A shallow pit and overhanging technology, which is applied in excavation, infrastructure engineering, construction, etc., can solve problems such as the inability to ensure the integrity of the internal structure's stress system, achieve shortened construction periods, significant economic and social benefits, and safe and stable stress Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments, so as to facilitate a clear understanding of the present invention, but they do not limit the present invention.
[0034] like Figure 1-2 As shown, the present invention is as figure 1 As shown, the typical cross-section of the structure implemented in the same period of the pit depth includes the cantilever beam-column system, the enclosure structure 1, the temporary column pile 2 and the support 3, the shallow pit 4, Deep pit 5, shallow pit internal structure 6 and deep pit internal structure 7.
[0035] In this embodiment, the enclosure structure 1 and the temporary column pile 2 of the two-stage foundation pit are cast as a whole.
[0036] First, the shallow pit 4 and the deep pit 5 are made: the whole is excavated to the shallow pit base 4-1, and the support 3 is supported along with the excavation. The inner structure 6 of the s...