A horizontal cement slurry spraying device and a paver with the device and applications thereof
By designing horizontal cement slurry spraying devices and pavers, the problems of inconvenience and agglomeration of cement slurry in the existing technology are solved, and the uniform spraying and paving of cement slurry is achieved, and the adhesion and construction of the base structure are improved. efficiency.
Patent Information
- Application Number
- CN202010008478.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-01-06
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2040-01-06
AI Technical Summary
The existing cement slurry spraying device requires independent traction of tire dump trucks, which is inconvenient for the lower lane groove, and the spraying and paving are not synchronized, resulting in the cement slurry being blocked and solidified, affecting the adhesion and strength of the base structure.
A horizontal cement slurry spraying device is designed, including a cement box and a screw pump arranged on the upper and lower surfaces, equipped with a stirrer and a return pipe, which is connected through pipes and hoses to achieve uniform stirring and spraying of cement slurry. The device can be installed in the paving On the machine, paving and spraying are carried out simultaneously to ensure uniformity and adhesion of cement slurry.
The uniform spraying and paving of cement slurry is achieved, which avoids the cement slurry being clumped and solidified, improves the adhesion and strength of the base structure, and improves the construction efficiency.
Smart Images

Figure CN111119011B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of highway construction equipment, and in particular relates to a horizontal cement slurry spraying device, a paver with the device and applications thereof. Background Art
[0002] With the rapid development of highway construction in the current society, road reconstruction and expansion work occurs from time to time. Under the influence of this national condition, the splicing of new and old roads is particularly important. However, in the process of combining the new and old roadbeds, due to the limitations and differences of practice and various factors, some large and small problems will arise in the process of combining. Therefore, the docking of the new and old roadbeds is a very important task.
[0003] In order to prevent and reduce the gaps and various road surface failures at the junction of the new and old roadbeds, the "reverse excavation construction process" is usually adopted. This construction process requires "cement slurry" with a water-cement mixture ratio to bond and reinforce the joints to increase the overall structural strength between layers. At present, the work of brushing and spraying cement slurry on the roadbed steps is done manually, which is very inefficient and has problems such as uneven brushing, which brings certain troubles to the construction progress.
[0004] At present, cement slurry spraying machines have been used to replace manual spraying, such as the application document with application number 201820073938.X, which mainly realizes the function of spraying cement slurry through various structural combinations on the automobile body.
[0005] However, the above device has the following problems:
[0006] (1) It must be independently towed by a tire dump truck, which is a special vehicle for special use. The road trench depth of the "reverse excavation construction process" is about 670mm, and it is inconvenient for a tire dump sprayer to go up and down the road trench;
[0007] (2) There is a time lag after the dump truck sprays the cement slurry. When the paver spreads the cement slurry, it agglomerates and solidifies early, and the characteristics of the cement slurry cannot be well guaranteed. This affects the adhesion between the base structures and the structural strength of the roadbed. Summary of the invention
[0008] The purpose of an embodiment of the present invention is to provide a horizontal cement slurry spraying device and a paver having the device and applications thereof. The first purpose is to solve the problem that the existing cement slurry spraying device must be independently towed by a truck, which makes it inconvenient to go up and down the road trough; the second purpose is to solve the problem that the existing spraying device and the paver cannot perform paving work synchronously, and there is a time difference that causes poor adhesion between the base structure and low structural strength.
[0009] In order to solve the above technical problems, the present invention provides a horizontal cement slurry spraying device, comprising a cement box and a screw pump arranged up and down, the cement box has a built-in agitator, a through hole is provided at the bottom of the cement box, the through hole is sealed and connected with the suction port of the screw pump, and the discharge port of the screw pump is connected in series with a No. 1 pipeline, a No. 2 pipeline, a No. 3 pipeline, a No. 5 pipeline, a No. 6 pipeline, a No. 1 hose, a first spraying pipe, a No. 2 hose, a second spraying pipe, a No. 3 hose, a third spraying pipe, a No. 4 hose, a No. 7 pipeline, a No. 8 pipeline, a No. 9 pipeline and a No. 5 water discharge hose in sequence;
[0010] The No. 2 pipeline and the No. 3 pipeline are connected through a three-way valve, and the No. 1 valve is installed at the third outlet of the three-way valve, and the No. 1 valve is connected to the first return pipe in the cement box;
[0011] The No. 2 pipe and the No. 3 pipe are also connected to one end of the No. 6 drain hose, the other end of which is a free end, and the No. Ⅲ valve is connected in series to the No. 6 drain hose;
[0012] The No. 1 hose and the No. 6 pipe are connected via a three-way valve, the No. 4 hose and the No. 7 pipe are connected via a three-way valve, the two three-way valves are connected to each other via the No. 4 pipe, the No. 4 pipe is connected in parallel with the second spray pipe, and the No. 4 pipe is connected in series with the No. Ⅳ valve, the No. 1 hose is connected in series with the No. Ⅴ valve, and the No. 4 hose is connected in series with the No. Ⅸ valve;
[0013] A No. 10 pipe connected in parallel with the second spray pipe is connected between the No. 2 hose and the No. 3 hose, a No. VI valve and a No. VII valve are connected in series from upstream to downstream on the second spray pipe, and a No. VIII valve is connected in series on the No. 10 pipe;
[0014] Pipeline No. 8 and pipeline No. 9 are connected via a three-way valve, the third outlet of the three-way valve is connected to the second return pipe in the cement box via valve No. Ⅹ, and valve No. Ⅻ is serially connected to drain hose No. 5.
[0015] Furthermore, the No. 3 pipeline and the No. 5 pipeline are connected via a three-way valve, a No. 2 valve is installed at the third outlet of the three-way valve, and the No. 2 valve is connected to the third return pipe in the cement box;
[0016] The No. 9 pipeline and the No. 5 drain hose are connected via a three-way valve, a No. XI valve is installed at the third outlet of the three-way valve, and the No. XI valve is connected to the fourth return pipe in the cement box.
[0017] Furthermore, the third return pipe and the fourth return pipe have the same structure and are arranged opposite to each other. Both are straight pipes. One end of the straight pipe is connected to valve No. II or valve No. XI, and the other end penetrates the wall of the cement box and extends into the cement box and is close to the bottom of the cement box.
[0018] Preferably, the first return pipe and the second return pipe have the same structure and are arranged opposite to each other, and are both composed of a U-shaped pipe and a straight pipe, wherein the opening end of the U-shaped pipe is a flat mouth and is inclined toward the bottom of the cement box, and the sealed end opposite to the opening end is connected to the straight pipe, and the straight pipe passes through the wall of the cement box and is connected to valve No. Ⅰ or valve No. Ⅹ.
[0019] Preferably, the bottom of the cement box consists of three sections, namely a central horizontal section and slope sections located on both sides of the horizontal section and symmetrically distributed about the horizontal section. The height of the slope section gradually increases from the center to the side wall. The through-hole of the cement box is opened in the horizontal section, and a sewage outlet is also opened in the horizontal section.
