Construction method for honeycomb-structured wave absorbing plate shrinkage ratio simulation material

The invention discloses a construction method for a honeycomb-structured wave absorbing plate shrinkage ratio simulation material. The construction method comprises the following steps that 1, modeling is conducted on a honeycomb-structured wave absorbing plate, and the reflection rates obtained when electromagnetic waves are transmitted into the honeycomb-structured wave absorbing plate in different angles are obtained through simulation calculation; 2, by calculating the reflection rates obtained when a simulation material is in different thicknesses and an electromagnetic absorbing agent is in different volume fractions at a shrinkage ratio test frequency and comparing the reflection rates with the reflection rate obtained when the honeycomb-structured wave absorbing plate is located at a prototype test frequency, the reflection rate, nearest to the reflection rate obtained when the honeycomb-structured wave absorbing plate is located at the prototype test frequency, of the shrinkage simulation material is found, and then the formula parameters and thickness of the honeycomb-structured wave absorbing plate shrinkage ratio simulation material are obtained; 3, the honeycomb-structured wave absorbing plate shrinkage ratio simulation material is constructed. According to the construction method, the honeycomb-structured wave absorbing plate shrinkage ratio simulation material is designed through the reflection coefficient, limitation of the material electromagnetic parameter and geometric parameter in an electromagnetic shrinkage ratio theory is broken through, and construction of the honeycomb-structured wave absorbing plate shrinkage ratio simulation material is achieved.
Owner:SHANGHAI RADIO EQUIP RES INST

Combined guided slipping type forepoling hydraulic support

The present invention provides a combined guide slippage type forepoling hydraulic bracket which comprises an internal support unit and an external support unit (12 and 11) which are symmetrical to each other at left and right. Each support unit comprises a top beam (1), a pedestal, a guide stabilizing mechanism and a hydraulic support component upright post. An upright post is articulated between the top beam and the pedestal. A telescopic link type guide stabilizing mechanism is arranged at the middle parts of the top beam and the pedestal. The outer side of the internal support unit is provided with the external support unit. Connecting slide rods (7) are respectively connected between the top beams and the pedestal beams at the same side of the adjacent internal and external support units. An inter-frame jack (8) is articulated between the top beam and the pedestal of the symmetrical internal support unit to form a section of bracket. The bracket forms an independent motor unit. The hydraulic bracket consists of a plurality of independent motor units. An advancing jack (17) is connected between the pedestals (9) of the independent motor units. The front end of the pedestal (9) of a section of bracket at the front end of the hydraulic bracket is connected with a head frame pulling and moving mechanism. The hydraulic bracket can effectively support a big section laneway and realizes the forepoling and the forepoling automatization of the big section laneway.
Owner:TIANDI SCI & TECH CO LTD

Simulation teaching system for single-chip microcomputer curriculum

InactiveCN102306462ARealize pure software emulationSolve difficult puzzlesTeaching apparatusMicrocontrollerMicrocomputer
The invention provides a simulation teaching system for a single-chip microcomputer curriculum. The system comprises at least a functional circuit board that includes a single-chip microcomputer and the function of the functional circuit board is realized under the control of the single-chip microcomputer. Besides, the simulation teaching system also comprises a teacher computer, a student computer, an RS485 communication line and a communication conversion module. The teacher computer is a teaching computer and is also used for executing software simulation, soft and hardware simulation and pure hardware simulation. The communication conversion module is connected with the teacher computer and the student computer and converts an RS232 interface into an RS 485 interface; besides, the communication conversion module is connected with the functional circuit board by the RS485 communication line. According to the simulation teaching system for the single-chip microcomputer curriculum provided in the invention, problems that teaching of a current single-chip microcomputer curriculum is abstract and there is no good simulated teaching means are solved; a mode of combination with concrete projects is employed, so that it is convenient for understanding and grasp for students.
Owner:BEIJING UNION UNIVERSITY

Cross-modal pedestrian re-identification method based on multi-modal image style conversion

The invention discloses a cross-modal pedestrian re-identification method based on multi-modal image style conversion, and the method comprises: carrying out the collection and preprocessing of training images according to a pedestrian image data set, and obtaining a training sample; constructing an automatic coding network model for decoupling image features, performing feature decoupling on thepedestrian image input after processing by the model, and dividing the pedestrian image into domain-independent content features and domain-related style features; and constructing a generation network and discrimination network model based on modal transformation, the model realizing style attribute information exchange of pedestrian images in different domains, and realizing style-transformed sample generation. Aiming at the problem that a pedestrian re-identification algorithm is easily influenced by different illumination, the similarity matrix of different images is learned by extractingthe characteristics of the pedestrian images through the neural network, the metric matrix learned by the method has flexibility compared with a manually selected matrix, and the similarity between the image characteristics can be better obtained.
Owner:CHINA UNIV OF MINING & TECH

