Slag and ash discharging device for garbage pyrolysis gasification furnace

By designing an elliptical cylindrical combustion chamber, a quadrilateral table-shaped slag bearing chamber and a rectangular ash discharge chamber in the garbage pyrolysis gasifier, and using partitions and spiral ash discharge machines, the ash discharge of the garbage pyrolysis gasifier is solved. The problem of unevenness achieves uniformity and efficient treatment of garbage combustion.

CN114383135BActive Publication Date: 2024-11-05ZHONGHUAN SDIC ECOLOGICAL TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111664935.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-31
Publication Date
2024-11-05
Estimated Expiration
2041-12-31

AI Technical Summary

Technical Problem

The ash output of existing garbage pyrolysis gasifiers is uneven, resulting in uneven drops of garbage in the furnace, affecting combustion efficiency and effect.

Method used

A garbage pyrolysis gasification furnace slag bearing and ash discharge device is designed, using an elliptical cylindrical combustion chamber, a quadrupole-shaped slag bearing chamber and a rectangular ash discharge chamber. By setting up partitions and spiral ash discharge machines, ash discharge machines are realized. even discharge.

Benefits of technology

The uniformity of garbage combustion is achieved, the efficiency and effect of garbage disposal is improved, and the uniform drying and pyrolytic gasification of garbage in the gasification furnace is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114383135B_ABST
    Figure CN114383135B_ABST
Patent Text Reader

Abstract

The invention discloses a slag receiving and ash discharging device for a garbage pyrolysis and gasification furnace, relates to the technical field of garbage treatment equipment, and solves the problem of uneven ash discharging in a garbage pyrolysis and gasification furnace; the slag receiving and ash discharging device for the garbage pyrolysis and gasification furnace is provided with a slag receiving chamber in the shape of an inverted quadrangular pyramid below an elliptical cylindrical garbage combustion chamber, the slag receiving chamber is provided with at least two slag receiving bins arranged side by side in a horizontal direction, and the projection areas of the bottom opening of the garbage combustion chamber vertically projected to the top openings of each slag receiving bin of the slag receiving chamber are equal; an ash discharging chamber in the shape of a rectangular parallelepiped is provided below the slag receiving chamber, the ash discharging chamber is provided with ash discharging bins of the same shape corresponding to the slag receiving bins, and each ash discharging bin is provided with a spiral slag discharging machine to evenly discharge the ash in each ash discharging bin. The slag receiving and ash discharging device helps the ash in the garbage combustion chamber to fall and be evenly discharged, thereby making the garbage in the garbage pyrolysis and gasification furnace evenly dried, pyrolyzed, gasified and burned in sequence, so as to improve the efficiency of garbage treatment and ensure the effect of garbage treatment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of garbage processing equipment, and in particular to a slag receiving and ash discharging device for a garbage pyrolysis and gasification furnace. Background Art

[0002] With the continuous improvement of living standards, people's quality of life has made great progress accordingly. At the same time, the amount of domestic waste generated is also increasing. The daily treatment of large amounts of urban and rural domestic waste, especially the treatment of small and medium-sized urban and rural domestic waste, has become a difficult problem.

[0003] At present, one way to deal with domestic waste is to carry out centralized landfill treatment. However, landfill produces garbage odor and garbage leachate, and it occupies a large amount of land. With people's high requirements for the environment, land resources are becoming increasingly scarce, the demand for landfill sites is increasing, and the landfill method is difficult to sustain. Moreover, landfill is only a temporary treatment method and cannot eliminate garbage.

[0004] One treatment method is traditional incineration. Although it can process a large amount of garbage, it has high requirements for garbage sorting. The garbage needs to stay in the plant. Small-scale garbage incineration plants even require pre-treatment such as crushing and filtering. Large-scale garbage incineration plants focus on power generation, and it is difficult to incinerate garbage at a high temperature of more than 850°C, which produces a large amount of toxic and harmful gases such as dioxins. Before garbage incineration, a large amount of garbage leachate and garbage odor are also produced. The slag also becomes harmful and hazardous solid waste due to incomplete incineration. Therefore, garbage incineration is highly polluting and it is difficult to achieve truly standard emissions.