[0020] Furthermore, a top cover of the cement box is provided with a feeding window and a water adding window, both the feeding window and the water adding window are paved with screens, and the diameter of the feeding window is larger than the diameter of the water adding window.
[0021] This embodiment also protects a paver with a horizontal cement slurry spraying device, which at least includes a body, a paver top push frame in front of the body, a cement box suspended by a suspension frame at the rear of the body, a screw pump driving motor and a stirrer stirring motor are connected to the power device of the paver, a No. 10 pipe is suspended by a mounting seat at the paver top push frame, the No. 10 pipe and a second spray pipe are parallel to each other and arranged along the width of the roadbed, and a plurality of nozzles on the second spray pipe are all facing the middle roadbed in front;
[0022] The first spray pipe and the third spray pipe are both arranged along the length direction of the roadbed and are respectively located on both sides of the vehicle body. The plurality of nozzles on the first spray pipe and the plurality of nozzles on the third spray pipe are both facing the adjacent side roadbed.
[0023] Furthermore, the suspension frame is a frame structure that can be detachably installed on the cement box and the paver body by bolts; the mounting seat is a right-angle angle iron with a plurality of through holes, one side plate of the right-angle angle iron is connected to the No. 10 pipe or the first spray pipe or the third spray pipe through a flexible strip clamp passing through the through holes, and the other side plate of the right-angle angle iron is fixed to the paver push frame or body by bolts.
[0024] Preferably, at least two escalators are provided on the side of the cement box, one of which is close to the material adding window and the other is close to the water adding window.
[0025] This embodiment also protects the application of a paver with a cement slurry spraying device, comprising the following steps:
[0026] S001. No spraying status
[0027] Add cement into the cement tank through the feeding window, and add clean water into the cement tank through the water adding window. Close valves III, V, IX and XII, open other valves, start the paver, and the agitator rotates first and rotates counterclockwise to stir the cement slurry mixture. The screw pump is started again, and the cement slurry is sucked into the pump body by the screw pump, passes through pipes No. 1 and No. 2 in turn, and is divided into two paths at the connection between pipes No. 2 and No. 3. One path enters the cement tank through valve No. 1 and is discharged through the first reflux pipe to flush the bottom of the cement tank, and the other path passes through pipe No. 3 Then it is divided into two paths, one path enters the cement tank through valve No. II and is discharged through the third return pipe to flush the bottom of the cement tank, and the other path flows through pipeline No. 5, pipeline No. 6, pipeline No. 4, pipeline No. 7 and pipeline No. 8 in sequence and then is divided into two paths, one path enters the cement tank through valve No. X and is discharged through the second return pipe to flush the bottom of the cement tank, and the other path passes through pipeline No. 9 and valve No. XI in sequence and is discharged through the fourth return pipe to flush the bottom of the cement tank. The four return pipes return and flush the bottom of the tank, forming a double mixing with the agitator, and the cycle continues until the cement slurry in the cement tank is evenly mixed;
[0028] S002. Working status:
[0029] S201. Front spraying while side spraying
[0030] Close valves III, IV, VIII and XII, open other valves, start the paver, the agitator starts to rotate first, and rotates counterclockwise to stir the cement slurry mixture, the screw pump starts again, the cement slurry is sucked into the pump body by the screw pump, and passes through pipes No. 1 and No. 2 in turn, and is divided into two paths at the connection between pipes No. 2 and No. 3. One path enters the cement tank through valve No. 1 and is discharged through the first return pipe to flush the bottom of the cement tank. The other path is divided into two paths after passing through pipe No. 3. One path enters the cement tank through valve No. Ⅱ and is discharged through the third return pipe to flush the bottom of the cement tank. The other path flows through pipe No. 4 in turn. The No. 5 pipeline, No. 6 pipeline, No. 1 hose, the first spraying pipe, No. 2 hose, the second spraying pipe, No. 3 hose, the third spraying pipe, No. 4 hose, No. 7 pipeline, and No. 8 pipeline are then divided into two routes. One route enters the cement tank through the No. Ⅹ valve and is discharged through the second return pipe to flush the bottom of the cement tank. The other route passes through the No. 9 pipeline and the No. Ⅺ valve in turn and is discharged through the fourth return pipe to flush the bottom of the cement tank. The cycle continues to ensure that the first spraying pipe and the third spraying pipe respectively spray cement slurry uniformly and continuously on the adjacent side roadbeds, and at the same time, the second spraying pipe sprays cement slurry uniformly and continuously on the middle roadbed;
[0031] S202. Front spray does not work while side spray works
[0032] Close valves III, IV, VI, VII and XII, open other valves, start the paver, the agitator rotates first, and rotates counterclockwise to stir the cement slurry mixture. The screw pump is started again, and the cement slurry is sucked into the pump body by the screw pump, passes through pipes No. 1 and No. 2 in turn, and is divided into two paths at the connection between pipes No. 2 and No. 3. One path enters the cement tank through valve No. 1 and is discharged through the first return pipe to flush the bottom of the cement tank. The other path is divided into two paths after passing through pipe No. 3. One path enters the cement tank through valve No. 2 and is discharged through the third return pipe. The other part flows through the No. 5 pipe, No. 6 pipe, No. 1 hose, the first spray pipe, No. 2 hose, No. 10 pipe, No. 3 hose, the third spray pipe, No. 4 hose, No. 7 pipe, and No. 8 pipe in sequence, and then is divided into two parts. One part enters the cement tank through the No. Ⅹ valve and is discharged through the second return pipe to flush the bottom of the cement tank. The other part passes through the No. 9 pipe, No. Ⅺ valve in sequence, and then is discharged through the fourth return pipe to flush the bottom of the cement tank. The cycle continues, ensuring that the first spray pipe and the third spray pipe respectively spray cement slurry evenly and uninterruptedly on the adjacent side roadbed;
[0033] S003. Cleaning status
[0034] Add clean water into the cement tank, open all valves, circulate the clean water in all pipes and spray the clean water through the first spray pipe, the second spray pipe, and the third spray pipe to flush the cement tank and pipes. Repeat multiple cycles until the cleaning is completed.
[0035] The beneficial effects of the present invention are as follows:
[0036] (1) The cement slurry spraying device can be installed on the paver to spray cement slurry on the roadbed while paving. This can avoid the cement slurry from agglomerating and solidifying due to spraying first and then paving, eliminate the time difference between paving and spraying, and ensure the adhesion of the base structure.
[0037] (2) The cement slurry spraying device mainly includes a cement box. The pipeline in the cement box extends out of the box, surrounds the paver and returns to the cement box. The pipeline is composed of a pipe and a hose. The hose can be bent according to the spraying position, and the position of the hose on the paver can be adjusted so that it fits the paver.
[0038] (3) The agitator in the cement tank cooperates with the reflux flushing of the reflux pipe to form double stirring. The mechanical rotation stirring of the agitator and the water flushing stirring of the reflux pipe continuously stir the cement slurry at the same time, so that the cement slurry maintains uniform mixing characteristics and does not stick and solidify.
