 35 is extended, and then the cut piece P is removed. The piston rod 351 presses the periphery of the cut piece P to be cut.

[0049] As a result, as shown in FIG. 6(c), the underside of the frame 33 is fixed to the main girder D of the road bridge B. The cut pieces P are then pulled up from the main girder D. It will be possible to remove it from the main girder D of Bridge B.

[0050] The deck removal device 30 has a lifting jig 36 installed on the top surface of the frame 33. The cut piece P is then lifted up together with the cut piece P by the lifting hoist 26 via the lifting jig 36.

[0051] The heavy load moving device 100 having the above-described configuration has an extendable frame mechanism 10 as shown in FIG. The sides are surrounded by the connecting truss 15 and the support columns 13 connected by the connecting truss 15. The truss structure 16 is used on the surface to reinforce it, and side panels 17 are installed. The side panel 17 is provided in the inner space of the telescopic frame mechanism 10. It acts as a protector for the work area.

[0052] Therefore, in the bridge deck replacement method, the cut pieces P of the existing deck are removed from the main girder D and moved. When moving the heavy object moving device 100, a general vehicle is allowed to pass by the side of the device, and the inside of the telescopic frame mechanism 10 is It is possible to proceed with the work in the work area. Both the cylinder 131 and the support 13 are provided in the height range of the cylinder 131. It does not interfere with the elongation or shortening behavior of 3.

[0053] As shown in FIG. 1, the side panel 17 is located on the driver's side when the vehicle is placed on the trailer 7. Or, either one of the passenger side is installed over the entire height range of the cylinder 131, and the other is It is advisable to provide a notch 171 at the bottom end. This is to allow the replacement work of the existing deck slab to be carried out over the entire surface (horizontal This method is suitable for replacing half sections of the deck slab, rather than replacing the entire section. It is suitable for use.

[0054] The half-section deck replacement method is applied to a two-lane road bridge B with an overtaking lane and a driving lane. Lane regulation is performed at the half section, that is, the driving lane side of the concrete deck 202 One of the sections on the passing lane side will be replaced with a new deck slab, and around the same time, the other half section will be replaced. Similarly, this method involves replacing the existing deck with a new one.

[0055] When this half-section deck replacement method is applied, the railings on both sides of road bridge B As shown in Figure 2, one side of the existing deck slab is left in place, and the other side is cut off. The notch 171 of the panel 17 is used to access the work area set in the inner space of the telescopic frame mechanism 10. It can be brought into the rear and removal work can be carried out.

[0056] On the other hand, the side where the side panel 17 is provided over the entire height range of the cylinder 131 is This can prevent equipment and cut pieces P from flying out of the work area due to an accident. The side panel 17 having the opening 171 is used to While removing the cut pieces P, the side panel 17 is installed over the entire height range of the cylinder 131. General vehicles can be safely used on the outside of the bridge.

[0057] <<Method for moving a heavy object using a heavy object moving device>> The method for moving a heavy object using the above-described heavy object moving device 100 is described below. In the case of the slab replacement method, when removing and moving the cut pieces P of the existing deck slab from the main girder D, and at the construction site As an example, a new deck piece N temporarily placed inside the building will be placed at the site where the cut piece P was removed and moved. The procedure is explained below. The cut pieces P, which are heavy objects, are placed in the following manner as shown in FIG. 7(a). When installed on the main girder D of the road bridge B, it is large enough to be loaded onto the loading platform of the transport vehicle C. It is already disconnected.

[0058] <When removing and moving the cut pieces P of the existing deck and transporting them from the construction site> First, as shown in FIG. 1, the heavy object moving device 100 is not disassembled, and the gate-shaped frame 1 The support columns 13 and connecting beams 14 of the road bridge B are loaded onto the trailer T in the shortest possible state. Transported to the construction site above.