[0005] In order to reduce welding points, facilitate cooling, and lower manufacturing costs, existing garbage pyrolysis and gasification furnaces basically use a cylindrical vertical form, that is, the bottom of the garbage pyrolysis and gasification furnace is circular. However, a circular bottom makes it difficult to achieve uniform slag and ash discharge at all locations. Existing ash discharge methods mainly use crawler grates, horizontal pushing, rotation, spiral pushing, or deadweight dropping to achieve ash discharge. These methods directly place the corresponding equipment at the bottom of the circular cylindrical garbage pyrolysis and gasification furnace. The main problem is uneven ash discharge at various locations. Specifically, the ash discharge at approximately the same horizontal plane is uneven, especially the uneven ash discharge of the cylindrical garbage pyrolysis and gasification furnace. This causes uneven garbage falling at various locations in the cylindrical garbage pyrolysis and gasification furnace, resulting in uneven drying, pyrolysis, gasification, and combustion of the garbage in the cylindrical garbage pyrolysis and gasification furnace, affecting the efficiency and effectiveness of garbage treatment. Summary of the Invention

[0006] In view of the above shortcomings, the present invention provides a slag-bearing and ash-discharging device for a garbage pyrolysis and gasification furnace, which is used to solve the problem of uneven ash discharge in existing garbage pyrolysis and gasification furnaces.

[0007] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a slag receiving and ash discharging device for a garbage pyrolysis gasification furnace, comprising a garbage combustion chamber, a slag receiving chamber and an ash discharging chamber distributed in sequence from top to bottom, wherein the garbage combustion chamber is an elliptical cylindrical structure, the slag receiving chamber is an inverted quadrangular pyramid chamber with a rectangular bottom and top surface, and the ash discharging chamber is a rectangular parallelepiped chamber; at least one upright slag receiving chamber partition is provided in the slag receiving chamber to divide the slag receiving chamber into two or more slag receiving bins arranged side by side in a horizontal direction, and the bottom surface opening of each slag receiving bin is of the same shape The rectangular and elliptical cylindrical bottom opening of the garbage combustion chamber has an equal projected area when vertically projected onto the top opening of each slag bin; the ash discharge chamber is provided with upright ash discharge chamber partitions whose number is the same as the slag chamber partitions to divide the ash discharge chamber into ash discharge bins whose number is horizontally parallel and the number is the same as the slag bins, and the top surface of the ash discharge chamber partition corresponds one to one with the bottom surface of the slag chamber partition; the ash discharge bin is a rectangular chamber structure with a uniform shape, and a spiral ash discharger is provided in the ash discharge bin for evenly discharging the ash in each ash discharge bin.

[0008] Furthermore, the bottom area of ​​the elliptical cylindrical garbage combustion chamber is equal to the bottom area of ​​the slag receiving chamber and the bottom area of ​​the ash discharge chamber; the top area of ​​the slag receiving chamber is larger than the bottom area of ​​the elliptical cylindrical garbage combustion chamber.

[0009] Furthermore, of the four bottom sides of the rectangular bottom surface of the inverted tetrahedral slag receiving chamber, two opposite bottom sides are parallel to the major axis of the ellipse of the bottom surface of the elliptical cylindrical garbage combustion chamber, and the other two bottom sides are parallel to the minor axis of the ellipse of the bottom surface of the elliptical cylindrical garbage combustion chamber; the length of the long side of the long-sided top surface of the inverted tetrahedral slag receiving chamber is equal to the length of the long axis of the elliptical bottom surface of the garbage combustion chamber, and the length of the short side of the long-sided top surface of the inverted tetrahedral slag receiving chamber is equal to the length of the minor axis of the elliptical bottom surface of the garbage combustion chamber; the garbage combustion chamber is arranged opposite to the slag receiving chamber and the ash discharge chamber.

[0010] Furthermore, oxygen supply pipes are provided on the top of the slag chamber partition and on the furnace wall of the garbage combustion chamber. The oxygen supply pipes are on the same horizontal plane, and multiple oxygen outlets are provided on the side of the oxygen supply pipes; cooling water pipes are welded under the oxygen supply pipes, and the cooling water pipes are closely connected to the slag chamber partition.