[0039] (4) A window for adding dry cement is set on the cover of the cement box. A screen is set to prevent large solid blocks that are difficult to melt from falling into the box and clogging and damaging the pump body. A small window is left for adding water or observation.
[0040] In order to make the above contents of the present invention more clearly understood, preferred embodiments are given below and described in detail in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 It is a structural schematic diagram of a horizontal cement slurry spraying device.
[0042] Figure 2 yes Figure 1 A partial enlarged view of middle A.
[0043] Figure 3 yes Figure 1 A partial enlarged view of B.
[0044] Figure 4 It is a structural schematic diagram of a cement slurry spraying device in a non-spraying state.
[0045] Figure 5 It is a structural schematic diagram of a cement slurry spraying device in which front spraying and side spraying are working simultaneously.
[0046] Figure 6 It is a structural schematic diagram of a cement slurry spraying device in which the front spraying is not working and the side spraying is working at the same time.
[0047] Figure 7 It is a structural schematic diagram of a horizontal cement slurry spraying device equipped with an escalator and a suspension frame.
[0048] Figure 8 It is a structural schematic diagram of a paver with a horizontal cement slurry spraying device.
[0049] Description of reference numerals:
[0050] 1. Cement tank; 2. Screw pump; 3. Agitator; 4. Push frame of paver; 5. Suspension frame; 6. Mounting seat; 7. Middle roadbed; 8. Side roadbed;
[0051] 101. Horizontal section; 102. Slope section; 103. Drainage outlet; 104. Through port; 105. Feeding window; 106. Watering window;
[0052] 901. Pipeline No. 1; 902. Pipeline No. 2; 903. Pipeline No. 3; 904. Pipeline No. 4; 905. Pipeline No. 5; 906. Pipeline No. 6; 907. Pipeline No. 7; 908. Pipeline No. 8; 909. Pipeline No. 9; 910. Pipeline No. 10;
[0053] 1001. Valve No. I; 1002. Valve No. II; 1003. Valve No. III; 1004. Valve No. IV; 1005. Valve No. V; 1006. Valve No. VI; 1007. Valve No. VII; 1008. Valve No. VIII; 1009. Valve No. IX; 1010. Valve No. X; 1011. Valve No. XI; 1012. Valve No. XII;
[0054] 1101. First spray pipe; 1102. Second spray pipe; 1103. Third spray pipe;
[0055] 1201. No. 1 hose; 1202. No. 2 hose; 1203. No. 3 hose; 1204. No. 4 hose; 1205. No. 5 drain hose; 1206. No. 6 drain hose;
[0056] 1301. The first return pipe; 1302. The second return pipe; 1303. The third return pipe; 1304. The fourth return pipe. DETAILED DESCRIPTION
[0057] The following describes the implementation of the present invention through specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0058] It should be noted that, in the present invention, the top, bottom, left and right in the figure are deemed to be the top, bottom, left and right of the horizontal cement slurry spraying device described in this specification.
[0059] The exemplary embodiments of the present invention are now described with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms used in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.
[0060] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.
[0061] First embodiment:
[0062] Reference Figure 1 , Figure 2 and Figure 3The first embodiment of the present invention relates to a horizontal cement slurry spraying device, comprising a cement box 1 and a screw pump 2 arranged up and down, the cement box 1 having a built-in agitator 3, a through hole 104 formed at the bottom of the cement box 1, the through hole 104 being sealed and connected to the suction port of the screw pump 2, the discharge port of the screw pump 2 being connected in series with a No. 1 pipeline 901, a No. 2 pipeline 902, a No. 3 pipeline 903, a No. 5 pipeline 905, a No. 6 pipeline 906, a No. 1 hose 1201, a first spraying pipe 1101, a No. 2 hose 1202, a second spraying pipe 1102, a No. 3 hose 1203, a third spraying pipe 1103, a No. 4 hose 1204, a No. 7 pipeline 907, a No. 8 pipeline 908, a No. 9 pipeline 909 and a No. 5 drain hose 1205 in sequence;
[0063] The No. 2 pipeline 902 and the No. 3 pipeline 903 are connected via a three-way valve, a No. 1 valve 1001 is installed at the third outlet of the three-way valve, and the No. 1 valve 1001 is connected to the first return pipe 1301 in the cement box 1;
[0064] The No. 2 pipe 902 and the No. 3 pipe 903 are also connected to one end of the No. 6 drain hose 1206, the other end of the No. 6 drain hose 1206 is a free end, and the No. Ⅲ valve 1003 is connected in series to the No. 6 drain hose 1206;
[0065] The No. 1 hose 1201 and the No. 6 pipe 906 are connected via a three-way valve, the No. 4 hose 1204 and the No. 7 pipe 907 are connected via a three-way valve, the two three-way valves are connected to each other via the No. 4 pipe 904, the No. 4 pipe 904 is connected in parallel with the second spray pipe 1102, and the No. 4 pipe 904 is connected in series with the No. Ⅳ valve 1004, the No. 1 hose 1201 is connected in series with the No. Ⅴ valve 1005, and the No. 4 hose 1204 is connected in series with the No. Ⅸ valve 1009;
[0066] A No. 10 pipe 910 connected in parallel with the second spray pipe 1102 is connected between the No. 2 hose 1202 and the No. 3 hose 1203. A No. VI valve 1006 and a No. VII valve 1007 are connected in series from upstream to downstream on the second spray pipe 1102. A No. VIII valve 1008 is connected in series on the No. 10 pipe 910.
[0067] The No. 8 pipeline 908 and the No. 9 pipeline 909 are connected via a three-way valve, the third outlet of the three-way valve is connected to the second return pipe 1302 in the cement box 1 via the No. X valve 1010, and the No. XII valve 1012 is connected in series to the No. 5 drain hose 1205.
[0068] The working principle or working process of the horizontal cement slurry spraying device protected by this embodiment is as follows:
[0069] Install the cement slurry spraying device on the paver, specifically, refer to Figure 8, hang the cement box 1 at the rear of the paver body, hang the No. 10 pipe 910 on the paver top push frame 4, adjust the impact angle of the nozzle of each spray pipe, ensure that the nozzle on the first spray pipe 1101 and the nozzle on the third spray pipe 1103 are facing the side roadbed 8, and the nozzle on the second spray pipe 1102 is facing the middle roadbed 7, and spray all roadbeds in all directions.
