Spraying method of plasma physical vapor deposition coating on multi-unit turbine guide blades
Through the linkage between the robot and the dual-axis displacement machine, the preheating and spraying trajectory of the coating is optimized, and the problem of insufficient deposition uniformity and thickness of the multi-connected turbine guide blade coating is solved, achieving better thermal protection effect, and applicable in industrial production.
Patent Information
- Application Number
- CN202211699253.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-28
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-12-28
AI Technical Summary
The existing plasma physical vapor-phase deposition coating technology of turbine guide blades is insufficient in the shielding area and edge plate positions, resulting in poor thermal protection effect, especially in the complex profile and large-angle effects of multi-contiguous turbine guide blades. Under the slightest, uniform and high-quality coating deposition is difficult to achieve.
Using a spraying method with a robot and a dual-axis displacement machine, the trajectory optimization and tilt control during preheating and powder spraying can ensure uniform preheating and spraying of the multi-connected turbine guide blades, reducing the disturbance of high-speed plasma jets Effects to improve the uniformity and thickness of the coating.
It significantly improves the uniformity and thickness of the coating, especially at right angles of the edge plate and the leaf body, enhances the thermal protection effect, is suitable for industrial production without the need for additional hardware and software support.
Smart Images

Figure CN115896705B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coating processing, and relates to a coating spraying method, in particular to a spraying method of a plasma physical vapor deposition coating of a multi-unit turbine guide blade. Background Art
[0002] The thermal protection coating of turbine guide vanes is one of the indispensable key technologies for advanced aircraft engines. With the continuous increase in the temperature before the turbine and the development and changes of high-temperature structural materials, the application of thermal barrier coatings (TBCs) on high-temperature alloy structural materials and environmental barrier coatings (EBCs) on the surface of ceramic-based composite materials has become an inevitable development direction. Thermal protection coating technology is an indispensable key technology in high-performance aircraft engines and an effective means to increase the operating temperature of hot end components and extend their service life.
[0003] The thermal barrier coating preparation methods currently used on a large scale include atmospheric plasma spraying (APS) and electron beam physical vapor deposition (EB-PVD). APS has high deposition efficiency, good thermal insulation effect, low equipment investment and use costs, but the service life of the coating is low; EB-PVD's columnar crystal structure coating has high bonding strength and a long service life, but poor thermal insulation performance, high equipment investment and use costs, resulting in high coating preparation and use costs. In addition, both APS and EB-PVD are line-of-sight deposition processes, that is, continuous spray deposition can be performed in the visible area, but the thickness of the deposited coating in the shielded position is extremely thin, and the uniformity of the coating thickness is greatly affected by the curvature characteristics of the blade surface. In addition, in addition to the thermal protection requirements for the shielded areas, the multi-unit turbine guide blades also have clear thermal protection requirements for the upper and lower edge plates. However, due to the edge plate size problem of APS, the edge plate coating thickness deposition is insufficient; EB-PVD has the problem that the steam angle is basically parallel to the edge plate during evaporation. If special swinging or angle adjustment auxiliary tooling devices are not used, the edge plate coating quality is extremely poor and cannot meet the edge plate thermal protection requirements.
[0004] Plasma Spraying-Physical Vapor Deposition (PS-PVD) is a coating preparation method developed on the basis of low-pressure plasma spraying. It combines the advantages of APS and EB-PVD. It uses a high-power plasma spray gun and ultra-low working gas pressure. The high-energy plasma jet generated can quickly vaporize the spraying powder, thereby quickly accelerating it to 2-3 times the speed of sound, realizing gas-liquid-solid multiphase composite deposition and quasi-columnar crystal composite structure coating preparation. During the spray deposition process, the PS-PVD process relies on the plasma expansion flow (diameter 200-400mm, length 1.5-2m) under ultra-low pressure conditions (5-200Pa) to achieve the effect of wrap-around plating (non-line-of-sight deposition) under high-energy and high-speed conditions, so that the thickness uniformity of turbine guide blades, especially multi-joint guide blades, is greatly improved. For example, in the throat area shielded by the twin guide blades, the coating thickness on the blade basin surface can reach about 50% of the maximum thickness, which is greatly improved compared with APS and EB-PVD. At the same time, during PS-PVD spray deposition, the inner side of the edge plate that requires thermal protection will also have a high-quality coating deposited, which will greatly improve the thermal protection effect of the blade.
[0005] Although PS-PVD has the above advantages, there are still several obvious problems: ① The leading edge and trailing edge are more prominent and sharper than other curvatures and plane positions of the blade; and PS-PVD deposition of high-performance coatings with columnar and quasi-columnar structures requires preheating the blade to 700-900°C. The temperature of sharp or raised parts is relatively high, resulting in a relatively fast coating deposition rate at this part, which is not conducive to the overall uniformity of the coating; ② The angle between the upper and lower edge plates and the blade body is basically 90°. The high-speed high-temperature plasma jet is sprayed and deposited perpendicular to the height direction of the blade body. Due to the large angle effect, there is a turbulent effect of the complex high-speed jet of gas-liquid-solid three-phase here. The thickness of the blade body near the edge plate is about 50% of the thickness of the middle part of the blade body, which affects the thermal protection effect of this area; ③ The deposition of the edge plate coating relies on the deposition of the parallel jet and the turbulent reflection jet at the angle of the edge plate, and the deposition thickness and quality need to be further improved.
[0006] CN107876261A discloses a flexible processing platform and spraying method for thermal barrier coating of multi-unit turbine guide blades. The method can realize integrated control of spray powder feeding, spray emergency stop, automatic gripping and workpiece transportation by setting up a flexible processing platform and spraying method for thermal barrier coating. However, the method has problems such as insufficient deposition quality in the shielded area and poor deposition uniformity.
[0007] CN103831224A discloses an automated spraying process for turbine guide blades, which determines the optimal spraying parameters, spraying spacing, blade spraying angle and spraying trajectory. However, this method is also unable to solve the turbulence effect of the complex high-speed jet of gas-liquid-solid three-phase at the edge plate angle caused by the large angle effect, resulting in insufficient deposition of the edge plate coating thickness.
[0008] Therefore, it is an urgent problem that needs to be solved at present to provide a flexible deposition processing method based on spray deposition posture to further improve the deposition uniformity and adapt to the continuous spray deposition of blades in engineering applications. Summary of the invention
[0009] In view of the above problems, the purpose of the present invention is to provide a method for spraying plasma physical vapor deposition coatings on multi-unit turbine guide blades. Compared with the prior art, the preparation method provided by the present invention adopts plasma physical vapor deposition, combined with the complex surfaces and shielding factors of multi-unit turbine guide blades, and cooperates with the trajectory optimization of a manipulator and a dual-axis positioner, which can effectively improve the uniformity of coating deposition and solve the problems of uniformity of spray deposition thickness on the inner side of the edge plate, the angle position of the edge plate-blade body, and the blade body.
[0010] In order to achieve the purpose of the invention, the present invention adopts the following technical solutions:
[0011] The present invention provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, wherein the spraying method is performed by using a manipulator and a dual-axis positioner; the turntable of the dual-axis positioner can rotate around a central axis and can be tilted by less than 45°; the tilting direction is a direction close to the manipulator or away from the manipulator;
[0012] The "close to the manipulator" mentioned in the present invention means that the disk surface close to the manipulator side is flipped downward to expose more spraying area of the multi-unit turbine guide blades; the "away from the manipulator" mentioned in the present invention means that the disk surface close to the manipulator side is flipped upward to expose more spraying area of the multi-unit turbine guide blades.
