MCS management system for intelligent manufacturing in large factories

By introducing an intelligent manufacturing MCS management system in large production factories, and using the analysis and scheduling strategies of equipment management modules and resource scheduling modules, the problems of equipment failure and uneven allocation of human resources are solved, and the production efficiency and stability of the production line are improved. It realizes rapid response to equipment and rational use of human resources.

CN118410991BActive Publication Date: 2024-11-19SHENZHEN LINGZHIGUANG MECHANICAL & ELECTRICAL AUTOMATION SYST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410637104.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-22
Publication Date
2024-11-19
Estimated Expiration
2044-05-22

AI Technical Summary

Technical Problem

Equipment failures and uneven allocation of human resources in large production plants lead to reduced production efficiency, bottlenecks and product quality problems. The traditional personnel scheduling methods cannot be adjusted in time, resulting in equipment overheating or overloading, increasing the risk of failure.

Method used

A production intelligent manufacturing MCS management system was designed, including equipment management module and resource scheduling module. By analyzing the equipment status and work videos, evaluating the equipment risk level and production line status, generating scheduling strategies, optimizing personnel scheduling and equipment alternating operations , ensure stable operation of the production line.

Benefits of technology

It realizes rapid response to equipment failures and stable operation of the production line, improves production efficiency and rational utilization of human resources, reduces production interruption time, and ensures efficient operation and intelligent level of the production line.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118410991B_ABST
    Figure CN118410991B_ABST
Patent Text Reader

Abstract

The present invention discloses an MCS management system for intelligent manufacturing of production for large factories, and relates to the technical field of production management; an equipment management module obtains an equipment operation status evaluation index by analyzing and comparing the operation parameters of the equipment to reflect the operation status of the equipment, so as to timely discover the problems and hidden dangers of the equipment; threshold comparison and analysis are performed based on the operation status evaluation index to judge the risk level of the equipment, and then corresponding measures are taken to improve the efficiency of equipment replacement and reduce the interruption time of the production line; a resource scheduling module monitors and analyzes the working status of workers in each production line, and can understand the work situation of personnel in real time, so as to generate a reasonable scheduling strategy; by optimizing personnel scheduling to achieve the rational use of human resources, improve production efficiency and the intelligent level of overall production and manufacturing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of production management, and in particular to an MCS management system for intelligent manufacturing of production in large factories. Background Art

[0002] The intelligent manufacturing MCS management system is a system that focuses on information security management, asset management, and operation and maintenance assistance. It is widely used in large-scale production plants, and the equipment in large-scale production plants is usually complex, high-speed, and large. For example, in the automobile manufacturing industry, there are generally several production lines for automobile parts, which are then assembled to complete automobile manufacturing. In the case of many production lines and a wide variety of manufactured parts, if there are equipment failures or uneven distribution of production resources during the production process, it will have relatively serious consequences for large-scale production plants. Therefore, it is very important to carry out intelligent manufacturing management for large-scale production plants.

[0003] At present, the intelligent manufacturing management of large-scale production plants usually fixes the number of people engaged in production on the production line, or personnel are transferred by superiors. This traditional personnel scheduling method cannot make timely personnel adjustments based on production status, resulting in unreasonable utilization of production human resources in the actual production process, which leads to reduced production efficiency, bottlenecks and congestion, and product quality problems; in addition, due to the overload operation of the production line, the equipment may overheat or overload, increasing the risk of failure and further threatening the production efficiency of large factories. Summary of the invention

[0004] Based on this, it is necessary to provide an MCS management system for intelligent manufacturing production in large factories in response to the problems mentioned in the above background technology.

[0005] The purpose of the present invention can be achieved by the following technical solutions: an MCS management system for intelligent production in large factories, the system comprising a server, an equipment management module and a resource scheduling module;

[0006] The equipment management module conducts in-depth analysis of the equipment status in each production line to obtain the operating status evaluation index of each equipment, determines the equipment risk level based on the operating status evaluation index and performs corresponding equipment alternating operations; at the same time, it comprehensively evaluates the operating status of the production line based on the equipment risk level to obtain the line status value, and sends it to the resource scheduling module;

[0007] The resource scheduling module cuts the working videos of workers in each production line and extracts features to obtain the state standard values ​​corresponding to each acquisition moment in the production line, and performs detailed analysis on the state standard values ​​corresponding to each acquisition moment to obtain scheduling parameters; the scheduling parameters include high increase demand value, high decrease demand value, medium increase demand value and medium decrease demand value; according to the state standard values ​​corresponding to each acquisition moment, the scheduling demand in the production line is analyzed to obtain the scheduling demand value; when the scheduling demand value is greater than the set demand threshold, it means that the production line corresponding to the scheduling demand value needs personnel scheduling, then the scheduling parameters in the production line are retrieved for scheduling analysis to generate a scheduling strategy, and the scheduling strategy is as follows:

[0008] The high increase adjustment demand value, high decrease adjustment demand value, medium increase adjustment demand value and medium decrease adjustment demand value corresponding to each acquisition moment in the production line are summed up to obtain the high increase adjustment total value, high decrease adjustment total value, medium increase adjustment total value and medium decrease adjustment total value, and they are recorded as C1, C2, C3 and C4 respectively. Substitute C1, C2, C3 and C4 into the set formula: Calculation is performed to obtain the dispatching number Cz, where b1, b2, b3, and b4 are respectively the set proportional coefficients, and b1>b2>0>b3>b4, and α is the set number conversion coefficient; when the dispatching number is a negative number, it means that the number of workers that need to be transferred from the production line is consistent with the absolute value of the dispatching number; when the dispatching number is a positive number, it means that the number of workers that need to be increased in the production line is consistent with the absolute value of the dispatching number; the corresponding worker dispatch is carried out according to the dispatching number of the production line to meet the production needs of each production line.

[0009] In some embodiments, the equipment status in each production line is analyzed in depth to obtain the operation status evaluation index of each equipment. The specific process is as follows:

[0010] Get the equipment operating parameters at different collection moments, where the equipment operating parameters include temperature, power, and vibration values, and record them as Tj, Pj, and Zj, where j=1, 2, 3...J, J is a positive integer, J represents the total number of collection moments, and j is the sequence number of any collection moment; call the production level corresponding to the current production line, compare and match it with all the set production levels to obtain the corresponding standard operating parameters, where the standard operating parameters include standard temperature HT, standard power HP, and standard vibration value HZ; substitute Tj, Pj, Zj, HT, HP, and HZ into the set formula Calculate to get the running state value ∆Hj corresponding to the j acquisition time, where h1, h2, h3 are the set proportional coefficients, and e is a natural constant;

[0011] Take time as the horizontal coordinate and the operating status value as the vertical coordinate to obtain a curve graph of the operating status value changing with time; draw a tangent line of the curve at the state point position, calculate the derivative corresponding to the tangent line and record it as Fj, sum the derivatives less than zero to obtain the state deterioration degree and record it as k1, sum the derivatives greater than zero and take the absolute value of the sum to obtain the state improvement degree and record it as k2; record the derivative equal to zero as the stable derivative, count the number of stable derivatives and record it as f1, extract the stable derivatives and the corresponding collection time, arrange them in the time sequence of their corresponding collection time, calculate the time difference between the collection time corresponding to adjacent stable derivatives to obtain the stable interval, compare and analyze the stable interval with the set interval interval to obtain the low stability number, medium stability number and high stability number, and record them as f2, f3 and f4 respectively; substitute f1, f2, f3 and f4 into the set formula Calculation is performed to obtain the state stability k3, where a1, a2, and a3 are respectively set proportional coefficients;

[0012] Substitute the derivative Fj, state deterioration degree k1, state improvement degree k2 and state stability degree k3 into the set formula Calculation is performed to obtain the operating status evaluation index FH, where h4, h5, and h6 are respectively set proportional coefficients, and e is a natural constant.

[0013] In some embodiments, the equipment risk level is determined according to the operation status evaluation index and the corresponding equipment alternating operation is performed. At the same time, the operation status of the production line is comprehensively evaluated according to the equipment risk level to obtain the line setting status value. The specific process is as follows:

[0014] Compare and analyze the operation status evaluation index with the set evaluation index to divide the equipment corresponding to the operation status evaluation index into first-level risk equipment, second-level risk equipment and third-level risk equipment; count the number of second-level risk equipment and third-level risk equipment, and record them as V1 and V2 respectively; substitute V1 and V2 into the set formula Vz=a4×V1+a5×V2 for calculation to obtain the line setting state value Vz, where a4 and a5 are the set proportional coefficients respectively, and the line setting state value of each production line can be obtained by analogy;

[0015] If a first-level risk device is generated, retrieve the device's number, location, spare device location and corresponding maintenance engineer; obtain the spare device location, and select the spare device closest to the first-level risk device as the target spare device; send a location acquisition instruction to the maintenance engineer's mobile terminal to obtain the maintenance engineer's current location, and select the maintenance engineer with the shortest distance to the target spare device as the target maintenance engineer, and send the target spare device location and the first-level risk device's number and location to the target maintenance engineer; sum the distance between the target engineer and the target spare device and the distance between the target spare device and the first-level risk device to obtain the total distance, compare the total distance with all the set distances to match the corresponding transition duration, and then perform equipment alternation after the production line operation duration is controlled to be consistent with the transition duration. When the equipment alternation operation is completed, start the target spare device and deactivate the first-level risk device.