[0070] No spraying state: Figure 4 As shown, cement is added into cement tank 1 through feeding window 105, and clean water is added into cement tank 1 through water adding window 106, valves III 1003, V 1005, IX 1009 and XII 1012 are closed, other valves are opened, and the paver is started. Agitator 3 rotates first and rotates counterclockwise to stir the cement slurry mixture, and screw pump 2 is started again. The cement slurry is sucked into the pump body by screw pump 2, passes through pipe No. 1 901 and pipe No. 2 902 in turn, and is separated at the connection between pipe No. 2 902 and pipe No. 3 903. There are two routes, one route enters the cement tank 1 through valve No. Ⅰ 1001 and is discharged through the first return pipe 1301 to flush the bottom of the cement tank 1, and the other route enters the cement tank 1 through pipeline No. 3 903, pipeline No. 5 905, pipeline No. 6 906, pipeline No. 4 904, pipeline No. 7 907, pipeline No. 8 908, valve No. Ⅹ 1010 and is discharged through the second return pipe 1302 to flush the bottom of the cement tank 1. The two return pipes return and flush the bottom of the tank body, forming a double mixing with the agitator 3, and the cycle continues until the cement slurry in the cement tank 1 is evenly mixed;
[0071] Front spraying work and side spraying work at the same time: Figure 5 As shown, valves III, IV, VIII, and XII are closed, other valves are opened, and the paver is started. Agitator 3 rotates first and rotates counterclockwise to stir the cement slurry mixture. Screw pump 2 is started again, and the cement slurry is sucked into the pump body by screw pump 2, and passes through pipeline No. 1 901 and pipeline No. 2 902 in sequence. At the connection between pipeline No. 2 902 and pipeline No. 3 903, it is divided into two paths. One path enters cement tank 1 through valve No. 1001 and is discharged through first reflux pipe 1301 to flush the bottom of cement tank 1. The other path flows through pipeline No. 3 903, pipeline No. 5 905, The sixth pipe 906, the first hose 1201, the first spray pipe 1101, the second hose 1202, the second spray pipe 1102, the third hose 1203, the third spray pipe 1103, the fourth hose 1204, the seventh pipe 907, the eighth pipe 908, and the X valve 1010 enter the cement tank 1 and are discharged through the second return pipe 1302 to flush the bottom of the cement tank 1, and the circulation is continuous, ensuring that the first spray pipe 1101 and the third spray pipe 1103 respectively spray cement slurry uniformly and continuously on the adjacent side roadbed 8, and the second spray pipe 1102 sprays cement slurry uniformly and continuously on the middle roadbed 7;
[0072] Front spray does not work while side spray works: Figure 6 As shown, valves III, IV, VI, VII, and XII are closed, other valves are opened, and the paver is started. Agitator 3 rotates first and rotates counterclockwise to stir the cement slurry mixture. Screw pump 2 is started again, and the cement slurry is sucked into the pump body by screw pump 2, and passes through pipeline No. 1 901 and pipeline No. 2 902 in sequence. At the connection between pipeline No. 2 902 and pipeline No. 3 903, it is divided into two paths. One path enters cement tank 1 through valve No. 1001 and is discharged through the first reflux pipe 1301 to flush the bottom of cement tank 1. The other path The cement slurry flows sequentially through the No. 3 pipe 903, the No. 5 pipe 905, the No. 6 pipe 906, the No. 1 hose 1201, the first spray pipe 1101, the No. 2 hose 1202, the No. 10 pipe 910, the No. 3 hose 1203, the third spray pipe 1103, the No. 4 hose 1204, the No. 7 pipe 907, the No. 8 pipe 908, the No. 10 valve 1010, enters the cement box 1, and is discharged through the second return pipe 1302 to flush the bottom of the cement box 1, and circulates continuously to ensure that the first spray pipe 1101 and the third spray pipe 1103 respectively spray cement slurry uniformly and uninterruptedly on the adjacent side roadbed 8;
[0073] Cleaning state: add clean water into the cement box 1, open all valves, circulate the clean water in all pipes and spray the clean water through the first spray pipe 1101, the second spray pipe 1102, and the third spray pipe 1103 to flush the cement box 1 and the pipes, and circulate multiple times until the cleaning is completed.
[0074] It should be noted that the screw pump 2 does not need to be equipped with a separate power device, but the power device of the paver is used to provide power for the screw pump 2 as a power source for pumping cement slurry.
[0075] All valves can be used together to adjust the cement slurry injection flow rate, adjust the flow direction of the cement slurry and the pipes it passes through, etc.
[0076] In particular, a certain proportion (the proportion is adjusted according to on-site needs) of cement and clean water needs to be manually poured into the cement box 1 in advance, and then sprayed after being evenly mixed in the cement box 1. Specifically, the cement slurry of the cement slurry spraying device is cyclically sprayed, a part of the cement slurry is sprayed on the roadbed, and the remaining part of the cement slurry is returned to the cement box 1, and then sucked and sprayed out by the screw pump 2 after stirring, and the cycle is continuously carried out. The remaining amount of cement slurry in the cement box 1 is observed, and cement slurry is added in time as needed to avoid uneven spraying caused by insufficient remaining amount.
[0077] In this embodiment, the cement slurry spraying device is suspended on the paver, which is convenient for disassembly and installation, and the cement spraying function is carried out simultaneously with the pavement paving work, ensuring the interlayer adhesion between the paving material and the cement slurry, avoiding the cement slurry from clumping and solidifying caused by spraying first and then paving, and eliminating the time difference between paving and spraying.
[0078] Second implementation method:
[0079] Different from the first embodiment, Figure 1 or Figure 4 or Figure 5 or Figure 6 In this embodiment, two return pipes are added. Specifically, the No. 3 pipe 903 and the No. 5 pipe 905 are connected via a three-way valve. The No. II valve 1002 is installed at the third outlet of the three-way valve. The No. II valve 1002 is connected to the third return pipe 1303 in the cement box 1.
[0080] The No. 9 pipeline 909 and the No. 5 drain hose 1205 are connected via a three-way valve, and a No. XI valve 1011 is installed at the third outlet of the three-way valve. The No. XI valve 1011 is connected to the fourth return pipe 1304 in the cement box 1.
[0081] The working principle of the cement slurry spraying device in this embodiment is as follows:
[0082] No spraying state: Figure 4 As shown, cement is added into cement tank 1 through feeding window 105, and clean water is added into cement tank 1 through water adding window 106, valves III 1003, V 1005, IX 1009 and XII 1012 are closed, other valves are opened, and the paver is started. Agitator 3 rotates first and rotates counterclockwise to stir the cement slurry mixture, screw pump 2 is started again, and the cement slurry is sucked into the pump body by screw pump 2, passes through pipeline No. 1 901 and pipeline No. 2 902 in turn, and is divided into two paths at the connection between pipeline No. 2 902 and pipeline No. 3 903. One path enters cement tank 1 through valve No. 1001 and is discharged through the first reflux pipe 1301 to flush the bottom of cement tank 1, and the other path passes through pipeline No. 3 After 903, it is divided into two paths. One path enters the cement tank 1 through the valve No. II 1002 and is discharged through the third return pipe 1303 to flush the bottom of the cement tank 1. The other path flows through the pipeline No. 5 905, the pipeline No. 6 906, the pipeline No. 4 904, the pipeline No. 7 907 and the pipeline No. 8 908 in sequence and then is divided into two paths. One path enters the cement tank 1 through the valve No. X 1010 and is discharged through the second return pipe 1302 to flush the bottom of the cement tank 1. The other path passes through the pipeline No. 9 909 and the valve No. XI 1011 in sequence and then is discharged through the fourth return pipe 1304 to flush the bottom of the cement tank 1. The four return pipes return and flush the bottom of the tank body, forming a double mixing with the agitator 3, and the cycle continues until the cement slurry in the cement tank 1 is evenly mixed.
