A prestressed cable connection node between a core tube and an outer steel frame
By designing the prestressed cable-stayed cable connection node between the core cylinder and the outer steel frame in high-rise buildings, the problems of large vertical loads and large cross-sectional sizes in traditional building structures are solved, and efficient force transmission and seismic resistance are improved. Free up the bottom floor space.
Patent Information
- Application Number
- CN202110597768.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-31
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2041-05-31
AI Technical Summary
In high-rise buildings, traditional architectural structures have large vertical loads due to the need to reduce the outer frame components, and the cross-sectional size of the conversion structure is large, which affects the permeability and seismic resistance of the bottom floor.
Design a prestressed cable connecting node between the core cylinder and the outer steel frame, and connect it to the first cable through the upper and lower end connection plates, increasing the force transmission path, reducing the vertical load of the outer frame, and passing through the middle The connecting plate is connected to the steel frame beam to improve structural redundancy and shear resistance.
It improves the force transmission efficiency, reduces the size of the conversion structure, enhances the seismic resistance, frees up the bottom floor space, and improves the reliability and stability of the structure.
Smart Images

Figure CN113338447B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building structures, and in particular to a prestressed inclined cable connection node between a core tube and an outer steel frame. Background Art
[0002] Due to the continuous economic development around the world, the application of high-rise building structures is becoming more and more widespread. Its building functions are mainly concentrated in commercial offices and hotel apartments. High-quality offices often hope that the bottom floors are transparent and the structural components are minimized, which brings great difficulties and challenges to the design of building structures. The traditional conventional structural system can no longer meet the requirements of architectural design. In order to adapt to the challenges brought by different architectural concepts to the structure, structural engineers need to innovate the design of building structures, solve the structural stress problems brought by new architectural shapes, enhance the integration of structural forms and architectural concepts, meet the overall safety, applicability and durability of the building, and realize the beauty of the structure.
[0003] For the building structure of steel frame and reinforced concrete core tube, since high-quality office hopes that the bottom floor is transparent, the outer frame tries to reduce the structural components as much as possible, which will inevitably lead to a large number of vertical components of the outer frame being unable to touch the ground. The vertical load must be transferred to the grounded columns through the conversion structure at the bottom of the outer frame. The conversion structure is borne by a large vertical load. Under the premise of ensuring safe structural rigidity, the cross-sectional size of the required conversion structure is large, which occupies a large space on the bottom floor and affects the permeability of the bottom floor. Summary of the invention
[0004] The purpose of the present invention is to overcome the defects of the above-mentioned prior art that the conversion structure is subjected to large vertical loads and the cross-sectional size of the conversion structure is large, and to provide a prestressed inclined cable connection node between the core tube and the outer steel frame, which has high force transmission efficiency and good seismic resistance.
[0005] The purpose of the present invention can be achieved by the following technical solutions:
[0006] A prestressed inclined cable connection node between a core tube and an outer steel frame, the outer steel frame includes steel frame columns and steel frame beams, the steel frame columns are connected to the core tube through the steel frame beams, the connection node is used to connect the core tube and the steel frame columns, and includes an upper connection plate and a lower connection plate, the height of the upper connection plate is greater than the height of the lower connection plate, the upper connection plate and the lower connection plate are respectively connected to the core tube and the steel frame column, the upper connection plate is connected to the lower connection plate through a first cable, the force transmission path is increased, the vertical load and lateral load borne by the steel frame column are transmitted to the core tube through the connection node, the vertical load of the conversion structure inside the outer steel frame and at the bottom of the outer steel frame is reduced, the required size of the conversion structure is reduced by increasing the structural redundancy, and the seismic performance of the outer steel frame is improved.
[0007] Furthermore, the upper connecting plate and the lower connecting plate are both provided with pin holes, and the first cable is connected to the upper connecting plate and the lower connecting plate through the pin and the pin hole, which has good flexibility and is easy to install.
[0008] Furthermore, a first connecting surface is provided on the upper connecting plate, the first connecting surface is a plane, and the first cable is vertically connected to the first connecting surface, thereby improving the shear resistance of the upper connecting plate.
[0009] Furthermore, a second connecting surface is provided on the lower end connecting plate, and the second connecting surface is a serrated surface. The first cable is fixed on the serrations on the serrated surface. The serrated surface has rounded corners at its corners, has strong shear resistance, and is not easily damaged and fails.
[0010] Furthermore, the connection node further comprises an intermediate connection plate, and the intermediate connection plate is connected to the upper connection plate and the lower connection plate via a first cable.
[0011] Furthermore, the intermediate connecting plate is connected to the steel frame beam via the second cable, which reduces the span of the first cable and reduces the shaking of the intermediate connecting plate, thereby improving the reliability and stability of the structure.
[0012] Furthermore, the upper end connecting plate is embedded in the concrete shear wall of the core tube and welded to the steel section in the concrete shear wall, and the lower end connecting plate is welded to the steel frame column.