Soil fertilization method by directly returning straw to filed

The invention relates to a soil fertilization method by directly returning straws to field. The specific operation steps comprise: 1, in a crop harvesting season, using a harvester to harvest straws and crops, reserving low stubbles, collecting crop straws; 2, concentrating crop straws collected in one mu field in 1/2 to 1/5 mu cultivated land, uniformly laying the straws, spreading lime nitrogen, performing rotary tillage, mixing the crop straws with surface soil, performing rotary tillage twice; fallowing the treated cultivated land for one month, planting crops normally on cultivated land which is not treated; 3, performing second rotary tillage, decomposition and conversion speed of the straws greatly accelerating; 4, fallowing the cultivated land for a crop growing season, the straws fully decomposing and converting into organic materials in the soil and releasing inorganic nutrients, to obtain a fallow field. Straw residual bodies cannot be seen in the soil in the fallow field, and organic material content in the surface soil of the fallow field is improved by more than 8%, soil total nitrogen content is improved by more than 5%, soil alkali-hydrolyzable nitrogen content is improved by more than 5%, and rapidly available potassium content is improved by more than 10%.
Owner:INST OF SOIL & FERTILIZER ANHUI ACAD OF AGRI SCI

Integral lifting construction method for cooling tower system and steel gallery

ActiveCN109208915AReduce the difficulty of hoisting and assemblingLabor savingBuilding material handlingPlatform modelEngineering
The invention provides an integral lifting construction method for a cooling tower system and a steel gallery, which comprises the steps of 1) conducting pre-construction preparation, firstly buildinga cooling tower steel structure supporting foundation model, a cooling tower maintenance platform model and a pipeline support model, then building an integral structure model by combining the builtmodels with a cooling tower, a cooling water pipeline and a steel gallery, performing stress simulation analysis on the model, ensuring the stress of each part in the lifting process to meet requirements, and deepening the design of construction drawings; 2) splicing the cooling tower system and the steel gallery on the ground according to the construction drawings; and 3) and integrally and synchronously lifting the spliced cooling tower system and steel gallery through a hydraulic lifting system. According to the invention, the cooling tower system and the steel gallery are firstly spliced on the ground and then integrally lifted, thereby reducing the hoisting and splicing difficulty of components of the cooling tower system, and saving the labor. In addition, the components of the cooling tower system can be simultaneously spliced, thereby ensuring the construction period, improving the installation and construction quality and efficiency of the cooling tower system.
Owner:CHINA CONSTR THIRD ENG BUREAU INSTALLATION ENG CO LTD

Method and device for preparing coating by using nanosecond pulse laser cladding

The invention discloses a method and a device for preparing a coating by using nanosecond pulse laser cladding, belonging to the technical field of the preparation of coatings on material surfaces through laser cladding, and aiming to solve the problems existing in the present nanosecond pulse laser cladding. According to the method and the device, a metal is deposited on the surface of a workpiece through MOCVD (metal organic chemical vapor deposition), and the surface of the workpiece is scanned by nanosecond laser light at the same time, so that the metal is cladded on the surface of the workpiece, and a coating with a micron or submicron level thickness is formed on the surface of the workpiece. The method and the device disclosed by the invention do not have special requirements for a substrate material, are wide in application range, and can meet the needs of the preparation of the coatings of plane workpieces and special-shaped workpieces; a prepared thin film coating has the advantages of densification, controllable thickness (micron or submicron) and firm film-substrate adhesion; meanwhile, the surface roughness of the workpiece subjected to processing is not less than that of the workpiece before cladding; the secondary processing such as grinding and polishing is not needed, so that the production cost is reduced; meanwhile, after being processed by the method and the device, the workpiece can not be deformed and can meet the processing requirements for precision workpieces.
Owner:SICHUAN INST OF MATERIALS & TECH

Organic/inorganic composite microcapsule fire-extinguishing agent and preparation method thereof