[0083] Front spraying work and side spraying work at the same time: Figure 5 As shown, valves III, IV, VIII, and XII are closed, other valves are opened, and the paver is started. Agitator 3 rotates first and rotates counterclockwise to stir the cement slurry mixture. Screw pump 2 is started again, and the cement slurry is sucked into the pump body by screw pump 2, passes through pipeline No. 1 901 and pipeline No. 2 902 in sequence, and is divided into two paths at the connection between pipeline No. 2 902 and pipeline No. 3 903. One path enters cement tank 1 through valve No. 1001 and is discharged through the first return pipe 1301 to flush the bottom of cement tank 1. The other path is divided into two paths after passing through pipeline No. 3 903. One path enters cement tank 1 through valve No. 2 1002 and is discharged through the third return pipe 1303 to flush the bottom of cement tank 1. The other path flows through pipeline No. 5 905, pipeline No. 6 906, pipeline No. 7 907, pipeline No. 8 908, pipeline No. 909, pipeline No. 1010, pipeline No. 1011, pipeline No. 1012, pipeline No. 1013, pipeline No. 1014, pipeline No. 1015, pipeline No. 1016, pipeline No. 1017, pipeline No. 1018, pipeline No. 1019, pipeline No. 110 The No. 906 pipe, the No. 1 hose 1201, the first spraying pipe 1101, the No. 2 hose 1202, the No. 2 spraying pipe 1102, the No. 3 hose 1203, the No. 3 spraying pipe 1103, the No. 4 hose 1204, the No. 7 pipe 907, and the No. 8 pipe 908 are then divided into two routes. One route enters the cement box 1 through the No. 10 valve 1010 and is discharged through the second return pipe 1302 to flush the bottom of the cement box 1. The other route passes through the No. 9 pipe 909 and the No. 11 valve 1011 in turn and is discharged through the fourth return pipe 1304 to flush the bottom of the cement box 1. The cycle continues, ensuring that the first spraying pipe 1101 and the third spraying pipe 1103 respectively spray cement slurry uniformly and continuously on the adjacent side roadbed 8, and at the same time, the second spraying pipe 1102 sprays cement slurry uniformly and continuously on the middle roadbed 7.
[0084] Front spray does not work while side spray works: Figure 6As shown, valves III, IV, VI, VII, and XII are closed, other valves are opened, and the paver is started. Agitator 3 rotates first and rotates counterclockwise to stir the cement slurry mixture. Screw pump 2 is started again, and the cement slurry is sucked into the pump body by screw pump 2, passes through pipeline No. 1 901 and pipeline No. 2 902 in sequence, and is divided into two paths at the connection between pipeline No. 2 902 and pipeline No. 3 903. One path enters cement tank 1 through valve No. 1001 and is discharged through the first return pipe 1301 to flush the bottom of cement tank 1. The other path is divided into two paths after passing through pipeline No. 3 903. One path enters cement tank 1 through valve No. 2 1002 and is discharged through the third return pipe 1303 to flush the cement tank. 1, and the other path flows through the No. 5 pipeline 905, the No. 6 pipeline 906, the No. 1 hose 1201, the first spraying pipe 1101, the No. 2 hose 1202, the No. 10 pipeline 910, the No. 3 hose 1203, the third spraying pipe 1103, the No. 4 hose 1204, the No. 7 pipeline 907, and the No. 8 pipeline 908, and then is divided into two paths. One path enters the cement tank 1 through the No. Ⅹ valve 1010 and is discharged through the second return pipe 1302 to flush the bottom of the cement tank 1, and the other path passes through the No. 9 pipeline 909, the No. Ⅺ valve 1011, and then is discharged through the fourth return pipe 1304 to flush the bottom of the cement tank 1, and the cycle continues, ensuring that the first spraying pipe 1101 and the third spraying pipe 1103 respectively spray cement slurry uniformly and uninterruptedly on the adjacent side roadbed 8;
[0085] Cleaning state: add clean water into the cement box 1, open all valves, circulate the clean water in all pipes and spray the clean water through the first spray pipe 1101, the second spray pipe 1102, and the third spray pipe 1103 to flush the cement box 1 and the pipes, and circulate multiple times until the cleaning is completed.
[0086] In this embodiment, the horizontal cement slurry spraying device has four reflux pipes. The mechanical rotation stirring of the agitator and the water flushing stirring of the four reflux pipes continuously stir the cement slurry simultaneously, so that the cement slurry maintains uniform mixing characteristics and does not stick and solidify.
[0087] Third embodiment:
[0088] Based on the second implementation mode, Figure 1 or Figure 4 or Figure 5 or Figure 6 The third return pipe 1303 and the fourth return pipe 1304 have the same structure and are arranged opposite to each other. They are both straight pipes. One end of the straight pipe is connected to valve No. Ⅱ 1002 or valve No. Ⅺ 1011, and the other end penetrates the wall of the cement box 1 and extends into the cement box 1 and is close to the bottom of the cement box 1.
[0089] In order to enhance the flushing pressure, the first return pipe 1301 and the second return pipe 1302 have the same structure and are arranged opposite to each other, both of which are composed of a U-shaped pipe and a straight pipe, wherein the opening end of the U-shaped pipe is a flat mouth and is inclined toward the bottom of the cement box 1, and the sealing end opposite to the opening end is connected with the straight pipe, and the straight pipe passes through the wall of the cement box 1 and is connected with valve No. Ⅰ 1001 or valve No. Ⅹ 1010.
[0090] Reference Figure 1 or Figure 4 or Figure 5 or Figure 6 The U-shaped flat ejection ports of the first return pipe 1301 and the second return pipe 1302 cooperate with the straight pipes of the third return pipe 1303 and the fourth return pipe 1304, which can increase the flow rate on the one hand and increase the injection pressure of the cement slurry on the other hand, thereby forming a vortex with the stirring of the agitator 3 and improving the uniformity of the stirring.
[0091] The bottom of the cement box 1 consists of three sections, namely a horizontal section 101 in the center, and slope sections 102 located on both sides of the horizontal section 101 and symmetrically distributed about the horizontal section 101. The height of the slope section 102 gradually increases from the center to the side wall. The through opening 104 of the cement box 1 is opened in the horizontal section 101, and the horizontal section 101 is also provided with a sewage outlet 103.
[0092] The horizontal section 101 is the low-lying part of the cement box 1 . The cement slurry in the cement box 1 slides down along the box wall or the sloped section 102 to the horizontal section 101 , is aggregated and mixed in the horizontal section 101 , and then enters the screw pump 2 through the through port 104 .
[0093] The above-mentioned design of the cement box 1 can prevent cement slurry from accumulating at the corners or the box walls of the cement box 1, thereby improving the utilization efficiency of the cement slurry.