[0016] In some embodiments, the working videos of workers in each production line are cut and feature extracted to obtain the state standard value corresponding to each acquisition time in the production line, wherein the extraction process is as follows:

[0017] Take any of the work videos of one of the workers, cut the work video of the worker evenly to obtain several segments, and identify the worker's actions in the segments; set each production line to correspond to a work action set, match the action with the work action set of the corresponding production line, and when the match is successful, the segment is recorded as a valid segment; otherwise, it is an invalid segment; arrange the generated valid and invalid segments according to their positions in the corresponding work video to obtain the worker's action analysis trajectory; number each segment in the action analysis trajectory according to its position in the corresponding work video, calculate the difference between the numbers of two adjacent valid and invalid segments to obtain the valid interval and the invalid interval, and calculate the mean of the valid interval and the invalid interval in the action analysis trajectory respectively to obtain the mean of the valid interval and the mean of the invalid interval, and record them as G1j and G2j respectively; substitute G1j and G2j into the set formula Calculate to get the working status value Gzj of the worker in the working video corresponding to the acquisition time, where g1 and g2 are the set proportional coefficients, and e is a natural constant; by analogy, the working status values ​​of all workers in the working video corresponding to the acquisition time can be obtained; the working status values ​​of all workers in the working video are averaged to get the working status value of the production line ; Get the production level in the current production line, match the production level in the current production line with all the set production levels to obtain the corresponding standard production status value recorded as HG; HG and Substitute the set formula Calculation is performed to obtain the state standard value GHj corresponding to the acquisition moment, and the state standard value corresponding to each acquisition moment in the production line can be obtained by analogy.

[0018] In some embodiments, the specific process of performing detailed analysis on the state standard values ​​corresponding to each acquisition moment to obtain the scheduling parameters is as follows:

[0019] Compare and analyze the state standard value with the set standard interval. When the state standard value is greater than the maximum value in the set standard interval, the collection moment is recorded as the high demand moment, and the state standard value corresponding to the collection moment is recorded as the high demand value; if the working state value of the production line is greater than the standard production state value, the high demand value is further recorded as the high increase demand value; if the working state value of the production line is less than the standard production state value, the high demand value is further recorded as the high decrease demand value;

[0020] When the state standard value is within the set standard range, the collection time is recorded as the medium demand time, and the state standard value corresponding to the collection time is recorded as the medium demand value. If the working state value of the production line is greater than the standard production state value, the medium demand value is further recorded as the medium increase demand value; if the working state value of the production line is less than the standard production state value, the medium demand value is further recorded as the medium decrease demand value;

[0021] The high increase demand value, the high decrease demand value, the medium increase demand value and the medium decrease demand value are recorded as the scheduling parameters of the production line.

[0022] In some embodiments, the scheduling requirements in the production line are analyzed according to the state standard values ​​corresponding to each acquisition time to obtain the scheduling requirement value, wherein the specific process of the scheduling requirement analysis is:

[0023] With time as the horizontal coordinate and the state calibration value as the vertical coordinate, a curve of the state calibration value changing with time in the production line is obtained; a tangent line is drawn at the calibration point to obtain the tangent line corresponding to the calibration point, and the tangent line expression is obtained by data fitting. The tangent line expression is derived to obtain the calibration derivative corresponding to the calibration point, which is recorded as Lj; using the set formula Calculate to get the dispatch demand value Bz, where g3, g4, g5, and g6 are the set proportional coefficients. is the mean of the quasi-derivatives at different acquisition times; and so on, the scheduling demand value of each production line can be obtained.

[0024] In some embodiments, the resource scheduling module is further used to analyze the capacity of each production line after scheduling to obtain a capacity value, and determine the production level of the production line according to the capacity value; the specific process is as follows:

[0025] Obtain the capacity parameters of each production line after worker scheduling, where the capacity parameters include output per unit time, yield rate and energy consumption, and record them as N1, N2 and N3 respectively; substitute N1, N2 and N3 into the set formula Calculation is performed to obtain the capacity value Nz, where b5, b6, and b7 are respectively set proportional coefficients; the capacity value is compared and analyzed with the set capacity threshold. When the capacity value is greater than the maximum value in the set capacity range, the first-level production is output; when the capacity value is within the set capacity range, the second-level production is output; when the capacity value is less than the minimum value in the set capacity range, the third-level production is output; the production level of each production line is extracted and sent to the equipment management module.