[0013] The spraying method comprises the following steps:
[0014] (1) At least one multi-unit turbine guide blade is placed on a turntable, and a manipulator holds a spray gun to preheat the multi-unit turbine guide blade along a preset trajectory. During preheating, the turntable tilts and / or rotates to obtain a preheated blade;
[0015] (2) The manipulator holds the spray gun and sprays the preheated blades with powder along a preset trajectory. During the powder spraying, the turntable tilts and / or rotates to achieve a plasma physical vapor deposition coating of the multi-unit turbine guide blades;
[0016] The preset trajectory in step (1) is: first preheating the positions on both sides of the multi-unit turbine guide blades, and then preheating the central starting position of the multi-unit turbine guide blades, and the preheating process is performed at least once;
[0017] The preset trajectory in step (2) is: first, powder spray the center starting position of the multi-unit turbine guide blades, then powder spray the positions on both sides of the multi-unit turbine guide blades, and powder spraying is performed at least once.
[0018] The multi-unit turbine guide blade includes a blade body and an upper edge plate and a lower edge plate respectively located at the upper and lower ends of the blade body. When the multi-unit turbine guide blade is placed on a turntable, the upper edge plate, the lower edge plate and the turntable surface are parallel. The "positions on both sides of the multi-unit turbine guide blade" mentioned in the present invention refers to the position of the blade body of the multi-unit turbine guide blade close to the upper edge plate and the lower edge plate.
[0019] During preheating, the present invention adopts a method of first preheating the position close to the edge plate and then preheating the central starting position, thereby avoiding the problem of excessive temperature at the central starting position caused by continuous preheating of the middle of the blade body.
[0020] During powder spraying, considering that the vapor deposition is continuous and uniform in the area around the central starting position and the gas phase ratio is high in the gas-liquid-solid three-phase, the present invention first powder sprays the central starting position and then powder sprays the position close to the edge plate, thereby ensuring the coating quality of the multi-unit turbine guide blades.
[0021] Moreover, the spraying method adopted by the present invention is carried out by a dual-axis positioner. The present invention does not specifically limit the model of the dual-axis positioner, as long as it can achieve a tilt of less than 45°. The present invention reduces the influence of jet turbulence at the edge plate position and the right angle position between the edge plate and the blade body through the cooperation of the manipulator and the dual-axis positioner. In addition, the cooperation of the manipulator and the dual-axis positioner can realize the combination of different spraying methods according to the size and number of multi-unit turbine guide blades, and has a good industrial application foundation.
[0022] In the present invention, the number of the multi-unit turbine guide blades is at least 1, for example, it can be 1, 2, 3, 4, 5, 6, 7, 8 or 9, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0023] Preferably, the blade body of the multi-unit turbine guide blade includes a central starting position, an upper boundary and a lower boundary, and the distance between the upper boundary and the lower boundary is more than 0.5 times the height of the blade body, for example, it can be 0.5 times, 0.6 times, 0.7 times, 0.8 times or 0.9 times, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0024] When the distance between the upper boundary and the lower boundary is more than 0.8 times the blade height, only the turntable is tilted during preheating and powder spraying. As a preferred technical solution of the present invention, the present invention controls the distance between the upper boundary and the lower boundary to be 0.5-0.8 times the height of the multi-unit turbine guide blade, and cooperates with the tilting of the turntable, which can improve the preheating quality and spraying quality of the multi-unit turbine guide blade, so that the spray gun can better process the multi-unit turbine guide blade.
[0025] Preferably, when preheating the two side positions of the multi-unit turbine guide blades, the turntable is tilted 15°-30°, for example, it can be 15°, 16°, 18°, 20°, 21°, 24°, 25°, 27°, 28° or 30°, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0026] During preheating, the present invention adopts a method of first preheating the position close to the edge plate and then preheating the center starting position, thereby avoiding the problem of excessive temperature at the center starting position caused by continuous preheating of the middle of the blade body; and by coordinating the order of the preheating positions and the angle of the turntable tilt, the turbulence effect of the high-speed plasma jet at the right angle is reduced, the temperature uniformity of the multi-unit turbine guide blades is improved, and the temperature difference of the entire multi-unit turbine guide blades is made ≤30°C, which provides a basis for ensuring the consistency of the deposition rate during powder spraying and avoids the problem of large deviation in the deposition rate caused by a large preheating temperature difference.
[0027] Preferably, when powder coating the two sides of the multi-unit turbine guide blades, the turntable is tilted 15°-30°, for example, it can be 15°, 16°, 18°, 20°, 21°, 24°, 25°, 27°, 28° or 30°, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0028] Preferably, the blade height of the multi-unit turbine guide blade is ≤80 mm, for example, it can be 50 mm, 55 mm, 60 mm, 65 mm, 70 mm, 75 mm or 80 mm, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable, preferably 50-80 mm.
[0029] Preferably, the central starting position is 2 / 5-3 / 5 of the blade height of the multi-unit turbine guide blade, for example, it can be 2 / 5, 1 / 2 or 3 / 5, but is not limited to the listed values. Other unlisted values within the numerical range are also applicable, preferably 1 / 2.
[0030] Preferably, when the spray gun moves from the central starting position to the upper boundary, the turntable is synchronously tilted 15°-30° in the direction close to the spray gun, for example, it can be 15°, 16°, 18°, 20°, 21°, 24°, 25°, 27°, 28° or 30°, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0031] When the spray gun moves from the central starting position to the lower boundary, the turntable synchronously tilts 15°-30° in the direction away from the spray gun, for example, it can be 15°, 16°, 18°, 20°, 21°, 24°, 25°, 27°, 28° or 30°, but is not limited to the listed values, and other values not listed within the numerical range are also applicable.
[0032] When the spray gun is located at the center starting position, the disk surface direction of the turntable is parallel to the horizontal direction.
[0033] Preferably, the tilting speed is 1.5° / s-2.5° / s, for example, it can be 1.5° / s, 1.6° / s, 1.8° / s, 2° / s, 2.1° / s, 2.4° / s or 2.5° / s, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0034] To address the problem of uneven coating on the edge plate near the inner side of the blade, the present invention controls the tilt angle of the turntable to 15°-30°, and controls the tilt speed to 1.5° / s-2.5° / s, thereby improving the uniformity of the coating on the inner side of the edge plate and reducing the thickness difference between the coating on the inner side of the edge plate and the coating on the blade.
[0035] When the number of the multi-unit turbine guide blade is one, the multi-unit turbine guide blade is arranged on the central rotation axis of the turntable, and the turntable rotates continuously or indexed.
[0036] Preferably, when the number of the multi-unit turbine guide blades is 1, the lateral reciprocating swing rate of the manipulator is 150-400 mm / s, for example, it can be 150 mm / s, 200 mm / s, 250 mm / s, 300 mm / s, 350 mm / s or 400 mm / s, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0037] As a preferred technical solution, when the number of the multi-unit turbine guide blades is one, the amplitude of the lateral reciprocating swing of the manipulator is along the swing direction of the manipulator, and the visible edges of the multi-unit turbine guide blades extend 10-15mm on both sides, for example, 10mm, 11mm, 12mm, 13mm, 14mm or 15mm, but are not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0038] Preferably, the number of the multi-unit turbine guide blades is one and when the turntable rotates continuously, the rotation speed of the turntable is 30-100rpm, for example, it can be 30rpm, 40rpm, 50rpm, 60rpm, 70rpm, 80rpm, 90rpm or 100rpm, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0039] As a preferred technical solution of the spraying method described in the present invention, when the turntable rotates at an indexing rate, during the powder spraying process in step (2), the multi-unit turbine guide blades undergo a first spraying, a second spraying, a third spraying and a fourth spraying respectively.
[0040] During the first spraying, the plane where the leading edge of the blade basin of the multi-unit turbine guide blade is located is perpendicular to the axis of the spray gun.
[0041] During the second spraying, the multi-unit turbine guide blades rotate counterclockwise by 25°-35° from the first spraying position, for example, it can be 25°, 27°, 28°, 30°, 32°, 33° or 35°, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0042] During the third spraying, the plane where the blade backs of the multi-unit turbine guide blades are located is perpendicular to the axis of the spray gun.