[0011] Furthermore, a semicircular groove is provided at the bottom of the ash discharge bin, and the two sides of the semicircular groove are in contact with the two side walls of the bottom of the ash discharge bin. The semicircular groove is located below the auger of the spiral ash discharger, and its extension direction is consistent with the extension direction of the auger of the spiral ash discharger.

[0012] Furthermore, the number of partitions in the slag receiving chamber is 2-4.

[0013] Furthermore, an ash conveyor is provided below the end of the spiral ash discharger.

[0014] Furthermore, the ash conveyor is a conveyor belt conveyor, and the conveyor belt of the ash conveyor is located directly below the end of each spiral ash discharger.

[0015] Furthermore, the spiral ash discharger is a shaftless spiral ash discharger.

[0016] Compared with the prior art, the beneficial effects of the present invention are:

[0017] The slag receiving and ash discharging device of the garbage pyrolysis gasification furnace of the present invention is achieved by arranging a slag receiving chamber under the bottom opening of the elliptical cylindrical garbage combustion chamber and arranging a plurality of slag receiving bins in the slag receiving chamber, and making the projection areas of the bottom opening of the elliptical cylindrical garbage combustion chamber vertically projected to the top openings of each slag receiving bin of the slag receiving chamber equal. According to Zu's principle, two solids of the same height have equal volumes if their cross-sectional areas at the same height are equal. Therefore, the volumes of ash distributed above the top openings of each slag receiving bin are equal, so that the volumes of ash falling from the bottom of the garbage combustion chamber into each slag receiving bin can be made equal. By arranging the ash discharging chamber under the bottom opening of the slag receiving chamber and arranging the ash discharging chambers with the same shape The corresponding rectangular ash discharge bin is connected to the slag receiving bin, and the slag receiving bin and the ash discharge bin form a long and narrow chamber. A spiral ash discharger is set in each ash discharge bin, so that the ash in the garbage combustion chamber enters each slag receiving bin evenly, and then enters the corresponding ash discharge bin below evenly, and is evenly discharged through the spiral ash discharger in the ash discharge bin, achieving uniform ash falling and ash discharge, and then achieving uniform combustion of garbage in the high-temperature gasification furnace, and further maintaining equal and uniform falling of garbage in the high-temperature gasification furnace, and automatically drying, carbonizing, cracking and burning in turn, to ensure the efficiency and effect of garbage combustion, and ensure stable and uniform drying and pyrolysis and gasification of garbage in the gasification furnace. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments.

[0019] Figure 1 A structural diagram of the present invention from one perspective;

[0020] Figure 2 A schematic diagram of a partial structure of the present invention from one viewing angle (the top is completely hollowed out);

[0021] Figure 3 A schematic diagram of a partial structure of the present invention from one viewing angle (the top is completely hollowed out);

[0022] Figure 4 It is a cross-sectional schematic diagram of the slag receiving chamber and the ash discharging chamber of the present invention.

[0023] Among them, the marks shown in the figure are: 61-slag receiving chamber; 62-slag receiving chamber vertical plate; 63-slag receiving bin; 64-spiral ash discharger; 65-ash conveyor; 66-semicircular trough; 67-garbage combustion chamber; 68-ash discharge chamber; 69-ash discharge chamber vertical plate; 610-ash discharge bin. DETAILED DESCRIPTION

[0024] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making any creative efforts shall fall within the scope of protection of the present invention.

[0025] In the description of the present invention, it should be noted that the orientation or positional relationship indicated by the term "inside" or the like is based on the orientation or positional relationship shown in the accompanying drawings, or is the orientation or positional relationship in which the product of the invention is usually placed when in use. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0026] In the description of the present invention, it should also be noted that, unless otherwise expressly specified or limited, the terms "disposed" and "connected" should be understood in a broad sense. For example, they can refer to fixed connections, detachable connections, or integral connections; mechanical connections, or electrical connections; direct connections, indirect connections through an intermediate medium, or internal connections between two components. Those skilled in the art will understand the specific meanings of the above terms in the present invention based on the specific circumstances.