[0026] Compared with the prior art, the present invention has the following beneficial effects:

[0027] 1. The equipment management module obtains the equipment operation status evaluation index by analyzing and comparing the equipment operation parameters to reflect the equipment operation status, so as to timely discover equipment problems and hidden dangers; threshold comparison and analysis is performed based on the operation status evaluation index to determine the risk level of the equipment, and then corresponding measures are taken to improve the efficiency of equipment replacement, reduce the interruption time of the production line, and maintain the stable operation of the production line, thereby improving production efficiency;

[0028] 2. The resource scheduling module monitors and analyzes the working status of workers in each production line, and can understand the work situation of personnel in real time, so as to generate a reasonable scheduling strategy; by optimizing personnel scheduling to achieve the rational use of human resources, improve production efficiency and the overall level of intelligent production and manufacturing; at the same time, it also ensures that the working status of the production line is consistent with the production level and standard requirements, so as to achieve the purpose of optimizing resource scheduling. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the conventional technology, the drawings required for use in the embodiments or the conventional technology descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0030] Figure 1 It is a principle block diagram of the present invention. DETAILED DESCRIPTION

[0031] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present invention, so the present invention is not limited by the specific embodiments disclosed below.

[0032] like Figure 1 As shown, the production intelligent manufacturing MCS management system for large factories includes: a server, an equipment management module and a resource scheduling module; the production intelligent manufacturing MCS management system is described in detail with an automobile manufacturing plant as a specific application scenario: it is assumed that there are several production lines in the automobile manufacturing plant, each production line produces a type of automobile part, and each production line produces according to the assigned automobile parts; standard operating parameters and standard production status values ​​are stored in the server; the server disassembles the received automobile order according to the set disassembly method to obtain several production parts, and sends the production parts to the corresponding production line, thereby obtaining the automobile parts required to be produced by each production line.

[0033] The equipment management module analyzes the equipment operation status of each production line to obtain the line status value and the risk level of each equipment, and implements corresponding measures according to the risk level of each equipment to minimize the impact of risky equipment on production; specifically:

[0034] Obtain the equipment operating parameters at different collection moments, where the equipment operating parameters include temperature, power, and vibration values, and record them as Tj, Pj, and Zj, respectively, where j=1, 2, 3...J, J is a positive integer, J represents the total number of collection moments, and j is the sequence number of any collection moment; set each production level to correspond to a standard operating parameter. It should be noted that the higher the production level, the larger the corresponding standard operating parameter. For example, the equipment operating status is divided into primary production, secondary production, and tertiary production; the standard operating parameters corresponding to the equipment in the primary production state are greater than the standard operating parameters corresponding to the secondary and tertiary production states; retrieve the production level corresponding to the current production line, compare and match it with all the set production levels to obtain the corresponding standard operating parameters, where the standard operating parameters include standard temperature HT, standard power HP, and standard vibration value HZ; use the set formula Calculate to obtain the running state value ∆Hj corresponding to the jth acquisition time, where h1, h2, and h3 are the set proportional coefficients, and e is a natural constant;