[0043] During the fourth spraying, the high point of the front blade back is the visible area.
[0044] The present invention controls the indexing rotation angle of the turntable to achieve powder spraying of different positions of the blade by the spray gun. As a preferred technical solution, the coating thickness of the entire blade is made more uniform by controlling the time of the first spraying, the second spraying, the third spraying and the fourth spraying.
[0045] When the turntable rotates indexingly, the total time for the powder spraying in step (2) is 8-20 minutes, for example, it can be 8 minutes, 10 minutes, 12 minutes, 15 minutes, 16 minutes, 18 minutes or 20 minutes, but is not limited to the listed values, and other values not listed within the numerical range are also applicable.
[0046] Preferably, the first spraying time is 15-25% of the total powder spraying time, for example, it can be 15%, 16%, 18%, 20%, 21%, 24% or 25%, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0047] Further preferably, the first spraying time is 1.6-4 min, for example, 1.6 min, 2 min, 2.5 min, 3 min or 4 min, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0048] Preferably, the second spraying time is 35-45% of the total powder spraying time, for example, it can be 35%, 36%, 38%, 40%, 42% or 45%, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0049] Further preferably, the second spraying time is 3.2-8 min, for example, 3.8 min, 4 min, 5 min, 6 min, 7 min or 8 min, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0050] Preferably, the third spraying time is 25-35% of the total powder spraying time, for example, it can be 25%, 27%, 28%, 30%, 32%, 33% or 35%, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0051] Further preferably, the time of the third spraying is 2.4-6 min, for example, 2.4 min, 3 min, 4 min, 5 min or 6 min, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0052] Preferably, the fourth spraying time is 5-15% of the total powder spraying time, for example, it can be 5%, 6%, 8%, 10%, 12% or 15%, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0053] Further preferably, the fourth spraying time is 0.8-2 min, for example, 0.8 min, 1 min, 1.2 min, 1.8 min or 2 min, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0054] As a second preferred technical solution of the spraying method of the present invention, when the number of the multi-unit turbine guide blades is at least 2, the turntable rotates continuously.
[0055] Preferably, when the number of the multi-unit turbine guide blades is at least 2, at least 2 multi-unit turbine guide blades are evenly arranged in the circumferential direction of the turntable.
[0056] As a preferred technical solution, when the number of the multi-unit turbine guide blades is at least 2, the amplitude of the lateral reciprocating swing of the manipulator is along the swing direction of the manipulator, and the visible edges of the multi-unit turbine guide blades extend 16-20 mm on both sides, for example, 16 mm, 17 mm, 18 mm, 19 mm or 20 mm, but are not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0057] Preferably, when the number of the multi-unit turbine guide blades is at least 2, the lateral reciprocating swing rate of the manipulator is 300-500 mm / s, for example, it can be 300 mm / s, 350 mm / s, 400 mm / s, 450 mm / s or 500 mm / s, but is not limited to the listed values, and other unlisted values within the numerical range are also applicable.
[0058] Preferably, the number of the multi-unit turbine guide blades is at least 2 and when the turntable rotates continuously, during the preheating process in step (1), the rotation speed of the turntable is 10-30 rpm and the rotation speed of the multi-unit turbine guide blades is 20-60 rpm.
[0059] When the number of the multi-unit turbine guide blades of the present invention is at least 2 and the turntable rotates continuously, during the preheating process in step (1), the rotation speed of the turntable is 10-30 rpm, for example, it can be 10 rpm, 15 rpm, 20 rpm, 25 rpm or 30 rpm, but is not limited to the listed values, and other values not listed within the numerical range are also applicable.
[0060] When the number of the multi-unit turbine guide blades of the present invention is at least 2 and the turntable rotates continuously, during the preheating process in step (1), the rotation speed of the multi-unit turbine guide blades is 20-60 rpm, for example, it can be 20 rpm, 25 rpm, 30 rpm, 35 rpm, 40 rpm, 45 rpm, 50 rpm, 55 rpm or 60 rpm, but is not limited to the listed values, and other values not listed within the numerical range are also applicable.
[0061] Preferably, when the number of multi-unit turbine guide blades is at least 2, during the powder spraying process in step (2), the reciprocating swing rate of the robot is 100-200 mm / s, for example, it can be 100 mm / s, 120 mm / s, 140 mm / s, 150 mm / s, 160 mm / s, 180 mm / s or 200 mm / s, but is not limited to the listed values, and other values not listed within the numerical range are also applicable.
[0062] Preferably, the number of the multi-unit turbine guide blades is at least 2 and when the turntable rotates continuously, during the powder spraying process in step (2), the rotation speed of the turntable is 20-50 rpm and the rotation speed of the multi-unit turbine guide blades is 40-100 rpm.
[0063] When the number of the multi-unit turbine guide blades of the present invention is at least 2 and the turntable rotates continuously, (2) during the powder spraying process, the rotation speed of the turntable is 20-50 rpm, for example, it can be 20 rpm, 25 rpm, 30 rpm, 35 rpm, 40 rpm, 45 rpm or 50 rpm, but is not limited to the listed values, and other values not listed within the numerical range are also applicable.
[0064] When the number of the multi-unit turbine guide blades of the present invention is at least 2 and the turntable rotates continuously, (2) during the powder spraying process, the rotation speed of the multi-unit turbine guide blades is 40-100 rpm, for example, it can be 40 rpm, 50 rpm, 60 rpm, 70 rpm, 80 rpm, 90 rpm or 100 rpm, but is not limited to the listed values, and other values not listed within the numerical range are also applicable.
[0065] Preferably, during the powder spraying in step (2), the spraying distance is 1-1.5 m, the Ar gas flow rate is 20-40 SLPM, the He gas flow rate is 50-70 SLPM, the current is 1600-1800 A, and the voltage is 30-40 V.
[0066] When the powder is sprayed in the present invention, the spraying distance is 1-1.5m, for example, it can be 1m, 1.1m, 1.2m, 1.3m, 1.4m or 1.5m, but it is not limited to the listed values, and other values not listed in the numerical range are also applicable.
[0067] During powder spraying of the present invention, the Ar gas flow rate is 20-40SLPM, for example, 20SLPM, 25SLPM, 30SLPM, 35SLPM or 40SLPM, but is not limited to the listed values, and other values not listed within the numerical range are also applicable.
[0068] During powder spraying of the present invention, the He gas flow rate is 50-70SLPM, for example, it can be 50SLPM, 55SLPM, 60SLPM, 65SLPM or 70SLPM, but is not limited to the listed values, and other values not listed within the numerical range are also applicable.
[0069] During powder spraying of the present invention, the current is 1600-1800A, for example, it can be 1600A, 1650A, 1700A, 1750A or 1800A, but is not limited to the listed values, and other values not listed within the numerical range are also applicable.
[0070] During powder spraying of the present invention, the voltage is 30-40V, for example, 30V, 32V, 35V, 36V, 38V or 40V, but is not limited to the listed values, and other values not listed within the numerical range are also applicable.
[0071] Compared with the prior art, the present invention has the following beneficial effects:
[0072] (1) The present invention combines the advantages of plasma physical vapor deposition jet (including large diameter and length, high energy, supersonic speed) and the complex profile, shielding factors and different curvature radii of multi-unit turbine guide blades, and realizes uniform preheating and spraying through a linkage manipulator and a dual-axis positioner. The operation is simple and the process design can be carried out according to the blades with different characteristics to improve the uniformity of preheating of the blade workpiece before spray deposition. At the same time, the uniformity of the spray deposition coating can also be improved. The spraying method does not require the superposition of auxiliary hardware and software and is suitable for industrial production.