The invention discloses an organic/inorganic composite microcapsule fire-extinguishing agent, and belongs to the field of fire-fighting materials. The organic/inorganic composite microcapsule fire-extinguishing agent comprises the following components in percentage by weight: 15 to 25 percent of monoammonium phosphate, 60 to 75 percent of ammonium sulfate, 0.5 to 1.5 percent of urea, 1 to 2.5 percent of potassium chloride, 4 to 9 percent of sodium silicate, 0.1 to 0.5 percent of fatty acid zinc, 0.2 to 0.5 percent of fatty acid magnesium and 1.5 to 2 percent of methyl silicane, wherein the sum of the components is 100 percent. According to the organic/inorganic composite microcapsule fire-extinguishing agent, grain diameters of the components are controlled, and the components are microencapsulated by a special process to prepare the fire-extinguishing agent, so that the fire-extinguishing agent cannot deteriorate after being used for 7 years and is inert at the temperature of less than 60 DEG C, and the standard of a product is applicable to international standard organization (ISO), European norm (EN) 615 and national standard (GB) 4066.2-2004; and the fire-extinguishing agent contains nutrient elements such as N, P, K and B which are required by plants and is absolutely harmless to human and animals, and microbes can be degraded within three days, so the organic/inorganic composite microcapsule fire-extinguishing agent is the most ideal 'reen' fire-extinguishing agent which is environment-friendly and low in cost and does not have carbon emission, is efficient in fire-extinguishing performance, wide in fire-extinguishing range and low in production cost and has high economic and social benefits.
Owner:姜发扬

Method for improving straw fermentation for preparing biogas

The invention discloses a method for improving straw fermentation for preparing biogas. The method is characterized by comprising smashing harvested fresh straw, then carrying out puffing treatment ona part of the straw, adding water to another part of the straw, humidifying the other part of the straw and then hermetically storing the other part of the straw; adding the straw subjected to puffing treatment into organic wastewater, pretreating the straw for 3-5 days, hermetically storing the straw for 15 days and then utilizing the straw for animal feed; mixing pretreated puffed straw and animal feces with each other to obtain mixtures, adding animal urine into the mixtures, carrying out anaerobic fermentation, utilizing biogas residues for fertilizer preparation, purifying the biogas andthen utilizing the biogas as fuel. The method has the advantages that the biogas yield and the biogas production rate of the biogas prepared from the straw can be increased by the aid of the method,the straw can be completely recycled, the organic wastewater is consumed, and accordingly the problem of environmental pollution due to the straw can be fundamentally solved; the method is free of added substances harmful for environments and is little in environmental influence; the method is simple, is high in operability and has a high practical value, and waste can be truly recycled by the aidof the method.
Owner:NORTHEAST NORMAL UNIVERSITY

Making method for super-thick copper foil and high heat-conducting copper clad laminate

The invention discloses a making method for a super-thick copper foil and high heat-conducting copper clad laminate. The method includes the steps of: glue solution preparation, gluing, superposition and hot pressing. Specifically, the glue solution comprises: low-bromine epoxy resin/phenolic curing system, a coupling agent, an imidazole curing accelerator and an inorganic filler, and a solvent butanone. By adjusting the production technological conditions, the method provided by the invention solves the difficult making problem of super-thick copper clad laminates, and is simple and convenient. The prepared super-thick copper clad laminate has good flatness, and the bonding force between the super-thick copper foil and a base material is good. At the same time, by adding a lot of excellent and efficient heat-conducting filler to the formula, the molded base plate has efficient heat-conducting property, and the thermal conductivity is greater than 1.6W/mk, thus well solving the rapid heat dissipation problem of heavy current base plates. The prepared super-thick and high heat-conducting copper clad laminate also has excellent heat resistance, with T260 being greater than 30min. Meanwhile, the invention can also meet the demands of a PCB lead-free making process.
Owner:NANTONG RODA ELECTRON

Coal mine drilling and dust removal device

InactiveCN104612607AWon't leakDilution does not exceed limitConstructionsAir compressionSpray nozzle
The invention relates to a coal mine drilling and dust removal device comprising a drill rod. A buried pipe is arranged outside the drill rod, a dust collection hood is arranged outside the buried pipe, a lower outlet is arranged in the lower portion of the dust collection hood, and an annular air-compression air knife is arranged at the center of the outer end of the dust collection hood; clamp plates are arranged at the center of the dust collection hood; baffles are arranged in the clamp plates; a round hole is arranged at the center of each clamp plate; baffle grooves are arranged at junctions of the baffles and the drill rod, and tension springs are arranged at two ends of each clamp plate passage; end caps are arranged at two ends of each clamp plate passage, a stay wire outlet is arranged in each end cap, and a stay wire is arranged in each stay wire outlet; a cloth bag and a spraying nozzle are arranged at the lower end of the lower outlet, and a funnel net and a conical net are arranged at the lower end of the spraying nozzle. The coal mine drilling and dust removal device is ingenious in design and simple in structure, can enable the drill rod entering end of the dust collection hood to be airtight, block dust and gas from leaking out, purify drilling cuttings and dust before the drilling cuttings and dust fall to the ground and dilute the gas to prevent the gas from exceeding limits, is a revolutionary innovation of the prior art and has high marketing value.
Owner:武精科