[0059] Next, as shown in FIG. 7(a), the lateral rail 11 provided on the telescopic frame mechanism 10 is set on the road. The heavy object moving device 100 is placed in a position straddling the cut piece P to be removed while facing the bridge axis direction of the bridge B. Then, the support columns 13 and connecting beams of the portal frame 12 are 14 is appropriately extended to adjust the telescopic frame mechanism 10 of the heavy load moving device 100 to a desired size. The trailer T is then removed while the vehicle is deployed and installed in place on the road bridge B. Before, during or at the same time as the work, the lifting hoist 26 of the lifting mechanism 20 is attached with the deck removal device 30. Install.

[0060] After this, the traverse trolley 21 is moved along the traverse rail 11, and the lifting mechanism 20 is The orthogonal trolley 23 is moved along the orthogonal rail 22 as needed. The lifting mechanism 20 is further moved in the direction perpendicular to the bridge axis, and the lifting mechanism 20 is supported by the The deck slab removal device 30 is positioned above the cut piece P to be removed.

[0061] After the positioning of the deck slab removal device 30 has been completed, as shown in FIG. The lifting hoist 26 of the lifting mechanism 20 is used to lift down the deck removal device 30, and the cut piece P Then, the cut pieces are stacked on the upper surface using the lifting anchor members 34 of the deck removal device 30. P is connected to the frame 33 of the deck removal device 30.

[0062] The cut piece P is provided with an anchor insertion hole (not shown) in advance, and is then inserted into the cut piece P as shown in FIG. The anchor rod 341 of the load anchor member 34 is inserted through the anchor insertion hole. The cut piece P is fixed to the bottom surface of the cut piece P with a tip nut 334. The part is fixed to the top surface of the frame 33 by a head nut 333 via an anchor plate 342. do.

[0063] After that, as shown in FIG. 6(c), the reaction jack 35 of the deck removal device 30 is extended. The lower surface of the piston rod 351 presses the periphery of the cut piece P, so that the cut piece P is deflected. The lifting mechanism 2 is then lifted up, and the cut piece P is completely torn off from the main girder. The frame 33 to which the cut pieces P are connected is raised to a predetermined height via the lifting hoist 26 of 0. Can.

[0064] In this embodiment, the length of the cut piece P in the direction perpendicular to the bridge axis is cut to be longer than the bridge axis direction. Therefore, as shown in FIG. 8(a), the swivel trolley 25 of the lifting mechanism 20 is mounted on the swivel rail 24. The deck removal device 30 and the cut pieces P are rotated by 90 degrees, and the transport vehicle C is Change the position to load onto the loading platform.

[0065] The cut piece P in this position and the deck removal device 30 are moved by the traverse trolley 21 of the lifting mechanism 20. The rail 11 is moved along the bridge axis by running along the rail 11, and one end of the rail 11 The container is placed directly below the loading hoist 112 installed in the container.

[0066] After removing the load anchor member 34 and releasing the connection between the cut piece P and the frame 33, The horizontal trolley 21 of the lifting mechanism 20 is moved along the horizontal rail 11 to remove only the deck slab removal device 30. is moved to the middle of the telescopic frame mechanism 10, and a new cut piece P is removed using the deck slab removal device 30. Removal work will begin.

[0067] On the other hand, the cut pieces P are lifted up by the loading hoist 112 as shown in FIG. 8(b). The cut pieces P are lifted to a predetermined height via the lifting mechanism, and a loading platform is placed below the lifted cut pieces P. The transport vehicle C is driven in so that the cut pieces P are positioned, and the cut pieces P are loaded onto the loading platform. The cut pieces P removed and moved by the moving device 100 can be transported out of the road bridge B. Cut.

[0068] <When placing the temporarily placed new deck piece N in the location where the cut piece P was removed> Repeat the above procedure to remove all the cut pieces P, then cut the main girder D. A new deck piece N will be laid on the site where piece P was removed.

[0069] The new deck piece N is transported to the construction site by the transport vehicle C and loaded using the loading hoist 112. The load is then removed from the loading platform of the transport vehicle C and temporarily placed on the existing deck below the loading hoist 112. In addition, the deck removal device 30 is removed from the lifting hoist 26 of the lifting mechanism 20, and then the deck removal device 30 is The trolley 21 is run along the traverse rail 11 to below the loading hoist 112.