[0073] (2) During preheating, the present invention adopts a method of first preheating the position close to the edge plate and then preheating the center starting position, thereby avoiding the problem of excessive temperature at the center starting position caused by continuous preheating of the middle of the blade body; and by coordinating the order of the preheating positions and the angle of the turntable tilt, the turbulence effect of the high-speed plasma jet at the right angle is reduced, the temperature uniformity of the multi-unit turbine guide blades is improved, and the temperature difference of the entire multi-unit turbine guide blades is ≤30°C, which provides a basis for ensuring the consistency of the deposition rate during powder spraying and avoids the problem of large deviation in the deposition rate caused by a large preheating temperature difference;
[0074] (3) During powder spraying, the present invention takes into account that the vapor deposition is continuous and uniform in the area around the central starting position and the gas phase ratio in the gas-liquid-solid three-phase is high. The present invention first powder sprays the central starting position and then powder sprays the position close to the edge plate, thereby ensuring the coating quality of the multi-unit turbine guide blades;
[0075] (4) The present invention controls the rotation and flipping of the multi-unit turbine guide blades by the linkage of the manipulator and the dual-axis positioner, and adopts the mode of rotation control or indexing control. The rotation parameters or indexing parameters are adjusted according to the required blade posture. On this basis, the preset trajectory of the manipulator is coupled to reduce the jet turbulence at the right angle position of the edge plate and the blade body. The spraying method can be designed according to factors such as blade size, edge plate size, single piece or multiple pieces, etc., with high control accuracy, providing a good flexible processing technology foundation for thickness design and uniform distribution, and increasing the process flexibility design and adjustment margin. It can adapt to different types of multi-unit blades and realize process flexibility design and adjustment through a variety of spraying trajectories, rotation, and swing linkage methods. BRIEF DESCRIPTION OF THE DRAWINGS
[0076] Figure 1 is a schematic structural diagram of the twin turbine guide blades of the present invention;
[0077] Figure 2 is a schematic diagram of the first spraying in the present invention;
[0078] Figure 3 is a schematic diagram of the second spraying in the present invention;
[0079] Figure 4 is a schematic diagram of the third spraying in the present invention;
[0080] Figure 5 It is a schematic diagram of the fourth spraying in the present invention.
[0081] Among them, 1 is the lower boundary; 2 is the upper boundary; 3 is the starting position. DETAILED DESCRIPTION
[0082] The technical solution of the present invention is further described below by specific implementation methods. It should be understood by those skilled in the art that the embodiments are only to help understand the present invention and should not be regarded as specific limitations of the present invention.
[0083] Example 1
[0084] This embodiment provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, the spraying method is performed using a manipulator and a dual-axis positioner; the turntable of the dual-axis positioner can rotate around the central axis and can be tilted by less than 45°;
[0085] The spraying method comprises the following steps:
[0086] (1) A multi-unit turbine guide blade is placed on the central rotating axis of the turntable, and the manipulator holds a spray gun to preheat the multi-unit turbine guide blade along a preset trajectory to obtain a preheated blade; during preheating, the manipulator oscillates back and forth at a rate of 300 mm / s, and the swing amplitude extends 12 mm on both sides of the visible edge of the multi-unit turbine guide blade, and the rotation speed of the multi-unit turbine guide blade is 60 rpm;
[0087] (2) The manipulator holds the spray gun and sprays the preheated blades with powder along a preset trajectory to achieve a plasma physical vapor deposition coating of the multi-unit turbine guide blades; during powder spraying, the turntable rotates continuously; the manipulator oscillates back and forth at a rate of 300 mm / s, the swing amplitude extends 12 mm on both sides of the visible edge of the multi-unit turbine guide blades, and the rotation speed of the multi-unit turbine guide blades is 60 rpm;
[0088] The blade body of the multi-unit turbine guide blade includes a central starting position 3, an upper boundary 2 and a lower boundary 1, and the distance between the upper boundary 2 and the lower boundary 1 is 0.6 times the height of the multi-unit turbine guide blade; the central starting position 3 is 1 / 2 of the blade body height of the multi-unit turbine guide blade; the height of the blade body is 70 mm;
[0089] The preset trajectory in step (1) is: first preheat the two sides of the blade, then preheat the center starting position 3 of the blade, and preheat to a center starting temperature of 800°C; during preheating, when the spray gun moves from the center starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the center starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is at the center starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s;
[0090] The preset trajectory in step (2) is: first, powder spray the central starting position 3 of the blade body, and then powder spray the positions on both sides of the blade body; during powder spraying, when the spray gun moves from the central starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the central starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is located at the central starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s.
[0091] During the powder spraying in step (2), the spraying distance is 1.2m, the Ar gas flow rate is 30SLPM, the He gas flow rate is 60SLPM, the current is 1700A, and the voltage is 35V.
[0092] Example 2
[0093] This embodiment provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, the spraying method is performed using a manipulator and a dual-axis positioner; the turntable of the dual-axis positioner can rotate around the central axis and can be tilted by less than 45°;
[0094] The spraying method comprises the following steps:
[0095] (1) A multi-unit turbine guide blade is placed on the central rotating axis of the turntable, and the manipulator holds a spray gun to preheat the multi-unit turbine guide blade along a preset trajectory to obtain a preheated blade; during preheating, the manipulator oscillates back and forth at a rate of 150 mm / s, and the swing amplitude extends 10 mm on both sides of the visible edge of the multi-unit turbine guide blade, and the rotation speed of the multi-unit turbine guide blade is 30 rpm;
[0096] (2) The manipulator holds the spray gun and sprays the preheated blades with powder along a preset trajectory to achieve a plasma physical vapor deposition coating of the multi-unit turbine guide blades; during powder spraying, the turntable rotates continuously; the manipulator oscillates back and forth at a rate of 150 mm / s, the swing amplitude extends 10 mm on both sides of the visible edge of the multi-unit turbine guide blades, and the rotation speed of the multi-unit turbine guide blades is 30 rpm;
[0097] The blade body of the multi-unit turbine guide blade includes a central starting position 3, an upper boundary 2 and a lower boundary 1, and the distance between the upper boundary 2 and the lower boundary 1 is 0.8 times the height of the multi-unit turbine guide blade; the central starting position 3 is 1 / 2 of the blade body height of the multi-unit turbine guide blade; the height of the blade body is 50 mm;
[0098] The preset trajectory in step (1) is: first preheat the two sides of the blade, then preheat the center starting position 3 of the blade, and preheat to a center starting temperature of 700°C; during preheating, when the spray gun moves from the center starting position 3 to the upper boundary 2, the turntable is synchronously tilted 15° in the direction close to the spray gun; when the spray gun moves from the center starting position 3 to the lower boundary 1, the turntable is synchronously tilted 15° in the direction away from the spray gun; when the spray gun is at the center starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 1.5° / s;
[0099] The preset trajectory in step (2) is: first, powder spray the central starting position 3 of the blade body, and then powder spray the positions on both sides of the blade body; during powder spraying, when the spray gun moves from the central starting position 3 to the upper boundary 2, the turntable is synchronously tilted 15° in the direction close to the spray gun; when the spray gun moves from the central starting position 3 to the lower boundary 1, the turntable is synchronously tilted 15° in the direction away from the spray gun; when the spray gun is located at the central starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 1.5° / s.
[0100] During the powder spraying in step (2), the spraying distance is 1m, the Ar gas flow rate is 20SLPM, the He gas flow rate is 50SLPM, the current is 1600A, and the voltage is 30V.
