Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Comprehensive evaluation method for power receiving engineering construction quality of power customers at 10kv or below

A comprehensive evaluation and customer-oriented technology, applied in data processing applications, instruments, calculations, etc., can solve problems such as inaccurate and reasonable results, achieve scientific and reasonable evaluation results, save operation and maintenance costs and difficulty

Inactive Publication Date: 2018-03-30
STATE GRID CHONGQING ELECTRIC POWER +1
View PDF0 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The present invention discloses a comprehensive evaluation method for the construction quality of power receiving projects of 10kv and below electric power customers. In the process of fuzzy comprehensive evaluation, the analytic hierarchy process is used to determine the weight of each index, which solves the problem of simply using the expert estimation method in the existing evaluation methods. To determine the weight of the indicator is too much affected by human factors, resulting in the defect that the result is not accurate and reasonable

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Comprehensive evaluation method for power receiving engineering construction quality of power customers at 10kv or below
  • Comprehensive evaluation method for power receiving engineering construction quality of power customers at 10kv or below
  • Comprehensive evaluation method for power receiving engineering construction quality of power customers at 10kv or below

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0011] The specific content of the present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.

[0012] as attached figure 1 As shown, the present invention provides a method for comprehensive evaluation of the construction quality of power receiving projects of 10kv and below power customers, comprising the following steps:

[0013] S1. Construct an evaluation index system, the evaluation index system includes a number of first-level indicators and b number of second-level indicators, wherein a and b are both natural numbers. Through on-the-spot investigations, data related to the research were collected; on the basis of questionnaire interviews with experts from the marketing department, operation and maintenance department of construction companies and power grid companies, an evaluation index system was established, specifically including three levels Indicators and nineteen secondary indicators, namely a=3, b=19, as ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention provides a method for comprehensive evaluation of the construction quality of power receiving projects for power customers of 10 kv or below, comprising the following steps: S1, constructing an evaluation index system, the evaluation index system includes a first-level indicators and b second-level indicators, wherein , a and b are both natural numbers, S2, respectively construct a judgment matrix for pairwise comparison between the first-level indicators and the second-level indicators, S3, calculate the weight of each first-level indicator and second-level indicator, S4, establish a comprehensive fuzzy evaluation model, The specific method is for the object to be evaluated, rating the secondary indicators described in step S1 by several experts, S5, calculating the membership matrix R according to the statistical results of step S4, S6, according to the weight of the membership matrix R and the secondary indicators , respectively calculate the evaluation vector of each first-level index, S7, calculate the fuzzy comprehensive vector B according to the weight of the first-level index and the evaluation vector of each first-level index, S8, quantify the score. Using fuzzy comprehensive evaluation method based on AHP, the evaluation result is more scientific and reasonable.

Description

technical field [0001] The invention relates to the field of project construction quality evaluation, in particular to a method for comprehensive evaluation of construction quality of power receiving projects for power customers of 10kV and below. Background technique [0002] Under the new situation that my country's power grid construction is constantly increasing, the position of 10kV and below customer power distribution projects is becoming more and more important. It is necessary to strengthen its project management and improve the quality of project construction in order to better meet the needs of enterprises and people. electricity demand. On the other hand, for the electric power company, the public transformation part of the 10kV and below customer power distribution project must be handed over to the electric power company for operation and maintenance management. In order to ensure that the cost and difficulty of operation and maintenance in the later stage are ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/0639G06Q50/06
Inventor 江京金晏偌峰李宗隆刘家禹龙浩陈亚
Owner STATE GRID CHONGQING ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products