[0035] A two-dimensional rectangular coordinate system is constructed with time as the horizontal coordinate and the operating status value as the vertical coordinate. The operating status values ​​are input into the coordinate system in sequence according to the corresponding collection time. The position of the operating status value in the coordinate system is recorded as the state point. The state points are connected in sequence with a smooth curve to obtain a curve graph of the operating status value changing with time. A tangent line is drawn at the state point, and the tangent expression is obtained by data fitting. The derivative is calculated based on the derivative formula expression to obtain the derivative at the state point, which is recorded as Fj. The derivatives less than zero are summed to obtain the state deterioration degree, which is recorded as k1. The derivatives greater than zero are summed and the absolute value of the sum is taken to obtain the state improvement degree, which is recorded as k2. The derivative equal to zero is recorded as a stable derivative. The number of statistical stable derivatives is recorded as f1, the stable derivatives and the corresponding collection moments are extracted and arranged in the time sequence of the corresponding collection moments, the time difference between the collection moments corresponding to the adjacent stable derivatives is calculated to obtain the stable interval, and the stable interval is compared and analyzed with the set interval interval. When the stable interval is greater than the maximum value in the set interval interval, a low stability is accumulated; when the stable interval is within the set stable interval, a moderate stability is accumulated; when the stable interval is less than the minimum value in the set stable interval, a high stability is accumulated; the number of low stability, moderate stability and high stability are counted respectively, and recorded as f2, f3 and f4 respectively, and the set formula is used Calculate to get the state stability k3, where a1, a2, a3 are the set proportional coefficients respectively; the derivative Fj, state deterioration k1, state improvement k2 and state stability k3 are calculated by the set formula Calculation is performed to obtain the operation status evaluation index FH, where h4, h5, and h6 are respectively the set proportional coefficients, and e is a natural constant; thus, the operation status evaluation index of each device in the production line can be obtained, and the operation status evaluation index is compared and analyzed with the set evaluation index. When the operation status evaluation index is greater than the maximum value in the set evaluation interval, it means that the operation status of the device is seriously poor and there is a relatively large safety risk, and the device is recorded as a first-level risk device; when the operation status evaluation index is within the set evaluation interval, the device is recorded as a second-level risk device; when the operation status evaluation index is less than the minimum value in the set evaluation interval, the device is recorded as a third-level risk device; the number of second-level risk devices and third-level risk devices is counted, and they are recorded as V1 and V2 respectively, and the set formula Vz=a4×V1+a5×V2 is used for calculation to obtain the line setting state value Vz, where a4 and a5 are respectively the set proportional coefficients; and the line setting state value of each production line can be obtained by analogy; the line setting state value of each production line is sent to the resource scheduling module.

[0036] If a first-level risk device is generated, retrieve the device number, location, spare device location, and corresponding maintenance engineer; it should be noted that each device corresponds to a number of maintenance engineers responsible for maintenance work, and each production line corresponds to a number of equipment warehouses to store spare parts and spare equipment; obtain the spare device location, and select the spare device closest to the first-level risk device as the target spare device; send a location acquisition command to the maintenance engineer's mobile terminal to obtain the maintenance engineer's current location, and select the maintenance engineer with the shortest distance to the target spare device as the target maintenance engineer, and compare the target spare device location with the first-level risk device. The number and location are sent to the target maintenance engineer; the distance between the target engineer and the target backup equipment and the distance between the target backup equipment and the first-level risk equipment are summed up to get the total distance, and each distance is set to correspond to a transition duration. The total distance is compared with all the set distances to match the corresponding transition duration. After the production line operation duration is controlled to be consistent with the transition duration, the equipment is alternately operated. After the equipment alternation operation is completed, the target backup equipment is started and the first-level risk equipment is disabled, which can minimize the impact on the production line and quickly respond to equipment with failure risks, ensuring stable and efficient operation of the production line;

[0037] By analyzing and comparing the operating parameters of the equipment, the equipment's operating status evaluation index is obtained to reflect the equipment's operating status, so that equipment problems and hidden dangers can be discovered in a timely manner. Based on the operating status evaluation index, threshold comparison analysis is performed to determine the risk level of the equipment, and then corresponding measures are taken to improve the efficiency of equipment replacement, reduce production line interruption time, and maintain stable operation of the production line, thereby improving production efficiency.

[0038] The resource scheduling module analyzes the working status of human resources in each production line and generates scheduling strategies to maximize the utilization of human resources; specifically:

[0039] Obtain the work videos of each worker in the production line at different machine acquisition times, randomly select the work video of one of the workers, evenly cut the work video of the worker to obtain several segments, and identify the worker's actions in the segment; set each production line to correspond to a work action set. Since each production line produces different types of parts, the work action set corresponding to each production line is inconsistent; match the action with the work action set of the corresponding production line, and when the match is successful, the segment is recorded as a valid segment; otherwise, it is an invalid segment; arrange the generated valid and invalid segments according to their positions in the corresponding work video to obtain the worker's action analysis trajectory; number each segment in the action analysis trajectory according to its position in the corresponding work video, and perform difference calculation on the numbers of two adjacent valid segments and invalid segments to obtain the valid interval and invalid interval, and perform mean calculation on the valid interval and invalid interval in the action analysis trajectory to obtain the valid interval mean and invalid interval mean, and record them as G1j and G2j respectively; use the set formula Calculation is performed to obtain the working state value Gzj of the worker in the working video corresponding to the acquisition moment, where g1 and g2 are respectively the set proportional coefficients, and e is a natural constant. It can be seen from the formula that when the effective interval is closer to zero and the invalid interval is larger, the working state value of the worker in the working video corresponding to the acquisition moment is larger; and by analogy, the working state values ​​of all workers in the working video corresponding to the acquisition moment can be obtained; the working state values ​​of all workers in the working video are averaged to obtain the production working state value ; Get the production level in the current production line, set each production level to correspond to a standard production status value, match the production level in the current production line with all the set production levels to obtain the corresponding standard production status value recorded as HG; use the set formula Calculation is performed to obtain the state accuracy value GHj corresponding to the collection moment. From the formula, it can be seen that when the working state value of the production line is closer to the standard production state value, it means that the possibility of scheduling in the production line at this time is smaller, and the state accuracy value is smaller; and so on, the state accuracy value corresponding to each collection moment in the production line can be obtained.