[0101] Example 3
[0102] This embodiment provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, the spraying method is performed using a manipulator and a dual-axis positioner; the turntable of the dual-axis positioner can rotate around the central axis and can be tilted by less than 45°;
[0103] The spraying method comprises the following steps:
[0104] (1) A multi-unit turbine guide blade is placed on the central rotating axis of the turntable, and the manipulator holds a spray gun to preheat the multi-unit turbine guide blade along a preset trajectory to obtain a preheated blade; during preheating, the manipulator oscillates back and forth at a rate of 400 mm / s, and the swing amplitude extends 15 mm on both sides of the visible edge of the multi-unit turbine guide blade, and the rotation speed of the multi-unit turbine guide blade is 100 rpm;
[0105] (2) The manipulator holds the spray gun and sprays the preheated blades with powder along a preset trajectory to achieve a plasma physical vapor deposition coating of the multi-unit turbine guide blades; during powder spraying, the turntable rotates continuously, the manipulator swings back and forth at a rate of 400 mm / s, the swing amplitude extends 15 mm on both sides of the visible edge of the multi-unit turbine guide blades, and the rotation speed of the multi-unit turbine guide blades is 100 rpm;
[0106] The blade body of the multi-unit turbine guide blade includes a central starting position 3, an upper boundary 2 and a lower boundary 1, and the distance between the upper boundary 2 and the lower boundary 1 is 0.7 times the height of the multi-unit turbine guide blade; the central starting position 3 is 1 / 2 of the blade body height of the multi-unit turbine guide blade; the height of the blade body is 80 mm;
[0107] The preset trajectory in step (1) is: first preheat the two sides of the blade, then preheat the center starting position 3 of the blade, and preheat to a center starting temperature of 900°C; during preheating, when the spray gun moves from the center starting position 3 to the upper boundary 2, the turntable is synchronously tilted 30° in the direction close to the spray gun; when the spray gun moves from the center starting position 3 to the lower boundary 1, the turntable is synchronously tilted 30° in the direction close to the spray gun; when the spray gun is at the center starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2.5° / s;
[0108] The preset trajectory in step (2) is: first, powder spray the central starting position 3 of the blade body, and then powder spray the positions on both sides of the blade body; during powder spraying, when the spray gun moves from the central starting position 3 to the upper boundary 2, the turntable is synchronously tilted 30° in the direction close to the spray gun; when the spray gun moves from the central starting position 3 to the lower boundary 1, the turntable is synchronously tilted 30° in the direction away from the spray gun; when the spray gun is located at the central starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2.5° / s.
[0109] During the powder spraying in step (2), the spraying distance is 1.5m, the Ar gas flow rate is 40SLPM, the He gas flow rate is 70SLPM, the current is 1800A, and the voltage is 40V.
[0110] Example 4
[0111] This embodiment provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, the spraying method is performed using a manipulator and a dual-axis positioner; the turntable of the dual-axis positioner can rotate around the central axis and can be tilted by less than 45°;
[0112] The spraying method comprises the following steps:
[0113] (1) Three multi-unit turbine guide blades are evenly arranged on the circumference of the turntable, and the manipulator holds a spray gun to preheat the multi-unit turbine guide blades along a preset trajectory to obtain preheated blades; during preheating, the manipulator oscillates back and forth at a rate of 400 mm / s, and the swing amplitude extends 18 mm on both sides of the visible edge of the multi-unit turbine guide blades, the rotation speed of the turntable is 20 rpm, and the rotation speed of the multi-unit turbine guide blades is 40 rpm;
[0114] (2) The manipulator holds the spray gun and sprays the preheated blades with powder along a preset trajectory to achieve a plasma physical vapor deposition coating of the multi-unit turbine guide blades; during powder spraying, the turntable rotates continuously; the manipulator oscillates back and forth at a rate of 150 mm / s, and the swing amplitude extends 18 mm on both sides of the visible edge of the multi-unit turbine guide blades, the turntable rotates at a speed of 35 rpm, and the rotation speed of the multi-unit turbine guide blades is 70 rpm;
[0115] The blade body of the multi-unit turbine guide blade includes a central starting position 3, an upper boundary 2 and a lower boundary 1, and the distance between the upper boundary 2 and the lower boundary 1 is 0.6 times the height of the multi-unit turbine guide blade; the central starting position 3 is 1 / 2 of the blade body height of the multi-unit turbine guide blade; the height of the blade body is 70 mm;
[0116] The preset trajectory in step (1) is: first preheat the two sides of the blade, then preheat the center starting position 3 of the blade, and preheat to a center starting temperature of 800°C; during preheating, when the spray gun moves from the center starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the center starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is at the center starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s;
[0117] The preset trajectory in step (2) is: first, powder spray the central starting position 3 of the blade body, and then powder spray the positions on both sides of the blade body; during powder spraying, when the spray gun moves from the central starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the central starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is located at the central starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s.
[0118] During the powder spraying in step (2), the spraying distance is 1.2m, the Ar gas flow rate is 30SLPM, the He gas flow rate is 60SLPM, the current is 1700A, and the voltage is 35V.
[0119] Example 5
[0120] This embodiment provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, the spraying method is performed using a manipulator and a dual-axis positioner; the turntable of the dual-axis positioner can rotate around the central axis and can be tilted by less than 45°;
[0121] The spraying method comprises the following steps:
[0122] (1) Three multi-unit turbine guide blades are evenly arranged on the circumference of the turntable, and the manipulator holds the spray gun to preheat the multi-unit turbine guide blades along a preset trajectory to obtain preheated blades; during preheating, the manipulator oscillates back and forth at a rate of 300 mm / s, and the swing amplitude extends 68 mm on both sides of the visible edge of the multi-unit turbine guide blades, the rotation speed of the turntable is 10 rpm, and the rotation speed of the multi-unit turbine guide blades is 20 rpm;
[0123] (2) The manipulator holds the spray gun and sprays the preheated blades with powder along a preset trajectory to achieve a plasma physical vapor deposition coating of the multi-unit turbine guide blades; during powder spraying, the turntable rotates continuously; the manipulator oscillates back and forth at a rate of 100 mm / s, the swing amplitude extends 16 mm on both sides of the visible edge of the multi-unit turbine guide blades, the turntable rotates at 20 rpm, and the rotation speed of the multi-unit turbine guide blades is 40 rpm;
[0124] The blade body of the multi-unit turbine guide blade includes a central starting position 3, an upper boundary 2 and a lower boundary 1, and the distance between the upper boundary 2 and the lower boundary 1 is 0.8 times the height of the multi-unit turbine guide blade; the central starting position 3 is 1 / 2 of the blade body height of the multi-unit turbine guide blade; the height of the blade body is 50 mm;
[0125] The preset trajectory in step (1) is: first preheat the two sides of the blade, then preheat the center starting position 3 of the blade, and preheat to a center starting temperature of 800°C; during preheating, when the spray gun moves from the center starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the center starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is at the center starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s;
[0126] The preset trajectory in step (2) is: first, powder spray the central starting position 3 of the blade body, and then powder spray the positions on both sides of the blade body; during powder spraying, when the spray gun moves from the central starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the central starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is located at the central starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s.
[0127] During the powder spraying in step (2), the spraying distance is 1.2m, the Ar gas flow rate is 30SLPM, the He gas flow rate is 60SLPM, the current is 1700A, and the voltage is 35V.