[0094] In order to facilitate the addition of cement and water, the top cover of the cement box 1 is provided with a feeding window 105 and a water adding window 106 , both of which are paved with screens, and the diameter of the feeding window 105 is larger than that of the water adding window 106 .
[0095] It should be noted that the water adding window 106 can also be used as an observation port to observe the remaining amount of cement slurry and replenish cement or clean water in time.
[0096] Fourth embodiment:
[0097] This embodiment protects a paver with a horizontal cement slurry spraying device, referring to Figure 7 and Figure 8, at least including a vehicle body, a top push frame 4 of the paver is in front of the vehicle body, a cement box 1 is suspended and installed through a suspension frame 5 at the rear of the vehicle body, a driving motor of a screw pump 2 and a mixing motor of a mixer 3 are both connected to a power device of the paver, a No. 10 pipe 910 is suspended and installed through a mounting seat 6 at the top push frame 4 of the paver, the No. 10 pipe 910 and a second spray pipe 1102 are parallel to each other and arranged along the width of the roadbed, and a plurality of nozzles on the second spray pipe 1102 are all facing the middle roadbed 7 in front;
[0098] The first spray pipe 1101 and the third spray pipe 1103 are both arranged along the length direction of the roadbed and are respectively located on both sides of the vehicle body. The plurality of nozzles on the first spray pipe 1101 and the plurality of nozzles on the third spray pipe 1103 are both facing the adjacent side roadbed 8 .
[0099] Specifically, the suspension bracket 5 is a frame structure that can be detachably installed on the cement box 1 and the paver body by bolts; the mounting seat 6 is a right-angle angle iron with a plurality of through holes, one side plate of the right-angle angle iron is connected to the No. 10 pipe 910 or the first spray pipe 1101 or the third spray pipe 1103 through a flexible strip clamp passing through the through holes, and the other side plate of the right-angle angle iron is fixed to the paver push frame 4 or the body by bolts.
[0100] The above is a preferred arrangement of the suspension bracket 5 and the mounting base 6, but is not limited thereto. Any structure that can suspend the cement slurry spraying device on the paver can be used. It is worth mentioning that the cement slurry spraying device can also be detachably installed on the paver or fixed to the paver or plugged into the paver. In order to facilitate installation and disassembly, the present embodiment preferably adopts a hanging method.
[0101] In order to facilitate the addition of cement and clean water, at least two escalators are provided on the side of the cement box 1 , one of which is close to the material adding window 105 , and the other is close to the water adding window 106 .
[0102] Fifth embodiment:
[0103] This embodiment provides an application of a paver with a cement slurry spraying device, comprising the following steps:
[0104] S001. No spraying status
[0105] Reference Figure 4, add cement into cement tank 1 through feeding window 105, and add clean water into cement tank 1 through water adding window 106, close valves III 1003, V 1005, IX 1009 and XII 1012, open other valves, start the paver, stirrer 3 rotates first, and rotates counterclockwise to stir the cement slurry mixture, screw pump 2 is started again, and the cement slurry is sucked into the pump body by screw pump 2, passes through pipeline No. 1 901 and pipeline No. 2 902 in turn, and is divided into two paths at the connection between pipeline No. 2 902 and pipeline No. 3 903. One path enters cement tank 1 through valve No. 1001 and is discharged through the first reflux pipe 1301 to flush the bottom of cement tank 1, and the other path passes through pipeline No. 3 9 03 and then divided into two paths, one path enters the cement tank 1 through valve No. II 1002 and is discharged through the third return pipe 1303 to flush the bottom of the cement tank 1, and the other path flows through pipeline No. 5 905, pipeline No. 6 906, pipeline No. 4 904, pipeline No. 7 907 and pipeline No. 8 908 in sequence and then divided into two paths, one path enters the cement tank 1 through valve No. X 1010 and is discharged through the second return pipe 1302 to flush the bottom of the cement tank 1, and the other path flows through pipeline No. 9 909 and valve No. XI 1011 in sequence and then is discharged through the fourth return pipe 1304 to flush the bottom of the cement tank 1. The four return pipes return and flush the bottom of the tank body, forming a double mixing with the agitator 3, and the cycle continues until the cement slurry in the cement tank 1 is evenly mixed;
[0106] S002. Working status:
[0107] S201. Front spraying while side spraying
[0108] Reference Figure 5, close valve No. III 1003, valve No. IV 1004, valve No. VIII 1008 and valve No. XII 1012, open other valves, start the paver, agitator 3 rotates first, and rotates counterclockwise to stir the cement slurry mixture, screw pump 2 is started again, and the cement slurry is sucked into the pump body by screw pump 2, and passes through pipeline No. 1 901 and pipeline No. 2 902 in turn, and is divided into two paths at the connection between pipeline No. 2 902 and pipeline No. 3 903. One path enters the cement tank 1 through valve No. I 1001 and is discharged through the first return pipe 1301 to flush the bottom of the cement tank 1, and the other path is divided into two paths after passing through pipeline No. III 903. One path enters the cement tank 1 through valve No. II 1002 and is discharged through the third return pipe 1303 to flush the bottom of the cement tank 1, and the other path flows through pipeline No. V 905, pipeline No. VI in turn. Pipeline 906, No. 1 hose 1201, first spraying pipe 1101, No. 2 hose 1202, second spraying pipe 1102, No. 3 hose 1203, third spraying pipe 1103, No. 4 hose 1204, No. 7 pipeline 907, No. 8 pipeline 908 are divided into two routes, one route enters the cement box 1 through No. X valve 1010 and is discharged through the second return pipe 1302 to flush the bottom of the cement box 1, and the other route passes through No. 9 pipeline 909, No. XI valve 1011 and then is discharged through the fourth return pipe 1304 to flush the bottom of the cement box 1, and the cycle continues, ensuring that the first spraying pipe 1101 and the third spraying pipe 1103 respectively spray cement slurry uniformly and continuously on the adjacent side roadbed 8, and at the same time, the second spraying pipe 1102 sprays cement slurry uniformly and continuously on the middle roadbed 7;
[0109] S202. Front spray does not work while side spray works
[0110] Reference Figure 6, close valve No. III 1003, valve No. IV 1004, valve No. VI 1006, valve No. VII 1007 and valve No. XII 1012, open other valves, start the paver, agitator 3 rotates first, and rotates counterclockwise to stir the cement slurry mixture, screw pump 2 is started again, the cement slurry is sucked into the pump body by screw pump 2, and passes through pipeline No. 1 901 and pipeline No. 2 902 in turn, and is divided into two paths at the connection between pipeline No. 2 902 and pipeline No. 3 903. One path enters the cement tank 1 through valve No. I 1001 and is discharged through the first return pipe 1301 to flush the bottom of the cement tank 1, and the other path is divided into two paths after passing through pipeline No. 3 903. One path enters the cement tank 1 through valve No. II 1002 and is discharged through the third return pipe 1303 to flush the cement tank 1 The other way flows through the No. 5 pipe 905, the No. 6 pipe 906, the No. 1 hose 1201, the first spray pipe 1101, the No. 2 hose 1202, the No. 10 pipe 910, the No. 3 hose 1203, the third spray pipe 1103, the No. 4 hose 1204, the No. 7 pipe 907, and the No. 8 pipe 908, and then splits into two ways. One way enters the cement box 1 through the No. Ⅹ valve 1010 and is discharged through the second return pipe 1302 to flush the bottom of the cement box 1. The other way passes through the No. 9 pipe 909, the No. Ⅺ valve 1011, and then is discharged through the fourth return pipe 1304 to flush the bottom of the cement box 1. The cycle continues, ensuring that the first spray pipe 1101 and the third spray pipe 1103 respectively spray cement slurry uniformly and uninterruptedly on the adjacent side roadbed 8;
[0111] S003. Cleaning status
[0112] Add clean water into the cement box 1, open all valves, circulate the clean water in all pipes and spray the clean water through the first spray pipe 1101, the second spray pipe 1102, and the third spray pipe 1103 to flush the cement box 1 and the pipes, and circulate multiple times until the cleaning is completed.