[0040] Compare and analyze the state standard value with the set standard interval. When the state standard value is greater than the maximum value in the set standard interval, it means that the manpower distribution in the production line is unreasonable and personnel scheduling is urgently needed. The collection time is recorded as the high demand time, and the state standard value corresponding to the collection time is recorded as the high demand value; if the working state value of the production line is greater than the standard production state value, the high demand value is further recorded as the high increase demand value; if the working state value of the production line is less than the standard production state value, the high demand value is further recorded as the high decrease demand value;

[0041] When the state standard value is within the set standard range, the collection time is recorded as the medium demand time, and the state standard value corresponding to the collection time is recorded as the medium demand value. If the working state value of the production line is greater than the standard production state value, the medium demand value is further recorded as the medium increase demand value; if the working state value of the production line is less than the standard production state value, the medium demand value is further recorded as the medium decrease demand value;

[0042] The high increase demand value, the high decrease demand value, the medium increase demand value and the medium decrease demand value are recorded as the scheduling parameters of the production line.

[0043] When the state standard value is less than the minimum value in the set standard interval, the collection time is recorded as the appropriate time; the number of high demand time, medium demand time and appropriate time is counted respectively, and they are recorded as B1, B2 and B3 respectively;

[0044] A two-dimensional rectangular coordinate system is constructed with time as the horizontal coordinate and state calibration value as the vertical coordinate. The state calibration values ​​are input into the coordinate system in sequence according to the corresponding acquisition time. The position of the state calibration value in the coordinate system is calibrated at the calibrated point, and the calibrated points are connected in sequence with a smooth curve to obtain a curve of the state calibration value changing with time in the production line. A tangent line is drawn at the calibrated point to obtain the tangent line corresponding to the calibrated point, and the tangent expression is obtained by data fitting. The tangent expression is derived to obtain the calibrated derivative corresponding to the calibrated point, which is recorded as Lj. The formula set is used Calculate to get the dispatch demand value Bz, where g3, g4, g5, and g6 are the set proportional coefficients. is the mean of the quasi-derivatives at different acquisition times; and so on, the scheduling demand value of each production line can be obtained.

[0045] Compare and analyze the scheduling demand value with the set demand threshold. When the scheduling demand value is greater than the set demand threshold, it means that the production line corresponding to the scheduling demand value needs personnel scheduling. Then, the scheduling parameters in the production line are retrieved for scheduling analysis to generate a scheduling strategy; specifically:

[0046] The high increase demand value, high decrease demand value, medium increase demand value and medium decrease demand value corresponding to each acquisition time in the production line are summed up to obtain the high increase total value, high decrease total value, medium increase total value and medium decrease total value, and they are recorded as C1, C2, C3 and C4 respectively. Using the set formula Calculate to get the dispatching number Cz, where b1, b2, b3, b4 are the set proportional coefficients, b1>b2>0>b3>b4, and α is the set number conversion coefficient; when the dispatching number is a negative number, it means that the number of workers that need to be transferred from the production line is consistent with the absolute value of the dispatching number; when the dispatching number is a positive number, it means that the number of workers that need to be added to the production line is consistent with the absolute value of the dispatching number; dispatch the corresponding workers according to the dispatching number of the production line to meet the production needs of each production line and maximize the utilization of human resources;

[0047] Obtain the capacity parameters of each production line after worker scheduling, where the capacity parameters include output per unit time, yield rate and energy consumption, and record them as N1, N2 and N3 respectively, using the set formula Calculation is performed to obtain the capacity value Nz, where b5, b6, and b7 are respectively set proportional coefficients; the capacity value is compared and analyzed with the set capacity threshold. When the capacity value is greater than the maximum value in the set capacity range, the first-level production is output; when the capacity value is within the set capacity range, the second-level production is output; when the capacity value is less than the minimum value in the set capacity range, the third-level production is output; the production level of each production line is extracted and sent to the equipment management module.