[0128] Example 6
[0129] This embodiment provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, the spraying method is performed using a manipulator and a dual-axis positioner; the turntable of the dual-axis positioner can rotate around the central axis and can be tilted by less than 45°;
[0130] The spraying method comprises the following steps:
[0131] (1) Three multi-unit turbine guide blades are evenly arranged on the circumference of the turntable, and the manipulator holds a spray gun to preheat the multi-unit turbine guide blades along a preset trajectory to obtain preheated blades; during preheating, the manipulator oscillates back and forth at a rate of 500 mm / s, and the swing amplitude extends 20 mm on both sides of the visible edge of the multi-unit turbine guide blades, the rotation speed of the turntable is 30 rpm, and the rotation speed of the multi-unit turbine guide blades is 60 rpm;
[0132] (2) The manipulator holds the spray gun and sprays the preheated blades with powder along a preset trajectory to achieve a plasma physical vapor deposition coating of the multi-unit turbine guide blades; during powder spraying, the turntable rotates continuously; the manipulator swings back and forth at a rate of 200 mm / s, and the swing amplitude extends 20 mm on both sides of the visible edge of the multi-unit turbine guide blades, the turntable rotates at a speed of 50 rpm, and the rotation speed of the multi-unit turbine guide blades is 100 rpm;
[0133] The blade body of the multi-unit turbine guide blade includes a central starting position 3, an upper boundary 2 and a lower boundary 1, and the distance between the upper boundary 2 and the lower boundary 1 is 0.7 times the height of the multi-unit turbine guide blade; the central starting position 3 is 1 / 2 of the blade body height of the multi-unit turbine guide blade; the height of the blade body is 80 mm;
[0134] The preset trajectory in step (1) is: first preheat the two sides of the blade, then preheat the center starting position 3 of the blade, and preheat to a center starting temperature of 800°C; during preheating, when the spray gun moves from the center starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the center starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is at the center starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s;
[0135] The preset trajectory in step (2) is: first, powder spray the central starting position 3 of the blade body, and then powder spray the positions on both sides of the blade body; during powder spraying, when the spray gun moves from the central starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the central starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is located at the central starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s.
[0136] During the powder spraying in step (2), the spraying distance is 1.2m, the Ar gas flow rate is 30SLPM, the He gas flow rate is 60SLPM, the current is 1700A, and the voltage is 35V.
[0137] Example 7
[0138] This embodiment provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, the spraying method is performed using a manipulator and a dual-axis positioner; the turntable of the dual-axis positioner can rotate around the central axis and can be tilted by less than 45°;
[0139] The spraying method comprises the following steps:
[0140] (1) A multi-unit turbine guide blade is placed on the central rotating axis of the turntable, and the manipulator holds a spray gun and preheats the multi-unit turbine guide blade along a preset trajectory to obtain a preheated blade; during preheating, the manipulator oscillates back and forth at a rate of 300 mm / s, and the swing amplitude extends 18 mm on both sides of the visible edge of the multi-unit turbine guide blade;
[0141] (2) The manipulator holds the spray gun and sprays the preheated blades with powder along a preset trajectory to achieve a plasma physical vapor deposition coating of the multi-unit turbine guide blades; during powder spraying, the turntable rotates at a scale; each multi-unit turbine guide blade undergoes a first spraying, a second spraying, a third spraying, and a fourth spraying; during the first spraying, the plane where the leading edge of the blade basin of the multi-unit turbine guide blade is located is perpendicular to the axis of the spray gun (see Figure 2 ), time is 3min; during the second spraying, the multi-unit turbine guide blade rotates 30° counterclockwise from the first spraying position (see Figure 3 ), time is 6.5min; during the third spraying, the plane where the back of the multi-unit turbine guide blade is located is perpendicular to the axis of the spray gun (see Figure 4 ), time is 4min; during the fourth spraying, the front leaf back high point position is the visible area (see Figure 5 ), time is 1.5min;
[0142] The blade body of the multi-unit turbine guide blade includes a central starting position 3, an upper boundary 2 and a lower boundary 1, and the distance between the upper boundary 2 and the lower boundary 1 is 0.6 times the height of the multi-unit turbine guide blade; the central starting position 3 is 1 / 2 of the blade body height of the multi-unit turbine guide blade; the height of the blade body is 70 mm;
[0143] The preset trajectory in step (1) is: first preheat the two sides of the blade, then preheat the center starting position 3 of the blade, and preheat to a center starting temperature of 800°C; during preheating, when the spray gun moves from the center starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the center starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is at the center starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s;
[0144] The preset trajectory in step (2) is: first, powder spray the central starting position 3 of the blade body, and then powder spray the positions on both sides of the blade body; during powder spraying, when the spray gun moves from the central starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the central starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is located at the central starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s.
[0145] During the powder spraying in step (2), the spraying distance is 1.2m, the Ar gas flow rate is 30SLPM, the He gas flow rate is 60SLPM, the current is 1700A, and the voltage is 35V.
[0146] Example 8
[0147] This embodiment provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, the spraying method is performed using a manipulator and a dual-axis positioner; the turntable of the dual-axis positioner can rotate around the central axis and can be tilted by less than 45°;
[0148] The spraying method comprises the following steps:
[0149] (1) A multi-unit turbine guide blade is placed on the central rotating axis of the turntable, and the manipulator holds a spray gun and preheats the multi-unit turbine guide blade along a preset trajectory to obtain a preheated blade; during preheating, the manipulator reciprocates laterally at a rate of 300 mm / s, and the swing amplitude extends 15 mm on both sides of the visible edge of the multi-unit turbine guide blade;
[0150] (2) The manipulator holds the spray gun and sprays the preheated blades with powder along a preset trajectory to achieve a plasma physical vapor deposition coating of the multi-unit turbine guide blades; during powder spraying, the turntable rotates at a scale; each multi-unit turbine guide blade undergoes a first spraying, a second spraying, a third spraying, and a fourth spraying; during the first spraying, the plane where the leading edge of the blade basin of the multi-unit turbine guide blade is located is perpendicular to the axis of the spray gun (see Figure 2 ), the time is 1.6min; during the second spraying, the multi-unit turbine guide blade rotates 25° counterclockwise from the first spraying position (see Figure 3 ), time is 3.2min; during the third spraying, the plane where the back of the multi-unit turbine guide blade is located is perpendicular to the axis of the spray gun (see Figure 4 ), time is 2.4min; during the fourth spraying, the high point position of the front blade back is the visible area (see Figure 5 ), time is 0.8min;
[0151] The blade body of the multi-unit turbine guide blade includes a central starting position 3, an upper boundary 2 and a lower boundary 1, and the distance between the upper boundary 2 and the lower boundary 1 is 0.8 times the height of the multi-unit turbine guide blade; the central starting position 3 is 1 / 2 of the blade body height of the multi-unit turbine guide blade; the height of the blade body is 50 mm;
[0152] The preset trajectory in step (1) is: first preheat the two sides of the blade, then preheat the center starting position 3 of the blade, and preheat to a center starting temperature of 800°C; during preheating, when the spray gun moves from the center starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the center starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is at the center starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s;
[0153] The preset trajectory in step (2) is: first, powder spray the central starting position 3 of the blade body, and then powder spray the positions on both sides of the blade body; during powder spraying, when the spray gun moves from the central starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the central starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is located at the central starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s.
[0154] During the powder spraying in step (2), the spraying distance is 1.2m, the Ar gas flow rate is 30SLPM, the He gas flow rate is 60SLPM, the current is 1700A, and the voltage is 35V.