Installation method of steel cofferdam for reinforcing bridge underwater structure

The invention discloses an installation method of a steel cofferdam for reinforcing a bridge underwater structure. The method is characterized in that by cleaning a stand column, arranging an anti-skid washer, installing a hoop, assembling a counterforce frame, fixing counterforce chain blocks, lowering the steel cofferdam, arranging cross beams and longitudinal beams, installing jacks and performing symmetrical pressing, rapid pressing installation of the steel cofferdam for reinforcing the bridge underwater structure is completed; the hoop and the counterforce frame are assembled into a whole through buckles, the counterforce chain blocks are connected with the stand column to form an inverted-triangle counterforce system, and the positions of the jacks are determined according to the specification of the steel cofferdam. The method has the advantages that construction is fast and convenient, steel cofferdams with different diameters can be pressed in place in one step, the operationis simple and easy to control, the self-counterforce system and hoisting equipment are integrated, large hoisting equipment is not needed, installation and detachment are easy, the space requirementis low, and the problem that as tie beams exist between a pier and a pile foundation, operation is difficult is solved; hoisting chain blocks can be used for lowering and adjusting the steel cofferdamand can also be used for lowering materials and formworks in the later stage, and the construction efficiency is greatly improved.
Owner:JIANGSU MODERN ROAD & BRIDGE +1

Simple pile head breakdown aided construction method

The invention discloses a simple pile head breakdown aided construction method which comprises the following steps: controlling the initial setting time of later concrete in a graded manner; treating pile head reinforcements, and reducing the peeling difficulty between the reinforcements and concrete; and inserting a plurality of PVC conical hollow pipes into the existing concrete pile head. According to the method disclosed by the invention, under the condition that the existing construction conditions and requirements are not changed, partial reinforcements of the pile head only need to be subjected to proper isolation treatment after reinforcement cage binding completion, a certain number of special PVC hollow pipes are inserted after underwater concrete grouting completion, and the aim can be achieved. The method disclosed by the invention is convenient to operate and less in matching equipment, the construction cost is not increased, and constructors can easily, rapidly and skillfully operate. According to the method disclosed by the invention, the problem that an underwater concrete pile head is difficult to break down for a long time is solved, the pile head breakdown efficiency is greatly improved, and the construction cost is reduced. With increase of construction quantity of site construction pile foundations and increase of manual cost, solution to the pile head breakdown problem creates huge economic benefits for state infrastructures.
Owner:EAST CHINA JIAOTONG UNIVERSITY

Throwing-hanging type grounding hook with monitoring function

PendingCN110544838ASolve the difficult problem of hooking the grounding wire in construction workSolve difficult puzzlesElectrical testingElectric connection structural associationsElectrical connectionComputer module
The invention discloses a throwing-hanging type grounding hook with a monitoring function. The grounding hook comprises a grounding hook body, a wire clamping hook tongue, a monitoring module and a hook. The grounding hook is characterized in that the monitoring module is installed on the wire clamping hook tongue; an electrode and a hook body electrode screw connected with the wire clamping hooktongue are arranged on the monitoring module; the electrode and the hook body electrode screw are respectively connected with a wire hanging detection circuit in the monitoring module through leads; the electrode and the wire clamping hook tongue are mutually insulated, circuit bare wires hung on the grounding hooks make contact with the electrodes and the wire clamping hook tongues to form an electrical connection loop, the electrical connection loop is connected with the monitoring module through wires, and the monitoring module transmits detected information to the system cloud platform server. According to the invention, the problem that the ground wire is difficult to hang in the current ultrahigh-voltage line construction operation is solved, the wire hanging state detection of the ground hook can be accurately completed, the working state of the used ground hook can be timely and accurately understood by the working personnel in the use field and the background of the remote monitoring center, and the casualty accident of accidental electric shock caused by illegal operation is avoided.
Owner:圣耀(集团)有限公司

