Preparation method of fruit pulp through HPB high-pressure instantaneous wall breaking
A pulp and high pressure technology, applied in the field of blackberry pulp preparation, can solve the problems of processing between multiple equipments, low production efficiency and high production cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] Embodiment 1: A kind of pulp preparation device of HPB high-pressure instantaneous wall breaking, comprising shock-absorbing base 1, the top of shock-absorbing base 1 is fixedly installed with support frame 2, and the top of support frame 2 is fixedly installed with ear seat 3, ear seat The outer wall of 3 is fixedly installed with the first box body 4, and the right side of the first box body 4 is fixedly installed with axle sleeve 5, and the inside of axle sleeve 5 is installed with drive shaft 6, and the outer wall of drive shaft 6 is positioned at the axle sleeve 5 The first oil seal 7 is movably installed on the right side, and a seal ring 8 is movably installed on the right side of the first oil seal 7 . A guard plate 10 is installed, a gear 11 is sleeved on the left side of the drive shaft 6, a mandrel 12 is movably installed inside the first box body 4 and on the left side of the gear 11, and the outer wall of the mandrel 12 is located in the first box body The ...
Embodiment 2
[0043] Embodiment 2: A kind of pulp preparation device of HPB high-pressure instant wall breaking, comprising shock-absorbing base 1, the top of shock-absorbing base 1 is fixedly installed with support frame 2, and the top of support frame 2 is fixedly installed with ear seat 3, ear seat The outer wall of 3 is fixedly installed with the first box body 4, and the right side of the first box body 4 is fixedly installed with axle sleeve 5, and the inside of axle sleeve 5 is installed with drive shaft 6, and the outer wall of drive shaft 6 is positioned at the axle sleeve 5 The first oil seal 7 is movably installed on the right side, and a seal ring 8 is movably installed on the right side of the first oil seal 7 . A guard plate 10 is installed, a gear 11 is sleeved on the left side of the drive shaft 6, a mandrel 12 is movably installed inside the first box body 4 and on the left side of the gear 11, and the outer wall of the mandrel 12 is located in the first box body The inner ...
Embodiment 3
[0057] Embodiment 3: A kind of pulp preparation device of HPB high-pressure instantaneous wall breaking, comprising shock-absorbing base 1, the top of shock-absorbing base 1 is fixedly installed with support frame 2, and the top of support frame 2 is fixedly installed with ear seat 3, ear seat The outer wall of 3 is fixedly installed with the first box body 4, and the right side of the first box body 4 is fixedly installed with axle sleeve 5, and the inside of axle sleeve 5 is installed with drive shaft 6, and the outer wall of drive shaft 6 is positioned at the axle sleeve 5 The first oil seal 7 is movably installed on the right side, and a seal ring 8 is movably installed on the right side of the first oil seal 7 . A guard plate 10 is installed, a gear 11 is sleeved on the left side of the drive shaft 6, a mandrel 12 is movably installed inside the first box body 4 and on the left side of the gear 11, and the outer wall of the mandrel 12 is located in the first box body The ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com