[0048] By monitoring and analyzing the working status of workers in each production line, we can understand the work situation of personnel in real time, so as to generate reasonable scheduling strategies; by optimizing personnel scheduling to achieve the rational use of human resources, improve production efficiency and the overall level of intelligent production and manufacturing; at the same time, it also ensures that the working status of the production line is consistent with the production level and standard requirements, so as to achieve the purpose of optimizing resource scheduling.

[0049] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0050] The above-mentioned embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. MCS management system for intelligent manufacturing in large factories, characterized by: include: Equipment management module and resource scheduling module; The equipment management module conducts in-depth analysis of the equipment status in each production line to obtain the operating status evaluation index of each equipment, determines the equipment risk level based on the operating status evaluation index and performs corresponding equipment alternating operations; at the same time, it comprehensively evaluates the operating status of the production line based on the equipment risk level to obtain the line status value, and sends it to the resource scheduling module; The resource scheduling module cuts the working videos of workers in each production line and extracts features to obtain the state standard values ​​corresponding to each acquisition moment in the production line, and performs detailed analysis on the state standard values ​​corresponding to each acquisition moment to obtain scheduling parameters; the scheduling parameters include high increase demand value, high decrease demand value, medium increase demand value and medium decrease demand value; according to the state standard values ​​corresponding to each acquisition moment, the scheduling demand in the production line is analyzed to obtain the scheduling demand value; when the scheduling demand value is greater than the set demand threshold, the scheduling parameters in the production line are retrieved and scheduling analysis is performed to generate a scheduling strategy, as follows: The high increase demand value, high decrease demand value, medium increase demand value and medium decrease demand value corresponding to each collection time in the production line are summed up to obtain the high increase total value, high decrease total value, medium increase total value and medium decrease total value, and they are analyzed to obtain the dispatching number; when the dispatching number is a negative number, it means that the number of workers that need to be transferred from the production line is consistent with the absolute value of the dispatching number; when the dispatching number is a positive number, it means that the number of workers that need to be added to the production line is consistent with the absolute value of the dispatching number; The operating status evaluation index of each equipment is obtained by conducting an in-depth analysis of the equipment status in each production line. The specific process is as follows: Obtain equipment operating parameters at different collection times, where equipment operating parameters include temperature, power and vibration values; retrieve the production level corresponding to the current production line, compare and match it with all set production levels to obtain corresponding standard operating parameters, where standard operating parameters include standard temperature, standard power and standard vibration values; analyze equipment operating parameters and standard operating parameters to obtain operating status values; With time as the horizontal axis and the operating state value as the vertical axis, a curve graph of the operating state value changing with time is obtained; Draw a tangent line of the curve at the state point position, calculate the derivative corresponding to the tangent line, sum the derivatives less than zero to obtain the state deterioration degree, sum the derivatives greater than zero and take the absolute value of the sum to obtain the state improvement degree; record the derivative equal to zero as the stable derivative, count the number of stable derivatives, extract the stable derivatives and the corresponding acquisition time, arrange them in the time sequence of their corresponding acquisition time, calculate the time difference between the acquisition times corresponding to adjacent stable derivatives to obtain the stable interval, compare and analyze the stable interval with the set interval interval to obtain the low stability number, the medium stability number and the high stability number, and calculate and analyze them to obtain the state stability; The derivative, state deterioration, state improvement and state stability are comprehensively analyzed to obtain the operation state evaluation index; The equipment risk level is determined based on the operation status assessment index and the corresponding equipment alternating operation is performed. At the same time, the operation status of the production line is comprehensively evaluated based on the equipment risk level to obtain the line setting status value. The specific process is as follows: Comparing and analyzing the operation status evaluation index with the set evaluation index to classify the equipment corresponding to the operation status evaluation index into level one risk equipment, level two risk equipment and level three risk equipment; Count the number of level 2 risk equipment and level 3 risk equipment, and perform formulaic calculation and analysis to obtain the line setting status value, and so on to obtain the line setting status value of each production line; If a first-level risk device is generated, retrieve the device number, location, backup device location, and corresponding maintenance engineer; obtain the backup device location, and select the backup device closest to the first-level risk device as the target backup device; send a location acquisition command to the maintenance engineer's mobile terminal to obtain the maintenance engineer's current location, select the maintenance engineer with the shortest distance to the target backup device as the target maintenance engineer, and send the target backup device location and the number and location of the first-level risk device to the target maintenance engineer; The distance between the target engineer and the target standby equipment and the distance between the target standby equipment and