[0155] Example 9
[0156] This embodiment provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, the spraying method is performed using a manipulator and a dual-axis positioner; the turntable of the dual-axis positioner can rotate around the central axis and can be tilted by less than 45°;
[0157] The spraying method comprises the following steps:
[0158] (1) A multi-unit turbine guide blade is placed on the central rotating axis of the turntable, and the manipulator holds a spray gun and preheats the multi-unit turbine guide blade along a preset trajectory to obtain a preheated blade; during preheating, the manipulator reciprocates laterally at a rate of 300 mm / s, and the swing amplitude extends 15 mm on both sides of the visible edge of the multi-unit turbine guide blade;
[0159] (2) The manipulator holds the spray gun and sprays the preheated blades with powder along a preset trajectory to achieve a plasma physical vapor deposition coating of the multi-unit turbine guide blades; during powder spraying, the turntable rotates at a scale; each multi-unit turbine guide blade undergoes a first spraying, a second spraying, a third spraying, and a fourth spraying; during the first spraying, the plane where the leading edge of the blade basin of the multi-unit turbine guide blade is located is perpendicular to the axis of the spray gun (see Figure 2 ), time is 4min; during the second spraying, the multi-unit turbine guide blade rotates 25° counterclockwise from the first spraying position (see Figure 3 ), time is 8min; during the third spraying, the plane where the back of the multi-unit turbine guide blade is located is perpendicular to the axis of the spray gun (see Figure 4 ), time is 6min; during the fourth spraying, the front leaf back high point position is the visible area (see Figure 5 ), time is 2min;
[0160] The blade body of the multi-unit turbine guide blade includes a central starting position 3, an upper boundary 2 and a lower boundary 1, and the distance between the upper boundary 2 and the lower boundary 1 is 0.7 times the height of the multi-unit turbine guide blade; the central starting position 3 is 1 / 2 of the blade body height of the multi-unit turbine guide blade; the height of the blade body is 80 mm;
[0161] The preset trajectory in step (1) is: first preheat the two sides of the blade, then preheat the center starting position 3 of the blade, and preheat to a center starting temperature of 800°C; during preheating, when the spray gun moves from the center starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the center starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is at the center starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s;
[0162] The preset trajectory in step (2) is: first, powder spray the central starting position 3 of the blade body, and then powder spray the positions on both sides of the blade body; during powder spraying, when the spray gun moves from the central starting position 3 to the upper boundary 2, the turntable is synchronously tilted 25° in the direction close to the spray gun; when the spray gun moves from the central starting position 3 to the lower boundary 1, the turntable is synchronously tilted 25° in the direction away from the spray gun; when the spray gun is located at the central starting position 3, the direction of the turntable is parallel to the horizontal direction; the tilting speed is 2° / s.
[0163] During the powder spraying in step (2), the spraying distance is 1.2m, the Ar gas flow rate is 30SLPM, the He gas flow rate is 60SLPM, the current is 1700A, and the voltage is 35V.
[0164] Comparative Example 1
[0165] The present comparative example provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, which is the same as Example 1 except that when the upper boundary 2 position of the blade body is preheated, the turntable is tilted 10° in the direction close to the spray gun; when the lower boundary 1 position of the blade body is preheated, the turntable is tilted 10° in the direction close to the spray gun; when the upper boundary 2 position of the blade body is powder-sprayed, the turntable is tilted 10° in the direction close to the spray gun; when the lower boundary 1 position of the blade body is powder-sprayed, the turntable is tilted 10° in the direction close to the spray gun.
[0166] Comparative Example 2
[0167] The present comparative example provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, which is the same as Example 2 except that when the upper boundary 2 position of the preheating blade body is located, the turntable is tilted 35° in the direction close to the spray gun; when the lower boundary 1 position of the preheating blade body is located, the turntable is tilted 35° in the direction close to the spray gun; when the upper boundary 2 position of the powder spraying blade body is located, the turntable is tilted 35° in the direction close to the spray gun; when the lower boundary 1 position of the powder spraying blade body is located, the turntable is tilted 35° in the direction close to the spray gun.
[0168] Comparative Example 3
[0169] This comparative example provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, which is the same as Example 3 except that the upper boundary 2 extends 19 mm upward from the center starting position 3 along the blade height direction, and the lower boundary 1 extends 19 mm downward from the center starting position 3 along the blade height direction.
[0170] Comparative Example 4
[0171] The present comparative example provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, which is the same as Example 4 except that when the upper boundary 2 position of the blade body is preheated, the turntable is tilted 10° in the direction close to the spray gun; when the lower boundary 1 position of the blade body is preheated, the turntable is tilted 10° in the direction close to the spray gun; when the upper boundary 2 position of the blade body is powder-sprayed, the turntable is tilted 10° in the direction close to the spray gun; when the lower boundary 1 position of the blade body is powder-sprayed, the turntable is tilted 10° in the direction close to the spray gun.
[0172] Comparative Example 5
[0173] The present comparative example provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, which is the same as Example 5 except that when the upper boundary 2 position of the preheating blade body is located, the turntable is tilted 35° in the direction close to the spray gun; when the lower boundary 1 position of the preheating blade body is located, the turntable is tilted 35° in the direction close to the spray gun; when the upper boundary 2 position of the powder spraying blade body is located, the turntable is tilted 35° in the direction close to the spray gun; when the lower boundary 1 position of the powder spraying blade body is located, the turntable is tilted 35° in the direction close to the spray gun.
[0174] Comparative Example 6
[0175] This comparative example provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, which is the same as Example 6 except that the upper boundary 2 extends 19 mm upward from the center starting position 3 along the blade height direction, and the lower boundary 1 extends 19 mm downward from the center starting position 3 along the blade height direction.
[0176] Comparative Example 7
[0177] The present comparative example provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, which is the same as Example 7 except that when the upper boundary 2 position of the blade body is preheated, the turntable is tilted 10° in the direction close to the spray gun; when the lower boundary 1 position of the blade body is preheated, the turntable is tilted 10° in the direction close to the spray gun; when the upper boundary 2 position of the blade body is powder-sprayed, the turntable is tilted 10° in the direction close to the spray gun; when the lower boundary 1 position of the blade body is powder-sprayed, the turntable is tilted 10° in the direction close to the spray gun.
[0178] Comparative Example 8
[0179] This comparative example provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, which is the same as Example 8 except that when the upper boundary 2 position of the preheating blade body is located, the turntable is tilted 35° in the direction close to the spray gun; when the lower boundary 1 position of the preheating blade body is located, the turntable is tilted 35° in the direction close to the spray gun; when the upper boundary 2 position of the powder spraying blade body is located, the turntable is tilted 35° in the direction close to the spray gun; when the lower boundary 1 position of the powder spraying blade body is located, the turntable is tilted 35° in the direction close to the spray gun.
[0180] Comparative Example 9
[0181] This comparative example provides a method for spraying a plasma physical vapor deposition coating on a multi-unit turbine guide blade, which is the same as Example 9 except that the upper boundary 2 extends 19 mm upward from the center starting position 3 along the blade height direction, and the lower boundary 1 extends 19 mm downward from the center starting position 3 along the blade height direction.
[0182] The thickness of the coatings in Examples 1-9 and Comparative Examples 1-9 was measured using a three-dimensional blue light scanning system. The results are shown in Table 1.
[0183] Table 1
[0184]
[0185] In summary, the present invention combines the advantages of plasma physical vapor deposition jet (including large diameter and length, high energy, supersonic speed) and the complex surface of multi-unit turbine guide blades, shielding factors and different curvature radii, etc., through a linkage manipulator and a dual-axis positioner, to achieve uniform preheating and spraying, and the operation is simple. The process design can be carried out according to the blades with different characteristics to improve the uniformity of preheating of the blade workpiece before spraying and deposition, and the uniformity of the spraying and deposition coating can also be improved. The spraying method does not require the superposition of auxiliary hardware and software, and is suitable for industrial production. When preheating, the present invention adopts the method of first preheating the position close to the edge plate, and then preheating the middle The method of the center starting position avoids the problem of excessive temperature at the center starting position caused by continuous preheating of the middle part of the blade body; and by coordinating the order of the preheating positions and the tilting angle of the turntable, the turbulence effect of the high-speed plasma jet at the right angle is reduced, the temperature uniformity of the multi-unit turbine guide blades is improved, and the temperature difference of the entire multi-unit turbine guide blades is made ≤30°C, which provides a basis for ensuring the consistency of the deposition rate during powder spraying and avoids the problem of large deviation in the deposition rate caused by the large preheating temperature difference; during powder spraying, the present invention takes into account that in the surrounding area of the center starting position, the vapor deposition is continuous and uniform and the proportion of the gas phase in the gas-liquid-solid three-phase is high. The present invention first powder sprays the center starting position, and then powder sprays the position close to the edge plate, thereby ensuring the coating quality of the multi-unit turbine guide blades; the present invention controls the rotation and flipping of the multi-unit turbine guide blades through the linkage of the manipulator and the dual-axis positioner, and adopts a rotation control or indexing control mode, and adjusts the rotation parameters or indexing parameters according to the required blade posture rotation, and on this basis couples the preset trajectory of the manipulator, so as to reduce the jet turbulence at the right angle position of the edge plate and the blade body; and the spraying method can be designed according to factors such as blade size, edge plate size, single piece or multiple pieces, with high control accuracy, providing a good flexible processing technology foundation for thickness design and uniform distribution, and increasing process flexibility design and adjustment margin, and can adapt to different types of multi-unit blades, and realize process flexibility design and adjustment through a variety of spraying trajectories, rotation, and swing linkage methods.