[0070] Next, as shown in FIG. 9(a), the temporarily placed new deck slab piece N is lifted by the lifting hoist of the lifting mechanism 20. The horizontal trolley 21 is moved along the horizontal rail 11 by using the extension frame 26. The cut pieces P are moved to a work area provided in the inner space of the arm mechanism 10. The orientation of the new deck piece N when it is placed is such that the length in the direction perpendicular to the bridge axis is longer than the length in the direction of the bridge axis. The swivel trolley 25 of the lifting mechanism 20 is made to travel along the swivel rail 24, and the newly constructed deck piece N Rotate the orientation by 90 degrees and change it to the position when installing it on the top surface of main girder D.

[0071] After that, if necessary, move the traverse trolley 21 along the traverse rail 11 as shown in FIG. The lifting mechanism 20 is further moved in the bridge axis direction by the orthogonal trolley 23. The lifting mechanism 20 is moved in the direction perpendicular to the bridge axis by running along the perpendicular rail 22. The position of the new deck slab P is determined at the planned installation position on the main girder D.

[0072] After aligning the new deck P in this way, as shown in Figure 9(b), The new deck piece N is lowered using the lifting hoist 26 of the mechanism 20 and placed on the top surface of the main girder D. do.

[0073] In addition, the lifting hoist 26 of the lifting mechanism 20 can be attached to the newly constructed deck piece N in advance. It is advisable to provide a suitable attachment that can be attached and detached. The placement work of the cutting P located in the work area provided in the inner space of the telescopic frame mechanism 10 After removing all the pieces, the new deck slab pieces N may be installed one by one. The work of placing the installed deck slab pieces N may be carried out alternately.

[0074] After the above work is completed, the heavy object moving device 100 is carried out from the construction site. The operating device 100 is not disassembled, but the support columns 13 and connecting beams 14 of the portal frame 12 are shortened to the shortest position. After downsizing it to a size that can be loaded onto a trailer T, this downsized heavy object can be transported. The device 100 is loaded onto a trailer T and transported from the construction site.

[0075] As mentioned above, in the bridge deck replacement method, the cut piece P of the existing deck is removed from the main girder D. When the heavy object moving device 100 is used for removing and moving the cut pieces P, the series of steps from removal to transporting can be completed easily. This allows the work to be carried out, and the work efficiency can be significantly improved. Since the lifting mechanism 20 can always support the deck slab removal device 30, a temporary storage area for the deck slab removal device 30 can be This eliminates the need for a large work area.

[0076] In addition, the heavy object moving device 100 needs to be assembled or disassembled every time it is carried in or out of the construction site. This makes it possible to significantly improve workability. Since it can be easily transported in and out, transportation costs are reduced compared to when multiple trailers are required. This will contribute to shortening the construction period and reducing construction costs.

[0077] The gate-shaped frame 12 has a structure with two support pillars, and the pair of gate-shaped frames 12 The telescopic frame mechanism 10 is constructed with a total of four support columns 13, so it can be used in small spaces. It is possible to install the heavy object moving device 10 at the construction site. When installing the gantry frame 12, the support columns 13 and connecting beams 14 are extended to the desired length. By doing so, the telescopic frame mechanism 10 can be deployed, and the inner space that will become the work area can be expanded to the desired size. It is possible to ensure the reliability.

[0078] The heavy object moving device of the present invention is not limited to the above-described embodiment, and the gist of the present invention is not limited to the above-described embodiment. Various modifications are possible within the scope of the present invention.

[0079] For example, in this embodiment, in order to peel off the cut piece P from the main girder D, the heavy object moving device 1 The deck removal device 30 is installed on the lifting mechanism 20 of 00, and the cut piece P is removed using the deck removal device 30. However, if the cut piece P is in a state where it can be removed simply by lifting it up, The cut pieces P are removed by using the lifting hoist 26 of the lifting mechanism 20 without using the removal device 30. It may be removed.