the first-level risk equipment are summed up to obtain the total distance, and the total distance is compared with all the set distances to match the corresponding transition duration. When the production line operation duration is controlled to be consistent with the transition duration, the equipment alternation operation is performed. When the equipment alternation operation is completed, the target standby equipment is started and the first-level risk equipment is deactivated; By cutting the working videos of workers in each production line and performing feature extraction, the corresponding state standard values ​​at each acquisition time in the production line are obtained. The extraction process is as follows: Randomly select a work video of one of the workers, cut the work video of the worker evenly to obtain several segments, and identify the worker's actions in the segments; set each production line to correspond to a work action set, match the action with the work action set of the corresponding production line, and when the match is successful, the segment is recorded as a valid segment; otherwise, it is an invalid segment; arrange the generated valid segments and invalid segments according to their positions in the corresponding work video to obtain the worker's action analysis trajectory; number each segment in the action analysis trajectory according to its position in the corresponding work video, calculate the difference between the numbers of two adjacent valid segments and invalid segments to obtain the valid interval and invalid interval, and respectively record the valid interval in the action analysis trajectory The mean of valid intervals and invalid intervals is calculated respectively to obtain the mean of valid intervals and the mean of invalid intervals, and they are analyzed to obtain the working status value of the worker in the working video corresponding to the acquisition moment; the working status values ​​of all workers in the working video corresponding to the acquisition moment can be obtained by analogy; the working status values ​​of all workers in the working video are calculated by mean to obtain the working status value of the production line; the production level in the current production line is obtained, the production level in the current production line is matched with all set production levels to obtain the corresponding standard production status value, and the standard production status value is comprehensively analyzed with the working status value of the production line to obtain the state standard value corresponding to the acquisition moment; and the state standard value corresponding to each acquisition moment in the production line is obtained by analogy; The specific process of refining the state standard value corresponding to each acquisition time to obtain the scheduling parameters is as follows: Compare and analyze the state standard value with the set standard interval. When the state standard value is greater than the maximum value in the set standard interval, the collection moment is recorded as the high demand moment, and the state standard value corresponding to the collection moment is recorded as the high demand value; if the working state value of the production line is greater than the standard production state value, the high demand value is further recorded as the high increase demand value; if the working state value of the production line is less than the standard production state value, the high demand value is further recorded as the high decrease demand value; When the state standard value is within the set standard range, the collection time is recorded as the medium demand time, and the state standard value corresponding to the collection time is recorded as the medium demand value. If the working state value of the production line is greater than the standard production state value, the medium demand value is further recorded as the medium increase demand value; if the working state value of the production line is less than the standard production state value, the medium demand value is further recorded as the medium decrease demand value; Record the high increase demand value, the high decrease demand value, the medium increase demand value and the medium decrease demand value as the scheduling parameters of the production line; According to the state standard value corresponding to each acquisition time, the scheduling demand in the production line is analyzed to obtain the scheduling demand value, wherein the specific process of scheduling demand analysis is as follows: With time as the horizontal coordinate and the state calibration value as the vertical coordinate, a curve of the state calibration value changing with time in the production line is obtained; a tangent line is drawn at the calibration point to obtain the tangent line corresponding to the calibration point, and the tangent line expression is obtained by data fitting. The tangent line expression is derived to obtain the calibration derivative corresponding to the calibration point, which is recorded as Lj; using the set formula Calculations are performed to obtain the scheduling demand value Bz, where g3, g4, g5, and g6 are set proportional coefficients, respectively, are the means of the quasi-derivatives at different acquisition times, B1, B2, and B3 are the numbers of high-demand moments, medium-demand moments, and suitable moments, respectively, and Vz is the line setting state value. Similarly, the scheduling demand value within each production line is obtained.

2. The MCS management system for intelligent manufacturing of large factories according to claim 1 is characterized in that: The resource scheduling module is also used to analyze the capacity of each production line after scheduling to obtain the capacity value, and determine the production level of the production line based on the capacity value; the specific process is as follows: Obtain the capacity parameters of each production line after worker scheduling, where the capacity parameters include output per unit time, yield rate and energy consumption, and conduct a comprehensive analysis to obtain the capacity value; compare and analyze the capacity value with the set capacity threshold. When the capacity value is greater than the maximum value in the set capacity range, output the first-level production; when the capacity value is within the set capacity range, output the second-level production; when the capacity value is less than the minimum value in the set capacity range, output the third-level production; extract the production level of each production line and send it to the equipment management module.