[0186] The applicant declares that the above is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Those skilled in the art should understand that any changes or substitutions that can be easily thought of by those skilled in the art within the technical scope disclosed by the present invention shall fall within the protection scope and disclosure scope of the present invention.
Claims
1. A method for spraying plasma physical vapor deposition coating on multi-unit turbine guide blades, characterized in that: The spraying method is performed by using a manipulator and a dual-axis positioner; the turntable of the dual-axis positioner can rotate around the central axis and can be tilted by less than 45°; the tilting direction is a direction close to the manipulator or away from the manipulator; The spraying method comprises the following steps: (1) At least one multi-unit turbine guide blade is placed on a turntable, and a manipulator holds a spray gun to preheat the multi-unit turbine guide blade along a preset trajectory. During preheating, the turntable tilts and / or rotates to obtain a preheated blade; (2) The manipulator holds the spray gun and sprays the preheated blades with powder along a preset trajectory. During the powder spraying, the turntable tilts and / or rotates to achieve a plasma physical vapor deposition coating of the multi-unit turbine guide blades; The preset trajectory in step (1) is: first preheat the positions on both sides of the multi-unit turbine guide blades, and then preheat the center starting position of the multi-unit turbine guide blades. The preheating process is performed at least once. The preset trajectory in step (2) is: first, powder spray the center starting position of the multi-unit turbine guide blades, then powder spray the positions on both sides of the multi-unit turbine guide blades, and powder spraying is performed at least once.
2. The spraying method according to claim 1, characterized in that: The blade body of the multi-unit turbine guide blade comprises a central starting position, an upper boundary and a lower boundary, and the distance between the upper boundary and the lower boundary is more than 0.5 times the height of the blade body.
3. The spraying method according to claim 2, characterized in that: The blade body of the multi-unit turbine guide blade includes a central starting position, an upper boundary and a lower boundary, and the distance between the upper boundary and the lower boundary is 0.5-0.8 times the height of the blade body, excluding 0.
5.
4. The spraying method according to claim 1, characterized in that: When preheating the positions on both sides of the multi-unit turbine guide blades, the turntable is tilted by 15°-30°.
5. The spraying method according to claim 1, characterized in that: When the powder is sprayed on both sides of the multi-unit turbine guide blades, the turntable is tilted 15°-30°.
6. The spraying method according to claim 1, characterized in that: The blade height of the multi-unit turbine guide blade is ≤80 mm.
7. The spraying method according to claim 6, characterized in that: The blade height of the multi-unit turbine guide blade is 50-80 mm.
8. The spraying method according to claim 1, characterized in that: The central starting position is 2 / 5-3 / 5 of the blade height of the multi-unit turbine guide blade.
9. The spraying method according to claim 2, characterized in that: When the spray gun moves from the central starting position to the upper boundary, the turntable is synchronously tilted 15°-30° in the direction close to the spray gun; When the spray gun moves from the central starting position to the lower boundary, the turntable is synchronously tilted 15°-30° in the direction away from the spray gun; When the spray gun is located at the center starting position, the disk surface direction of the turntable is parallel to the horizontal direction.
10. The spraying method according to claim 9, characterized in that: The tilting speed is 1.5° / s-2.5° / s.
11. The spraying method according to claim 9, characterized in that: When the number of the multi-unit turbine guide blade is one, the multi-unit turbine guide blade is arranged on the central rotation axis of the turntable, and the turntable rotates continuously or indexed.
12. The spraying method according to claim 9, characterized in that: When the number of the multi-unit turbine guide blades is one, the rate of the lateral reciprocating swing of the manipulator is 150-400 mm / s.
13. The spraying method according to claim 9, characterized in that: The number of the multi-unit turbine guide blades is one, and when the turntable rotates continuously, the multi-unit turbine guide blades rotate with the turntable at a speed of 30-100 rpm.
14. The spraying method according to claim 11, characterized in that: When the turntable rotates indexingly, during the powder spraying process in step (2), the multi-unit turbine guide blades undergo a first spraying, a second spraying, a third spraying and a fourth spraying respectively; During the first spraying, the plane where the leading edge of the blade basin of the multi-unit turbine guide blade is located is perpendicular to the axis of the spray gun; During the second spraying, the multi-unit turbine guide blades rotate counterclockwise by 25°-35° from the first spraying position; During the third spraying, the plane where the back of the multi-unit turbine guide blades is located is perpendicular to the axis of the spray gun; During the fourth spraying, the high point of the front blade back is the visible area.
15. The spraying method according to claim 14, characterized in that: When the turntable rotates at an indexing rate, the total time for the powder spraying in step (2) is 8-20 minutes.
16. The spraying method according to claim 14, characterized in that: The time of the first spraying is 15-25% of the total time of powder spraying.
17. The spraying method according to claim 14, characterized in that: The time of the second spraying is 35-45% of the total time of powder spraying.
18. The spraying method according to claim 14, characterized in that: The time of the third spraying is 25-35% of the total powder spraying time.
19. The spraying method according to claim 14, characterized in that: The time of the fourth spraying is 5-15% of the total powder spraying time.
20. The spraying method according to claim 9, characterized in that: When the number of the multi-unit turbine guide blades is at least 2, the turntable rotates continuously.
21. The spraying method according to claim 20, characterized in that: When the number of the multi-unit turbine guide blades is at least 2, the at least 2 multi-unit turbine guide blades are evenly arranged in the circumferential direction of the rotating disk.
22. The spraying method according to claim 20, characterized in that: When the number of the multi-unit turbine guide blades is at least 2, during the preheating process in step (1), the rate of the lateral reciprocating swing of the manipulator is 300-500 mm / s.
23. The spraying method according to claim 20, characterized in that: When the number of the multi-unit turbine guide blades is at least 2, during the preheating process in step (1), the rotation speed of the turntable is 10-30 rpm, and the rotation speed of the multi-unit turbine guide blades is 20-60 rpm.
24. The spraying method according to claim 21, characterized in that: When the number of the multi-unit turbine guide blades is at least 2, during the powder spraying process in step (2), the reciprocating swing rate of the robot is 100-200 mm / s.
25. The spraying method according to claim 21, characterized in that: When the number of the multi-unit turbine guide blades is at least 2 and the turntable rotates continuously, during the powder spraying process in step (2), the rotation speed of the turntable is 20-50 rpm, and the rotation speed of the multi-unit turbine guide blades is 40-100 rpm.
26. The spraying method according to any one of claims 1 to 25, characterized in that: During the powder spraying in step (2), the spraying distance is 1-1.5m, the Ar gas flow rate is 20-40SLPM, the He gas flow rate is 50-70SLPM, the current is 1600-1800A, and the voltage is 30-40V.
Citation Information
Patent Citations
Automatic spraying process for turbine countervanes
CN103831224A
Multiunit turbine guide blade thermal barrier coating flexible processing platform and spray-coating method
CN107876261A
Series connection six-shaft industrial robot control device and method
CN104908041A
Multiple-connection-blade precision casting method
CN105290337A
Method for preparing guiding blade assembly coating through automatic thermal spraying of manipulator
CN107354417A