[0013] Furthermore, the upper connecting plate is provided with a first transverse stiffening plate along the horizontal direction and a first vertical stiffening plate along the vertical direction, and the lower connecting plate is provided with a second transverse stiffening plate along the horizontal direction and a second vertical stiffening plate along the vertical direction, thereby improving the structural stiffness and shear resistance of the upper connecting plate and the lower connecting plate, and achieving structural stability.
[0014] Furthermore, the first cable includes two fixed ends and a rope between the two fixed ends, the two fixed ends are respectively connected to the upper connecting plate and the lower connecting plate, and the rope is provided with an adjustment end for adjusting the tightness of the rope. After the rope is installed, the prestress on the first cable is adjusted through the adjustment end, and the operation is flexible.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] (1) In the present invention, an upper connecting plate and a lower connecting plate are fixed on the core tube and the steel frame column, respectively. The height of the upper connecting plate is greater than that of the lower connecting plate. The upper connecting plate is connected to the lower connecting plate through an inclined first cable, thereby increasing the force transmission path. The vertical load on the steel frame column and the vertical load are transmitted to the core tube through the connection node, thereby reducing the vertical load of the conversion structure inside the outer steel frame and at the bottom of the outer steel frame. More vertical loads are transmitted to the core tube, and the force transmission efficiency is high. While ensuring the required structural rigidity, the required size of the conversion structure is reduced, the space of the floor below the outer steel frame is released, the permeability is good, and the seismic performance of the outer steel frame is improved.
[0017] (2) The present invention provides a first connection surface on the upper end connection plate. The first connection surface is a plane and is vertically connected to the first cable. It has good shear resistance and is not easily damaged and fails.
[0018] (3) The present invention provides a second connection surface on the lower end connection plate, the second connection surface is a serrated surface, the first cable is fixed on the serrations on the serrated surface, and the serrated surface is provided with a rounded corner, so as to have strong shear resistance;
[0019] (4) The intermediate connecting plate of the present invention is connected to the upper connecting plate and the lower connecting plate through the first cable, and the intermediate connecting plate reduces the length required for the first cable. The intermediate connecting plate is connected to the steel frame beam through the second cable, which reduces the shaking of the intermediate connecting plate and improves the reliability and stability of the structure as a whole;
[0020] (5) The present invention provides a first transverse stiffening plate along the horizontal direction and a first vertical stiffening plate along the vertical direction on the upper connecting plate, and provides a second transverse stiffening plate along the horizontal direction and a second vertical stiffening plate along the vertical direction on the lower connecting plate, thereby improving the structural stiffness and shear resistance of the upper connecting plate and the lower connecting plate, and achieving structural stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a structural schematic diagram of the present invention;
[0022] Figure 2 is a structural schematic diagram of the first cable;
[0023] Figure 3 is a structural schematic diagram of the upper end connecting plate;
[0024] Figure 4 is a structural schematic diagram of the lower end connecting plate;
[0025] Figure 5 It is a structural schematic diagram of the middle connecting plate;
[0026] Description of the numbers in the figure:
[0027] 1. Core tube, 2. Steel frame beam, 3. Steel frame column, 4. First cable, 5. Upper connecting plate, 6. Lower connecting plate, 7. Second cable, 8. Middle connecting plate, 81. First pull ring, 82. Second pull ring, 41. Fixed end, 42. Adjusting end, 43. Rope, 51. First connecting surface, 52. First vertical stiffening plate, 53. First horizontal stiffening plate, 61. Second connecting surface, 62. Second vertical stiffening plate, 63. Second horizontal stiffening plate. DETAILED DESCRIPTION
[0028] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.
[0029] A prestressed cable connection node between the core tube and the outer steel frame, such as Figure 1 The outer steel frame includes a steel frame column 3 and a steel frame beam 2. The steel frame column 3 is connected to the core tube 1 through the steel frame beam 2. The connection node is used to connect the core tube 1 and the steel frame column 3, including an upper connection plate 5, a lower connection plate 6 and an intermediate connection plate 8. The height of the upper connection plate 5 is greater than the height of the lower connection plate 6. The upper connection plate 5 is pre-buried in the concrete shear wall of the core tube 1 and welded to the steel section in the concrete shear wall. The lower connection plate 6 is welded to the steel frame column 3. The intermediate connection plate 8 connects the upper connection plate 5 and the lower connection plate 6 through the first cable 4, which increases the force transmission path. The vertical load and lateral load borne by the steel frame column 3 are transmitted to the core tube 1 through the connection node, which reduces the vertical load of the conversion structure inside the outer steel frame and at the bottom of the outer steel frame. The required size of the conversion structure is reduced by increasing the structural redundancy, and the seismic performance of the outer steel frame is improved at the same time.
[0030] The middle connecting plate 8 reduces the length required by the first cable 4. The middle connecting plate 8 is connected to the steel frame beam 2 through the second cable 7, which reduces the shaking of the middle connecting plate 8 and improves the reliability and stability of the structure as a whole. Figure 5 A first pull ring 81 and a second pull ring 82 are provided on the middle connecting plate 8, the first cable 4 is connected to the middle connecting plate 8 through the second pull ring 82, and the second cable 7 is connected to the middle connecting plate 8 through the first pull ring 81.