[0027] Please refer to Figures 1 to 4, a preferred embodiment of the present invention provides a slag receiving and ash discharging device for a garbage pyrolysis gasification furnace, which is used to solve the problems of ash falling and ash discharging in the garbage pyrolysis gasification furnace, so as to achieve uniform ash falling and uniform ash discharging. The slag receiving and ash discharging device for the garbage pyrolysis gasification furnace includes a garbage combustion chamber 67, a slag receiving chamber 61 and an ash discharging chamber 68, which are sequentially distributed from top to bottom, wherein the garbage combustion chamber 67 is an elliptical cylindrical structure, the slag receiving chamber 61 is an inverted quadrangular pyramid chamber with a rectangular bottom and top, and the ash discharging chamber 68 is a rectangular parallelepiped chamber; two upright slag chamber partitions 62 are arranged in the slag chamber 61 to divide the slag chamber 61 into three slag bins 63 arranged side by side in the horizontal direction, and the bottom opening of each slag bin 63 is a uniform rectangular shape, and the bottom opening of the elliptical cylindrical garbage combustion chamber 67 is vertically projected to each The projected area of ​​the top opening of the slag receiving bin 63 is equal; the ash discharge chamber 68 is provided with vertically arranged ash discharge chamber partitions 69 whose number is the same as the slag receiving chamber partitions 62 to divide the ash discharge chamber 68 into horizontally parallel ash discharge chambers 610 whose number is the same as the slag receiving bin 63, and the top surface of the ash discharge chamber partition 69 corresponds one-to-one with the bottom surface of the slag receiving chamber partition 62. At this time, the ash discharge bin 610 corresponds one-to-one with the slag receiving bin 63, and the ash discharge bin 610 is a rectangular cavity structure with the same shape. The ash discharge bin 610 is provided with a spiral ash discharger 64 of the same model for evenly discharging the ash in each of the ash discharge bins 610.

[0028] The existing garbage high-temperature cracking gasification furnace mainly realizes ash discharge by arranging crawler grates, horizontal pushers, spiral pushers or self-weight drops at the bottom of the combustion chamber of the high-temperature gasification furnace. These components act directly on the bottom of the combustion chamber of the garbage high-temperature cracking gasification furnace. Since the combustion chamber is mainly cylindrical, the ash discharge at each position is uneven, which makes the garbage at each position in the garbage high-temperature cracking gasification furnace fall unevenly, resulting in uneven combustion of the garbage in the high-temperature gasification furnace, affecting the garbage combustion efficiency and effect.

[0029] The top of the slag chamber 61 is directly connected to the bottom of the garbage combustion chamber 67, and no partition is provided to allow the ash produced by the combustion in the garbage combustion chamber 67 to directly enter the slag chamber 61. When implemented, the garbage combustion chamber 67 of the present invention can be set below the combustion chamber of the garbage pyrolysis gasification furnace and used as an integral part of the combustion chamber of the garbage pyrolysis gasification furnace, or it can directly replace the combustion chamber of the garbage pyrolysis gasification furnace. The garbage combustion chamber 67 of the present invention is an elliptical cylindrical structure. Since the elliptical cylindrical garbage combustion chamber 67 has a long side, the internal volume of the elliptical cylindrical garbage combustion chamber 67 is larger and can accommodate more garbage, thereby improving the efficiency of garbage disposal. It is understandable that when the major axis radius of the ellipse is equal to the minor axis radius, the garbage combustion chamber 67 is a cylindrical structure, which can still achieve the effects of the present invention. Therefore, the cylindrical garbage combustion chamber 67 is a special form of the garbage combustion chamber 67 of the present invention and should not be excluded. The projection area of ​​the bottom opening of the elliptical cylindrical garbage combustion chamber 67 vertically projected onto the top opening of each slag bin 63 of the slag chamber 61 is equal. According to Zu's principle, two solids of the same height have equal volumes if their cross-sectional areas at the same height are equal. Therefore, the volumes of ash distributed above the top openings of each slag bin 63 are equal, so that the volumes of ash falling from the bottom of the garbage combustion chamber 67 into each slag bin 63 are equal.