[0113] In summary, the cement slurry spraying device and the paver with the device and their applications protected by the present invention mainly include a cement box. The pipeline in the cement box extends out of the box, circles around the paver and returns to the cement box. The pipeline is composed of a pipe and a hose. The hose can be bent according to the spraying position, and the position of the hose on the paver can be adjusted to fit the paver. The cement slurry spraying device can be installed on the paver to spray cement slurry on the roadbed while paving, avoiding cement slurry agglomeration and solidification caused by spraying first and then paving, eliminating the time difference between paving and spraying, and ensuring the adhesion of the base structure. The agitator in the cement box cooperates with the reflux flushing of the reflux pipe to form double stirring. The mechanical rotation stirring of the agitator and the water flow flushing stirring of the reflux pipe continuously stir the cement slurry at the same time, so that the cement slurry maintains uniform mixing characteristics and does not stick and solidify.
[0114] Those skilled in the art will appreciate that the above-mentioned embodiments are specific examples for implementing the present invention, and in actual applications, various changes may be made thereto in form and detail without departing from the spirit and scope of the present invention.
Claims
1. A paver with a horizontal cement slurry spraying device, characterized in that: The horizontal cement slurry spraying device comprises a cement box (1) and a screw pump (2) arranged in an upper and lower manner, wherein the cement box (1) has a built-in stirrer (3), a through hole (104) is provided at the bottom of the cement box (1), the through hole (104) is sealed and connected to a suction port of the screw pump (2), and the discharge port of the screw pump (2) is connected in series with a No. 1 pipeline (901), a No. 2 pipeline (902), a No. 3 pipeline (903), a No. 5 pipeline (905), a No. 6 pipeline (906), a No. 1 hose (1201), a first spraying pipe (1101), a No. 2 hose (1202), a second spraying pipe (1102), a No. 3 hose (1203), a third spraying pipe (1103), a No. 4 hose (1204), a No. 7 pipeline (907), a No. 8 pipeline (908), a No. 9 pipeline (909) and a No. 5 drain hose (1205) in sequence; The No. 2 pipeline (902) and the No. 3 pipeline (903) are connected via a three-way valve, a No. 1 valve (1001) is installed at the third outlet of the three-way valve, and the No. 1 valve (1001) is connected to the first return pipe (1301) in the cement box (1); The No. 2 pipe (902) and the No. 3 pipe (903) are also connected to one end of the No. 6 drain hose (1206), the other end of the No. 6 drain hose (1206) is a free end, and the No. Ⅲ valve (1003) is connected in series to the No. 6 drain hose (1206); The No. 1 hose (1201) and the No. 6 pipe (906) are connected via a three-way valve, the No. 4 hose (1204) and the No. 7 pipe (907) are connected via a three-way valve, the two three-way valves are connected to each other via the No. 4 pipe (904), the No. 4 pipe (904) and the second spray pipe (1102) are connected in parallel, and the No. 4 pipe (904) is connected in series with the No. Ⅳ valve (1004), the No. 1 hose (1201) is connected in series with the No. Ⅴ valve (1005), and the No. 4 hose (1204) is connected in series with the No. Ⅸ valve (1009); A No. 10 pipe (910) connected in parallel with the second spray pipe (1102) is connected between the No. 2 hose (1202) and the No. 3 hose (1203); a No. VI valve (1006) and a No. VII valve (1007) are connected in series from upstream to downstream on the second spray pipe (1102); and a No. VIII valve (1008) is connected in series on the No. 10 pipe (910); The No. 8 pipeline (908) and the No. 9 pipeline (909) are connected via a three-way valve, the third outlet of the three-way valve is connected to the second return pipe (1302) in the cement box (1) via a No. X valve (1010), and the No. XII valve (1012) is connected in series to the No. 5 drain hose (1205); The No. 3 pipeline (903) and the No. 5 pipeline (905) are connected via a three-way valve, a No. 2 valve (1002) is installed at the third outlet of the three-way valve, and the No. 2 valve (1002) is connected to the third return pipe (1303) in the cement box (1); The No. 9 pipeline (909) and the No. 5 drain hose (1205) are connected via a three-way valve, a No. XI valve (1011) is installed at the third outlet of the three-way valve, and the No. XI valve (1011) is connected to the fourth return pipe (1304) in the cement box (1); The third return pipe (1303) and the fourth return pipe (1304) have the same structure and are arranged opposite to each other. Both are straight pipes. One end of the straight pipe is connected to the valve No. II (1002) or the valve No. XI (1011), and the other end penetrates the wall of the cement box (1) and extends into the cement box (1) and is close to the bottom of the cement box (1). The first return pipe (1301) and the second return pipe (1302) have the same structure and are arranged opposite to each other, and are both composed of a U-shaped pipe and a straight pipe, wherein the open end of the U-shaped pipe is flat and inclined toward the bottom of the cement box (1), and the sealed end opposite to the open end is connected to the straight pipe, and the straight pipe passes through the wall of the cement box (1) and is connected to the No. I valve (1001) or the No. X valve (1010); The paver comprises at least a body, a paver push frame (4) is located in front of the body, a cement box (1) is suspended and mounted via a suspension frame (5) at the rear of the body, a driving motor of a screw pump (2) and a stirring motor of a stirrer (3) are both connected to a power device of the paver, a No. 10 pipe (910) is suspended and mounted via a mounting seat (6) at the paver push frame (4), the No. 10 pipe (910) and a second spray pipe (1102) are parallel to each other and are arranged along the width of the roadbed, and a plurality of nozzles on the second spray pipe (1102) are all facing the middle roadbed (7) in front; The first spray pipe (1101) and the third spray pipe (1103) are both arranged along the length direction of the roadbed and are respectively located on both sides of the vehicle body, and the plurality of nozzles on the first spray pipe (1101) and the plurality of nozzles on the third spray pipe (1103) are both facing the adjacent side roadbed (8).