[0031] The upper connecting plate 5 and the lower connecting plate 6 are both provided with pin holes, and the first cable 4 is connected to the upper connecting plate 5 and the lower connecting plate 6 through the pin and the pin hole, which has good flexibility and is easy to install.
[0032] like Figure 3 and Figure 4A first connecting surface 51 is provided on the upper connecting plate 5 , and the first connecting surface 51 is a plane. The first cable 4 is vertically connected to the first connecting surface 51 , thereby improving the shear resistance of the upper connecting plate 5 .
[0033] The lower end connecting plate 6 is provided with a second connecting surface 61, which is a serrated surface. The first cable 4 is fixed on the serrations on the serrated surface. The serrated surface has rounded corners, has strong shear resistance, and is not easily damaged and fails.
[0034] The number of the first cables 4 is one or more, and the number of the first cables 4 can be flexibly selected according to the required prestress.
[0035] The upper connecting plate 5 is provided with a first horizontal stiffening plate 53 along the horizontal direction and a first vertical stiffening plate 52 along the vertical direction, and the lower connecting plate 6 is provided with a second horizontal stiffening plate 63 along the horizontal direction and a second vertical stiffening plate 62 along the vertical direction, so as to ensure the shear resistance of the upper connecting plate 5 and the lower connecting plate 6, and have high rigidity and good stability.
[0036] like Figure 2 The first cable 4 includes two fixed ends 41 and a rope 43 between the two fixed ends 41 . The two fixed ends 41 are respectively connected to the upper connecting plate 5 and the lower connecting plate 6 . The rope 43 is provided with an adjusting end 42 for adjusting the tightness of the rope 43 .
[0037] During installation, first install the upper connecting plate 5 and the lower connecting plate 6, and then connect the upper connecting plate 5 and the lower connecting plate 6 through the first cable 4. After installing the rope 43, the prestress on the first cable 4 and the vertical load on the steel frame column 3 are transferred to the core tube 1 through the first cable 4 through the adjusting end 42.
[0038] The present embodiment proposes a prestressed inclined cable connection node between the core tube and the outer steel frame. By respectively arranging an upper connecting plate 5 and a lower connecting plate 6 on the core tube 1 and the steel frame column 3, and then connecting the upper connecting plate 5 and the lower connecting plate 6 through a first cable 4 and an intermediate connecting plate 8, the force transmission path is increased, more vertical loads are transmitted to the core tube 1, the force transmission efficiency is high, the structural load on the conversion structure below the outer steel frame is reduced, and the required size of the conversion structure is reduced.
[0039] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A prestressed cable connection node between a core tube and an outer steel frame, wherein the outer steel frame comprises a steel frame column (3) and a steel frame beam (2), wherein the steel frame column (3) is connected to the core tube (1) via the steel frame beam (2), It is characterized in that The connection node comprises an upper connection plate (5) and a lower connection plate (6), the height of the upper connection plate (5) is greater than the height of the lower connection plate (6), the upper connection plate (5) and the lower connection plate (6) are respectively connected to the core tube (1) and the steel frame column (3), and the upper connection plate (5) is connected to the lower connection plate (6) via a first cable (4); The upper end connecting plate (5) is provided with a first connecting surface (51), the first connecting surface (51) is a plane, and the first cable (4) is vertically connected to the first connecting surface (51); The lower end connecting plate (6) is provided with a second connecting surface (61), the second connecting surface (61) is a serrated surface, the first cable (4) is fixed on the serrations on the serrated surface, and the folded corners of the serrated surface are provided with rounded corners; It also includes an intermediate connecting plate (8), wherein the intermediate connecting plate (8) is connected to the upper connecting plate (5) and the lower connecting plate (6) via a first cable (4); The intermediate connecting plate (8) is connected to the steel frame beam (2) via a second cable (7).
2. A prestressed cable connection node between a core tube and an outer steel frame according to claim 1, It is characterized in that The upper end connecting plate (5) is pre-buried in the core tube (1) and welded to the steel section in the core tube (1).
3. The prestressed cable connection node between the core tube and the outer steel frame according to claim 1, It is characterized in that The lower end connecting plate (6) is welded to the steel frame column (3).
4. The prestressed cable connection node between the core tube and the outer steel frame according to claim 1, It is characterized in that The first cable (4) is connected to the upper connecting plate (5) and the lower connecting plate (6) via a pin shaft.
5. The prestressed cable connection node between the core tube and the outer steel frame according to claim 1, It is characterized in that The upper end connecting plate (5) is provided with a first transverse stiffening plate (53) along the horizontal direction and a first vertical stiffening plate (52) along the vertical direction.
6. The prestressed cable connection node between the core tube and the outer steel frame according to claim 1, It is characterized in that The lower end connecting plate (6) is provided with a second transverse stiffening plate (63) along the horizontal direction and a second vertical stiffening plate (62) along the vertical direction.