Rapid propagation technology for aseptic seedlings of curcuma wenyujin

InactiveCN109463279ASolve the problem of continuous expansionSolve difficult puzzlesHorticulture methodsPlant tissue cultureFungal endophyteSeedling
The invention provides a rapid propagation technology for aseptic seedlings of curcuma wenyujin. The rapid propagation technology comprises the following steps: (1) explants are obtained; (2) the explants are sterilized; (3) cluster buds are induced into tissue culture seedlings; (4) root tips are induced for producing calluses; (5) the calluses are induced into the aseptic seedlings of the curcuma wenyujin; and (6) the aseptic seedlings of the curcuma wenyujin propagate. The invention adopts the mean of tissue culture seedling for inducing root tip meristem to produce the calluses and obtainsthe aseptic seedlings after differentiation , thereby effectively solving the difficult problem that aseptic meristem is difficult to get directly from the explants, ensuring the obtainment of the aseptic seedlings and solving the problem that the tissue culture seedlings produced through the induction to the explants cannot continuously propagate due to carried endophyte. The technology providedby the invention realizes the continuous propagation of the aseptic seedlings in a MS culture medium added with 2.0 mg / L of 6-benzylaminopurine(6-BA) and 0.5 mg / L of naphthlcetic acid(NAA) and fulfills propagation and rooting synchronously, thereby omitting the processes of rooting and seedling development and reducing the cost in tissue culture.
Owner:SHAOXING UNIVERSITY

Horizontal geological survey equipment adopting coiled tubing and coring method

The invention discloses horizontal geological survey equipment adopting a continuous pipe and a coring method. The equipment comprises a chassis, a drilling rig, a power head, the continuous pipe, a conveying mechanism, an outer drilling rod, coring equipment and a winding drum assembly. A guide drilling tool and an inner flat and hollow outer drilling rod are used for conducting guide drilling; the coiled tubing is conveyed in an area needing coring or geological exploration; the continuous pipe can carry the coring cylinder or other geological exploration equipment to be conveyed to a drilling position; the high-pressure fluid conveyed by the continuous pipe drives the coring equipment so as to drive the drilling machine to carry out horizontal coring or other geological exploration requirements. Different from a rope used in a traditional rope coring process, the continuous pipe is dragged, conveyed and corrected through the power head assembly and the conveying mechanism winding drum assembly, so that high-pressure fluid in the continuous pipe drives coring equipment, and a coring drilling tool in the coring equipment is efficiently conveyed; the problem that a coring drilling tool is difficult to convey in a horizontal hole is effectively solved, and the horizontal coring drilling efficiency of equipment is improved.
Owner:XUZHOU XUGONG FOUND CONSTR MACHINERY

Infinitesimal-based conductor temperature calculation method for cable joint and body

ActiveCN113190972AAccurate structural featuresFully reflect the structural characteristicsDesign optimisation/simulationConstraint-based CADElectrical conductorEngineering
The invention discloses an infinitesimal-based conductor temperature calculation method for a cable joint and a body, and the method comprises the steps: constructing an axial thermal circuit model, and enabling the axial thermal circuit model to divide the cable joint into a plurality of segment intervals according to the insulation thickness of each structure of the cable joint, dividing each segment interval of the cable joint into a plurality of segments of infinitesimal elements along the axial direction by taking the center of a crimping pipe of the cable joint as an original point; uniformly dividing the cable body into a plurality of sections of infinitesimal elements along the axial direction; and based on the axial thermal circuit model, inputting the surface temperatures of the cable joint and the cable body, and carrying out iterative calculation to obtain the conductor temperatures of the cable joint and the cable body. Compared with the prior art, the method has the advantages that the calculation result is more accurate, the calculation result can be obtained only by inputting the surface temperatures of the cable joint and the body in the model, less time and energy are consumed, and the problem that the sensor is difficult to arrange is solved.
Owner:GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD

Preparing method for vanadium-titanium magnetite oxidation pellet for vertical furnace