2. The paver with a horizontal cement slurry spraying device according to claim 1, characterized in that: The bottom of the cement box (1) is composed of three sections, namely a central horizontal section (101) and slope sections (102) located on both sides of the horizontal section (101) and symmetrically distributed about the horizontal section (101). The height of the slope sections (102) gradually increases from the center to the side wall. The through opening (104) of the cement box (1) is opened in the horizontal section (101). The horizontal section (101) is also provided with a sewage outlet (103).
3. The paver with a horizontal cement slurry spraying device according to claim 1, characterized in that: The top cover of the cement box (1) is provided with a material adding window (105) and a water adding window (106), both of which are provided with screens, and the diameter of the material adding window (105) is larger than that of the water adding window (106).
4. The paver with a horizontal cement slurry spraying device according to claim 1, characterized in that: The suspension frame (5) is a frame structure that is detachably mounted on the cement box (1) and the body of the paver by means of bolts; the mounting seat (6) is a right angle iron with a plurality of through holes, one side plate of the right angle iron is connected to the No. 10 pipe (910) or the first spray pipe (1101) or the third spray pipe (1103) by means of a flexible strip clamp that passes through the through holes, and the other side plate of the right angle iron is fixedly connected to the top push frame (4) or the body of the paver by means of bolts.
5. The paver with a horizontal cement slurry spraying device as claimed in claim 3, characterized in that: At least two escalators are provided on the side of the cement box (1), one of which is close to the material adding window (105) and the other is close to the water adding window (106).
6. An application method of a paver with a horizontal cement slurry spraying device according to claim 3, characterized in that: The following steps are involved: S001. No spraying status Cement is added into the cement tank (1) through the material adding window (105), and clean water is added into the cement tank (1) through the water adding window (106). The valves No. III (1003), No. V (1005), No. IX (1009), and No. XII (1012) are closed, and the other valves are opened. The paver is started, and the agitator (3) rotates first and rotates counterclockwise to stir the cement slurry mixture. The screw pump (2) is then started, and the cement slurry is sucked into the pump body by the screw pump (2), and passes through the No. 1 pipe (901) and the No. 2 pipe (902) in sequence. At the connection between the No. 2 pipe (902) and the No. 3 pipe (903), it is divided into two paths. One path enters the cement tank (1) through the No. 1 valve (1001) and is discharged through the first return pipe (1301) to flush the bottom of the cement tank (1). The other path passes through the No. 3 pipe (9 03) and then divided into two paths, one path enters the cement box (1) through valve No. II (1002) and is discharged through the third return pipe (1303) to flush the bottom of the cement box (1), and the other path flows through pipe No. 5 (905), pipe No. 6 (906), pipe No. 4 (904), pipe No. 7 (907) and pipe No. 8 (908) in sequence and then divided into two paths, one path enters the cement box (1) through valve No. X (1010) and is discharged through the second return pipe (1302) to flush the bottom of the cement box (1), and the other path flows through pipe No. 9 (909), valve No. XI (1011) in sequence and then is discharged through the fourth return pipe (1304) to flush the bottom of the cement box (1). The four return pipes return and flush the bottom of the box body, forming a double mixing with the agitator (3), and the cycle continues until the cement slurry in the cement box (1) is evenly mixed; S002.Working status S201. Front spraying while side spraying Close valves III (1003), IV (1004), VIII (1008) and XII (1012), open other valves, start the paver, and the agitator (3) rotates first and rotates counterclockwise to stir the cement slurry mixture. The screw pump (2) is then started, and the cement slurry is sucked into the pump body by the screw pump (2), and passes through pipes No. 1 (901) and No. 2 (902) in sequence, and then passes through pipes No. 2 (902) and No. 3 ( The cement tank (1) is divided into two paths at the connection point of No.
903. One path enters the cement tank (1) through the No. Ⅰ valve (1001) and is discharged through the first return pipe (1301) to flush the bottom of the cement tank (1). The other path is divided into two paths after passing through the No. 3 pipe (903). One path enters the cement tank (1) through the No. Ⅱ valve (1002) and is discharged through the third return pipe (1303) to flush the bottom of the cement tank (1). The other path flows through the No. 5 pipe (905), the No. 6 pipe ( The flushing water is then divided into two paths, one of which enters the cement box (1) through the No. X valve (1010) and is discharged through the second return pipe (1302). The bottom of the mud box (1), and the other route is discharged through the ninth pipeline (909), the Ⅺ valve (1011) and the fourth return pipe (1304) to flush the bottom of the cement box (1), and the cycle continues, ensuring that the first spraying pipe (1101) and the third spraying pipe (1103) respectively spray cement slurry uniformly and continuously on the adjacent side roadbed (8), and the second spraying pipe (1102) sprays cement slurry uniformly and continuously on the middle roadbed (7); S202. Front spray does not work while side spray works Close valves III (1003), IV (1004), VI (1006), VII (1007) and XII (1012), open other valves, start the paver, and the agitator (3) rotates first and rotates counterclockwise to stir the cement slurry mixture. The screw pump (2) is then started, and the cement slurry is sucked into the pump body by the screw pump (2), passes through pipe No. 1 (901) and pipe No. 2 (902) in sequence, and is divided into two paths at the connection between pipe No. 2 (902) and pipe No. 3 (903). One path enters the cement tank (1) through valve No. 1 (1001) and is discharged through the first return pipe (1301) to flush the bottom of the cement tank (1). The other path passes through pipe No. 3 (903) and is divided into two paths. One path enters the cement tank (1) through valve No. 2 (1002) and is discharged through the third return pipe (1303) to flush the bottom of the cement tank (1). The other path flows sequentially through the fifth pipeline (905), the sixth pipeline (906), the first hose (1201), the first spraying pipe (1101), the second hose (1202), the tenth pipeline (910), the third hose (1203), the third spraying pipe (1103), the fourth hose (1204), the seventh pipeline (907), and the eighth pipeline (908), and then is divided into two paths. One path enters the cement box (1) through the No. X valve (1010) and is discharged through the second return pipe (1302) to flush the bottom of the cement box (1). The other path flows sequentially through the No. 9 pipeline (909), the No. XI valve (1011), and then is discharged through the fourth return pipe (1304) to flush the bottom of the cement box (1). The cycle continues, ensuring that the first spraying pipe (1101) and the third spraying pipe (1103) respectively spray cement slurry uniformly and continuously on the adjacent side roadbed (8); S003. Cleaning status Add clean water into the cement box (1), open all valves, and allow the clean water to circulate in all pipes and spray through the first spray pipe (1101), the second spray pipe (1102), and the third spray pipe (1103) to flush the cement box (1) and the pipes. Repeat the cycle several times until the cleaning is completed.
Citation Information
Patent Citations
Pavement base cement paste spray truck
CN207828748U
Slurry spraying equipment
CN101737065A
SPRR sprinkler
CN205775734U
Shield constructs pulping equipment
CN206812202U
Traditional chinese medicine that can remove foam draws concentrator
CN207203524U