[0030] In a preferred embodiment, the bottom area of ​​the elliptical cylindrical garbage combustion chamber 67 is equal to the bottom area of ​​the slag chamber 61 and the bottom area of ​​the ash discharge chamber 68; the top area of ​​the slag chamber 61 is larger than the bottom area of ​​the elliptical cylindrical garbage combustion chamber 14. The four bottom sides of the rectangular bottom surface of the inverted quadrangular pyramid-shaped slag chamber 61, two of which are parallel to the long axis of the bottom ellipse of the elliptical cylindrical garbage combustion chamber 67, and the other two bottom sides are parallel to the short axis of the bottom ellipse of the elliptical cylindrical garbage combustion chamber 67; the length of the long side of the long side of the long side of the inverted quadrangular pyramid-shaped slag chamber 61 is equal to the length of the long axis of the elliptical bottom surface of the garbage combustion chamber 67, and the short ... The length is equal to the short axis length of the elliptical bottom surface of the garbage combustion chamber 67; the garbage combustion chamber 67 is arranged opposite to the slag chamber 61 and the ash discharge chamber 68. Specifically, the intersection of the long axis and the short axis of the elliptical bottom surface of the elliptical cylindrical garbage combustion chamber 14, the intersection of the diagonal of the upper top surface rectangle of the slag chamber 61 and the intersection of the diagonal of the lower bottom surface rectangle of the slag chamber 61, and the intersection of the diagonal of the bottom surface rectangle of the ash discharge chamber 68 are on the same vertical line.

[0031] The bottom opening of the garbage combustion chamber 67 is vertically projected onto the top opening of each slag bin 63, and the area thereof is equal. Therefore, the amount of ash formed in the garbage combustion chamber 67 entering each slag bin 63 is basically the same. Since the ash discharge chamber 68 is provided with a number of ash discharge bins 610 arranged horizontally and side by side that is the same as the slag bin 63, and the top surface of the ash discharge chamber partition 69 corresponds one-to-one to the bottom surface of the slag chamber partition 62, each ash discharge bin 610 is a narrow and long rectangular cavity structure with the same structure. A spiral ash discharger 64 is provided at the bottom of each ash discharge bin 610 for discharging the ash in each ash discharge bin 610. The spiral ash discharger 64 discharges the ash in its own ash discharge bin 610. Each ash discharge bin 610 is opposed to each other and does not affect each other under the separation of the ash discharge chamber partition 69. Therefore, when the ash discharge rate of the spiral ash discharger 64 in each ash discharge bin 610 is the same, the ash falling and ash discharge of each ash discharge bin 610 are uniform. are consistent, so uniform ash discharge and ash falling can be achieved, and then uniform combustion of garbage in the high-temperature gasification furnace can be achieved, and the garbage in the high-temperature gasification furnace can be further kept falling in equal amounts and evenly, and automatically dried, carbonized, cracked and burned in turn to ensure the efficiency and effect of garbage combustion; since the ash discharge chamber 68 is in the form of a rectangular cavity as a whole, the ash discharge chamber partition 69 separates a plurality of ash discharge bins 610, forming a plurality of separate, narrow ash discharge bins 610, and the narrow ash discharge bins 610 can form a square structure at the bottom of the ash discharge bin 610, which is more compatible with the working form of the spiral ash discharger 64, and is more conducive to slag discharge and ash discharge; at the same time, a slag receiving chamber 61 and an ash discharge chamber 68 are provided, which can be conducive to the gradual cooling of the ash in the slag receiving chamber 61 and the ash discharge chamber 68, so that the ash has a cooling process, and the temperature is relatively low when discharged, so that it is not easy to burn the related components of the subsequent ash treatment. When the spiral ash discharger 64 in the ash discharge bin 610 discharges ash, it does not affect the adjacent ash discharge bin 64 and has minimal impact on the combustion of waste in the garbage combustion chamber 67. During ash discharge, the garbage combustion chamber 67 maintains normal combustion. The uniform ash discharge and ash fall of the garbage pyrolysis and gasification furnace ensures uniform drying, pyrolysis, gasification, and combustion. This maintains a stable temperature above 850°C within the furnace, improving waste treatment efficiency and ensuring effective waste treatment.