ActiveCN106906355ASolve the difficult problem of making ballsReduce manufacturing costShaft furnacePelletizingSodium carbonate
The invention discloses a preparing method for a vanadium-titanium magnetite oxidation pellet for a vertical furnace. The preparing method includes the steps that vanadium-titanium magnetite concentrate powder and bentonite are mixed, so that a first mixed material is obtained; part of the first mixed material is mixed with sodium carbonate and water, so that a second mixed material is obtained; the second mixed material is subjected to first pelletizing treatment, so that a mother bulb is obtained; the other part of the first mixed material is mixed with water, so that a pelletized material is obtained; the mother bulb and the pelletized material are mixed and subjected to second pelletizing treatment, the mother bulb is wrapped by the pelletized material, and a vanadium-titanium magnetite pellet is obtained; and the vanadium-titanium magnetite pellet is subjected to drying and oxidizing roasting, so that the vanadium-titanium magnetite oxidation pellet for the vertical furnace is obtained. By the adoption of the method, the problem that direct reduction of a vanadium-titanium magnetite pellet gas base for the single full-vanadium-titanium iron concentrate preparing vertical furnace is difficult can be solved, in addition, the production cost is effectively reduced, and a guarantee is provided for economical running of the vertical furnace.
Owner:JIANGSU PROVINCE METALLURGICAL DESIGN INST

Scientific research partner recommendation method based on multi-dimensional features under Research Gate platform

The invention discloses a scientific research partner recommendation method based on multi-dimensional features under a Research Gate platform. According to the method, association relationships between scientific researchers and other scientific researchers are measured from three dimensions of text similarity of papers published by the scientific researchGate platform, social association degreesamong the scientific researchers and influences of the scientific researchers; and a scientific research partner recommendation model is constructed by using a linear combination method to perform Top-N recommendation, so that personalized scientific research partner recommendation services are provided for scientific research workers. Wherein text similarity calculation is carried out by utilizing a Doc2Vec text depth representation model, and weight parameters are adjusted through a stochastic gradient descent and back propagation algorithm, so that the model is optimal; the social correlation degree is calculated based on the common proportion of friends, and the higher the proportion is, the more similar the two are. Personalized scientific research partner recommendation services canbe provided for scientific research workers, and therefore the problem that scientific research partners are difficult to find is solved.
Owner:HOHAI UNIV

Hooking type grounding hook with monitoring function

The invention discloses a hooking type grounding hook with a monitoring function. The hooking type grounding hook comprises a grounding hook body, a wire clamping hook tongue, a monitoring module anda rotary connection hanging frame. The hooking type grounding hook is characterized in that: a hanging hook is arranged at the upper portion of the grounding hook body; a hanging fixing pin is arranged on the rotary connection hanging frame; the hanging fixing pin is used for hooking the hanging hook at the upper portion of the grounding hook body; the lower portion of the rotary connection hanging frame is movably connected with the grounding hook body through a connecting pin; the monitoring module is installed on the wire clamping hook tongue; a wire bare conductor hung on the grounding hook contacts with an electrode and the wire clamping hook tongue, so that an electrical connection loop can be formed; the electrical connection loop is connected with the monitoring module through a wire; and the monitoring module transmits information to a system cloud platform server. With the hooking type grounding hook with the monitoring function of the invention adopted, the problem that a ground wire is difficult to hang in current ultrahigh-voltage line construction operation is solved; the wire hanging state detection of the grounding hook can be accurately completed, so that the working state of the grounding hook in use can be timely and accurately understood by working personnel in a use site and the background of a remote monitoring center, and casualty accidents caused by accidental electric shock due to illegal operation are avoided.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO LTD MAINTENANCE BRANCH +1

Construction method for optical orthogonal signature graph codes with autocorrelation constraint of 1 and autocorrelation constraint of 2

The invention discloses a construction method for optical orthogonal signature graph codes with the autocorrelation constraint of 1 and the autocorrelation constraint of 2. The construction method comprises the following steps that a two-dimensional integer pair table M is constructed; n integer pair tables N1, N2,..., Nn are constructed according to the code number and the code weight, numbers are fetched from the integer pair tables Ni (i=1, 2,..., n) according to a preset number fetching rule, and mark two-dimensional gap triangular matrixes Di (i=1, 2,...,) and two-dimensional gap pair sets i (i=1, 2,...,) corresponding to the optical orthogonal signature graph codes with the autocorrelation constraint of 1 and the autocorrelation constraint of 2 are constructed according to the two-dimensional integer pair tables; and according to the mapping relation formed by the mark two-dimensional gap triangular matrixes Di (i=1, 2,...), the optical orthogonal signature graph codes with the autocorrelation constraint of 1 and the autocorrelation constraint of 2 are constructed. According to the method, a large number of high-weight optical orthogonal signature graph codes with the autocorrelation constraint of 1 and the autocorrelation constraint of 2 can be effectively constructed, and any number of any-weight optical orthogonal signature graph codes with the autocorrelation constraint of 1 and the autocorrelation constraint of 2 are constructed.
Owner:SHENZHEN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products