[0080] In addition, the heavy objects to be removed by the heavy object moving device are not limited to cut pieces. The heavy object moving device can also be applied to heavy objects such as the above.

[0081] Furthermore, the horizontal rail 11, the orthogonal rail 22, the horizontal trolley 21, the orthogonal trolley 23, the turning The number of trolleys 25, etc. is not limited to the above-mentioned number. [Explanation of symbols]

[0082] 100 Heavy object moving equipment 10 Telescopic frame mechanism 11 Traverse rail 111 Chain Block 112 Loading hoist 12 Gate-type frame 121 Brace material 13 Posts 131 cylinders 132 Piston rod 14 Connecting beam 15 Connecting Truss 16 Truss structure 17 Side Panel 20 Lifting mechanism 21 Traverse trolley 22 Orthogonal Rail 23 Orthogonal trolley 24 Swivel rail 25 Swivel trolley 251 Connecting material 26 Lifting hoist 30 Floor slab removal device 31 Vertical members 32 Crosspiece 33 frames 34 Anchor member for lifting loads 341 Anchor Rod 342 Anchor Plate 343 Head Nut 344 Tip Nut 35 Reaction jack 351 Piston rod 352 cylinders T Trailer C. Transport vehicle P cut piece H high railing B Road bridge D Main girder N Newly installed floor slab

Claims

[Claim 1] a first portal frame having first and second pillars that are extendable and adjustable in spacing (excluding a portal frame in which a first upper frame is provided between the first pillar and the second pillar, a first extendable inclined leg that rotates around a connecting portion with the first upper frame as a pivot axis, a tip end side of which is connected and attached to the tip end side of the first pillar and functions as a reinforcing material for the first pillar, and a second extendable inclined leg that rotates around a connecting portion with the first upper frame as a pivot axis, a tip end side of which is connected and attached to the tip end side of the second pillar and functions as a reinforcing material for the second pillar); and a second portal frame having third and fourth pillars that are extendable and adjustable in spacing (excluding a portal frame in which a second upper frame is provided between the third pillar and the fourth pillar, a second extendable inclined leg that rotates around a connecting portion with the second upper frame as a pivot axis, a tip end side of which is connected and attached to the tip end side of the third pillar and functions as a reinforcing material for the second pillar). a lifting mechanism, but not including a deck slab removal device that peels off the existing deck slab from the main girder of a road bridge (excluding deck slab moving devices that are provided with a vertically extending, extendable column in addition to the first to fourth columns), on a trailer and transported to a construction site, the delivery process including: a delivery process in which a deck slab moving device (excluding deck slab moving devices that are provided with a vertically extending, extendable column in addition to the first to fourth columns) is transported to a construction site, the delivery process including: a delivery process in which a part of the deck slab moving device is loaded on the trailer in a state in which the spacing between the first to fourth columns is within a width that can be loaded on the trailer, and the heights of the first to fourth columns are adjusted to a height that allows road traffic when loaded on the trailer; An installation process for installing the deck moving device at a predetermined position, the installation process including extending the first to fourth columns in a height direction and widening a distance between the first column and the second column and a distance between the third column and the fourth column; a removal step of removing the trailer; A step of installing a deck removal device on the deck moving device after the removal step; A process of cutting an existing deck of a road bridge to a size that can be loaded onto a loading platform of a transport vehicle to form a cut piece, wherein a length of the cut piece in a direction perpendicular to the bridge axis is longer than a length of the cut piece in a direction along the bridge axis; A step of peeling off the cut piece from the main girder by the deck removal device; and lifting the cut pieces by the lifting mechanism. A step of driving a transport vehicle so that a loading platform is positioned below the lifted cut piece of the existing deck slab; and loading the cut pieces onto the bed of the transport vehicle.

Citation Information

Patent Citations

  • Communication control equipment

    JP1985004353A

  • Floor slab removing method and floor slab removing device

    JP2007239408A

  • Member renewal method using lifting device

    JP2018204427A