[0032] During implementation, when the spiral ash discharger 64 discharges slag, the volume of the garbage is reduced due to the pressure of the upper garbage and the gravity of the garbage itself, as well as the combustion, pyrolysis, gasification and drying and dehydration of the garbage. The solid garbage burned in the garbage combustion chamber 67 becomes ash and falls into the slag receiving bin 63 and then into the ash discharge bin 610. The solid garbage in the garbage pyrolysis chamber, garbage drying chamber and garbage storage chamber above the garbage combustion chamber 67 moves downward in turn, while the unburned gaseous garbage rises to the garbage pyrolysis chamber, garbage drying chamber and garbage storage chamber due to the buoyancy of the induced draft fan and the gaseous garbage. The spiral ash discharger 64 discharges slag in small amounts and multiple times at intervals, so that the garbage in the garbage combustion chamber, garbage pyrolysis chamber, garbage drying chamber and garbage storage chamber can be more fully burned, pyrolyzed, gasified and dehydrated in a relatively static state.

[0033] In a preferred embodiment, oxygen supply pipes are provided on the top of the slag chamber partition 62 and on the furnace wall of the garbage combustion chamber 67, and each oxygen supply pipe is on the same horizontal plane. A plurality of oxygen outlets are provided on the side of the oxygen supply pipe. The oxygen supply pipe can adopt the oxygen supply pipe of the existing garbage pyrolysis gasification furnace, but the oxygen supply pipe of the present invention is provided on the top of the slag chamber partition 62 and on the furnace wall of the garbage combustion chamber 67; the oxygen supply pipe is used to supply oxygen to the garbage combustion chamber 76 from the bottom upward; the top of the slag chamber partition 62 of the slag chamber 61 is provided with an oxygen supply pipe, so that the ash after the garbage combustion passes through the oxygen supply area and then falls into the slag bin 63, so that the incompletely burned solid garbage continues to contact with oxygen when it falls and burns, and the slag that has just burned is at a higher temperature. The oxygen passes through the high-temperature slag, so that the oxygen is further heated and easier to burn with the garbage, making the garbage burn more thoroughly. A cooling water pipe is welded beneath the oxygen supply pipe and tightly connected to the slag chamber partition 62. This cooling water pipe cools the oxygen supply pipe to prevent it from melting in the high-temperature environment. Oxygen from the oxygen supply pipe is pumped into the garbage combustion chamber 67 via a pipeline connected by an oxygen distribution blower. A furnace operator's door is located at the top of each end of the slag chamber 63 between the two oxygen supply pipes and at the bottom of the garbage combustion chamber 67. This door is used for ignition, monitoring combustion in the furnace, and clearing out any difficult-to-burn or incombustible materials that are difficult to discharge from the spiral ash discharger 64.

[0034] The bottom of the ash bin 610 is provided with a semicircular groove 66. The two sides of the semicircular groove 66 are aligned with the two side walls of the bottom of the ash bin 610. The semicircular groove 66 is located below the auger of the spiral ash discharger 64 and extends in the same direction as the auger of the spiral ash discharger 64, that is, in the same direction as the length of the ash bin 610. The semicircular groove 66 is a semicircular groove with an inner diameter that is approximately 1 cm larger than the auger diameter of the spiral ash discharger 64. This allows the spiral ash discharger 64 to completely discharge the ash residue under the action of the semicircular groove 66, preventing some ash residue from accumulating in the dead corners at the bottom of the ash bin 610 and being unable to be discharged by the spiral ash discharger 64, thereby achieving clean ash discharge. The spiral ash discharger 64 adopts a shaftless spiral type, which facilitates the smooth discharge of larger ash residues such as iron wire in the ash residue. In a preferred embodiment, an ash conveyor 65 is provided below the distal end of the spiral ash discharging device 64. Ash discharged from the spiral ash discharging device 64 falls onto the ash conveyor 65 and is then transported to a designated location for storage or processing. The ash conveyor 65 is preferably a belt conveyor. The conveyor belt of the ash conveyor 65 is located directly below the distal end of each spiral ash discharging device 64. The ash discharged is then transported directly to a designated location for storage or processing by the conveyor belt of the ash conveyor 65, which is convenient and efficient.

[0035] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by a person skilled in the art within the technical scope disclosed in the present invention should be included in the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be based on the scope of protection of the claims.

Claims

1. A slag-carrying and ash-discharging device for a garbage pyrolysis gasification furnace, characterized in that: The invention comprises a garbage combustion chamber (67), a slag chamber (61) and an ash discharge chamber (68) which are sequentially arranged from top to bottom, wherein the garbage combustion chamber (67) is an elliptical cylindrical structure, the slag chamber (61) is an inverted quadrangular pyramid chamber whose bottom and top surfaces are rectangular, and the ash discharge chamber (68) is a rectangular parallelepiped chamber; at least one vertically arranged slag chamber partition (62) is arranged in the slag chamber (61) to divide the slag chamber (61) into two or more slag chambers (63) arranged side by side in a horizontal direction, the bottom surface of each slag chamber (63) is open in a uniform rectangular shape, and the bottom of the elliptical cylindrical garbage combustion chamber (67) is open. The projection areas of the openings of the ash discharge chambers (63) projected vertically onto the top openings of the slag receiving bins (63) are equal; the ash discharge chamber (68) is provided with vertical ash discharge chamber partitions (69) whose number is the same as the slag receiving chamber partitions (62) so as to divide the ash discharge chamber (68) into ash discharge chambers (610) whose number is the same as the slag receiving bins (63) and which are arranged side by side in a horizontal direction; the top surfaces of the ash discharge chamber partitions (69) correspond one to one with the bottom surfaces of the slag receiving chamber partitions (62); the ash discharge bins (610) are rectangular chamber structures with the same shape; the ash discharge bins (610) are provided with spiral ash dischargers (64) for uniformly discharging ash and slag in the ash discharge bins (610); The four bottom sides of the rectangular bottom surface of the inverted quadrangular pyramid-shaped slag receiving chamber (61) are parallel to the major axis of the bottom surface ellipse of the elliptical cylindrical garbage combustion chamber (67), and the other two bottom sides are parallel to the minor axis of the bottom surface ellipse of the elliptical cylindrical garbage combustion chamber (67); the length of the long side of the long side top surface of the inverted quadrangular pyramid-shaped slag receiving chamber (61) is equal to the length of the major axis of the elliptical bottom surface of the garbage combustion chamber (67), and the length of the short side of the long side top surface of the inverted quadrangular pyramid-shaped slag receiving chamber (61) is equal to the length of the minor axis of the elliptical bottom surface of the garbage combustion chamber (67); the garbage combustion chamber (67) is arranged opposite to the slag receiving chamber (61) and the ash discharge chamber (68); Oxygen supply pipes are arranged on the top of the slag chamber partition (62) and on the furnace wall of the garbage combustion chamber (67), and the oxygen supply pipes are located on the same horizontal plane. A plurality of oxygen outlets are arranged on the side of the oxygen supply pipes. A cooling water pipe is welded below the oxygen supply pipe, and the cooling water pipe is closely connected to the slag chamber partition (62).

2. The slag-carrying and ash-discharging device for a garbage pyrolysis gasification furnace according to claim 1 is characterized in that: The bottom surface area of ​​the elliptical cylindrical garbage combustion chamber (67) is equal to the bottom surface area of ​​the slag receiving chamber (61) and the bottom surface area of ​​the ash discharge chamber (68); the top surface area of ​​the slag receiving chamber (61) is larger than the bottom surface area of ​​the elliptical cylindrical garbage combustion chamber (67).

3. The slag-carrying and ash-discharging device for a garbage pyrolysis gasification furnace according to claim 1, characterized in that: A semicircular groove (66) is provided at the bottom of the ash discharge bin (610), and two sides of the semicircular groove (66) are in contact with two side walls of the bottom of the ash discharge bin (610). The semicircular groove (66) is located below the auger of the spiral ash discharger (64), and its extension direction is consistent with the extension direction of the auger of the spiral ash discharger (64).

4. The slag-carrying and ash-discharging device for a garbage pyrolysis gasification furnace according to claim 1, characterized in that: The number of the slag chamber partition plates (62) is 2 to 4.

5. The slag-carrying and ash-discharging device for a garbage pyrolysis gasification furnace according to claim 1, characterized in that: An ash conveyor (65) is provided below the end of the spiral ash discharger (64).

6. The slag-carrying and ash-discharging device for a garbage pyrolysis gasification furnace according to claim 5, characterized in that: The ash conveyor (65) is a conveyor belt type conveyor, and the conveyor belt of the ash conveyor (65) is located directly below the end of each spiral ash discharger (64).

7. The slag-carrying and ash-discharging device for a garbage pyrolysis gasification furnace according to claim 1, characterized in that: The spiral ash discharger (64) is a shaftless spiral ash discharger.